Before the MP Electricity Regulatory Commission

Similar documents
MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, E-5 Arera Colony, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, E-5 Arera Colony, Bhopal

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL.

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, BHOPAL.

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY *********

Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

The Chief Engineer Maharashtra State Load Despatch Center Phone Fax Executive Summary MSLDC s Budget

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

Petition No. 05 of 2016

Case No. 30 of In the matter of Petition filed by MSETCL for approval of SLDC Budget for FY and FY

Order on. Petition No. 21/2014

Bhopal: Dated 5 th May 2006

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos.

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2007 to March 2008

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

ORDER ON TRUE-UP OF ARR FOR THE PERIOD April 06 to March 07

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

Multi Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19

M.P. Power Transmission Company Ltd., Jabalpur Blok No. 2, Shakti Bhawan, Rampur, Jabalpur Petitioner. V/s

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015

State Load Dispatch Centre (SLDC)

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Jharkhand State Electricity Regulatory Commission

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS,

MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD., BHOPAL

Madhya Gujarat Vij Company Ltd.

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

FINANCIAL MANAGEMENT ASSESSMENT AND PROJECTIONS

FILED BY MEGHALAYA POWER DISTRIBUTION CORPORATION LIMITED. Lum Jingshai, Short Round Road, Shillong

Madhya Gujarat Vij Company Ltd.

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016

TARIFF ORDER

M.P. Electricity Regulatory Commission Bhopal

MADHYA PRADESH PASCHIM KSHETRA VIDYUT VITARAN COMPANY LTD., INDORE

Uttar Pradesh Electricity Regulatory Commission

3.1 In FY , the transmission loss is 4.08% as compared to last year loss

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

Submitted to. Maharashtra Electricity Regulatory Commission. Mumbai

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2012 to March 2013

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal

Vidarbha Industries Power Limited - Transmission

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST)

1Pl r ~1~r11rtr. ~~ ~.nz. I. ~ fcr'lljll ' '-'1\:\:1 ' ~' ~ 18 ~ 2011

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2017 HESCOM ANNUAL PERFORMANCE REVIEW FOR FY16

Case No. 38 of Shri Vijay L. Sonavane, Member Smt. Chandra Iyengar, Member

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

ANNUAL REVENUE REQUIREMENT & FY

Case No. 24 of In the matter of Application of Reliance Infrastructure Ltd. for Amendment of Transmission Licence No.

M.P. Electricity Regulatory Commission Bhopal

Paschim Gujarat Vij Company Ltd.

For approval of R&M scheme of BTG of Parichha Unit-1.

2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No.

BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

M.P. Electricity Regulatory Commission Bhopal

Uttar Pradesh Electricity Regulatory Commission

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ************

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)

MYT PETITION FOR JUBILANT INFRASTRUCTURE LTD

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal

KARNATAKA ELECTRICITY REGULATORY COMMISSION TARIFF ORDER 2018 BESCOM ANNUAL PERFORMANCE REVIEW FOR FY17

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

MADHYA PRADESH STATE ELECTRICITY BOARD

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH PASCHIM KSHETRA VIDYUT VITARAN COMPANY LTD., INDORE

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

Bhopal Dated : 5th October 2004

Gujarat Energy Transmission Corporation Limited (GETCO)

BEFORE THE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL PETITION NO. 10 OF 2018

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

Madhya Gujarat Vij Company Ltd.

GOVERNMENT OF MADHYA PRADESH

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14

In the matter of Retrospective Recovery regarding IT/ITES Consumer

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 60 / 13-14

Case No. 47 of In the matter of

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION HYDERABAD. Date : Present. Sri. K. Swaminathan, Chairman. Sri. Surinder Pal, Member

KERALA STATE ELECTRICITY REGULATORY COMMISSION

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

Transcription:

