...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019.

Similar documents
BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids.

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

Chapter 6: Financial Resources

Transportation Improvement Program

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

FY Work Funding Total Fed State Local

City of Dallas Infrastructure Management Plan

10-Year Capital Highway Investment Plan DRAFT

Exhibit Tribal Transportation Improvement Plan-Approved by Board Resolution 15-XXX

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS

Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017

Financial Capacity Analysis

March 21, Mr. Patrick McKenna, Director Missouri Department of Transportation P.O. Box 270 Jefferson City, Missouri 65102

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

Overview of Funding Sources

Transportation Improvement Program

PMS: PUTTING THE DATA TO WORK. Judith Corley-Lay May 16, 2016

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

Route Route Z Intersection Realignment

TYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for:

Appendix E: Revenues and Cost Estimates

Capital District Transportation Committee March 3, Amendments to the TIP

How to Read the Project Modification Listings Roadway Section

City of Grand Forks Staff Report

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019

Updated TIP Project Pages as of March 22, 2018

FY February Quarterly Revision. Bryan DISTRICT

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

Annual Listing of Obligated Projects Federal Fiscal Year 2013

Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure.

2008 UTILITIES STP 2,200,000 1,760, , CONST ES 11,200,000 11,200,000. FY Work Funding Total Fed State Local

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

Chapter 5: Cost and Revenues Assumptions

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2012

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT

Chapter 6 Transportation Improvements & Financial Plan

Columbia Area Metropolitan Planning Organization

City of Glendale, Arizona Pavement Management Program

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($):

Wednesday, June 6, 2018

Attachment #1. Statement of Change to the 2013 FTIP

Transportation Committee

NON-MOTORIZED FACILITIES

How to Read the Project Modification Listings Roadway Section

FY TRANSPORTATION IMPROVEMENT PROGRAM

Summary of Projects List

CITY OF SPOKANE VALLEY Request for Council Action

Fees/Privatization/Sponsorship Opportunities

Appendix D Total Project Cost and Year of Expenditure Breakdown

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

How to Read the Project Modification Listings - Roadway Section

GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34. GASB Statement No. 34 the basics

Development of the Cost Feasible Plan

Chapter 7. Future Network and Implementation

TECHNICAL PLANNING COMMITTEE AGENDA 3/18/2015; ITEM II.B. Amendment Number Four to the FY Transportation Improvement Program

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY

TRANSPORTATION CAPITAL PROGRAM

Sun Corridor MPO Transportation Improvement Program (TIP) Administrative Amendment #9 Approved 08/04/2017

Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012)

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

GOVERNMENTAL CAPITAL

September 20, 2011 Fargo, ND IACC 412. Upper Great Plains Transportation Institute North Dakota State University

UNIFIED TRANSPORTATION PROGRAM

Residential Street Improvement Plan

Pavement Management Technical Report

This page intentionally left blank

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario.

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD

Pavement Preservation

CITY OF SAN JACINTO Capital Improvement Program Project Details

CHAPTER 4 1 Transportation Financial Analysis

TAUSSIG. & Associates, Inc. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO (PLATINUM TRIANGLE) DAVID

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements

Revision Report A5.M Approved Dollars. Scope: S. Bennington Rd over Russell Brook Bridge Rehab or Replacement

State of the Industry

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015

CITY COUNCIL AGENDA - ADJOURNED MEETING 291 N. MAIN ST., PORTERVILLE, CALIFORNIA CITY HALL COUNCIL CHAMBERS AUGUST 29, 2006, 6:30 P.M.

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

Alternate Bids Comparison For the January 26, 2007 Bid Opening

QUALITY TRANSPORTATION SUMMARY

Technical Report No. 4. Revenue and Costs

TEXAS DEPARTMENT OF TRANSPORTATION

Summary Narrative of Amendment 3 to the FFY Transportation Improvement Program for the Northern Middlesex Region

Michigan City Urbanized Area & Non-Urban LaPorte County Changes

Steve Cook, Acting Director, Transportation Planning and Operations. Administrative Modifications to the Transportation Improvement Program

Transportation Improvement Program FY 2018 FY 2022

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

ENGINEER S REPORT PROPOSED ASSESSMENT FOR CSA-41 AREA ROAD MAINTENANCE AND CAPITAL IMPROVEMENTS

Transcription:

DOT-1208 (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) REVISION NUMBER: 19-001...;..;...;.;;..;.. J USTI FICA TION: Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY. Interstate Maintenance Projects ITEM # PROJECT PCN ROUTE COUNTY LENGTH LOCATION IMPROVEMENT YEAR ORIG REVISED 21.13 IM 0292(84)61 0729 129N, 129S 21.9 1-29 - From Canton (Exit62 to Tea (Exit73) Shoulder Improvement & CRC Pavement Repair 0.000 6.535 +6.535 PROPOSED : Add to as Item 20.13 in the Interstate Category at a Total Cost: $6.535; Federal: $5.945; State. $0.590. Interstate Maintenance Projects +6.535 Total Change for Revision: 19-001 +6.535 /41 «{w4z= Name: Policy Board Chairman X Name -~ {l~ J2sDDOT X 1 Disa pprove Comments : Page 1 18-001

