GOLD RESERVES INCREASED BY 155% TO 2.15 MILLION OUNCES AT SIMBERI GOLD PROJECT

Similar documents
SIGNIFICANT GOLD INTERCEPTS AT PIGIBO PROSPECT

31 December 2008 Half Year Financial Report

ALLIED GOLD MINING PLC ALLIED GOLD REPORT FOR QUARTER AND HALF YEAR 30 JUNE

Investor Roadshow November Mark Caruso Executive Chairman Frank Terranova Chief Financial Officer

Allied Gold. growing strong ~200,000ozpa producer in waiting six months to go. Allied Gold Limited Investor Presentation September

For personal use only

RNI INCREASES GROSVENOR GOLD ORE RESERVES TO 523,000oz

West African Resources awards underground mining contract for M1 South to Byrnecut

For personal use only

For personal use only

AZUMAH MINING LEASES GRANTED

Paulsens Project resource soars 41% to 318,000oz as 2012 surplus cashflow forecast hits $35m

RAMELIUS TAKEOVER OFFER FOR EXPLAURUM LTD

For personal use only

MEDIA RELEASE. OCEANAGOLD HAILE OPTIMISATION STUDY DELIVERS ENHANCED VALUE (All financial figures in US Dollars unless otherwise stated)

For personal use only

ASX ANNOUNCEMENT QUARTERLY REPORT PERIOD ENDED 30 SEPTEMBER 2017 SUMMARY. 31 October ASX Code: HOR. Management

TUNKILLIA GOLD PROJECT

For personal use only

KBL Mining Limited (ASX: KBL) Investor Presentation October KBL Mining Limited : : Investor Presentation

ASX Announcement $26M CAPITAL RAISING TO POSITION BLACKHAM FOR TRANSITION TO +100,000OZ PER ANNUM GOLD PRODUCER 1

For personal use only

For personal use only

Hot Chili Arranges Capital Raising of up to $35.5 Million with Strong Support

12,178gpt intersection at Paulsens

Quarterly Activities Report Quarter Ended 30 June 2017

A New Growth Story in Western Australian Gold

CRUSADER RESOURCES LIMITED ABN: HALF-YEAR REPORT FOR THE HALF-YEAR ENDED 31 DECEMBER 2012

Emerging Producer in the. Murchison Goldfields

For personal use only

Company Announcements Office. PNG Chamber of Mines and Petroleum Mining Seminar Wafi-Golpu Joint Venture

Mine Gold. Create Value. Full Year Results for the year ending 30 June 2017

Overview. ASX Release Monday 10 December ASX Code: SAU

TIRIS URANIUM PROJECT EXPLOITATION LICENCE GRANTED KEY MILESTONE ACHIEVED FOR PROJECT MOMENTUM FOR DEVELOPMENT BUILDING

June 2016 Annual Results Webcast

Celebrating 21 years of African gold mining. Presentation by Lee-Anne de Bruin, Chief Financial Officer Mining Indaba 2018, Cape Town

SOUTHERNGOLD GOLD PRODUCER. Cannon Mine, Early February 2016 ASX Ticker: SAU

PRODUCING AND EXPLORING Q WEBCAST

For personal use only

Agreement to Acquire Remaining Interest in the Golden Ridge Gold and Nickel Project

For personal use only. Investor presentation

FORREST GIMP COPPER-GOLD DISCOVERY UPDATE

A$37M INSTITUTIONAL PLACEMENT TO ACCELERATE EXPLORATION PROGRAMS AT WESTRALIA AND CAMERON WELL AND EXTINGUISH JUPITER LIFE OF MINE ROYALTY OBLIGATION

INVESTOR PRESENTATION March 2017

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018

For personal use only Updated Announcement - Acquisition of an Advanced Gold Project in Haiti

For personal use only

GOLD IN SENEGAL. For personal use only. Investor Presentation - July 2012

For personal use only

20% Increase in T3 Feasibility Study Plant Throughput to 3Mtpa

KBL Mining Limited (ASX: KBL) Presentation May 2015 Resources Investment Symposium BROKEN HILL

BOSS FINALISES EARN IN AGREEMENT WITH GRYPHON MINERALS

For personal use only

For personal use only. Burkina Faso ASX:MET. The Gold Symposium. Sydney (14-15 November 2011)

ASX ANNOUNCEMENT 18 SEPTEMBER More High Grade Results at the Zara Gold Project in Eritrea

June 2014 Quarterly Results. Sandeep Biswas Managing Director & Chief Executive Officer

