MALINGUNDE GRAPHITE PROJECT

Similar documents
MALINGUNDE SCOPING STUDY

ABN: For personal use only MALINGUNDE PFS LOWEST OPERATING COST COARSE FLAKE GRAPHITE PROJECT GLOBALLY NOVEMBER 2018 ASX:SVM

For personal use only

ABN ANNUAL REPORT.

For personal use only

Pathway to Production

Sovereign Metals Limited (ASX: SVM) - Update

Authier Lithium Project Advances to the Definitive Feasibility Stage

Developing an Advanced Lithium Project in Quebec, Canada

For personal use only

For personal use only

MAHENGE BEST IN CLASS GRAPHITE PROJECT. 121 Mining Investment Cape Town

Fast-tracking a globally significant graphite project Investor Presentation Trevor Matthews Chief Executive Officer October 2017

BMO 2018 Global Metals and Mining Conference

ASX: KNL FSE: FMK BUILDING A SUSTAINABLE ECO-FRIENDLY GLOBAL GRAPHITE BUSINESS BUSINESS UPDATE CAPE TOWN 2019

KIBARAN RESOURCES INVESTOR PRESENTATION

Strategic Entry into the Lithium Market

14 March ASX Announcements Platform Bridge Street Sydney NSW 2000

PROSPECT ANNOUNCES SIGNIFICANT VALUE UPGRADE OF ARCADIA LITHIUM PROJECT FOLLOWING UPDATED PRE-FEASIBILITY STUDY

TAMPIA GOLD PROJECT FEASIBILITY STUDY

Disclaimer. Forward Looking Statements

Offtake and Mining FINNISS LITHIUM PROJECT

Large-Flake Graphite Production and developing Expandable Graphite Manufacturing

EPANKO GRAPHITE PROJECT

Pilgangoora: a world class lithium and tantalum project

ANNUAL GENERAL PRESENTATION

For personal use only

Syrah Resources and Graphite Market JP Morgan Clean Energy Conference 17 May Shaun Verner, Managing Director & CEO

ALTURA MINING LIMITED ANNUAL GENERAL MEETING

Advancing a Portfolio of Lithium Projects

GAINING MOMENTUM: DRILLING TWO HIGH POTENTIAL AUSTRALIAN LITHIUM PROJECTS MARCH 2018 ASX : LTR

Company Presentation ASX:TAW

Constructing the Salamanca uranium mine in Western Spain. 121, Cape Town, February 2017

Deutsche Bank Access Asia Conference

For personal use only

Salamanca. The only major new uranium mine being developed in the world today

For personal use only

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa

Achmmach Tin Project, Morocco DFS complete, Funding Underway. Melbourne Mining Club, 17 July 2018 Russell Clark, CEO

For personal use only LARGE FLAKE GRAPHITE PRODUCTION & MARKETS AUSTRALIAN ENERGY & BATTERY MINERALS INVESTOR CONFERENCE MARCH 2018

6 September 2017 AFRICA DOWN UNDER AMENDED PRESENTATION

MERGER PRESENTATION JULY 2018

For personal use only

For personal use only. Lindi Jumbo Flake Graphite Project

For personal use only

Developing a Diversified Minerals Portfolio Investor Presentation August 2017

Specialty Metals Exploration and Development - May 2009

Panda Hill Niobium Project. January 2014

For personal use only Arafura Resources Annual General Meeting

Strong progress on construction and supply contracts puts Battery Minerals on track for commissioning in November

D I S C L A I M E R. For Consideration

For personal use only

A US Critical Materials Company

Sourcing the raw materials of the future

REPLACEMENT INVESTOR PRESENTATION

JULY 2018 Investor Presentation ASX: AEV ABN

WODGINA ORE RESERVE COMMENTARY

Emerging Producer in the. Murchison Goldfields

North America s Pre-Eminent Diversified Battery Minerals Developer

Sourcing the raw materials of the future. Authier Lithium Project JORC Resource Overview ASX: SYA JULY 2016

Dragon Energy Limited

Managing Director s Review of Operations

CINOVEC a globally significant previously mined lithium deposit in the heart of Europe

As the uranium market tips into the biggest supply deficit in its history, Salamanca is the only major uranium mine being built in the world today

It s all about the flakes

For personal use only

For personal use only

Developing First Lithium Resource in NT

ELEMENTOS. Building a profitable, robust & sustainable Tin mining company. (ASX:ELT) July Renewable energy needs Tin.

