Subject: Upper Merrimack and Pemigewasset River Study Task 9 - Water Supply Evaluation

Similar documents
Development Fee Program: Comparative risk analysis

Flood Risk Management and Columbia River Treaty Review

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

University Drive Flood Risk Management Project Phase I 58 th Ave S to 500 S of 64 th Ave S City of Fargo Project FM-15-C1

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

7. Understand effect of multiple annual exposures e.g., 30-yr period and multiple independent locations yr event over 30 years 3%

Model Development to Support Assessment of Flood Risk for the Columbia River Treaty Review

Flood Resilience Study Findings

SPILLWAY ADEQUACY ANALYSIS ROUGH RIVER LAKE LOUISVILLE DISTRICT

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT

CRISP COUNTY, GEORGIA AND INCORPORATED AREAS

Westfield Boulevard Alternative

The AIR Inland Flood Model for the United States

obligation incurred herein, in accordance with Article II, Section 22 of the Ohio Constitution.

The AIR Inland Flood Model for Great Britian

FLOOD INUNDATION MAPPING SCIENCE. Gardner Bent, U.S. Geological Survey, New England Water Science Center

Appendix 5D Water Transfer Analysis Methodology and Results

Trinity River Restoration Program

DRAFT Memorandum. Background

CITY COUNCIL STUDY SESSION MEMORANDUM

APPENDIX to the PROGRESS REPORTS to the INTERNATIONAL JOINT COMMISSION. by the INTERNATIONAL ST. LAWRENCE RIVER BOARD OF CONTROL

RESPONSE TO FEBRUARY 16, 2018 REQUEST FOR ADDITIONAL INFORMATION, RESOURCE AGENCY LATE FILING, AND OTHER RELATED INFORMATION ATTACHMENT D

1. What are the approved revisions to the DRBC project review fees and water supply charges?

Mapping flood risk its role in improving flood resilience in England

An Economic Analysis of the Conowingo Hydroelectric Generating Stations

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction

APPENDIX E ECONOMICS

BASIN REGULATIONS WATER SUPPLY CHARGES

310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION PREFACE TO REVISIONS TO THE MASSACHUSETTS WATER RESOURCES MANAGEMENT PROGRAM (310 CMR 36.

DECATUR COUNTY, GEORGIA AND INCORPORATED AREAS

Global Tactical Asset Allocation

McKenzie Surface Water Source Alternatives

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter

Inflow and Infiltration/ Sewer Overflow Reduction Program Part 3. November 10, 2011

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development

New Hampshire Medicaid Program Enrollment Forecast SFY Update

BUTTS COUNTY, GEORGIA AND INCORPORATED AREAS

GLWA: Working In Collaboration. Sue McCormick, CEO

Administrative Manual - Part III BASIN REGULATIONS WATER SUPPLY CHARGES

The maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively.

Strategic Business Plan Department of Water Resources. Gwinnett County Department of Water Resources

FLOODPLAIN MANAGEMENT: A PRESENT AND A 21st CENTURY IMPERATIVE. Gerald E. Galloway, Jr. United States Military Academy

Cedric Grant, CAO Gwen LeBlanc, CFO Bill Roux, Director, Drainage

INTERNATIONAL RAINY LAKE BOARD OF CONTROL (IRLBC) INTERNATIONAL RAINY RIVER WATER POLLUTION BOARD (IRRWPB) NEWSLETTER

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Municipal Economics & Planning A division ifruekert/mielke

Canada s exposure to flood risk. Who is affected, where are they located, and what is at stake

Skagit County Flood Insurance Study Update. Ryan Ike, CFM FEMA Region 10

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP)

FLOODPLAIN INFORMATION SERVICES PROVIDED BY THE ILLINOIS STATE WATER SURVEY DURING

FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES IN URBAN ENVIRONMENT

Ohio Environmental Protection Agency

NEW FEDERAL RULE FOR COMBINED SEWER OVERFLOW DISCHARGES PUBLIC NOTIFICATON PLAN

Comprehensive Monthly Financial Report July 2013

APPENDIX K Drainage Study

LRD IWTF Projects Update Inland Waterway Users Board

Dealing With Unnumbered A Zones in Maine Floodplain Management

AREAWIDE WATER QUALITY MANAGEMENT PLAN AMENDMENT PROCESS

Corps Water Management System (CWMS)

SENECA COUNTY, OHIO AND INCORPORATED AREAS

Risk Based Approaches for Levees in the U.S. and Abroad: Lessons for the NFIP

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES

Requirements for Mapping Levees Complying with Section of the NFIP Regulations

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)