INVESTOR PRESENTATION

For personal use only

For personal use only ABN

For personal use only

PMI Targets Maiden Gold Resource for Dynamite Hill After Further High Grade Hits

RAMELIUS APPROVES VIVIEN GOLD MINE

SOUTHERNGOLD. Compelling Value in a Unique Gold Explorer. ASX Ticker: SAU

TAMPIA GOLD PROJECT FEASIBILITY STUDY

Press Release 31 January 2018

FOCUS MINERALS LIMITED

Building a quality gold business. Mark Clark

For personal use only

PNG Mining and Petroleum Conference

Resource and Investment NL ASX: RNI Paydirt s Gold Conference Presentation 3 April 2014

September 2014 Quarterly Results

SYDNEY MINING CLUB FEBRUARY 2019 DUNCAN GIBBS MANAGING DIRECTOR & CEO

CONSOLIDATED ZINC LIMITED ACN INTERIM FINANCIAL REPORT FOR THE HALF YEAR ENDED 31 DECEMBER 2017

For personal use only

For personal use only

ASX RELEASE 28 February, Half Year Ended 31 December 2006

For personal use only

Dragon Mining A Decade of Nordic Gold Production

FY18 guidance upgraded as record production sees cash and equivalents rise 22% to A$102m

Low capital development cost and high grades maximise free cash flow

For personal use only

QUARTERLY REPORT APRIL TO JUNE 2014

For personal use only

MERGER PRESENTATION JULY 2018

For personal use only

QUARTERLY REPORT OCTOBER TO DECEMBER 2014

For personal use only

December 2015 Half Year Results Webcast 25 February 2016

BULLETIN RESOURCES LIMITED ACN HALF-YEAR FINANCIAL REPORT 31 DECEMBER 2018

For personal use only

An Australian gold miner for global investors Macquarie Securities Conference - May 2018

Resource and Investment NL ASX: RNI November 2013 AGM Presentation

For personal use only

For personal use only

Diggers & Dealers Forum

INVESTOR PRESENTATION

Kingsgate Consolidated Limited

Graynic Completes Joint Venture for Central American Nickel Assets

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017

For personal use only

Transcription:

ASX:ALD TSX:ALG AIM:AGLD 10 September 2010 Media Release This press release is not for dissemination in the United States and shall not be disseminated to United States news services. GOLD RESERVES INCREASED BY 155% TO 2.15 MILLION OUNCES AT SIMBERI GOLD PROJECT H I G H L I G H T S Extensive drilling programme over the past 18 months has resulted in a substantial increase of 1.31 million ounces of gold ore, equivalent to a 155% increase in Proven and Probable Reserves Total Proven and Probable Reserves by material types are now: Oxide - 26.3M/t at 1.03g/t Transitional - 4.5M/t at 1.11g/t Sulphide 15.1M/t at 2.31g/t Increased Reserves to underpin current Oxide plant expansion and delivery of Sulphide Pre-Feasibility Study expected to be completed by the end of this month Ongoing exploration program aims to focus on testing known Sulphide and Oxide mineralisation at Sorowar, Pigiput, Pigibo and Samat which remain open Group Reserves increased to 3.43 million ounces

Allied Gold (ASX:ALD, TSX:ALG, AIM:AGLD) has received new Proven and Probable Reserve Estimates for the Simberi Island gold deposits from consultants Golder Associates totalling 45.9Mt @ 1.46g/t Au for 2.15 million ounces of contained gold. This is a substantial increase of 1.31 million ounces of gold ore equivalent to a 155% increase in Reserves. Previous Proven and Probable Reserves (September 2009) were reported as 22.0 million tonnes at 1.19g/t Au for 0.84 million ounces of contained gold. Simberi Reserves Comparison 2009-2010 Material Type September 2009 September 2010 Proven Probable Total (Mt) Au (g/t) (Mt) Au (g/t) (Mt) Au (g/t) Proven Probable Total (Mt) Au (g/t) (Mt) Au (g/t) (Mt) Au (g/t) Oxide 11.11 1.21 8.55 1.15 19.66 1.18 11.29 1.05 14.99 1.01 26.28 1.03 Transitional 0.58 1.10 0.67 1.43 1.25 1.27 0.55 1.08 3.95 1.11 4.50 1.11 Sulphide 0.38 1.10 0.74 1.49 1.12 1.36 0.38 1.1 14.69 2.34 15.07 2.31 Total 12.06 1.20 9.96 1.19 22.03 1.19 12.23 1.06 33.62 1.60 45.85 1.46 Exploration drilling completed over the past 18 months, with results previously reported to market, has identified these substantial increases in both oxide and sulphide ore types. The access to sulphide ore at the Pigiput/Pigibo deposits requires the removal of the overlying oxide and transitional ores which collectively total approximately 19Mt. The company has budgeted exploration expenditure of A$8 million for FY 2011 to undertake 20,000 meters of Core and 40,000 meters of RC drilling. The focus will be targeting pit edge oxides at the Sorowar deposit and underlying sulphide mineralisation at Pigiput, Pigibo and Sorowar, as well as testing the possible link between the Samat North and Samat East deposits. In order to take advantage of these additional reserves and to allow quicker access to the underlying sulphide ore, the company is currently expanding the oxide process plant from 2.0Mtpa to 3.5Mtpa. In addition to these sulphide Reserves, the Sorowar deposit has approximately 14Mt of ore (including minor transitional and sulphides) that are yet to be mined. On completion of the oxide expansion in 2011, this will equate to a minimum of 10 year oxide mine life to produced annualised average production of approximately 100,000 ounces. The sulphide Reserves at Pigiput/Pigibo with a minor contribution from the Samat deposit amounts to approximately 15Mt of ore. A pre-feasibility study on the development of the sulphide Mineral Resources will be completed in September 2010. This study is evaluating a 1.5Mtpa sulphide operation that involves roasting of a concentrate to produce an annualised life of mine average of approximately 90,000 ounces over 10 years. The Mineral Reserves and the Inferred Resources within the pit design, categorised by material type are summarised in the table on the next page. The location of the pits are shown on the plan following the table.