Before the MP Electricity Regulatory Commission Filling No. Petition No. IN THE MATTER OF LEVY AND COLLECTION OF FEE AND CHARGES BY STATE LOAD DESPATCH CENTRE (SLDC) JABALPUR FOR THE YEAR 2019-20 AND IN THE MATTER OF STATE LOAD DESPATCH CENTRE, MPPTCL, NAYAGAON, P.O VIDYUT NAGAR, RAMPUR, JABALPUR. 482 008. THE PETITIONER AND 1. M.P.POORVA KSHETRA VIDYUT VITARAN CO. LTD, JABALPUR, BLOCK NO-6, G, SHAKTI BHAWAN, RAMPUR, JABALPUR 2. M.P. MADHYA KSHETRA VIDYUT VITARAN CO. LTD BHOPAL, NISHTHA PARISAR, BIJLI NAGAR, GOVINDPURA, BHOPAL 462 023 3. M.P. PASCHIM KSHETRA VIDYUT VITARAN CO. LTD, INDORE, GPS CAMPUS, POLOGROUND, INDORE. 452 003 4. M.P. AUDYOGIK KENDRA VIKAS NIGAM (INDORE) LTD. (A GOVT OF MP UNDERTAKING SUBSIDIARY OF MPSIDC), FREE PRESS HOUSE, FIRST FLOOR, 3/54, PRESS COMPLEX, A.B. ROAD, INDORE 452 008 (MP) 5. CHIEF ELECTRICAL DISTRIBUTION ENGINEER, GENERAL MANAGER S OFFICE, ELECTRICAL DEPT., WEST CENTRAL RAILWAY, JABALPUR-482001 6. M.P. POWER MANAGEMENT COMPANY LTD., JABALPUR BLOCK NO-16,SHAKTI BHAWAN, RAMPUR, JABALPUR 482008 7. M.P. POWER TRANSMISSION COMPANY LIMITED JABALPUR, BLOCK NO-2, FIRST FLOOR, SHAKTI BHAWAN, RAMPUR, JABALPUR. 8. KALPATARU SATPURA TRANSCO PVT LTD. 101, PART III, G.I.D.C ESTATE, SECTOR-28, GANDHINAGAR, GUJRAT, 382028 9. M.P. POWER GENERATING COMPANY, LTD, BLOCK NO-9, 1 st Floor, SHAKTI BHAWAN, RAMPUR, JABALPUR. 482 008. 10. NARMADA HYDERO-ELECTRIC DEVELOPMENT CORPORATION LTD, BHOPAL, NHDC SQUARE, BLOCK-2, 5TH FLOOR, PRYAVAS BHAWAN, ARERA HILLS, BHOPAL 462 011. 11. NARMADA VALLEY DEVELOPMENT AUTHORITY, NARMADA BHAWAN, 59, ARERA HILLS, BHOPAL 462-011. 3

12. JAIPRAKASH POWER VENTURES LTD, SECTOR-128, NOIDA-201304 UTTAR PRADESH 13. BLA POWER PRIVATE LIMITED, 84, MARKER CHAMBERS III, NARIMAN POINT, MUMBAI-400021.. RESPONDENTS The petitioner most respectfully submits as under :- 1.0 That I, R.K. Gupta, aged about 51 years, S/o Shri N.D. Gupta, do hereby solemnly affirm and declare that I am Superintending Engineer in the office of the Chief Engineer, State Load Despatch Centre, Madhya Pradesh Power Transmission Co. Ltd., Jabalpur (M.P) and duly authorised by SLDC as OIC in the case. 2.0 That the applicant State Load Despatch Centre, hereinafter called SLDC, is the apex body for scheduling and system operation in the State of MP incorporated under Section 31 of Electricity Act 2003. In exercise of the Powers conferred under Section 31(1) of Electricity Act-2003 (Central Act 36 of 2003), the Government of MP vide order No 2489/13/04 dated 17-05-2004 has notified the State Load Despatch Centre, Jabalpur as apex body to ensure integrated operation of the power system in the state, to be operated by the State Transmission Utility, hereinafter called as STU. 3.0 That in pursuance to section 32(3) of Indian Electricity Act 2003, Hon ble Commission through its Regulation has directed the SLDC to file a petition in the matter of levy and collection of fee and charges by State Load Despatch Centre (SLDC) Jabalpur. 4.0 That as per section 32(3) of IE Act 2003, the SLDC may levy and collect such fee and charges from the generating companies and licensees engaged in intra-state transmission of electricity as may be specified by the State commission. However, the Ministry of Power, Govt of India, in exercise of powers conferred under section 183 of the Electricity Act 2003, issued an order for Removal of Difficulties on 8 th June 2005 (S.O. 795(E)) in respect of levy and collection of fees and charges for using the transmission systems. As per the order, the State Load Despatch Centre may levy and 4

