Prioritization of Climate Change Adaptation Options. The Role of Cost-Benefit Analysis

Similar documents
Prioritization of Climate Change Adaptation Options. The Role of Cost-Benefit Analysis

Adaptation Assessment: Economic Analysis of Adaptation Measures

DRAFT TEXT on. Version 05/12/ :36

The role of private sector in GHG mitigation

Prioritization of Climate Change Adaptation Options. The Role of Cost-Benefit Analysis. Session 8: Conducting CBA Step 7

CLIMATE CHANGE SPENDING IN ETHIOPIA

Disaster Risk Management

Climate Risk Management For A Resilient Asia-pacific Dr Cinzia Losenno Senior Climate Change Specialist Asian Development Bank

UNFCCC Expert Meeting on Loss and Damage from Climate Change

Module 7. Costing, assessing and selecting adaptation and mitigation. Training workshops on mainstreaming climate change

Incremental cost methodology: potential approaches for the Green Climate Fund

Negotiating the. Indrajit Bose

Financing the LAC NDCs

Green Climate Fund Private Sector Facility. Jiwoo Choi May 2017,

Adaptation for developing countries in a post-2012 UN Climate Regime

Infrastructure Prioritization Framework: Considering Resilience in Infrastructure Investment Decisions

Scaling up Climate Finance (Improving The Impact Of Our Interventions)

Peaceful Island Life. Investing in Seychelles climate smart Blue Economy

Austrian Climate Change Workshop Summary Report The Way forward on Climate and Sustainable Finance

AFRICA ADAPTATION INITIATIVE

Key Messages. Climate negotiations can transform global and national financial landscapes. Climate, finance and development are closely linked

Purpose. 2 Third Crossing Business Plan

Climate Finance. Philippines. Helena Gaddi Climate Change Office Climate Change Commission. Session 5: Climate Finance

Green Climate Fund and the Paris Agreement

From Climate Talk to Climate Action: Financing NDCs

Governance and Management

Goal 13. Target number: 13.a

3. The paper draws on existing work and analysis. 4. To ensure that this analysis is beneficial to the

Recent developments on adaptation under the UNFCCC

with GIZ for the Kingdom of Thailand 3 July 2015 NDA Strengthening & Country Programming

SUBMISSION BY DENMARK AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES

Fiji Climate Friendly House Loan Programme. Fiji Fiji Development Bank

Draft Terms of Reference Preparation of a background paper on climate change and natural hazards For the Pacific Possible Report

Informing the global stocktake Inputs fit for purpose

Clean Technology Fund (CTF) Proposal for CTF 2.0

Financing Strategies: A missing link to translate NDCs into action

Cost-Benefit Analysis (CBAs) in the Pacific. NAP process and the P-CBA initiative UNFCCC LEG-NAP Workshop 3-7 th November, Vanuatu

City of Stockton Community Development Department 345 N. El Dorado Street Stockton, CA 95202

Green Climate Fund & Role of National Designated Authority (NDA)

Introduction to economics of climate change. Ankara, 5 September 2016

Summary and Recommendations by the Standing Committee on Finance on the 2016 Biennial Assessment and Overview of Climate Finance Flows

South Africa s Intended Nationally Determined Contribution (INDC), to the United Nations Framework Convention on Climate Change:

Engaging with the Green Climate Fund Ousseynou Nakoulima Director, Country Programming

Organisation strategy for Sweden s cooperation with the Green Climate Fund for

Paris Legally Binding Agreement

Aloysius M. Kamperewera [PhD] Ministry of Environment and Climate Change Managment Director for Environmental Affairs

G20 STUDY GROUP ON CLIMATE FINANCE PROGRESS REPORT. (November )

NEW ZEALAND. Submission to the Ad Hoc Working Group on the Durban Platform for Enhanced Action. Work Stream 1 October 2014

Some Specific Comments on the Co-Chairs Draft Decision. Paragraph and Annex. From China

DRAFT TEXT on. Version 08/12/ :20. Draft text produced under the APA Co-Chairs responsibility

UNCTAD World Investment Forum, Ministerial Round Table, 16/10/2014, 3 to 6 pm, Room XX, Palais des Nations

Integrating climate risk assessment/management/drr into national policies, programmes and sectoral planning. G Midgley, South Africa

Green Finance for Green Growth

Strategies and approaches for long-term climate finance

Strengthening LDC participation & capacity for implementing the Rio Conventions

Infrastructure Financing: the Role of Sustainability and Resilience

Policy Implementation for Enhancing Community. Resilience in Malawi

Goal 13. Target 13.2: Integrate climate change measures into national policies, strategies and planning