Table 1: Mineral Reserve and Inferred Resource by Material Type Classification Oxide Transition Sulphide Total Ore Au Au Au Au (Mt) (g/t) (Mt) (g/t) (Mt) (g/t) (Mt) (g/t) Sorowar Proven 6.45 1.22 0.55 1.08 0.38 1.1 7.38 1.2 Probable 5.59 1.17 0.52 1.29 0.74 1.49 6.85 1.21 Total Mineral Reserves 12.04 1.2 1.08 1.18 1.12 1.36 14.23 1.21 Inferred Resource 0.45 0.84 0 0.82 0.06 1.39 0.51 0.9 Pigiput Proven 4.11 0.74 4.11 0.74 Probable 5.51 0.82 1.67 0.86 12.51 2.39 19.69 1.82 Total Mineral Reserves 9.62 0.79 1.67 0.86 12.51 2.39 23.8 1.64 Inferred Resource 1.79 0.62 0.34 0.71 1.02 2.33 3.15 1.18 Samat Proven Probable 0.33 1.13 0.11 2.74 1.01 2.38 1.45 2.12 Total Mineral Reserves 0.33 1.13 0.11 2.74 1.01 2.38 1.45 2.12 Inferred Resource 0.03 1.09 0 0.53 0 1.62 0.03 1.1 Botlu South Proven 0.74 1.35 0.74 1.35 Probable 0.12 1.61 0.12 1.61 Total Mineral Reserves 0.86 1.39 0 0 0.86 1.39 Inferred Resource 0.02 1.4 0.02 1.4 Pigibo Proven Probable 3.43 1 1.65 1.21 0.43 2.04 5.51 1.14 Total Mineral Reserves 3.43 1 1.65 1.21 0.43 2.04 5.51 1.14 Inferred Resource 0.58 0.77 0.02 0.63 0.6 0.77 Total Proven 11.29 1.05 0.55 1.08 0.38 1.1 12.23 1.06 Probable 14.99 1.01 3.95 1.11 14.69 2.34 33.62 1.6 Total Mineral Reserves 26.28 1.03 4.5 1.11 15.07 2.31 45.85 1.46 Inferred Resource 2.87 0.69 0.36 0.71 1.08 2.28 4.31 1.09

Simberi mineral deposits and 2009-2010 exploration drill holes

Proven and Probable gold Reserves (NI 43-101 Compliant) for the group totals 3.43 million ounces as indicated in the table below. Allied Gold Group Reserves Proven Probable Total Proven+Probable Mine (Mt) Au (g/t) Au (koz) (Mt) Au (g/t) Au (koz) (Mt) Au (g/t) Au (koz) Gold Ridge 23.25 1.71 1,282 23.25 1.71 1,282 Simberi 12.23 1.06 417 33.62 1.60 1,732 45.85 1.46 2,149 Total 12.23 1.06 417 56.87 1.65 3,014 69.10 1.54 3,431 Note discrepancies due to rounding Yours faithfully ALLIED GOLD LIMITED Mark V. Caruso Executive Chairman For more details, please contact: Mr Mark Caruso Executive Chairman +61 8 9356 2776 Mr Frank Terranova Chief Financial Officer +61 7 3252 5911 Mr Simon Jemison Investor Relations & Media + 61 7 3252 5911 / 0418 853 922 Ms. Rebecca Greco Investor Relations, North America +1 416 839 8610