INVESTOR PRESENTATION

For personal use only

FINNISS LITHIUM. PROJECT Sydney Resources Round-Up Conference May ASX code: CXO

KBL Mining Limited (ASX: KBL) Presentation May 2015 Resources Investment Symposium BROKEN HILL

AZUMAH MINING LEASES GRANTED

For personal use only

Developing NT s First Lithium Resource

Operations update. Annual General Meeting 31 March 2015 THE EMERGING PACIFIC RIM MINER

Proposed Merger. Investor Presentation September 2018

Quarterly Activities Report For The Period Ending 30 September 2018

PRE FEASIBILITY STUDY FINNISS LITHIUM PROJECT

For personal use only

Charging forward with Lithium. Investor Update. August Pilgangoora Lithium: World Class Near Term Production Project

A New Growth Story in Western Australian Gold

For personal use only

Developing the Salamanca project Europe s only major uranium mine

For personal use only

For personal use only

Presentation August ASX Code: TNG

Atlas Iron Limited Annual General Meeting 23 October 2017

Overview of our Lithium Technology

Building on our sustainable production and infrastructure platform to create shareholder value. Atlas Iron Limited Investor Presentation March 2018

HALF YEAR 2017 RESULTS PRESENTATION 16 FEBRUARY 2017

SISSON PROJECT: TUNGSTEN MOLYBDENUM. New Brunswick, Canada

SEPTEMBER 2018 QUARTERLY REPORT

Mount Peake A major new resource project in Australia

Sourcing the raw materials of the future

Emang Manganese Project

Strong progress on construction at Montepuez

For personal use only

A US Critical Materials Company

Transcription:

MALINGUNDE GRAPHITE PROJECT A RARE COMBINATION OF EXCEPTIONALLY LOW CAPEX & OPEX NOVEMBER 2017 ASX:SVM

SOVEREIGN METALS OVERVIEW. For personal use only A RARE COMBINATION OF EXCEPTIONALLY LOW CAPEX & OPEX PROVIDES A CLEAR PATHWAY TO PRODUCTION.. 1. THE WORLD S LOWEST COST GRAPHITE PROJECT. 2. A SIMPLE STRATEGY BASED ON MARKET FUNDAMENTALS. 3. A STABLE JURISDICTION WITH CLEAR PATHWAY TO MARKET. 4. FULLY FUNDED WITH A WORLD CLASS BOARD & MANAGEMENT TEAM. 1

MALINGUNDE: THE LOWEST COST GRAPHITE DEVELOPMENT. Saprolite is the very soft, graphite-bearing, clay-rich oxide material that is formed from intense weathering of the original bedrock. Malingunde is the world s largest reported saprolite-hosted graphite resource: Total: High-grade: 28.8Mt @ 7.1% TGC (4.0% TGC cut-off) 8.9Mt @ 9.9% TGC (7.5% TGC cut-off) Near surface with free dig mining, low strip ratios and a simple flow sheet equates to low cost production. Almost all graphite peers are hosted in hard rock. Scalable to match demand: just 28% of resource included in mine plan. Huge exploration upside. 2

POTENTIAL FOR A SIMPLE & HIGHLY PROFITABLE FLAKE GRAPHITE OPERATION. MALINGUNDE SOFT SAPROLITE-HOSTED DEPOSIT TO DELIVER VERY LOW COST PRODUCTION, WITH BEST IN CLASS MARGINS. OPERATING COST BOTTOM OF THE COST CURVE CAPITAL COST & INTENSITY LOWEST OF ALL PEERS OPERATIONS SIMPLE MINING & PROCESSING ONLY HIGHEST MARGINS $ LOWEST RISK MARKETING EXISTING MARKETS + BATTERY SUPPLY CHAIN 3