Indicative Minimum Benchmarks

GREEN CLIMATE FUND. COP 23 FINTECC Event. Jiwoo Choi. Green Climate Fund November 2017

WORKING PAPER. Budgeting for NDC action: initial lessons from four climate-vulnerable countries. By Neil Bird, Overseas Development Institute

Investment criteria indicators

Session 4 Status of Climate Finance in the Philippines

Launch a Vulnerability Assessment. Building Regional Disaster Resilience

CLIMATE-FRIENDLY ECONOMY: REDUCING EMISSIONS AND LIMITING CLIMATE CHANGE

Green Bond Webinar Questions and Answers

THINGS TO KNOW ABOUT CLIMATE FINANCE IN 2015

Challenges in implementing SDGs, Paris Climate Agreement. Ms. Tuhina Sinha, Asst. Professor, SPA, JNAFAU, Hyderabad

National Climate Laws

with GIZ for the Republic of Peru 29 January 2018 NDA Strengthening & Country Programming

Green Climate Fund: Private Sector Renewable Energy

provide insight into progress in each of these domains.

Decisions of the Board Thirteenth meeting of the Board, June 2016

Regional training workshop pn adaptation for the African Anglophone LDCs (Kigali Rwanda) Success stories in mainstreaming adaptation

Terms of Reference Consultancy for the Assessment of Green Investment Opportunities in Kenya October 2017

The Constitution of Santos is not conducive to the right of shareholders to place resolutions on the agenda of a shareholder meeting.

Tracking Climate Finance

Fact sheet: Financing climate change action Investment and financial flows for a strengthened response to climate change

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC

NEXT STEPS FOR CONVERTING INTENDED NATIONALLY DETERMINED CONTRIBUTIONS INTO ACTION

Submission by Japan Views on agenda item 3 on the Ad Hoc Working Group on the Paris Agreement (4 April 2017)

EUROPEAN COUNCIL Brussels, 26 March Delegations will find attached the conclusions of the European Council (25/26 March 2010).

Business Plan. BC Oil and Gas Research and Innovation Society. April 1, 2017 to March 31, 2020 Version Harbour Road Victoria, BC V9A 0B7

Investment and financial flows example - Tourism. Ankara, 6 September 2016

Adapting to climate change and reducing greenhouse gas

Ready for Climate Finance GIZ s approach for making climate finance work

Agricultural Insurance Markets Development Programme. Colombia IDB

LGUGC Facts Brief History Vision & Mission

The hybrid system would need to apply two sets of rules depending on whether or not the project activity is a SDMO or a SDMI.

Green Bond Workshop. Monitoring, Reporting and Market Aspects. Amal-Lee Amin

MEMBERS' REFERENCE SERVICE LARRDIS LOK SABHA SECRETARIAT, NEW DELHI REFERENCE NOTE. No.25/RN/Ref./July/2017

AGEC 604 Natural Resource Economics

Challenges with climate change financing in the Pacific

Opportunities related to the Green Climate Fund

Summary of the workshop

with UNDP for the Republic of India 29 December 2015 NDA Strengthening & Country Programming

Response to UNFCCC Secretariat request for proposals on: Information on strategies and approaches for mobilizing scaled-up climate finance (COP)

SUPPLEMENTARY INFORMATION

TC workshop on lessons learned from relevant funds and institutions. The Adaptation Fund experience. 12 July 2011

IBERDROLA FRAMEWORK FOR GREEN FINANCING (the Framework )

Transcription:

Prioritization of Climate Change Adaptation Options The Role of Cost-Benefit Analysis Session 1: Introduction to the Nature of Cost- Benefit Analysis Accra (or nearby), Ghana October 25 to 28, 2016

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

After Paris: Adaptation is still needed Global average temperature has already reached 1 C above pre-industrial times in 2015. An additional warming of 0.4-0.5 C is expected as a result of historical emissions. The 1.5 C could be reached by the early 2030s. 195 countries adopted the Paris Agreement on climate change. 83% of the pledges are partially or totally conditional to the use of USD 100 billion per year in financial assistance for their implementation. Ghana s emission reduction goal is to unconditionally lower its GHG emissions by 15% relative to a business-as-usual (BAU) scenario emission of 73.95MtCO2e by 2030. An additional 30% emission reduction is attainable on condition that external support is made available to Ghana.

