Appendix 8h: Approach to cost adjustment claims. Author: Yorkshire Water

Similar documents
Delivering Water 2020: consultation on PR19 methodology Guidance on business plan data tables

Draft price control determination notice: company-specific appendix South West Water

South West Water: focused on PR19 Analyst & Investor Presentation. 15 September 2017

Appendix 13f Financeability analysis Price controls. Appendix 13f: Financeability Price Controls

Establishing a bioresources market in Yorkshire. Proposed RCV allocation

PR19 UPDATE. 4 September 2018

Board assurance of our PR19 business plan resubmission. South Staffs Water (incorporating Cambridge Water)

Financial resilience analysis

Cover sheet. Introduction. Instructions Please select your company from this drop down list: Submission

Appendix 8.1.A Economic Insight report on input cost and frontier shift assumptions. Wessex Water

Appendix 13a: RoRE Risk Analysis

Board assurance of our PR19 business plan. South Staffs Water (incorporating Cambridge Water)

2014 Price Review Business Plan Supporting Appendices Change Protocol. Published 2 December 2013

Appendix RA11 1. Board assurance statement 2. Jacob s independent assurance reports 3. Independent internal audit report.

Cover sheet. Introduction

UNITED UTILITIES PR19 BUSINESS PLAN SUBMISSION

South West Water Business Plan Update Ofwat s Draft Determination

United Utilities Proposed approach to the water resources RCV allocation at PR19

Analytics across the asset life cycle

Balancing Risk & Reward at PR19

A11: Aligning risk and return. Supporting material

Flood Risk Management Planning in Scotland: Arrangements for February 2012

A challenging initial assessment for the water companies in England and Wales

PR19 Business Plan. Water Resources RCV Allocation Submission January 2018

Minute of the first meeting of the Water Forum. Severn Trent Centre, Coventry. 2 March Milo Purcell. Ian Butterfield.

Innovation Centres Monitoring and Evaluation Framework (MEF) Introduction

ACCOUNTING SEPARATION STATEMENT Analysis of Operating and Fixed Asset Costs by Business Unit

Revised budget

Economic asset valuation for the bioresources RCV allocation at PR19

Reporter s Overview of the Northumbrian Water June Return 2011

Solvency II Detailed guidance notes for dry run process. March 2010

A reduction of over 1 billion in expenditure compared to AMP5. Innovation, efficiency and use of market mechanisms are contributors to lower costs.

Accounting Methodology Statement Section 1: Overview Section 2: Reporting Principles Section 3: Allocation Principles Section 4: Capital Expenditure

AMP6 Reporter Annual Performance Report Bristol Water. 13 July 2017

Dee Valley Water plc Year ended 31 March Annual Performance Report - accounting separation and upstream services methodology statement

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

Severn Trent Water Accounting Separation Methodology Statement

Growth Accelerator Guidance

United Utilities Water Limited PR14 Reconciliation Executive Summary and Overview July 2018

Accounting Separation Methodology Accounting Separation Methodology

FORECASTS OF COMMON PERFORMANCE COMMITMENTS

Learning Le cy Document

2. The BCPP collaboration encompasses 13 Funds with combined assets of 36bn (fund valuations at 31 March 2015).

1. INFORMATION NOTE STATUS 2 2. BACKGROUND 2 3. SUMMARY OF CONCLUSIONS 3 4. CONSIDERATIONS 3 5. STARTING POINT 4 6. SHALLOW MARKET ADJUSTMENT 4

B.29[17d] Medium-term planning in government departments: Four-year plans

Statement of Guidance for Licensees seeking approval to use an Internal Capital Model ( ICM ) to calculate the Prescribed Capital Requirement ( PCR )

Hot Topic: Understanding the implications of QIS5

Potential approaches for transition from RPI to CPI (updated)

Appendix 15: Finance tables

Save Money by Saving Carbon

16 January Totex menu choices. Source: Thames Water menu choices. Shares of totex spend calculated based on Ofwat s menu formula.