Citi Dynamic Asset Selector 5 Excess Return Index

A Voluntary Regional Agreement

SACRAMENTO WATER ALLOCATION MODEL (SACWAM) DEMAND PRIORITIES AND SUPPLY PREFERENCES

DOCKET NO. D CP-18 DELAWARE RIVER BASIN COMMISSION. Located in the Drainage Area of Special Protection Waters

Toonumbar Operations Plan

SECTION 9: MAPS AND DATA

The City of El Paso APPENDIX D DAM RISK INVENTORY ASSESSMENT

PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS

Hypothetical Illustration

At this time an understanding of flood damages

Additional Dwelling Supplement Preliminary Outturn Report. November 2016

Planning and Flood Risk

1997 PACIFIC NORTHWEST COORDINATION AGREEMENT

Technical Memorandum 3.4 E Avenue NW Watershed Drainage Study. Appendix E Floodplain Impacts and Implications Memo

INTERNATIONAL RAINY LAKE BOARD OF CONTROL (IRLBC) INTERNATIONAL RAINY RIVER WATER POLLUTION BOARD (IRRWPB) NEWSLETTER.

SUSQUEHANNA RIVER BASIN COMMISSION

Agency MBS: Still Attractive for Now

USACE Levee Screening Tool Understanding the Classification

Update of Project Benefits

ESTATE TAXES, DEFICITS, AND BUDGET IMPLICATIONS

August 2016 Flood Preliminary Report Amite River Basin

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update

PUTNAM COUNTY, GEORGIA

Rate Structure Administrative Procedures Handbook FY 2017/18

EARNED VALUE AS A RISK ASSESSMENT TOOL

OPERATING AGREEMENT. executed by THE UNITED STATES OF AMERICA. acting by and through the SAVANNAH DISTRICT, CORPS OF ENGINEERS.

2017 WATER AND WASTEWATER IMPACT FEE STUDY CITY OF AZLE, TEXAS

Good Practice Guide. GPG 101 Document Owner: Steve Cook. Page 1 of 7.

Feasibility: Creating Railroads on Paper

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET

Recommended Improvements to the Flexible Flow Management Program for Coldwater Ecosystem Protection in the Delaware River Tailwaters.

LCRA BOARD POLICY 301 FINANCE. April 18, 2018

Stormwater Management Fee Policy Options and Recommendations

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination

HOLMES COUNTY, FLORIDA AND INCORPORATED AREAS

Transcription:

Memorandum To: From: Barbara Blumeris, USACE Ginger Croom and Kirk Westphal, CDM Date: April 14, 2008 Subject: Upper Merrimack and Pemigewasset River Study Task 9 - Water Supply Evaluation Executive Summary Several significant water supply withdrawals from the mainstem of the Merrimack River in Southern New Hampshire are in various stages of development and permitting. From 1986 to 1996, Pennichuck Water Works, which supplies Nashua and other neighboring communities, operated with a permit that allowed withdrawals from the river up to 20 MGD under certain flow conditions. In 1996, this permit was increased to a maximum allowable withdrawal of 30 MGD under favorable flow conditions. The City of Manchester is planning future withdrawals from the Merrimack in Hooksett, phased in increments of 5 7 MGD over time up to a maximum of 20 MGD. The prospective withdrawals for Manchester are not currently permitted. A preliminary investigation of water supply withdrawal scenarios at the two active and proposed locations between Hooksett, New Hampshire and the New Hampshire/Massachusetts state border was conducted as Task 9 of the Upper Merrimack and Pemigewasset River Study. The analysis utilized the existing watershed hydrology and river hydraulics models developed during Phase I of the Merrimack River Watershed Assessment Study, without modification. The models were run under the baseline conditions defined in Phase I for two representative years (dry and average) to test the sensitivity of the river flow to incremental levels of water supply withdrawals. A representative wet year was not included since the focus of this evaluation was on the impact of water withdrawals during low flows. The impacts on water quality were not considered here, but examination of potential water quality impacts is proposed as part of subsequent tasks of the Upper Merrimack and Pemigewasset River Study.