MALAWI: A MINING FRIENDLY JURISDICTION WITH LOGISTICS SOLUTION IN PLACE. Enviable access to infrastructure; just 20km from Lilongwe, the capital of Malawi. A stable, transparent jurisdiction, increasingly attracting significant international investment. Transport MoU signed with Vale & Mitsui. US$65/t Total transport MINE GATE TO PORT The Government actively encourages foreign investment in Malawi s mining industry, and provides a friendly and stable environment for investors. To this end, the Government of Malawi offers its full support and assistance to Sovereign Metals in order to develop Malawi s first flake graphite operation at Malingunde. Hon. Aggrey Masi, Minister of Natural Resources, Energy and Mining 4

MALINGUNDE: PROJECT ECONOMICS

MALINGUNDE: GENERATING VALUE THOUGH A SIMPLE, LOW COST STRATEGY. JUNE 2017 SCOPING STUDY OUTCOMES. US$301/t Average OPERATING COST US$29m Total DEVELOPMENT CAPEX <1.5 years Capital PAYBACK PERIOD 17yrs Total MINE LIFE 44kt Average ANNUAL PRODUCTION 6

MALINGUNDE: LOW COST EQUATES TO SUPERIOR MARGINS & VERY SHORT PAYBACK IN ALL PRICING SCENARIOS. Credible pricing assumptions for product sold to existing markets. For personal use only Exceptional margins even in bearish global pricing scenarios. MALINGUNDE OPEX BREAKDOWN (US$/t conc.) 350 300 250 200 150 100 50 0 Mining 42 Processing 126 G&A 69 Transport 65 Opex (FOB) 301 MALINGUNDE MARGIN & PAYBACK ANALYSIS Margin (US$/t conc.) 1,200 1,000 800 600 400 200 0 2.0 1.6 Margin (FOB, ex. royalty) Payback (yrs) 1.4 1.2 1.1 CURRENT PRICE ESTIMATE $800/t $900/t $1,000/t $1,100/t $1,200/t $1,300/t $1,400/t Basket price (US$/t conc.) 1.0 0.9 7

MALINGUNDE: THE ABILITY TO GENERATE CASH FROM EXISTING MARKETS. SVM s simple, low cost strategy is the clearest and lowest risk path to market. Low cost will enable sales to existing traditional markets and the rapidly growing battery supply chain. Project economics not contingent on extreme volume & pricing assumptions. LISTED SUPPLY PIPELINE: OPEX (US$/t) 750 650 550 450 350 250 SVM US$301/t PEER AVERAGE ~US$500/t LISTED SUPPLY PIPELINE: CAPEX (US$M) 300 250 200 150 100 50 0 SVM US$29M PEER AVERAGE ~US$150M Capex + Spherical 8 Source: Company Reports

MALINGUNDE: A VERY RARE COMBINATION OF LOW OPEX & LOW CAPEX WITH REALISTIC SCALE. Malingunde achieves Q1 operating costs and best in class capital intensity. Malingunde s production volumes can be reasonably placed into current markets. Many peers are only economic at unrealistic scale & when applying niche pricing. SCALE v. OPEX v. CAPITAL INTENSITY For personal use only Capital intensity (US$m / ktpa) 4.00 3.50 3.00 2.50 2.00 1.50 1.00 World Leading Opex & Capex AT MARKETABLE SCALE SYR 2 +300ktpa SVM SYR 1 150ktpa 0.50 Bubble size = annual production rate 0.00 250 300 350 400 450 500 550 600 650 700 Opex (US$/t conc.) Source: Company Reports 9 1. SYR forecast production year 1-2 2. SYR forecast production year 2+

MALINGUNDE: TECHNICAL DETAIL

MINING: SOFT, NEAR SURFACE MATERIAL. FREE DIG, SIMPLE AND CHEAP TO MINE. Saprolite is the very soft, graphite-bearing, clay-rich oxide material formed from intense weathering of the original bedrock. The Malingunde deposit is near surface, free dig and has a low strip ratio of 0.5. By comparison, almost all graphite peers are hosted in hard rock. WORLD S LARGEST SAPROLITE HOSTED GRAPHITE RESOURCE 28.8Mt @ 7.1% TGC (4.0% TGC cut-off) TOTAL SAPROLITE RESOURCE 8.9Mt @ 9.9% TGC (7.5% TGC cut-off) HIGH GRADE SAPROLITE RESOURCE PROPOSED MINING OVERVIEW 83% Production target INDICATED CATEGORY 11 PRODUCTION TARGET 8.0Mt @ 10.0% TGC 44kt Average ANNUAL PRODUCTION 17yrs Total MINE LIFE

