SR V1.1.1 ( )

Similar documents
ETSI TS V1.1.1 ( )

ETSI EN V1.1.1 ( )

ETSI TS V1.1.1 ( )

Document review and conversion processes

ISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Information security risk management

EEA EFTA States Internal Market Scoreboard. March 2011

ETSI GR NFV-IFA 023 V3.1.1 ( )

ANNEX. to the. Proposal for a Council Decision

IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System)

Financial Services - Legal Entity Identifier (LEI) Services financiers Identifiant d'entité légale (LEI) ISO/TC 68 N 000 ISO/DIS 17442

(Information) EUROPEAN COMMISSION. MONETARY AGREEMENT between the European Union and the Principality of Andorra (2011/C 369/01)

INTERNAL MARKET SCOREBOARD. No. 36

Internal Market Scoreboard. EEA EFTA States. EFTA Surveillance Authority

EEA EFTA States Internal Market Scoreboard. September 2011

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

INTERNAL MARKET SCOREBOARD. No. 35

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

Seizing the opportunity for effective legal reform in Albania

CEN/CENELEC Internal Regulations - Part 4: Internal Regulations Part 4. Certification

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

LOW VOLTAGE AGREEMENT GROUP (LOVAG) AGREEMENT

(recast) (Text with EEA relevance)

ARTICLE 29 Data Protection Working Party

46th CIML Meeting DRAFT BASIC PUBLICATION. Draft 2. 46th CIML Meeting. Prague 2011 ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION

INTERNAL MARKET SCOREBOARD

Protocol on the Operation of CESR MiFID Database

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

INTRODUCTION - The context and status of this Q and A :

on national provisional lists of the most representative services linked to a payment account and subject to a fee

(recast) (Text with EEA relevance)

PLEASE REPLY BEFORE 31 OCTOBER 2018

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

Proposal for a COUNCIL DECISION

Ordinance of the Takeover Board on Public Takeover Offers

***I POSITION OF THE EUROPEAN PARLIAMENT

Final report Technical advice on third country regulatory equivalence under EMIR South Korea

INTERNAL REGULATIONS PART 4 CERTIFICATION (Aussi disponible en français) (Auch in deutscher Fassung erhältlich)

(Text with EEA relevance) (OJ L 173, , p. 84)

INTERNATIONAL COURT OF ARBITRATION LEADING DISPUTE RESOLUTION WORLDWIDE. Rules of ICC

Terms and Conditions.

Mono-Beneficiary Model Grant Agreement

ECB-PUBLIC DECISION (EU) [YYYY/[XX]] OF THE EUROPEAN CENTRAL BANK. of 23 January 2019

Beijing Arbitration Commission Arbitration Rules

(Non-legislative acts) DIRECTIVES

PRINCIPLES AND PROCEDURES EAST AFRICAN STANDARDS

Official Journal of the European Union

Final report Technical advice on third country regulatory equivalence under EMIR Hong Kong

Partnership Agreement between the Lead Partner and the other project partners

Fact Sheet 14 - Partnership Agreement

INVESTOR RELATIONS POLICY NETCOMPANY GROUP A/S. Investor Relations Policy - Netcompany Group A/S, CVR no Page 1 of 5

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT

ERIC. Practical guidelines. Legal framework for a European Research Infrastructure Consortium. Research and Innovation

Turkmenistan. UNCTAD Compendium of Investment Laws. Law on Investment Activities (1992) Unofficial translation

ISO INTERNATIONAL STANDARD. Acceptance sampling plans and procedures for the inspection of bulk materials

1. HALF-YEARLY FINANCIAL REPORTS

Consultation Paper. Clearing Obligation under EMIR (no. 6) 11 July 2018 ESMA

IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System)

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1 AGREEMENT NUMBER

Requirements of explicit consent

UNFCU Digital Banking Agreement

LAW OF 13 FEBRUARY 2007 RELATING TO SPECIALISED INVESTMENT FUNDS (FONDS D INVESTISSEMENT SPÉCIALISÉS) (SIF)

Questions and answers

RULES OF ICC AS APPOINTING AUTHORITY IN UNCITRAL OR OTHER AD HOC ARBITRATION PROCEEDINGS

KINGDOM OF SAUDI ARABIA. Capital Market Authority AUTHORISED PERSONS REGULATIONS

Technical advice on Minimum Information Content for Prospectus Exemption

Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué Issy-les-Moulineaux

COMMISSION DELEGATED REGULATION (EU) /... of

GRANT AGREEMENT for a: Project with multiple beneficiaries under the ERASMUS+ Programme 1. AGREEMENT NUMBER [EPLUS LINK Generated No.