Principals and their appointed representatives in the general insurance sector

Scottish Police Authority Three Year Financial Plan 2018/19 to 2020/21

PR19 FINAL METHODOLOGY

Economic regulation of capacity expansion at Heathrow: policy update and consultation

Investor summary. Our Fast Track Plan

OUR PLAN Representations on the Draft Determination October 2014 I NN

Dee Valley Water plc Year ended 31 March Annual Performance Report - accounting separation and upstream services methodology statement

Held in the Meeting Room at Henley Campus

Worcestershire County Council 2020 Vision Concept Paper - Self-Sufficient Council

Statement on Climate Change

United Utilities Group PLC. Credit Investor update Summer 2017

Introduction. General assurance processes

performance level - forecast PCL met? forecast forecast outperformance payment or underperformance penalty in-period ODIs

RAG 1.08 Principles and guidelines for regulatory reporting under the new UK GAAP regime

Joint UKRN and ONS lunchtime seminar: Inflation indices in price control decisions

SEED ADVANTAGE EIS FUND INVESTING IN START-UP AND EARLY STAGE COMPANIES

Good Governance when Determining Significant Service Changes Blaenau Gwent County Borough Council

Ministry of Business, Innovation and Employment. Draft Financial Services Legislation Amendment Bill and proposed transitional arrangements

Impact Summary: Making Tax Simpler Improvements to the administration of tax for individuals.

ANNUAL PLAN 2018/19. WEL Energy Trust

Financial Performance Monitoring,

A risk-based approach to setting the baseline for base capital maintenance

Date: Humber NHS Foundation Trust Estate Strategy December 2016 Review. To approve To ratify To consider To note

Chief Constable of North Yorkshire Police

Pricing Cost Assurance and Analysis Service (CAAS) Estimates Constraints

The Annual Audit Letter for Leeds Teaching Hospitals NHS Trust

The Gibraltar Financial Services Commission. Consultation Paper Regulation of personal pension schemes

Cabinet (Performance Management) Panel 12 June 2017

ADB Support to Thailand on the Development of Emissions Trading; Project synopsis

BARNSLEY METROPOLITAN BOROUGH COUNCIL

BARNSLEY METROPOLITAN BOROUGH COUNCIL

Griffith University. Preparing strata title communities for climate change survey: On line questionnaire findings summary for survey respondents

VOLTA RIVER AUTHORITY

eastsussex.gov.uk UK Stewardship Code Statement

THE BOARD OF THE PENSION PROTECTION FUND. Guidance in relation to Contingent Assets. Type A Contingent Assets: Guarantor strength 2018/2019

The Annual Audit Letter for Chorley and South Ribble Clinical Commissioning Group

Greater Bristol Bus Network Major Scheme Business Case. Chapter 1. Developing the Full Approval Major Scheme Business Case

Strategic flood risk management

United Utilities Wholesale Charges A consultation on United Utilities proposed NAV tariff

Statement of Board Assurance provided to the Water Services Regulation Authority Indicative Wholesale charges

Report. by the Comptroller and Auditor General. HM Treasury. Spending Review 2015

Employer Covenant Working Group

11D. DIRECT PROCUREMENT FOR CUSTOMERS BUSINESS CASE: SOUTH LINCOLNSHIRE RESERVOIR

Lloyd s Minimum Standards MS6 Exposure Management

REPORT FROM: Director of Community & Planning OPEN PARAGRAPH NO:

BAILLIE GIFFORD. Governance, Risk Management and Capital Disclosures ( Pillar 3 ) June 2018

Reservoir safety risk assessment a new guide

Study of the market for new appointments and variations summary of findings and next steps

Gas Innovation Reporting Framework

Transcription:

Appendix 8h: Approach to cost adjustment claims Author: Yorkshire Water

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 2 Contents Contents 2 Approach to cost adjustment claims 3 1. Executive summary 3 2. Purpose 3 3. Introduction 3 4. Our Aim 4 5. Regulatory guidance 4 6. Process 5 7. Phase 1 High level assessment 5 8. Phase 2 - Detailed development 6 9. In the round assessment 6 10. Implicit allowance 7 11. Materiality assessment 7 12. Engagement 8 13. Timeline of submissions 9 14. Final cost adjustment claims in our PR19 plan - September 11