Page 2 The evaluation showed that the proposed water withdrawal scenarios for Manchester Water Works and the current withdrawal permit for Pennichuck Water Works would have minor hydrologic impacts on the Merrimack River. For Manchester WW, the maximum proposed withdrawal pumping rate of 20 MGD did not cause significant impacts on the river flow. Additionally, the upstream withdrawal of 20 MGD by Manchester WW had very little impact on Pennichuck WW s withdrawal amounts under the current permit conditions. A hypothetical scenario, in which Pennichuck WW was allowed to withdraw at the maximum rate of 30 MGD at all times, had a minor impact on the river, but under both the prior and current permits this rate was only allowed during a short period of the year. For Manchester WW, the maximum withdrawal scenario (20 MGD) resulted in a maximum flow reduction under low flow conditions (i.e. when the river flow is less than the 7Q10 flow) of 5-6% while the current permit for Pennichuck WW resulted in a reduction of 3%. If Pennichuck WW was allowed to withdraw at the maximum rate of 30 MGD at all times, which is not possible under their current permit and presented only for illustrative purposes, then the low flow reduction was 7%. Under the worst case scenario with both Manchester WW withdrawing at 20 MGD and Pennichuck WW operating under the current permit at 12 MGD under low flow conditions, the low flow reduction was about 7-8% downstream of the Pennichuck WW withdrawal intake. 1.0 Objectives Two objectives framed this analysis: Develop a preliminary understanding of the magnitude of the impacts of the specified mainstem withdrawals on the flow regimes in the river; Estimate the frequency at which the prospective withdrawals would be available to the water purveyors, as governed by known conditions on withdrawal permits. 2.0 Models and Methodology For Phase I of the Merrimack River Watershed Assessment, CDM developed a series of models to simulate watershed runoff and loading, river hydraulics, and in-stream water quality conditions of the Lower Merrimack River beginning at the Hooksett Dam just north of Manchester, NH and extending to the Atlantic Ocean (see CDM (2006) for more details on the model development for Phase I). These models included combined sewer overflow (CSO) models for five municipalities along the river using SWMM and MOUSE, a watershed runoff and loading model using HSPF, a river hydraulics model using SWMM, and an in-stream water quality model using WASP. The models were calibrated to a wide range of flow regimes and water quality conditions. For this preliminary water withdrawal evaluation, the existing CSO discharge models (SWMM and MOUSE), the watershed loading model (HSPF), and the river hydraulics model (SWMM) were used without any additional modification. The WASP water quality model

Page 3 was not used for this evaluation since the focus was solely on the impacts on river flow and not water quality. The models were configured to represent current conditions for basin hydrology and drainage infrastructure. Simulations were run for the representative dry and average years (1993 and 1994, respectively) over the same 185 day period (May 1 - November 1) that was used in Phase I. Runoff from each subcatchment was estimated with the HSPF model, and the river flow (with no withdrawals at the two sites under investigation) was simulated with SWMM. This established a baseline for comparison to the withdrawal scenarios, which were simulated with the current and proposed withdrawal thresholds and restrictions. Withdrawals were evaluated at one location for the Manchester Water Works in Hooksett, NH and a second location for Pennichuck Water Works in Merrimack, NH. The Manchester Water Works withdrawal location is downstream of the I-93 bridge near Exit 10. The Pennichuck Water Works withdrawal location is on the west side of the river, approximately 1 mile upstream of the Merrimack/Nashua town line. The water withdrawal locations, wastewater treatment facility discharges, streamflow gages, and dams between Hooksett and Nashua are shown in Figure 1. The withdrawal scenarios were evaluated by subtracting the rate of withdrawal from the simulated flows at each withdrawal location. While existing return flows from the watershed, including from the Manchester Wastewater Treatment Facility (WWTF), were included in the model, they were not altered in response to changes in the withdrawal rates since the focus of this analysis was on the flow conditions just downstream of the withdrawal locations. While increases in river withdrawals would result in increases in WWTF discharges, the 8-mile reach between the withdrawal intake and the discharge location would be unaffected by this return flow. For the scenario with both Manchester WW and Pennichuck WW withdrawing, the return flow from the Manchester WWTF, which is 9.5 miles upstream of the Pennichuck WW intake location, was not increased in order to provide conservative (i.e. minimum) estimates of flow conditions at the Pennichuck WW. Other return flows from the watershed (such as from groundwater via septic system leaching) also enter the river at various points but these flows are difficult to quantify and were not changed in this analysis to again provide conservative flow estimates. The impacts of water withdrawal rates on watershed return flows will be considered in subsequent proposed tasks of this study. The resulting downstream flows were compared to the estimated 7Q10 flow at each withdrawal location. The NH DES Dam Bureau reported a 7Q10 flow of 644 cfs at the USGS streamflow gage near Goff s Falls below Manchester, NH (Gage ID: 01092000) (NH DES, 2007). While the 7Q10 flow may differ depending on the period of record used in the calculation, this value was assumed to be representative for the purpose of this analysis. As shown in Figure 1, the Goff s Falls gage is located about midway between the two withdrawal locations. To estimate the 7Q10 at each withdrawal location, the ratio of simulated flows between the withdrawal location and Goff s Falls was calculated for low flows that were near the 7Q10 of 644 cfs at Goff s Falls. For the Manchester WW withdrawal location, the average