Banks Fine-tuning Their PSD Preparations

COMMISSION REGULATION (EU) / of XXX

Internal Market Scoreboard EEA EFTA States

CENTRAL BANK OF MALTA DIRECTIVE NO 1. in terms of the. CENTRAL BANK OF MALTA ACT (Cap. 204 of the Laws of Malta)

ess target EEA business rights

CEN GUIDE 414. Safety of machinery Rules for the drafting and presentation of safety standards. Edition 3,

Economic and Monetary Union

3: Equivalent markets

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

Terms of Business 1. INTRODUCTION.

e-services usage Terms & Conditions ( AlAhlionline AlAhlimobile )

Final report Technical advice on third country regulatory equivalence under EMIR Singapore

Bank ICBC (Joint-Stock Company) (Bank ICBC (JSC))

Frequently asked questions regarding Prospectuses: Common positions agreed by CESR Members 11 th Updated Version - July 2010

Photo credits: Cover MIND AND I Shutterstock.com OECD 2017

VOLUNTARY CONDITIONAL CASH OFFER. Oversea-Chinese Banking Corporation Limited. for and on behalf of. Mountbatten Enterprises Pte. Ltd.

Education, Audiovisual and Culture Executive Agency GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES

Directive 2011/7/EU. of the European Parliament and of the Council of 16 February 2011 on combating late payment in commercial transactions

COMMISSION DELEGATED REGULATION (EU) /... of

Final Report. Clearing Obligation under EMIR (no. 6) 27 September 2018 ESMA

COMMISSION DELEGATED REGULATION (EU) No /.. of

Summary. Introduction

ess target EEA business rights

የ}hhK < ¾ÓMÓM Å w The Revised Arbitration Rules

STATUTES EIF 04/2015 QY EN-C ISBN doi: /77327 EIB GraphicTeam

EU LEGISLATION (PAYMENT SERVICES SEPA) (JERSEY) REGULATIONS 2015

Practical guidance on the extension of Commission Decision Annexes in the new Accession Country languages

AS/NZS IEC 62198:2015

EE PAYM TERMS TERMS AND CONDITIONS

Terms and Conditions

Terms and Conditions.

Transcription:

Special Report Guidelines for the national transposition of deliverables in Central and Eastern European Countries (CEEC)

2 Reference DSR/BOARD-00003 (jbo00ict.pdf) Keywords CEEC Postal address F-06921 Sophia Antipolis Cedex - FRANCE Office address 650 Route des Lucioles - Sophia Antipolis Valbonne - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association à but non lucratif enregistrée à la Sous-Préfecture de Grasse (06) N 7803/88 Internet secretariat@etsi.fr Individual copies of this deliverable can be downloaded from http://www.etsi.org Copyright Notification No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 1998. All rights reserved.

3 Contents Foreword...4 1 Scope...4 2 References...4 3 Definitions...4 3.1 Deliverables... 4 3.2 Deliverables - previous nomenclature... 5 4 Basic philosophy...5 4.1 Recommended transposition policy, step 1... 5 4.2 Recommended transposition policy, step 2... 6 4.3 Recommended transposition policy, step 3... 6 4.4 Recommended transposition policy, step 4... 7 Annex A (informative): Process chart for the national transposition steps 1 to 3...8 Bibliography...9 History...10