After Paris: Adaptation is still needed Global average temperature has already reached 1 C above pre-industrial times in 2015. An additional warming of 0.4-0.5 C is expected as a result of historical emissions. The 1.5 C could be reached by the early 2030s. 195 countries adopted the Paris Agreement on climate change. 83% of the pledges are partially or totally conditional to the use of USD 100 billion per year in financial assistance for their implementation. If all pledges are implemented, global GHG emissions will be 33% above the level of what they should be in 2030 to stay below 2C above pre-industrial levels. The 2 C target could be reached by 2050, even if pledges are fully implemented. Source: Universal Ecological Fund. 2016. The Truth about Climate Change.

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

The role of cost-benefit analysis In presence of limited resources, decision makers are left with the difficult problem of evaluating and choosing investment projects and assessing policies in a context of significant complexity and uncertainty. For this purpose, decision makers have a need for a framework which structures information in a way which makes feasible and transparent this process of evaluation and selection.

The role of cost-benefit analysis Cost-benefit analysis provides a means of assessing and comparing the impacts of projects and policies, even when benefits and costs occur over long time horizons. It provides a systematic means to identify, quantify, and wherever possible monetize all impacts of a project or policy (including their environmental impacts), and present these impacts as social costs and social benefits. The role of cost-benefit analysis is to provide information to the decision-maker about the costs and benefits of the project or the policy. The cost-benefit analysis informs decision-makers, does not replace them.

The role of cost-benefit analysis Technically, the cost-benefit analysis 1) Is a process (technique) to compare all the gains and losses resulting from a project or from a policy into a common unit of measurement. 2) Summarizes all positive (benefits) and negative (costs) aspects of a project or policy into one number. 3) The economic analysis of a project (or policy) serves as an organizing framework for stakeholders to discuss the various aspects, both positive and negative, of projects or policies. 4) Aims to provide information about the economic efficiency of a project or policy.

The role of cost-benefit analysis For any given project (or policy), we want to know: Is this a good project (or policy)? For any given group of projects (or policies), we want to know: Which project (or policy) is better? Given a set of options all achieving a given objective, we want to know: Which of these options is better?

The role of cost-benefit analysis However: Good or better for whom? For a project proponent OR for Government OR for society? How do we measure good or better? Proponent s profits OR Government budget OR society s welfare?

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

Economic, financial and fiscal analysis Cost-benefit analysis: Cost-benefit analysis has become a generic term. As its name suggests, it is an analysis which aims to compare the costs and benefits of a project or a policy. The question is: Whose costs and whose benefits? The answer to this question will determine the difference between a financial analysis, a fiscal analysis, or an economic analysis. Economists will generally equate cost-benefit analysis to economic analysis where costs and benefits to society are included in the analysis. However, project proponents also do cost-benefit analysis where costs and benefits to the project components are included in the analysis.

Economic, financial and fiscal analysis Financial analysis: A financial analysis is a cost-benefit analysis but where: The only stakeholder included in the analysis is the developer (or investor). The only costs included in the analysis are the costs of the project to the developer or investor. The only benefits included in the analysis are the benefits to the developer or investor. A financial analysis examines the profitability of a project for the developer of the project or for the investor; it is based on a cash-flow analysis and looks at costs paid by the investor, and revenues received by the investor. The question is: Will the project increase investors wealth?

Economic, financial and fiscal analysis Fiscal analysis: A fiscal analysis is a cost-benefit analysis but where: The only stakeholder included in the analysis is the Government. The only costs included in the analysis are the costs of the project to State budget. The only benefits included in the analysis are the benefits of the project to State budget. A fiscal analysis examines the impacts of the project on government s fiscal (budgetary) position. The question is: What is the impact of the project on Government budget?

Economic, financial and fiscal analysis Economic analysis: An economic analysis is a cost-benefit analysis but where: The stakeholder is all society, not only the developer or investor. The costs included in the analysis are all costs of the project for society resulting from all impacts. The benefits included in the analysis are all benefits of the project for society. The question is: Will this project increase society s well-being (welfare)?

Economic, financial and fiscal analysis Is this a good project? For investor For government For society Private sector Conduct a financial analysis or private costbenefit analysis Public sector Conduct a fiscal analysis Conduct an economic analysis or social costbenefit analysis These 3 types of analyses are very different from one another and will provide different types of information to different types of decision-makers.

Economic, financial and fiscal analysis Common (unfortunate) practices: Often times financial, fiscal, and economic costs and benefits are put in a same table and then added and subtracted with one another and then compared. Often times financial costs to the project developer (such as labor costs and investment costs) are treated as economic benefits to the country. In a large number of cases, project developers (when requesting tax exemptions, fee concessions, or grants) submit a financial analysis of the project not an economic analysis. While these analyses assert to demonstrate how good the project is for the country, in fact they demonstrate how good the project is for the developer.