Page 4 ratio of the withdrawal location flows to Goff s Falls flows was 0.91. For the Pennichuck WW, the average ratio of Goff s Falls flows to the withdrawal location flows was 0.87. Using these ratios, the estimated 7Q10 flows were 586 cfs at the Manchester WW withdrawal location and 740 cfs at the Pennichuck WW withdrawal location. Time series and flow duration curves were generated based on the resulting downstream flows. For the water withdrawal scenarios at Pennichuck Water Works, where the rate of withdrawal depended on water surface elevation and downstream flow, operational logic was included to evaluate specific elevation and flow criteria (see below for more details). Time series plots of water withdrawal rates were also generated for the Pennichuck withdrawal scenarios. Summary statistics of total water withdrawal volumes and the distributions of water withdrawal rates were calculated for each scenario.

Page 5 Figure 1 Map of Water Withdrawal Locations, WWTPs, Streamflow Gages and Dams

Page 6 3.0 Manchester Water Works Four water withdrawal scenarios were evaluated for Manchester Water Works. Each scenario included a constant rate of water withdrawal ranging from 0 to 20 MGD. The specific withdrawal rates and total withdrawal volumes over the 185 day simulation period are shown in Table 1. These withdrawal scenarios are in addition to the existing Manchester Water Works withdrawal from Lake Massabesic, which is included in the model. Table 1 - Water Supply Withdrawal Scenarios for Manchester Water Works Withdrawal Rate (MGD) Total Withdrawal* (MG) 0 (Baseline) 0 7 1,295 14 2,590 20 3,700 * Total withdrawal over 185-day simulation period. Since these scenarios do not depend on water surface elevation or downstream flow requirements, each withdrawal rate was simply subtracted from the simulated flows generated by SWMM at the withdrawal location. The water withdrawal permit may condition withdrawals on downstream residual flow, but absent that information, the withdrawals were simulated as constant, and the associated impacts and volumes should be viewed as an upper limit. Because the rates of withdrawal were considerably smaller than the flow rate in the river, the time series of downstream flows only include the two scenarios with the minimum (0 MGD) and maximum (20 MGD) withdrawal rates. These two scenarios provide lower and upper bounds to the downstream flows resulting from the other two scenarios (7 and 14 MGD). Time series of downstream flows during the dry year (1993) and average year (1994) are presented in Figures 2 and 3, respectively. The percent change in daily flow between the baseline and maximum withdrawal scenarios are shown in Figure 4 for both years. The flow duration curves for the two years are shown in Figures 5 and 6. Low-flow conditions are indicated on these graphs by the estimated 7Q10 flow of 586 cfs at the Manchester WW withdrawal location. For the baseline simulation (no withdrawals) the flow was less than the 7Q10 about 8% of the time for 1993 (dry) and about 3% of the time for 1994 (average) (Figures 5 and 6).

Page 7 Figure 2 - Time Series for Manchester WW Scenarios during 1993 (Dry) 100,000 800 750 Downstream Flow (cfs) 700 650 600 550 500 450 Downstream Flow (cfs) 10,000 1,000 400 7/11/1993 7/16/1993 7/21/1993 7/26/1993 7/31/1993 Date 100 May 1993 Jun 1993 Jul 1993 Aug 1993 Sep 1993 Oct 1993 Nov 1993 Date Baseline 20 MGD 7Q10 Figure 3 - Time Series for Manchester WW Scenarios during 1994 (Average) 100,000 10,000 Downstream Flow (cfs) 1,000 100 May 1994 Jun 1994 Jul 1994 Aug 1994 Sep 1994 Oct 1994 Date Baseline 20 MGD 7Q10

Page 8 Figure 4 Change in Flow from Baseline to Maximum (20 MGD) Withdrawal for Manchester WW during 1993 (Dry) and 1994 (Average) 6% Below 7Q10 Flow 5% 4% Percent Change in Flow 3% 2% 1% 0% May Jun Jul Aug Sep Oct Nov Date 1993 (Dry) 1994 (Average)

Page 9 Figure 5 - Flow Duration Curves for the Minimum and Maximum Manchester WW Withdrawal Scenarios during 1993 (Dry) 100% 90% 80% 70% Non-Exceedence Frequency 60% 50% 40% 30% 20% 10% 0% 100 1,000 10,000 100,000 Downstream Flow (cfs) Baseline 20 MGD 7Q10 Figure 6 - Flow Duration Curves for the Minimum and Maximum Manchester WW Withdrawal Scenarios during 1994 (Average) 100% 90% 80% 70% Non-Exceedence Frequency 60% 50% 40% 30% 20% 10% 0% 100 1,000 10,000 100,000 Downstream Flow (cfs) Baseline 20 MGD 7Q10