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 3 Approach to cost adjustment claims 1. Executive summary We have submitted the following cost adjustment claims as part of PR19 business plan. Table 1: Claims summary table Claims (September) Type Reference Value Appendix Cellared properties Regional operating circumstances YKY WWN+01 105.9m Appendix 8k: Cellared properties Wastewater Growth Atypically large YKY WWN+04 55.3m Appendix 8l: Wastewater growth Bioresources WINEP enhancement expenditure Atypically large YKY BR-01 60.4m Appendix 8m: Bioresources WINEP enhancement expenditure Total = 221.6m All these claims have been subjected to the same process in developing our finalised claims. This also applies to claims that we have explored and not submitted as part of our finalised plan. The process we have followed is set out in this document. 2. Purpose The purpose of this document is to evidence the approach we have taken in developing our cost adjustment claims; submitted as part of our PR19 business plan. This document should be read in conjunction with the following technical appendices: Appendix 8i: In the round assessment of the need for cost adjustment claims, Oxera Cost adjustment claims - Appendix 8k: YKY WWN+01 Cellared properties Cost adjustment claims - Appendix 8l: YKY WWN+04 Wastewater growth Cost adjustment claims - Appendix 8m: YKY BR-01 Bioresources WINEP enhancement expenditure 3. Introduction In assessing, developing and rationalising our cost adjustment claims we have done so being mindful of the updated regulatory guidance, as well as aligning any claim with our customer priorities, in addition to the challenges that have been provided by the

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 4 Yorkshire Forum for Water Customers (YFWC). The claims have been subject to external audit by Jacobs. We understand that the use of cost adjustment claims (formerly special cost factors) should only be applied to exceptional items and that there has been a shift in methodology from PR14 to PR19. Noting this we set ourselves a challenge to only include cost adjustment claims where absolutely necessary. This was embedded in our aim which was agreed and supported by both the YFWC and our Board. 4. Our Aim The aim is to provide well evidenced claims, supported by customers and needed to deliver the services agreed as part of our wider business plan engagement. 5. Regulatory guidance We have based our final cost adjustment claims, i.e. those that have been included within this plan, on the following regulatory guidance: Delivering Water 2020: Our final methodology for the 2019 price review (December 2017) Appendix 11: Securing cost efficiency PR19 final methodology queries and answers (specifically 24 April 2018, query no.269) Information Notice: Price review early submissions on 3 May 2018 for performance commitment definitions and cost adjustment claims (18/02 March 2018) Information Notice: Enhancement expenditure - setting expectations for wellevidenced proposals and clarifying interaction with cost adjustment claims (IN 18/11 June 2018)

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 5 6. Process In understanding any potential cost adjustment claims which we potentially would be submitting as part of our business plan we developed a long list of possible items. This was developed internally with our asset management and operational professionals. The list drawn up considered where there were: Business pressures Regional specific operational issues or factors New or atypical costs in comparison to PR14 Significant requirements. We appraised the initial long list using a two-stage approach. To support us in doing this process we commissioned Stantec and ICS through our PR19 strategic planning partner framework. This supported our assessment and development of claims utilising their asset management, regulatory, and economic expertise to ensure that we only submitted claims that were robust, well evidenced, in the interests of our customers and could meet the regulatory evidential requirements. 7. Phase 1 High level assessment In phase 1 we challenged ourselves to understand in more detail: Is there a case to be made? This initial assessment was to establish whether there is a good, strong and robust argument to be made that a cost adjustment claim is required. This considered, but was not be limited to: Is there a regional circumstance for Yorkshire? Are we materially different to other operating regions including an assessment of whether there is an evidence base to draw upon to support this. Is this new expenditure not captured? Is the base reason for the claim new and as such not evidenced in any historical core cost modelling process, such as that used to determine efficient cost baselines for companies. Historical precedence - Has a claim previously been submitted and if so what was the assessment of the claim. This was used to ensure that we were not submitting claims that have previously received a regulatory assessment that means it is an inappropriate claim.

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 6 Is it likely to be included for in modelling? We considered whether the claim is atypical to any other historical or future expenditure for Yorkshire water and what is expected in the industry. 8. Phase 2 - Detailed development In phase 2 we developed the case where we deemed there maybe one to be made. At this stage we did assume all the claims would be taken to full submission. We started developing the cases and where any limitations were observed these were discounted for our early submission in May. Making the case for a cost adjustment claim We split the evidence criteria into two parts, this reflected our proposal to evidence iteratively as part of our early submission in May and then develop further for the business plan submission in September. This activity included our full assurance and board assurance occurring on our final claims limiting the cost of assurances and ensuring that the focus could be applied to those claims that were most appropriate for our circumstances and our customers. 9. In the round assessment In developing and assessing any cost adjustment claims it is essential to consider top down information and alongside focus on the bottom up claim specific evidence to establish a legitimate need for any cost adjustment claims. To ensure that our claims are required, we commissioned Oxera to undertake an independent in the round assessment of our allowances and cost adjustment claims. The scope of the project was to assess if, based on historical outturn cost modelling, there were allowances that could predicate, or offset, the need for cost adjustment claims. The work was not intended to review or assess the evidence base for any of our claims on an individual basis, it was to assess a general theoretical need based on allowances in the round. The full report is provided in Appendix 8i: An in the round assessment of cost adjustment claims. The conclusion reached was that, with reference to the three final claims being submitted, there was not any compelling evidence to suggest that there are allowances in the round that could offset the need for these claims.