collect such fee and charges from the licensees using the intra-state transmission system as may be specified by the State Commission. 5.0 That this application for approval of SLDC fee and charges for the year 2019-20 is hereby submitted as per Madhya Pradesh Electricity Regulatory Commission (Levy and Collection of Fee and Charges by State Load Despatch Centre ) Regulations, 2004 Revision-1, 2006 ( Third Amendment ) notified on 19 th Nov 2010. 6.0 EMPLOYEE POSITION AT SLDC & SUB-LDCS : The Load Despatch Centre is carrying out the function of system operation and control in the State. The employee position as on 30 th September 2018 is total 152 sanctioned posts and 100 working strength in all the cadres which also include one post of Executive Finance and one post of OA-GR-III on contract basis at SLDC, one post of Junior Engineer and one post of OA-GR-III on contract basis posted at Sub- LDC Indore and one post of Testing Attendant on contract basis at Backup SLDC Bhopal & Sub-LDC Indore. It is submitted that The Addl.CE is given current charge of CE, one SE is given current charge of Addl C.E, One EE is given Current charge of SE and also two AEs & two JEs is given current charge of EE & AE respectively. Towards projection of salary for the FY 2019-20, It is submitted that projection toward salary of one executive trainee shall also considered which is likely to posted in SLDC in the month of November-2018. The detail of sanctioned, working and vacant position in SLDC as on 30-09- 2018 is Annexed in Annexure OC1. 7.0 The projections of SLDC Fee and Charges for FY 2019-20, under various heads and the information related to various formats of the regulation are mentioned hereunder:- 7.1 EMPLOYEE COST : The employee cost for FY 19-20 has been worked out for the working strength at SLDC & Sub-LDCs as on 30-09-2018 As per recommendations of Manpower, Certification and Incentive for system operation and ring fencing Load Despatch Centers, basic level training and specialist level Certification course for Load Despatch 5

system operation is carried out continuously. Accordingly, lumsum projection for training & certification fees for specialist level and management level training programs and various workshop, training etc. has been made during FY 2019-20. As per recommendation of Pradhan Committee constituted for Man Power Certification and Incentives for System Operation and Ring Fencing Load Despatch centre, the engineers who have completed training are to be considered for certification linked incentive. However, provision for certification based incentive is not made in employee cost for FY 2019-20 and it is proposed that the same shall be adjusted in true up, if required to be paid. Further, it is submitted that the as per Chief Engineer (HR &A), MPPTCL Order No. म.प र.प.ट.क.ल./ई-6/41 1 6 dated 29.12.2017, 7 th Pay commission has been implemented from 1 st January 2016. Accordingly, New pay structure has been implemented from the month of Jan-18 and wage revision arrears for the period 01.01.2016 to 31.12.2017 shall be paid in 36 installments. Accordingly, the projection of wage revision arrears for FY 2019-20 has been considered as actual installment is being paid in the FY 2018-19. The total employee cost works out to ` 1315.36 Lakhs (Form-F4). The provisions for vacant posts, terminal benefit on retirement (pension, gratuity and EL encashment on retirement) have not been considered in the projected employee cost and it is proposed that the same shall be adjusted in true up, if required to be paid. 7.2 ADMINISTRATION AND GENERAL EXPENSES: The Administration and General expenses for SLDC, Backup SLDC & Sub LDC for the year 2019-20 works out to ` 242.83 Lakhs (Form-F5). The above A&G projection comprises of Electricity Charges, Communication charges, consultancy charges, travelling expenses, Security service charges, Vehicle hire charges, books & stationery, MPERC fee, advertisement expenses, legal charges, corporation tax of SLDC Building at Bhopal, outsourcing expensesl and miscellaneous expenses as contingent. 6