Page 10 Both the time series and the flow duration curves indicate that the maximum rate of water withdrawal for Manchester Water Works would have a small impact on the flow of the river, even at low flows when the river flow is less than the 7Q10 flow. The average flows during the month of August, the summer, and the overall simulation period for the dry year (1993) are compared to the 7Q10 flow in Table 2. The percent change in average flow from the baseline scenario to the maximum 20 MGD scenario for each period is also presented in Table 2. For the lowest simulated flow of 527 cfs, which occurred during July 1993, the maximum withdrawal of 20 MGD (31 cfs) would result in a 5.9% reduction to a flow of 496 cfs. Table 2 Summary of Average Flows in 1993 (Dry) for Manchester Water Works Withdrawals Scenario 7Q10 (cfs) August Average (cfs) Summer Average* (cfs) Overall Average** (cfs) Baseline 586 3,306 1,772 2,608 7 MGD 586 3,295 1,761 2,597 14 MGD 586 3,284 1,751 2,586 20 MGD 586 3,275 (0.9%) * June 21 September 23 ** May 1 November 1 Percent change in flow from Baseline scenario 4.0 Pennichuck Water Works 1,741 (1.7%) 2,577 (1.2%) The following five water withdrawal scenarios were evaluated for Pennichuck Water Works. Baseline (0 MGD) Prior Withdrawal Permit (12-20 MGD) Current Withdrawal Permit (12-30 MGD) Maximum Withdrawal (30 MGD) Combined Maximum Withdrawal including Manchester WW (30 MGD + 20 MGD upstream) The allowable withdrawal rates and permit requirements for each of these scenarios are summarized in Table 3. For the prior withdrawal permit, the rate of withdrawal depends on the water surface elevation at the point of withdrawal. If the water surface elevation is greater than 91.2 ft MSL, then the elevation criterion is met and the rate of withdrawal is set to 20 MGD. If the elevation is below 91.2 ft MSL and the criterion is not met then the rate of withdrawal is set to 12 MGD.

Page 11 Under the current withdrawal permit, the withdrawal rate depends on the same elevation requirement as the prior permit in addition to a downstream flow requirement and a greater maximum withdrawal rate of 30 MGD. The downstream flow requirement is satisfied if the flow after withdrawal is greater than 4,460 cfs during May and June or greater than 1,715 cfs during the other months. If both the elevation and the flow criteria are met then the allowable withdrawal rate is 30 MGD, but if only the flow criterion is met then the allowable withdrawal rate is 20 MGD. If the flow requirement is not met then the current permit reverts to the flow rates under the prior permit with 20 MGD if the elevation criterion is met and 12 MGD otherwise. For the no withdrawal and maximum withdrawal scenarios, the withdrawal rates are simulated as constant in order to provide an upper bound. In these cases, the withdrawals do not depend on the water surface elevation or downstream flow requirements. Although the current permit does not allow Pennichuck to withdraw at 30 MGD during low flows, the maximum withdrawal scenario was included for illustrative purposes in this analysis. The combined maximum withdrawal scenario was included to consider the impact on the river of having both utilities withdrawing water at the maximum allowable rates, which again is not allowed under the current Pennichuck permit during low flows and is included solely for illustrative purposes. Table 3 - Water Withdrawal Scenarios for Pennichuck Water Works Scenario Elevation Criterion Satisfied? Flow Criterion Satisfied? Withdrawal Rate (MGD) No Withdrawal: -- -- 0 Prior Permit: Yes -- 20 No -- 12 Current Permit: Yes Yes 30 Yes No 20 No Yes 20 No No 12 Maximum (Pennichuck Only)*: -- -- 30 Combined Maximum**: -- -- 30 * Included for illustrative purposes only and not allowed under current permit ** After Manchester has withdrawn 20 MGD upstream, and also included for illustrative purposes only and not allowed under current permit. 4.1 Alternative Elevation Criteria During Phase I of the Merrimack River Watershed Assessment, the river hydraulics model was calibrated using measurements of flow. Water surface elevation was not a specific calibration criterion, due to lack of available data, except for locations in the estuary. As a result, the ability of the model to accurately and consistently evaluate the elevation criterion