PROCESSING: HIGH GRADE CONCENTRATES PRODUCED VIA A SIMPLE PROCESS FLOW-SHEET. CONCENTRATE COMPOSITION v. PEERS MALINGUNDE 2017 FLOTATION RESULTS TEST #F13 For personal use only Simple process flowsheet no primary crush or grind. Significant capex & opex benefits over hard-rock processing. Modular design enables scalability. High grade concentrate across all flake size fractions. 12 Super jumbo Amorphous % 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Source: Company Reports +80 MESH PARTICLE SIZE Tyler Mesh (µm) C (%) Distribution (wt. %) Flake Category + 32 + 500 97 14 Super jumbo + 48 + 297 96 33 Jumbo - 48 + 80-297 + 177 97 25 Large - 80 + 100-177 + 149 97 6 Medium - 100 + 200-149 + 74 97 17 Small - 200-74 95 5 Amorphous TOTAL 97 100

THE GRAPHITE MARKET

NATURAL FLAKE GRAPHITE: UNDERSTANDING DEMAND. Long term growth forecasts for energy storage are very compelling. Significant graphite demand is also driven by traditional industrial applications. For personal use only OVERALL NATURAL GRAPHITE DEMAND (ktpa) 2,500 2,000 1,500 1,000 500 0 TRADITIONAL DEMAND (BY VOLUME) CURRENT APPLICATIONS FOR NATURAL GRAPHITE 85% Existing TRADITIONAL DEMAND (BY VALUE) OTHER REFRACTORIES + FOUNDRIES Traditional Batteries 14 Source: Canaccord Genuity Source: Canaccord Genuity, UBS, Metal Bulletin & Company estimates

THE BATTERY REVOLUTION IS RAPIDLY GAINING MOMENTUM. SOVEREIGN METALS WILL BE IN THE BEST POSITION TO SUPPLY HIGH QUALITY, LOW COST GRAPHITE FOR BOTH BATTERY & TRADITIONAL APPLICATIONS. ANNUAL GLOBAL EV SALES BY VEHICLE CLASS (million cars per year) Bloomberg New Energy Finance BATTERY PACK COMMODITY BREAKDOWN (by weight) UBS Evidence Lab 20% 15% 10% 5% 0% 15% 6% 2% 15 Source: The Visual Capitalist

NATURAL FLAKE GRAPHITE: UNDERSTANDING SUPPLY. The ability to compete on price with China is critical to project success, noting Chinese supply is increasingly constrained by quality & environmental factors. China remains the dominant and lowest cost global producer. Canada 2% Turkey 4% 75% India 4% EXISTING SUPPLY Brazil 9% Other 5% 16 Source: Canaccord Genuity, Metal Bulletin Research

CASE STUDY: MALINGUNDE v. WA SPODUMENE PROJECTS. Superior margins: Malingunde cash generation potential (per tonne) is significantly greater than WA spodumene (hard-rock lithium) projects. Huge valuation upside: Malingunde generates significantly more cash (per tonne), despite being valued at 3x 8x less per unit of production. MARGIN COMPARISON (US$/t conc.) 1,200 300 900 800 250 550 Price Opex For personal use only EXPOSURE TO THE ELECTRIC VEHICLE REVOLUTION VALUE COMPARISON 2 Malingunde WA spodumene 1 COMPANY Market cap. 2 Annual production Market cap / t per annum Pilbara Minerals A$M Ktpa $/tpa 1,650 314 5,300 Altura Mining 760 219 3,500 Kidman Resources 575 288 2,000 Margin Price Opex Margin Sovereign Metals 30 44 700 + SCALE UPSIDE 17 1. Pilbara Minerals, Altura Mining and Kidman Resources. Opex based upon the average of study results publicly released by each Company, excludes royalties and by-product credits. Price based upon recent pricing for 6% Li 2 O concentrates. 2. Rounded, as at 13 November 2017.