Economic, financial and fiscal analysis Hence: Before conducting a cost-benefit analysis, a first key step is to ask: what type of cost-benefit analysis or whose point of view will this analysis take? Once an answer is given to the above question, then the analyst must ensure that only those costs and benefits consistent with that point of view are included in the analysis. As mentioned earlier, economists will generally equate costbenefit analysis to economic analysis in which one aims to assess the impacts of the investment project or policy on society s welfare.

Economic, financial and fiscal analysis For example: GIZ. 2016. COST-BENEFIT ANALYSIS OF INDC ADAPTATION AND MITIGATION OPTIONS OF GHANA The Ministry of Environment, Science, Technology and Innovation put together a Technical Committee comprising representatives from Government Ministries and Agencies as well as other stakeholders to review the 20 mitigation and 11 adaptation programme actions. The Committee selected five Priority Actions (four mitigation actions and one adaptation action).

Economic, financial and fiscal analysis Priority 1 INDC Policy Actions Scale up renewable energy penetration by 10% by 2030 Programme of Action Scale up rooftop solar systems to 200,000 households Priority 2 Fuel diversification Fuel diversification in thermal power supply Priority 3 Priority 4 Priority 5 Scale up renewable energy penetration by 10% by 2030 Agriculture resilience building in climate vulnerable landscapes Agriculture resilience building in climate vulnerable landscape Scale-up solar mini-grid to 255 to serve an estimated 1,200 island and lakeside communities Double 10,000 ha annual reforestation/afforestation of degraded lands Promote climate smart agriculture in the savannah landscapes of Ghana

Economic, financial and fiscal analysis The cost-benefit analysis was conducted on these five Priority Actions. What type of cost-benefit analysis was conducted? The following Actions among the five Priority Actions show positive Net Present Values: i) Scale-up rooftop solar systems to 200,000 households; ii) Scale-up solar mini-grid to 255 serve 1,200 island and lakeside communities; and iii) Promote climate-smart agriculture in the savannah landscapes. ( ) and the positive Net Present Values clearly reflect favourable financial returns on the investments that may be made to implement them. So? What type of cost-benefit analysis was conducted? The key limitation of the cost-benefit analysis of the Actions under Ghana s INDC is the lack of disaggregated financial data on the Actions. Seems to be a financial analysis. Let see later..

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

Economic versus cost-effectiveness analysis Cost-effectiveness analysis: When undertaking a cost-effectiveness analysis, we do not ask the question: Is this a good project? Instead, we ask the question: What is the least cost way of achieving the same stream of benefits or the same objective or the same target?

Economic versus cost-effectiveness analysis Example: We must achieve net zero GHG emissions by 2050. Roads must be able to withstand a 1-in-50 flood event. Question is: What is the least cost way of achieving these targets?

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

Economic analysis versus EIA Economic analysis versus EIA: A key difference between a financial and economic analysis is that the economic analysis includes an economic assessment of the environmental impacts of the project or policy. But in order to undertake this economic assessment of the environmental impacts, these impacts have to be identified and where possible quantified. The purpose of EIA is precisely to identify and quantify the environmental impacts of projects. So, EIA is the crucial first step in order to undertake the economic assessment of environmental impacts.

Economic analysis versus EIA Environmental impact assessment Input into Economic assessment of environmental impacts Economic analysis (social cost-benefit analysis) Input into

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

Timing of the economic analysis Timing of the economic analysis Purpose of the analysis Before project During project After project Learning about the expected value of the project, and whether to go ahead or not. Yes. This is most useful. Generally not. Too late. The project has been implemented. Learning about the actual value of the project No. Have to wait for project to be implemented. To some extent. Yes. This is most useful. Learning about the expected value of other similar projects. Generally not. It may provide some information. Yes. Issue will be: How similar?

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

Cost-benefit analysis in practice Requirements to conduct CBA nature exist in numerous countries, including Australia, Canada, Philippines, and the United Kingdom among numerous others. In Asian Development Bank and World Bank All projects submitted to the Board of Management of these institutions must contain an economic analysis of the investment projects. These countries and institutions have developed guidelines to conduct economic analyses. These are freely available on the web.

Economic and financial analysis For Green Climate Fund: All projects must conduct economic analysis. If the project includes activities which may generate revenues (for example a water supply project), then a financial analysis must also be conducted.