Page 12 for Pennichuck withdrawals was uncertain, especially because the withdrawal location can be influenced by backwater from the Pawtucket Dam in Lowell. To reduce the impacts of this uncertainty on this evaluation, withdrawal scenarios were assessed by: Substituting a flow-based criterion for the elevation criterion, to provide a likely range of impacts; Assuming maximum constant withdrawal, to provide an upper bound on the impacts. A relationship between flow and elevation was constructed using the SWMM output at the Pennichuck withdrawal location. The flow corresponding to an elevation of 91.2 ft MSL was then used as a substitute for the elevation criterion. In general, the relationship between flow and elevation is expected to be one-to-one with one flow rate corresponding to one elevation. However, due to the influence of backwater from the Pawtucket Dam, the flows corresponding to an elevation of 91.2 ft MSL ranged from 3,210 to 4,240 cfs. These two flows were used as surrogates for elevation, in order to effectively estimate a range of potential impacts. The current permit scenarios were thus evaluated using three versions of the elevation criterion: Elevation of 91.2 ft MSL (Original) Flow of 3,210 cfs (Upper Bound least restrictive) Flow of 4,240 cfs (Lower Bound most restrictive) Comparison of these three versions of the elevation criterion show that the resulting water withdrawal rates and volumes are not significantly different among the three versions of the elevation criterion (see below). For simplicity, only the results of the original elevation criteria are presented in the time series and flow duration curves (Figures 7 11). All three forms of the elevation criterion are included in the final summary charts and statistics to show the differences between them (Table 5 and Figures 12 14). However, since all three types of simulated thresholds result in somewhat restrictive withdrawal allowances, the relationship between flow and water surface elevation at the withdrawal location should be examined more thoroughly in subsequent phases of this study (e.g. during the field work, or through daily operational record-keeping at the intake facility).

Page 13 4.2 Impact on River Flow Similar to the results for Manchester Water Works withdrawal scenarios, the Pennichuck Water Works scenarios have minor impacts on the downstream river flow. Time series plots of downstream flows for each of the five scenarios are shown in Figures 7 and 8 for 1993 (dry year) and 1994 (average year), respectively. The percent change in daily flow for both years between the baseline and maximum (Pennichuck Only) scenarios are shown in Figure 9. The flow duration curves are shown in Figures 10 and 11. The estimated 7Q10 flow of 740 cfs at the Pennichuck WW withdrawal location is also included in these graphs. The simulated flows under baseline conditions (no withdrawals) were less than the estimated 7Q10 flow about 4% of time during 1993 and less than 1% during 1994. In general, the differences between the prior permit and current permit scenarios are very small such that the lines for these two scenarios overlap frequently in each plot. Figure 7 - Time Series for Pennichuck Withdrawal Scenarios during 1993 (Dry) 100,000 900 850 Downstream Flow (cfs) 800 750 700 650 600 550 Downstream Flow (cfs) 10,000 1,000 500 7/11/1993 7/16/1993 7/21/1993 7/26/1993 7/31/1993 Date 100 May 1993 Jun 1993 Jul 1993 Aug 1993 Sep 1993 Oct 1993 Nov 1993 Date Baseline (No Withdrawal) Prior Permit Current Permit Maximum (Pennichuck Only) Combined Maximum 7Q10

Page 14 Figure 8 - Time Series for Pennichuck Withdrawal Scenarios during 1994 (Average) 100,000 Downstream Flow (cfs) 10,000 1,000 100 May 1994 Jun 1994 Jul 1994 Aug 1994 Sep 1994 Oct 1994 Nov 1994 Date Baseline (No Withdrawal) Prior Permit Current Permit Maximum (Pennichuck Only) Combined Maximum 7Q10 Figure 9 - Change in Flow from Baseline to Maximum Withdrawal Scenario for Pennichuck WW during 1993 (Dry) and 1994 (Average) 8% Below 7Q10 Flow 7% 6% Percent Change in Flow 5% 4% 3% 2% 1% 0% May Jun Jul Aug Sep Oct Nov Date 1993 (Dry) 1994 (Average)

Page 15 Figure 10 - Flow Duration Curves for Pennichuck Withdrawal Scenarios during 1993 (Dry) 100% 90% 80% Non-Exceedence Frequency 70% 60% 50% 40% 30% 20% 10% 0% 100 1,000 10,000 100,000 Downstream Flow (cfs) Baseline (No Withdrawal) Prior Permit Current Permit Maximum (Pennichuck Only) Combined Maximum 7Q10 Figure 11 - Flow Duration Curves for Pennichuck Withdrawal Scenarios during 1994 (Average) 100% 90% 80% Non-Exceedence Frequency 70% 60% 50% 40% 30% 20% 10% 0% 100 1,000 10,000 100,000 Downstream Flow (cfs) Baseline (No Withdrawal) Prior Permit Current Permit Maximum (Pennichuck Only) Combined Maximum 7Q10