SUMMARY

For personal use only NEXT STEPS: RAPID PATHWAY TO PRODUCTION. ACCELERATED PROJECT DEVELOPMENT BASED ON EXCEPTIONAL SCOPING STUDY OUTCOMES. 19 1. Pre-feasibility study. Q2 2018 2. Product sales agreements. Underway 3. Feasibility study & permitting. Q4 2018 4. Project finance. Q1 2019

For personal use only MALINGUNDE: THE WORLD S BEST FLAKE GRAPHITE PROJECT. US$301/t US$29m Average OPERATING COST Total DEVELOPMENT CAPEX 44kt Average ANNUAL PRODUCTION 17yrs Total MINE LIFE TECHNICAL FINANCIAL World s largest, soft saprolite graphite resource Best in class opex High-grade, low strip ratio No requirement for drill & blast No requirement for crush or primary grind Marketable production volume 20 <2 years Capital PAYBACK PERIOD Best in class capex & capital intensity Access to low cost infrastructure Ability to enter existing & future markets Low capex will facilitate ease of funding

APPENDIX

MARKET INFORMATION. OPPORTUNITY FOR MATERIAL RE-RATE: DELIVERY OF WORLD CLASS SCOPING STUDY WITH A CLEAR & SIMPLE STRATEGY. CAPITAL STRUCTURE Pro-forma shares on Issue 1 276,796,073 Unlisted Options 2 ($0.10 to $0.47) 24,416,667 Performance Rights 1,400,000 ASX : SVM SHARE PRICE MOVEMENT 0.16 MAIDEN RESOURCE ANNOUNCEMENT RELEASE OF SCOPING STUDY RAIL MoU WITH VALE & MITSUI A$6.5M INSTITUTIONAL PLACEMENT 16 Un-Diluted Market Capitalisation @A$0.110 1 Cash (30 September 2017) 1 A$30.5 m ~A$7.7 m 0.14 14 1. Pro-forma, post A$6.5M placement announced 25 October 2017 2. Pro-forma, post issue of 12m options to offtake advisor 0.12 12 SHAREHOLDERS PRICE (AUD) 0.10 0.08 0.06 0.04 10 8 6 4 VOLUME (M) 7% Project vendors 6% Directors 18% Funds and institutions 0.02 0.00 Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2 0 22% 7% German investors High net worth Source: ASX as at market close 13 November 2017 22

MALINGUNDE: SIGNIFICANT ABILITY TO GENERATE CASH. Rapid payback of initial capital. Margin sensitivity highlights the significant cash generated across a wide range of price scenarios. CAPITAL ESTIMATE (US$M) CASH FLOW PROFILE PRICING SENSITIVITY (US$, 44ktpa for 17 yrs) DEVELOPMENT CAPITAL US$M Basket price ($/t conc.) $800 $1,000 $1,200 $1,400 Mining 0.4 Capitalised pre-strip 1.6 Processing 10.7 Infrastructure 3.0 Tailings 3.3 Indirect & ~35% Contingency 9.9 Total Development Capital 28.9 Opex ($/t conc.) (300) (300) (300) (300) Royalty ($/t conc.) (40) (50) (60) (70) Margin ($/t conc.) 460 650 840 1,030 Margin ($M per year) 20 29 37 45 LoM Margin ($M, pre-tax) 345 490 630 770 23