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 7 10. Implicit allowance To assess whether any of our claims contained any implicit allowance we commissioned the support of Economic Insight (EI). Based on the work with EI, and the uncertainty surrounding the treatment of costs within the cost modelling process, it was determined that the best way to approach claim development was to submit all claims on an incremental basis. I.e. the part of the expenditure that is different or atypical, this ensures that there is no implicit allowance already accounted for in cost baselines. We have set out, where readily quantifiable, implicit allowances based on the PR14 approach. 11. Materiality assessment In assessing the materiality of our potential claims, we have used the thresholds that are set out in the final methodology 1. Table 2 shows, by price control, our threshold for materiality based on the Totex values of our plan. Table 2: materiality assessment (general) Control Materiality assessment Business plan Percentage Threshold Water resources 226.4m* 6% 13.6m Water network plus 1,797.6m* 1% 18.0m Wastewater network plus 2,512.3m* 1% 25.1m Bioresources 380.3m* 6% 22.8m Residential retail 262.6m** 4% 10.5m Business retail 38.0m** 6% 2.3m As a percentage of business plan (5-year) net Totex in the respective control. *all costs expressed in 2017/18 prices including RPE consistent with the data tables WS1 and WWS1 ** all costs expressed in outturn prices and IPI to be consistent with the data tables R1 and R5 We have used the above values to satisfy ourselves that the claims we are submitting as part of the business plan are material against the criteria set out in the final methodology documentation. Table 3 shows our final three claims including their value and subsequent materiality assessment as a percentage of the relevant Totex value. 1 Delivering Water 2020: Our final methodology for the 2019 price review, Ofwat, 13 December 2017, pg149

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 8 For completeness we show the materiality gross and net of implicit allowance where we have deemed there may potentially be an allowance already accounted for in the modelling. Table 3: materiality assessment (claims) Claims Materiality assessment Price control Value Materiality (gross) Materiality (net) Cellared properties (WWN+01) Wastewater growth (WWN+04) Wastewater Network Plus Wastewater Network Plus 105.9m 4.2% 4.2% 55.3m 2.2% 1.7% Bioresources WINEP enhancement expenditure (BR-01) Bioresources 60.4m 15.9% 15.9% 12. Engagement 12.1 Customers For all of our indicative cost adjustment claims submitted as part of our early submissions in May we conducted specific customer engagement which was delivered by Qa Research. The results of this engagement for the specific claims submitted as part of our business plan are provided in each claim specific appendices. Due to the uncertainty surrounding the Water Industry National Environment Programme (WINEP), and the impact it has on our expected sludge volumes, we did not submit claim BR-01 in May. In our covering letter we stated that we would review our WINEP3 documentation and submit a claim as part of the business plan should we deem that the impact was material and met the relevant criteria for a cost adjustment claim. Based on further analysis undertaken after May, it was deemed that a claim for the enhancement expenditure incurred because of our Phosphorus removal (P-Removal) requirements in our WINEP was appropriate and necessary. As the claim was dependant on our ongoing engagement with DEFRA and the Environment Agency (EA) we did not include the claim BR-01 in our initial research on cost adjustment claims. However, all claims were included in our secondary research as part of our overall affordability and acceptability testing which gained overall support of 86% 2. 2 Appendix 5a: PR19 Customer and Stakeholder Engagement.