Page 16 The Pennichuck Water Works withdrawal scenarios again resulted in minor impacts on the downstream river flow. The minimum flow in July of 1993 was reduced by 7.0% from 666 cfs to 620 cfs for the maximum withdrawal rate of 30 MGD (without Manchester withdrawals). Although the current permit would not allow Pennichuck to withdraw at 30 MGD, this result shows that it would still have a minor impact on the river flows. In Table 4, the average flows during the month of August, the summer, and the overall simulation period are compared to the estimated 7Q10 flow for the dry year (1993). For the maximum and maximum combined scenarios, the percent change in average flow from the baseline scenario for each period is also included in Table 4. Table 4 Summary of Average Flows in 1993 (Dry) for Pennichuck Water Works Withdrawals Scenario 7Q10 (cfs) August Average (cfs) Summer Average* (cfs) Overall Average** (cfs) Baseline 740 3,529 1,951 3,104 Prior Permit 740 3,508 1,932 3,084 Current Permit 740 3,496 1,928 3,078 Maximum 740 3,482 (1.3%) 1,904 (2.4%) 3,058 (1.5%) Maximum Combined 740 3,451 (2.2%) 1,874 (3.9%) 3,027 (2.5%) * June 21 September 23 ** May 1 November 1 Percent change in average flow from Baseline scenario Maximum withdrawals by both Manchester WW (20 MGD) and Pennichuck WW (30 MGD) 4.3 Water Withdrawal Totals and Distributions In addition to the impacts on the river flow, the total amounts and distribution of water withdrawals were evaluated for the Pennichuck Water Works scenarios. (This was not done for the Manchester Water Works withdrawals, since those were simulated as unconditional withdrawals in the absence of defined permit conditions). For each scenario (excluding the no withdrawal scenario), the percent of the total 185-day period that each withdrawal rate was applied was calculated. As discussed above, the current permit scenario was evaluated using three versions of the elevation criterion (Original, Lower Bound, and Upper Bound), all of which are included in this section. Also included is the current permit scenario (using the original elevation criterion) with maximum withdrawal (20 MGD) upstream by Manchester Water Works. For this scenario, the upstream flows at the Pennichuck withdrawal location were reduced by 20 MGD before calculating the allowed water withdrawals for Pennichuck under the future permit conditions. For each scenario and each year, the total volumes of permitted withdrawals over the 185 day period are presented in Table 5 and Figure 12. The distribution of withdrawal rates as percent

Page 17 of the simulation period are also included in Table 5 and shown in Figures 13 and 14 for each year. Between the dry (1993) and average (1994) years, the differences in total withdrawal volumes were minor. In some cases, the withdrawal volumes were less for the average year (1994) than for the dry year (1993); although these differences are not significant and are due mainly to the distribution of low flows during the two years. The amount of water withdrawals allowed under the current permit requirements (~ 3,200 MG) was about 30% greater than the amount allowed under the prior permit (~ 2,500 MG). When the maximum withdrawal rate was used for the entire period, the total volume of water (5,550 MG) was more than twice that withdrawn under the prior permit. Table 5 - Totals and Distributions of Water Withdrawals for Pennichuck Water Works Pennichuck WW Scenario 1993 (Dry Year) 1994 (Average Year) Total* % Time Pumping at: Total* % Time Pumping at: (MG) 12 MGD 20 MGD 30 MGD (MG) 12 MGD 20 MGD No Withdrawals 0 -- -- -- 0 -- -- -- 30 MGD Prior Permit 2,460 84 16 0 2,532 79 21 0 Current Permit (Original) 3,184 55 29 16 3,136 64 16 20 Current Permit (Upper Bound) 3,356 50 28 22 3,242 60 17 23 Current Permit (Lower Bound) 3,190 54 30 16 3,096 64 18 18 Current Permit w/ Max. 3,172 55 30 15 3,088 64 17 19 Manchester Maximum Withdrawal** 5,550 0 0 100 5,550 0 0 100 * Over 185-day Period (May 1 November 1) ** Included for illustrative purposes only and not allowed under current permit

Page 18 Figure 12 - Total Withdrawals for Pennichuck Water Works 6,000 5,000 1993-Dry Year 1994-Average Year Total Withdrawal (Mil. Gal.) 4,000 3,000 2,000 1,000 0 Prior Permit Current Permit (Original) Current Permit Current Permit (Upper Bound) (Lower Bound) Scenario Current Permit w/ Maximum Manchester Withdrawal Maximum Withdrawal Figure 13 - Distributions of Withdrawal Rates for Pennichuck Water Works during 1993 (Dry) 100% 90% 80% Perecnt of Total Time 70% 60% 50% 40% 30% 20% 10% 0% Prior Permit Current Permit (Original) 12 MGD 20 MGD 30 MGD Current Permit (Upper Bound) Scenario Current Permit (Lower Bound) Current Permit w/ Maximum Manchester Withdrawal Maximum Withdrawal