For personal use only MANAGEMENT TEAM WITH A PROVEN TRACK RECORD OF SUCCESS. RAISED +A$285M IN 2017 TO FUND NATURAL RESOURCE PROJECTS, INCLUDING TWO PROJECTS CURRENTLY IN CONSTRUCTION. IAN MIDDLEMAS Chairman JULIAN STEPHENS Managing Director DOMINIC ALLEN Business Development Manager ANDRIES KRUGER Country Manager 24 Mr Middlemas was a Senior Group Executive for Normandy Mining for more than ten years, which was Australia s largest gold miner before merging with Newmont Mining. He is currently Chairman of Salt Lake Potash, Berkeley Energia, Paringa Resources, Prairie Mining & a number of other listed resource companies. Mr Middlemas was also previously Chairman of Papillon Resources Limited and Mantra Resources Limited.an Dr Stephens is a Geologist with over 20 years experience in mineral exploration across many commodity types, and has spent 10 years working on minerals projects in Malawi. Julian identified, secured and led the team that discovered the Malawi Flake Graphite Project.an Mr Allen is a Chartered Accountant with over 10 years commercial experience in the resources sector, including senior roles with Rio Tinto Limited and Oyu Tolgoi LLC. Mr Allen previously worked for Ernst & Young Transaction Advisory Services. Mr Kruger is a Geologist with over 20 years experience in mineral exploration. Mr Kruger has spent 10 years working on major Malawian minerals projects for ASX listed companies, directing all in-country activities relating to project development.

DISCLAIMERS. DISCLAIMER NOTICE This presentation has been prepared as a summary only, and does not contain all information Sovereign Metals Limited s ( SVM ) assets and liabilities, financial position and performance, profits and losses, prospects, and the rights and liabilities attaching to SVM s securities. The securities issued by SVM are considered speculative and there is no guarantee that they will make a return on the capital invested, that dividends will be paid on the shares or that there will be an increase in the value of the shares in the future. SVM does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this report. Recipients of this report should carefully consider whether the securities issued by SVM are an appropriate investment for them in light of their personal circumstances, including their financial and taxation position. The material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation to subscribe for, or purchase any security in SVM nor does it form the basis of any contract or commitment. SVM makes no representation or warranty, express or implied, as to the accuracy, reliability or completeness of this material. SVM, its directors, employees, agents and consultants shall have no liability, including liability to any person by reason of negligence or negligent misstatement, for any statements, opinions, information or matters, express or implied, arising out of, contained in or derived from, or for any omissions from this material except liability under statute that cannot be excluded. Statements contained in this material, particularly those regarding possible or assumed future performance, costs, dividends, production levels or rates, prices, resources, reserves or potential growth of SVM, industry growth or other trend projections are, or may be, forward looking statements. Such statements relate to future events and expectations and, as such, involve known and unknown risks and uncertainties. Actual results and developments may differ materially from those expressed or implied by these forward looking statements depending on a variety of factors. FORWARD LOOKING STATEMENT This release may include forward-looking statements, which may be identified by words such as "expects", "anticipates", "believes", "projects", "plans", and similar expressions. These forward-looking statements are based on Sovereign s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release. CAUTIONARY STATEMENTS The Scoping Study referred to in this presentation has been undertaken to determine the potential viability of an open pit mine and graphite processing plant constructed onsite at the Malingunde Project ( Project ) and to reach a decision to proceed with more definitive studies. The Scoping Study has been prepared to an accuracy level of ±35%. The results should not be considered a profit forecast or production forecast. The Scoping Study is a preliminary technical and economic study of the potential viability of the Project and is based on low-level technical and economic assessments that are not sufficient to support the estimation of ore reserves. Further evaluation work including infill drilling and appropriate studies are required before SVM will be able to estimate any ore reserves or to provide any assurance of an economic development case. Approximately 83% of the total production target is in the Indicated resource category with 17% in the Inferred resource category. Approximately 96% of the scheduled throughput over the first four years (the estimated maximum payback period based on downside pricing) of production is in the Indicated category, with 4% in the Inferred category. SVM has concluded that it has reasonable grounds for disclosing a production target which includes a modest amount of Inferred material. However, there is a low level of geological confidence associated with Inferred mineral resources and there is no certainty that further exploration work (including infill drilling) on the Malingunde deposit will result in the determination of additional Indicated mineral resources or that the production target itself will be realised. The Scoping Study is based on the material assumptions outlined in an announcement made on 20 June 2017. These include assumptions about the availability of funding. While SVM considers all the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved. To achieve the range outcomes indicated in the Scoping Study, additional funding will likely be required. Investors should note that there is no certainty that SVM will be able to raise funding when needed. It is also possible that such funding may only be available on terms that dilute or otherwise affect the value of the SVM s existing shares. It is also possible that SVM could pursue other value realisation strategies such as sale, partial sale, or joint venture of the Project. If it does, this could materially reduce SVM s proportionate ownership of the Project. The Company has concluded it has a reasonable basis for providing the forward looking statements included in this announcement and believes that it has a reasonable basis to expect it will be able to fund the development of the Project. Given the uncertainties involved, investors should not make any investment decisions based solely on the results of the Scoping Study. 25