4 Foreword This Special Report (SR) has been produced by. "Selective national transposition policy" recommended in the present document does not mean any deviation from the standards transposition rules laid down in the EU "acquis". Selectivity here concerns the translation and not the transposition of the deliverables. Translation is only one of the possible ways for realizing national transposition. Besides, the present document suggests some priorities to be followed in the transposition process, which do not influence the final target to be achieved, only allocate steps to be taken on a time scale. Though this time scale is longer than required within the Community, the transposition times are recommended especially for the CEEC and other states outside the EU in order to catch up with the EU countries during a transition period before entering the community. These transposition times are to be applied only during the transition period and not thereafter, so that as soon as they become EU members, EU "acquis" will be fully applied to them. 1 Scope The present document gives guidelines for the national transposition of deliverables in CEEC. 2 References Void. 3 Definitions The present document uses the terms and definitions of the Technical Working Procedures. 3.1 Deliverables deliverable: A document (TS, TR, ES, EG or EN (telecommunications series); or, in previous nomenclature, ETS, I-ETS, ETR, TBR, TCR-TR or TC-TR) produced as the result of an work item. Guide, EG: An deliverable, containing mainly informative elements, approved for publication by application of the Membership Approval Procedure. Standard, ES: An deliverable, containing normative provisions, approved for publication by application of the Membership Approval Procedure. Technical Specification, TS: An deliverable, containing normative provisions, approved for publication by a Technical Body. Technical Report, TR: An deliverable, containing mainly informative elements, approved for publication by a Technical Body. European Standard (telecommunications series), EN (telecommunications series), EN: An deliverable containing normative provisions, approved for publication in a process involving the National Standards Organizations and/or National Delegations with implications concerning standstill and national transposition. Harmonized Standard: An EN (telecommunications series) which has been entrusted to by a mandate from the European Commission under European Directive 83/189/EEC and has been drafted taking into account the applicable essential requirements and whose reference has subsequently been announced in the Official Journal of the European Communities. Special Report, SR: A document other than an deliverable, which contains information which it is felt useful to make publicly available for reference purposes.

5 3.2 Deliverables - previous nomenclature Amendment: An deliverable defining a change other than editorial to a published ETS, I-ETS, ETR or TBR, approved by a Technical Body and the subsequent approval procedure used for that type of deliverable. Corrigendum: An deliverable defining an editorial change to a published ETS, I-ETS, ETR or TBR, published by the Secretariat in consultation with a Technical Body Chairman. European Telecommunication Standard, ETS: An deliverable, containing normative, provisions approved for publication in a process involving the National Standards Organizations and/or National Delegations with implications concerning standstill and national transposition. Interim European Telecommunication Standard, I-ETS: An deliverable, containing normative provisions, approved for publication by weighted national voting, with no standstill or national transposition implications. Technical Report, ETR: An deliverable, containing informative elements, approved for publication by a Technical Committee. GSM Technical Specification, GSM-TS: An deliverable approved for publication by the Special Mobile Group. Technical Basis for Regulation, TBR: An deliverable produced under a mandate from the European Commission specifically for the purpose of European regulation containing only essential requirements (as defined in European Directive 91/263/EEC), approved for publication by weighted national voting, with implications concerning standstill and national transposition. 4 Basic philosophy Considering the fact that: the primary language of standardization is English both at European and international level; the terminology of the most advanced techniques is always created first in English, and needs huge effort to be translated correctly to other languages; even the best translation involves the risk of distorting and loosing information; the settlement of any legal dispute concerning the content of a standard needs to be based on a uniformly understandable text of that standard everywhere in the world; all CEEC NSO s will be required to follow the community "acquis communautaire" as regards the official EU standardization system and processes once the country has become a member of the European Union, it is advised to maintain, transpose, implement and use all deliverables - as far as possible - in their originally issued form. However, the legislation in some countries still requires the unconditional use of national language in standardization. This question is advised to be handled with a reasonable compromise between the demand for using national language and the unconditional demand for adopting European standards. To this end, a selective and pragmatic transposition policy is to be implemented in 4 steps, fully in line with the European legislation, but allowing a transition period for CEEC in order to catch up, as follows. 4.1 Recommended transposition policy, step 1 Considering the fact that all CEEC who intend to be integrated into the EU should transpose standards into their national standards system as soon as possible, preferably within 3 months after published by ; Considering the fact that the great majority of deliverables addresses only a very small group of professionals and specialists in each country and that these understand and use deliverable without translation, (50 to 300 persons per deliverable, as it was clearly pointed out in the Assessment Report on the CEEC Questionnaire "Let us pave the route towards Europe" - see the document ETSAG #11 Temp.Doc.17);