Economic and financial analysis 4 pieces of economic analysis in GCF proposal: Section E.6.1 Cost effectiveness and efficiency A short paragraph which reports the estimated NPV. Section F.1 Economic and financial analysis A short but more detailed description of the economic analysis. Appendix XII Complete economic analysis. Excel Spreadsheet

Economic and financial analysis Warning Numerous criteria are used (or should be used, or must be used) to assess projects or policies, such as: The physical or biological impacts; Economic efficiency; Distributional equity; Social and cultural and religious acceptability; Operational practicality; Administrative feasibility; Legality. The economic analysis informs decision-makers and policymakers about the economic efficiency of projects or policies.

Economic and financial analysis Warning Economic efficiency is only one criterion used to decide whether a project should be funded or not. Other criteria are also used. Hence, even if the economic analysis could show a negative NPV, it does not mean that a project should not be supported.

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

Selecting adaptation options Provided that adaptation is still needed, then society faces a number of important questions, including: What is the cost of climate change expected to be for different sectors (e.g. agriculture, water, health, coastal resources, etc.)?

Selecting adaptation options Ghana: Population distribution

Selecting adaptation options 1.4000 % of land impacted (1m SLR) 1.2000 1.0000 0.8000 0.6000 0.4000 0.2000 0.0000 Sub-Saharan countries (per World Bank)

Selecting adaptation options 9.000 % of total population impacted (1m SLR) 8.000 7.000 6.000 5.000 4.000 3.000 2.000 Ghana: Approximately 220,000 people 1.000 0.000 Sub-Saharan countries (per World Bank)

Selecting adaptation options 8.000 % of urban extent impacted (1m SLR) 7.000 6.000 5.000 4.000 3.000 2.000 1.000 0.000 Sub-Saharan countries (per World Bank)

Selecting adaptation options 10.000 % of GDP impacted (1m SLR) 9.000 8.000 7.000 6.000 5.000 4.000 3.000 2.000 1.000 0.000 Sub-Saharan countries (per World Bank)

Selecting adaptation options Provided that adaptation is still needed, then society faces a number of important questions, including: What is the cost of climate change expected to be for different sectors (e.g. agriculture, water, health, coastal resources, etc.)? How much to invest in adaptation? What are the costs and benefits of different adaptation measures? Which adaptation measure to select? What is the appropriate combination of soft measures (policies) and hard measures (infrastructure)? How to account for the cobenefits of ecosystem-based adaptation measures?

Outline of presentation 1) After Paris: Adaptation is still needed 2) The role of cost-benefit analysis 3) Economic, financial, and fiscal analysis 4) Economic versus cost-effectiveness analysis 5) Economic versus environmental impact analysis 6) Timing of the economic analysis 7) Cost-benefit analysis in practice 8) Selecting adaptation options 9) Climate-proofing investment projects

Climate-proofing investment projects A menu of possible decisions: Invest now Be ready and invest later if needed Do nothing and invest later if needed

Climate-proofing investment projects Invest now if: costs of climate-proofing now are relatively small while the expected benefits are estimated to be very large (a low-regret approach), and/or costs of climate-proofing at a later point are expected to be prohibitive, or climate-proofing at a later point in time is technically not possible; and/or among climate-proofing options there exist options which deliver net positive economic benefits regardless of the nature and extent of climate change, including the current climate conditions (a no-regret approach); and/or the set of climate-proofing options includes options which not only reduce project climate risks, but also have other social, environmental or economic benefits (co-benefits). The presence of co-benefits, if any, must be included in the economic analysis of adaptation options.

Climate-proofing investment projects Be ready and invest later if: No climate-proofing investment is needed now, but the project can be designed to accommodate climate-proofing in the future if and when circumstances indicate this to be a better option than not climateproofing. This type of decisions aim to ensure that a project is climate ready.

Climate-proofing investment projects Do nothing and invest later if: costs of climate-proofing now are estimated to be large relative to the expected benefits; and/or costs (in present value terms) of climate-proofing (e.g. retro-fitting) at a later point in time are expected to be no larger than climate-proofing now; and/or expected benefits of climate-proofing are estimated to be relatively small. Note: The decision to do nothing does not come from ignoring climate change, but from rationally deciding out of a technical and economic assessment that the best thing to do for now is to do nothing.

Role of cost-benefit analysis? GROUP DISCUSSION How do you see the role of CBA in your work? What are the barriers and constraints to the use of CBA?

Prioritization of Climate Change Adaptation Options The Role of Cost-Benefit Analysis Session 1: Introduction to the Nature of Cost- Benefit Analysis Accra (or nearby), Ghana October 25 to 28, 2016