COMPETENT PERSONS STATEMENT. COMPETENT PERSONS STATEMENT The information in this presentation that relates to Malingunde Exploration Results is extracted from announcements dated 29 August 2016, 5 September 2016, 12 October 2016, 26 October 2016, 18 January 2017, 21 February 2017 and 15 March 2017. These announcements are available to view on www.sovereignmetals.com.au. The information in the original ASX Announcements that related to Malingunde Exploration Results were based on, and fairly represents, information compiled by Dr Julian Stephens, a Competent Person who is a member of the Australasian Institute of Geoscientists (AIG). Dr Stephens is the Managing Director of Sovereign Metals Limited and is also a substantial holder of shares, options and performance rights in Sovereign Metals Limited. Dr Stephens has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in which the Competent Person s findings are presented have not been materially modified from the original market announcements. The information in this presentation that relates to Mineral Resources is extracted from an announcement dated 18 April 2017. This announcement is available to view on www.sovereignmetals.com.au. The information in the original ASX Announcement that related to Mineral Resources was based on, and fairly represents, information compiled by Mr David Williams, a Competent Person, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Williams is employed by CSA Global Pty Ltd, an independent consulting company. Mr Williams has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person s findings are presented have not been materially modified from the original market announcement. The information in this presentation that relates to Metallurgical Testwork Results is extracted from announcements dated 23 November 2016 and 27 February 2017. These announcements are available to view on www.sovereignmetals.com.au. The information in the original ASX Announcements that related to Metallurgical Testwork Results was based on, and fairly represents, information compiled by Mr Oliver Peters, M.Sc., P.Eng., MBA, who is a Member of the Professional Engineers of Ontario ( PEO ), a Recognised Professional Organisation ( RPO ). Mr Peters is a consultant of SGS Canada Inc. ( SGS ). SGS is engaged as a consultant by Sovereign Metals Limited. Mr Peters has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. The Company confirms that it is not aware of any new information or data that materially affects the information including in the original market announcements. The Company confirms that the form and context in which the Competent Person s findings are presented have not been materially modified from the original market announcements. The information in this presentation that relates to Mining, Processing, Infrastructure, Production Targets, and Capital and Operating Costs is extracted from an announcement dated 20 June 2017. This announcement is available to view on www.sovereignmetals.com.au. The information in the original ASX Announcement that related to Mining, Processing, Infrastructure, Production Targets, and Capital and Operating Costs based on and fairly represent information compiled or reviewed by Mr David Dodd, who is a Fellow of the Southern Africa Institute of Mining and Metallurgy. Mr Dodd is a consultant to Amec Foster Wheeler. Mr Dodd has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activities undertaken. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in which the Competent Person s findings are presented have not been materially modified from the original market announcements. PRODUCTION TARGET The Production Target referred to in this presentation is based on SVM s Scoping Study for the Malingunde Project released to the ASX on 20 June 2017. The information in relation to the Production Target that the Company is required to include in a public report in accordance with ASX Listing Rules 5.16 and 5.17 was included in SVM s ASX Announcement released on 20 June 2017. The Company confirms that the material assumptions underpinning the Production Target referenced in the 20 June 2017 release continue to apply and have not materially changed. FORWARD LOOKING STATEMENT This release may include forward-looking statements, which may be identified by words such as "expects", "anticipates", "believes", "projects", "plans", and similar expressions. These forward-looking statements are based on Sovereign s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release. 26

Sovereign Metals Limited ASX : SVM T: +61 8 9322 6322 F: +61 8 9322 6558 E: info@sovereignmetals.com.au www.sovereignmetals.com.au Level 9, BGC Centre, 28 The Esplanade, PERTH WA 6000 ABN: 71 120 833 427 FOLLOW US