Board of Directors: Mark Caruso Executive Chairman & CEO Monty House Non Executive Director Tony Lowrie Non Executive Director Greg Steemson Non Executive Director Sean Harvey Non Executive Director Frank Terranova Executive Director & CFO Peter Torre Company Secretary Competent Persons The information in this Stock Exchange Announcement that relates to Mineral Exploration results and Mineral Resources, together with any related assessments and interpretations, have been verified by and approved for release by Mr C R Hastings, MSc, BSc, M.Aus.I.M.M., a qualified geologist and full-time employee of the Company. Mr Hastings has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hastings consents to the inclusion of the information contained in this ASX release in the form and context in which it appears. Mr. C. R. Hastings is also a Qualified Person as defined by Canadian National Instrument 43-101. The information in this Stock Exchange Announcement that relates to Mineral Reserves has been compiled by Mr J Battista of Golder Associates who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Battista has had sufficient experience in Ore Resource estimation relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Battista consents to the inclusion of the information contained in this ASX release in the form and context in which it appears. ASX Code: ALD AIM Code: AGLD TSX Code: ALG Principal Office 34 Douglas Street Milton, Queensland 4064 Telephone +61 7 3252 5911 Facsimile +61 7 3252 3552 Email info@alliedgold.com.au Website: www.alliedgold.com.au Postal Address PO Box 2019, Milton 4064 Registered Office Unit B9, 431 Roberts Road Subiaco, WA 6008 Forward-Looking Statements This press release contains forward-looking statements concerning the projects owned by Allied Gold. Statements concerning mineral reserves and resources may also be deemed to be forward-looking statements in that they involve estimates, based on certain assumptions, of the mineralisation that will be found if and when a deposit is developed and mined. Forward-looking statements are not statements of historical fact, and actual events or results may differ materially from those described in the forward-looking statements, as the result of a variety of risks, uncertainties and other factors, involved in the mining industry generally and the particular properties in which Allied has an interest, such as fluctuation in gold prices; uncertainties involved in interpreting drilling results and other tests; the uncertainty of financial projections and cost estimates; the possibility of cost overruns, accidents, strikes, delays and other problems in development projects, the uncertain availability of financing and uncertainties as to terms of any financings completed; uncertainties relating to environmental risks and government approvals, and possible political instability or changes in government policy in jurisdictions in which properties are located. Forward-looking statements are based on management s beliefs, opinions and estimates as of the date they are made, and no obligation is assumed to update forward-looking statements if these beliefs, opinions or estimates should change or to reflect other future developments. Share Registry Computershare Investor Services Level 2, Reserve Bank Building 45 St Georges Terrace Perth, Western Australia WA 6000 Not an offer of securities or solicitation of a proxy This communication is not a solicitation of a proxy from any security holder of Allied Gold, nor is this communication an offer to purchase or a solicitation to sell securities. Any offer will be made only through an information circular or proxy statement or similar document. Investors and security holders are strongly advised to read such document regarding the proposed business combination referred to in this communication, if and when such document is filed and becomes available, because it will contain important information. Any such document would be filed by Allied Gold with the Australian Securities and Investments Commission, the Australian Stock Exchange and with the U.S. Securities and Exchange Commission (SEC).

BACKGROUND Allied Gold Limited s gold production and exploration development portfolio is centred on Simberi and the Tabar Islands of Papua New Guinea and the Gold Ridge Project located on the Island of Guadalcanal in the Solomon Islands. Simberi is approximately 60 kilometres from Lihir Island which hosts a plus 40 million ounce gold resource, (see diagram below). In 2009-2010, Allied produced 64,327 ounces of gold. Construction has commenced on expansion of the oxide plant at Simberi from 2Mtpa to 3.5Mtpa to increase life of mine annualised production to 95,000 oz. Redevelopment of the Gold Ridge Mine in the Solomon Islands will be completed first quarter 2011 and contribute additional life of mine annualised production of approximately 125,000 oz. A study focused on the feasibility of development of the sulphide resources at Simberi is looking at the optional configuration for an additional 90,000 oz pa sulphide operation. Total group combined Measured, Indicated and Inferred Resources stand at 7.8Moz. Simberi currently hosts Measured, Indicated and Inferred mineral resources of approximately 5.7 million ounces of gold. Gold Ridge hosts approximately 2.11Moz of Measured, Indicated and Inferred resources. Group Reserves (Proven and Probable) total 3.43 million ounces including 2.15 million ounces at Simberi and 1.28 million ounces at Gold Ridge respectively. Allied Gold currently owns 100% of Simberi and 100% of the EL on the nearby Tatau and Big Tabar Islands covering a total area of 170km 2. Allied holds an additional 130km 2 of exploration tenure in the Solomon Islands.