6 Considering the fact that the volume of deliverables at the moment runs over 160.000 pages and its rated annual growth is at least 20 000 pages per year, it is recommended - as a first step - to announce all deliverables published by (like ENs, TBRs, ETSs and I-ETSs) with their full English (and translated) titles in the Official Journal of the NSO within 3 months after their publication. This announcement should be legally considered as equivalent to their official introduction into the national standards system. It is also recommended to announce in the official journal of the NSO deliverables like ETRs, ESs, EGs, TRs and TSs within 3 months after their publication by and accept them at national level as documents to which standards may have normative references. 4.2 Recommended transposition policy, step 2 Considering the fact that all CEEC who intend to be integrated into the EU have a very restricted budget for transposition purposes; Considering the fact that all CEEC who intend to be integrated into the EU suffer from insufficient professional translating capacity which is by far not enough to keep pace with the growth of newly published deliverables; Considering the fact that - simultaneously with the translation of deliverables - a national vocabulary of new technical terms is advisable to be developed in order to ensure a professionally good and understandable translation, it is strongly recommended that a competent standards committee of the NSO - representing all relevant participants of the concerning segment of the national telecom market should decide on the further handling of the announced EN, TBR, ETS and I-ETS and categorize them within 6 months after being published by, taking into account the following questions: 1) Is the deliverable relevant for supporting regulatory purposes, i.e. does it serve as a harmonized or normatively referred document for fulfilling requirements of EU directives or not? (E.g.: TBRs, harmonized standards, or ETSs (and ETRs in exceptional cases) normatively referred by a TBR or an harmonized standard). If so, rank the considered deliverable into the category No.1. 2) Consider the deliverables of category No.1 and investigate, which of them have public interest and are to be used outside of the narrow circle of professionals (i.e. 50 to 300 specialists per country, as already mentioned). Those deliverables, to be used by the general public, leave in the category No.1, while the others (even TBRs if they are not to be used by the general public) rank into the category No.2. 3) Take the remaining group of deliverables announced but not categorized yet. Consider, which of them have key importance e.g. giving an introduction into new techniques or services to be implemented or giving instructions for the use of a family of standards. (E.g. many ETRs and TRs have such functions). Rank them into the category No.3 and the rest of the group to category No.4. 4.3 Recommended transposition policy, step 3 1) Ensure that category No.1 documents be fully translated and issued in the national language by the NSO possibly within 1 year after being issued by. (This category may cover about 5 per cent of deliverables). 2) Ensure that category No.2 documents be provided with national foreword possibly within 1 year after being published by. It is recommended that the "Table of contents" be also translated and issued by the NSO. (This category may cover about 10 per cent of deliverables). 3) Ensure that category No.3 documents be handled on a case-by-case basis, whether they: - be fully translated; - be provided with national foreword; - be provided with national foreword (possibly including translated table of contents);

7 - be provided with national foreword, translated table of contents and a national vocabulary part. The category No.3 may be stretched over 10 % of deliverables, depending on the human resources and the budget of the NSO available for translation purposes. 4) The overwhelming 75 % or more of the deliverables ranked into the category No.4 do not need any special care after the announcement in the Official Journal of the NSO. 4.4 Recommended transposition policy, step 4 In the case of ENs, TBRs and ETSs being rejected by a negative national vote, whose immediate introduction into the national standards system is suspended, the competent standards body of the NSO should initiate the necessary measures to be taken at national level in order to eliminate - as soon as possible - the reasons for the suspension. Simultaneously, the NSO should notify of the fact of suspension, as well as of the planned date of its withdrawal. When the suspension is withdrawn, the standard be announced without delay in the Official Journal of the NSO and the steps 1, 2 and 3 be applied.

8 Annex A (informative): Process chart for the national transposition steps 1 to 3 Step 1: All deliverables with their full English (and translated) titles should be announced in the NSO's Official Journal. Does it serve for fulfilling the requirements of the EU directives? YES NO Will it be used by general public? new technologies, instructions, guides YES NO YES NO Category No. 1 (5%) Category No. 2 (10%) Category No. 3 (10%) Category No. 4 (75%) Either fully translated fully translated within 1 year national foreword + "table of contents" translated possibly within 1 year OR with national foreword OR with national foreword and "table of contents" translated OR with national foreword, "table of contents" translated and a national vocabulary part Figure A.1

9 Bibliography The following material, though not specifically referenced in the body of the present document (or not publicly available), gives supporting information. - ETSAG #11 Temp.Doc.17: "Assessment Report on the CEEC Questionnaire "Let us pave the route towards Europe".

10 History Document history V1.1.1 December 1998 Publication ISBN 2-7437-2717-9 Dépôt légal : Décembre 1998