Page 19 Figure 14 - Distributions of Withdrawal Rates for Pennichuck Water Works during 1994 (Average) 100% 90% 80% Percent of Total Time 70% 60% 50% 40% 30% 20% 10% 0% Prior Permit Current Permit (Original) 12 MGD 20 MGD 30 MGD Current Current Permit (Upper Permit (Lower Bound) Bound) Scenario Current Permit w/ Maximum Manchester Withdrawal Maximum Withdrawal Time series of the withdrawal rates under the prior permit, the current permit (using the original elevation criterion), and the current permit with maximum withdrawals upstream by Manchester WW are shown in Figures 15 and 16 for each year. For all three scenarios, the maximum withdrawal rate was not allowed for extended periods of time except during the wet spring season. During the remainder of the year, the maximum withdrawal rate was only allowed for short periods coinciding with major storm events.

Page 20 Figure 15 - Time Series of Withdrawal Pumping Rates for Pennichuck Water Works during 1993 (Dry) 35 30 25 Pumping Rate (MGD) 20 15 10 5 0 May 1993 Jun 1993 Jul 1993 Aug 1993 Sep 1993 Oct 1993 Nov 1993 Date Prior Permit Current Permit (Original) Current Permit w/ Manchester Withdrawal Figure 16 - Time Series of Withdrawal Pumping Rates for Pennichuck Water Works during 1994 (Average) 35 30 25 Pumping Rate (MGD) 20 15 10 5 0 May 1994 Jun 1994 Jul 1994 Aug 1994 Sep 1994 Oct 1994 Nov 1994 Date Prior Permit Current Permit (Original) Current Permit w/ Manchester Withdrawal

Page 21 5.0 Conclusions and Recommendations This preliminary evaluation indicates that the proposed water withdrawal scenarios for both Manchester Water Works and Pennichuck Water Works would have minor hydrologic impacts on the Merrimack River. For Manchester WW, the maximum withdrawal pumping rate of 20 MGD does not cause significant impacts on the river flow. Additionally, the upstream withdrawal of 20 MGD by Manchester WW has very little impact on Pennichuck WW s withdrawal amounts under the future permit conditions. In a hypothetical scenario where Pennichuck WW was allowed to withdraw at the maximum rate of 30 MGD, the impact on the river would be minor even during low flows, but under both the prior and current permits this rate is only allowed during a short period of the year. For Manchester WW, the maximum withdrawal scenario (20 MGD) resulted in a reduction of 5-6% under low flow conditions (i.e. when the river flow is less than the 7Q10 flow) while the current permit for Pennichuck WW resulted in a reduction of 3%. If Pennichuck WW was allowed to withdraw at the maximum rate of 30 MGD at all times, which is a hypothetical scenario included only for illustrative purposes, then the low flow reduction would be 7%. Under the worst case scenario with both Manchester WW withdrawing at 20 MGD and Pennichuck WW operating under the current permit at 12 MGD under low flow conditions, the reduction is about 7-8% downstream of the Pennichuck WW withdrawal intake. Due to the uncertainty in the correlation between flow and water surface elevation at the Pennichuck intake (flow is not measured here, and no measured data exist on the correlation between water level and flow at this location), it is advisable to examine this correlation more carefully in subsequent phases of this study. Continuous daily monitoring of staff gage height and streamflow at the Pennichuck WW intake location would be needed to improve this correlation. A monitoring period of at least one year is recommended in order to capture the full range of low to high flow conditions since the correlation is not likely to be constant across this range. This period would also include times when the relationship between water level and flow is impacted by dam operations downstream of the intake location. All three types of simulated threshold conditions (based solely on hydraulic model relationships that are inferred, but not calibrated at this specific site due to lack of data) result in somewhat restrictive withdrawal allowances, and it is difficult to ascertain the realism of such restrictions without more substantive data on flows and water levels at this site. Despite the minor hydrologic impacts on the river flows, the impacts on water quality may be significant and will be assessed under subsequent tasks of the Upper Merrimack and Pemigewasset River Study. 6.0 References CDM (2003). Merrimack River Watershed Assessment Study: Description of Existing Conditions. Prepared for New England District US Army Corps of Engineers. (Sponsor Communities: Manchester, NH; Nashua, NH; Lowell, MA; GLSD, MA; and Haverhill, MA)

Page 22 CDM (2006). Merrimack River Watershed Assessment Study: Simulation Model Development. Prepared for New England District US Army Corps of Engineers. (Sponsor Communities: Manchester, NH; Nashua, NH; Lowell, MA; GLSD, MA; and Haverhill, MA) NH DES (2007). Drought Data October 2007. Available online at <http://www.des.state.nh.us/dam/drought_data/oct07_data.pdf> (Accessed December 12, 2007).