DOT-1 20B (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 SEPTEMBER 30) REVISION NUMBER: 19-002 JUSTIFICATION: ITEM # PROJECT 107.00 IM 0020(186) 06FV 129N, 129S. 190E During the Scoping process. PCNs 06FV and 06UQ were identified for advancement and a polymer chip seal is needed for the structures. It was decided to do at the same time due to the same lane closures. The 2020 Approach Slab Repair Project. which is outside the MPO area. was moved to 2022. Pavement Preservation Projects PCN ROUTE COUNTY LENGTH LOCATION IMPROVEMENT YEAR ORIG REVISED 0.00 Various Locations Throughout the Mitchell Region 2021 Regionwide Approach Slab Repair 2021 2020 1.082 0.000 0.000 1.130-1.082 +1.130 PROPOSED : Advance from 2021 to 2020 as item #92.10 in the Pavement Preservation Category; Change Imp Desc to "2020 Regionwide Approach Slab Repair and Polymer Chip Seal"; Increase cost to: Total: $1.130; Fed: $0.926; State: $0.204 112.00 IM 0020(19 5 06UQ 190E, 0.00 Various Locations Throughout the 2022 Regionwide Approach Slab Repair 2022 1.104 190W Mitchell Region 2021 0.000 PROPOSED CHA NGE : Advance from 2022 to 2021 as item #109.10 in the Pavement Preservation Category; Change Imp Desc to "2021 Regionwide Approach Slab Repair and Polymer Chip Seal"; Increase cost to : Total: $1.743; Fed: $1.428; State: $0.315 Pavement Preservation Projects 2020 2021 2022 0.000 1.743-1.104 +1.743 +1.130 +0.661-1.104 Total Change for Revision: 19-002 2020 2021 2022 +1.130 +0.661-1.104 Policy Board Chairman V 11 /8/18 Name: Disa pprove Page 1 19-002

DOT-1208 (6/09) JUSTIFICATION: ITEM # PROJECT (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) ----------- REVISION NUMBER: 19-003 FY 2018 Sioux Area Metro FTA Operating funds didn't get obligated by October 1, 2018 so this project needs to be added to the -2022 TIP so FTA can obligate the funding. Public Transit 5307 PCN ROUTE COUNTY LENGTH LOCATION IMPROVEMENT YEAR ORIG REVISED FTA 5307 Lincoln, City of Sioux Falls (Sioux Area Metro) FY2018 Operating Assistance 0.000 $8,360,140 + 8,360,141 Minnehaha PROPOSED : Add to at a cost of: Total: $8,360,141; Federal: $2,631,049; Local: $5,729,092. Public Transit 5307 + 8,360,141 Total Change for Revision: 19-003 + 8,360,141 Policy Board Chairman ~ X Page 1 19-003

DOT-120B (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) REVISION NUMBER: 19-004 JUSTIFICATION: Funding Category : ITEM# PROJECT 5.00 IM-FP 2292(06)5 Final Plans have been submitted and the final estimate upated which increased the project costs. The final costs also reflect costs for PE. ROW, Utiliites, etc. which wasn't included in the original TIP costs. The increase in costs requires a TIP Rev1s1on. No change in project scope. Interstate Maintenance Projects PCN ROUTE COUNTY LENGTH LOCATION IMPROVEMENT 4778 Minnehaha 0.00 1229 - Exit 5 (26th SI. lntch/yeager Rd) Interchange Improvement 1n Sioux Falls YEAR ORIG 12.452 REVISED 14.878 +2.426 PROPOSED : Increase cost to: Total: $14.878; Fed: $11.830; State: $3.047. Interstate Maintenance Projects +2.426 ITEM # PROJECT Local Urban System Projects PCN ROUTE COUNTY LENGTH LOCATION IMPROVEMENT YEAR ORIG REVISED 1.00 P 1358(05) 05JE Minnehaha 0.00 26th Street from Cleveland Avenue to Grading, Intersection 1,050 feet West of Southeastern Improvements. Storm Sewer. Curb Avenue 1n S11oux Falls & Gutter. PCCP and AC Surfacing, Signals, Lighting, Permanent Signing, Sidewalk, Structure 15.280 18.000 +2.720 PROPOSED : Increase cost to: Total: $1 8.000; Fed: $13.194; State: $4.806. 1.00 P 1225(06) 05JF Minnehaha 0.00 Southeastern Avenue from Klondike Trail to South Lighthouse Place in Sioux Falls Grading, Intersection Improvements, Storm Sewer, Curb & Gutter, PCCP and AC Surfacing, Signals. Lighting, Permanent Signing, Sidewalk, Structure 4.220 12.400 +8.180 PROPOSED : Increase cost to: Total $12.400; Fed: $7.212; State: $5.188. Local Urban System Projects +2.426 Page 1 19-004

Funding Catego!}'.: Roadway Safety ITEM# PROJECT PCN ROUTE COUNTY LENGTH LOCATION IMPROVEMENT YEAR ORIG REVISED Mill ions 35.00 PH 0229(05)4 0727 1229N, Minnehaha 0.40 1229 - NB & SB curve at Cliff Ave. 1229S Interchange High Friction Surface Treatment 0.416 0.614 +0.198 PROPOSED CHA NGE: Increase cost to: Total: $0.614; Fed: $0.552; State: $0.061. Roadway Safety Improvement +0.198 Total Change for Revision: 19-004 +13.524 Final Action 12/6/2018 Name: Comments : X Page 2 19-004