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 9 12.2 The Yorkshire Forum for Water Customers (YFWC) We have continuously engaged with the YFWC regarding our cost adjustment claims explored for inclusion as part of our business plan. It was crucial that we involved the YFWC to enable valid challenge on an ongoing basis regarding the suitability of our claims. We have received robust and challenging engagement from the YFWC which has led to our claims being revised to reflect our final three claims submitted as part of the plan. Challenge from the YFWC led to that our claim relating to a new customer resolution management system not being progressed. The YFWC felt that the cost of the claim did not reflect good value for money and didn t sufficiently represent our customers priorities. Additionally, the cost of our claims has been significantly reduced based on the challenges that the YFWC has lodged based on affordability to customers. Of the claims submitted in May that have progressed to full submission the costs have been revised as follows: Table 4: Revised claim values, from early submission to final claims Claims Claim Value May September** Cellared properties (WWN+01) 150.6m 105.9m** Wastewater growth (WWN+04) 54.6m 55.3m** ( 42.7m+**) Bioresources WINEP enhancement expenditure (BR-01) + Net of implicit allowance **inclusive of real price effects N/a 60.4m** 13. Timeline of submissions 13.1 Before May Prior to the submission of our indicative cost adjustment claims in May we progressed with the developing the following claims based on the process set out. For the avoidance of doubt, we did not formally submit any of these claims at any stage whether that be early submission in May or as part of the formal business plan submission.

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 10 Table 5: All claims actively explored Claims Type Reason for not progressing HS2 Mains Diversions Withernsea WWTW relocation *IT Customer resolution management system (CRM) Growth (water) Flood resilience of YW assets WINEP Clean Atypically large Regional operating circumstances Atypically large Atypically large Material new costs Atypically large Materiality - Claim assessed as being immaterial against the increased materiality thresholds set for PR19 Materiality - Claim assessed as being immaterial against the increased materiality thresholds set for PR19 Customer Priority - Challenges from our Forum, the Yorkshire Forum for Water Customers. We did not progress the claim as it was not supported or deemed to be a priority for our customers. Materiality - Claim assessed as being immaterial against the increased materiality thresholds set for PR19 Need for cost adjustment The narrative supporting how different or special our scenario is, was not strong enough. Cost could potentially be offset Materiality - Claim assessed as being immaterial against the increased materiality thresholds set for PR19 13.2 Indicative cost adjustment claims submitted in May As part of our early submissions in May we submitted the cost adjustment claims shown in table 6. Table 6: Early submission claims Claims submitted Type Claim reference Value Reason for not progressing Cellared properties Hull and Haltemprice Growth (wastewater) Raw water quality Leakage Regional operating circumstances Regional operating circumstances Atypically large Regional operating circumstances Atypically large WWN+01 150.6m N/a progressed to full claim. WWN+02 30.0m Materiality consideration -whilst the claim is still material we have challenged ourselves to assess whether the pressure can be managed in the round. WWN+04 54.6m N/a progressed to full claim. WN+01 73.5m Regulatory treatment This is efficient enhancement expenditure and as such should be remunerated outside of core cost modelling. WN+02 224.7m Regulatory treatment This is efficient enhancement expenditure and as such should be fairly remunerated outside of core cost modelling. Total 533.4m

Yorkshire Water PR19 Submission Appendix 8h: Approach to cost adjustment claims 11 14. Final cost adjustment claims in our PR19 plan - September We committed to further refining and evidencing the claims identified to challenge ourselves further to only submit claims as part of the formal business plan that were absolutely necessary. The extract below is from our covering letter submitted as part of the early submission in May: We will continue to develop our cost adjustment claims submission between now and our business plan submission in September. This early submission represents the completed work done to date and as such our claims at this point are being considered on that basis only. Subsequent work undertaken between now and September will be considered and submitted as appropriate. Therefore, our list of cost adjustment claims (if any) as part of our formal business plan submission may differ from those outlined in this submission. We will continue to challenge ourselves rigorously in this area to ensure that we are asking only for cost adjustment claims where necessary. Our aim for the final submission as part of our business plan in September is to provide well evidenced claims, supported by customers and needed to deliver the services agreed as part of our wider business plan engagement 3. The output of work undertaken between May submission is that we are including three cost adjustment claims as part of our business plan submission. These are identified in table 7. Of those claims submitted in May, but not submitted as part of the final business plan we have outlined the reason for the removal in table 6 on the previous page. Table 7: Final cost adjustment claims Claims (September) Type Reference Value Cellared properties Regional operating circumstances WWN+01 105.9m Wastewater growth Atypically large WWN+04 55.3m Bioresources WINEP enhancement expenditure Atypically large BR-01 60.4m Total 221.6m 3 Early submission of cost adjustment claims for PR19, Yorkshire Water, 3 May 2018