7.3 REPAIR AND MAINTENANCE CHARGES: The Repair and maintenance expenses for the year 2019-20 are estimated to ` 196.62 Lakhs (Form-F6). This includes maintenance charges of SCADA/EMS & Wideband Communication system, Unified real Time Dynamic Measurement System (URTDSM) system, CCTV BASED Surveillance system, Hot line exchange, Voice logger system, AMC charges for ABT Computer System, Maintenance costs of Auxiliary Power Supply system (UPS, DG Set), maintenance of system support services, maintenance of AC Plant, maintenance of office equipment, maintenance of building (including Backup SLDC at Bhopal & Sub-LDC Indore), Video Conferencing System, Video Projection System, Fire Alarm system, Cyber Security system etc. The provision for civil maintenance works mainly comprise of replacement of doors & doors frames, maintenance of office chambers, improvement/strengthening of sanitation/water supply system, development of garden/landscaping, renovation of False flooring & aluminum partition in SCADA hall of SLDC etc. The five-year R&M plan of SLDC, Backup SLDC & Sub LDC for FY 18-19 to FY 22-23 is also annexed herewith as Annexure RM1. 7.4 DEPRECIATION, ROE AND INCOME TAX : The GoMP has identified the assets of SLDC as a part of MPPTCL. The depreciation has been worked out to ` 36.01 Lakhs (Form F7) using Straight Line Method as per rates and in the manner prescribed in the Electricity Act 2003. The ROE has been worked out to ` 22.04 Lakhs based on normative debt to equity ratio as 70:30. The Income Tax provision are also worked out to ` 7.63 Lakhs. However, in line with the orders passed by Hon ble Commission for levy & collection of fee & charges for FY 08-09, these charges are not included in the Annual Revenue Requirement of SLDC for the FY 19-20. 7.5 INTEREST AND FINANCE CHARGES : 7

The interest and finance charges comprise of only one component i.e. Interest on Working Capital (Form F8). 7.6 WORKING CAPITAL : The working capital has been computed considering the expenses for Employee cost, A&G, R&M and IWC. The monthly working capital comes out to ` 146.23 Lakhs. 7.7 INTEREST ON WORKING CAPITAL : - As per third amendment in regulation of SLDC fee and charges notified on 19 th Nov 2010, the Rate of interest on working capital has to be considered on normative basis equal to the Base Rate of State Bank of India as on 1 st April of the year plus 4%. Accordingly the rate of IWC has been taken as 12.70 % (Base Rate 8.70 % wef 1 st April 2018). The IWC works out to ` 18.57 Lakhs (FORM F8). 7.8 FUTURE PLAN FOR CAPITAL EXPENDITURE : The capital work in progress and proposed to implemented during FY 18-19 to FY 2022-23 have been summarized in Annexure-CP1. 7.9 INCOME FROM OPEN ACCESS CHARGES: Earning of ` 247.00 Lakhs has been projected as income from Scheduling & Operation Charges (50% of the total receipt), Connectivity Charges and Application processing fee from Short Term Open Access Customers (STOAC) on the basis of income received in current year. (Form F1). 7.10 OTHER INCOME :- A lump sum provision for FY 19-20 for ` 5.0 lakh has been considered in Form F2 towards recoveries of transport facility, Rental for Staff quarter/water charges, recovery for telephone charges & Misc income. 8.0 PAYMENT OF STATUTORY TAXES, DUTIES ETC: The Fee and Charges to be levied and collected by SLDC from the licensees using the intra-state transmission system has been worked out exclusive of statutory taxes, levy, duty, CESS or any other kind of impost by the Government or any statutory authority. Such expenses, if any, shall be borne by the licensees using the intra-state 8

transmission system and shall be adjusted in the subsequent years. Some of the Open Access Customers have paid Application processing Fee & Scheduling & Operating charges after deducting TDS. However, the amount of TDS is not claimed by SLDC. 9.0 METHEDOLOGY AND ASSUMPTIONS ADOPTED IN PREPARATION OF FEE & CHARGES OF SLDC ; The assumptions made and methodology adopted for preparation of the Fee and Charges for the FY 19-20 are annexed herewith as Annexure -I. 10.0 TOTAL FEE & CHARGES OF SLDC : The total revenue requirement of SLDC for FY 19-20 is as under: Sr.No. PARTICULARS AMOUNT ( ` LAKH) 1 Employee Cost 1315.36 2 Administration and General Charges 242.83 3 Repairs and Maintenance Expenses 196.62 4 Depreciation 0 5 Interest and finance charges 18.57 6 Return on equity/investments 0 7 Provision for Income Tax 0 Total 1773.38 8 Less: Revenue from other Charges (i.e Scheduling & Operation charges(50%), Connectivity charges & Application Processing Fee 247.00 9 Less: Other Income 5.00 Net Revenue Requirement for FY 2019-20 1521.38 The net Fee and Charges of SLDC taking into all components described above works out to ` 1521.38 Lakhs summarized in FORM S-4. 11.0 ACTUAL EXPENSES & TRUE UP FOR FY 2017-18 : The expenses towards Employee cost, A&G and R&M for FY 2017-18, shown in forms of the petition for FY 19-20, are on the basis of Financial Statements of SLDC for the FY 17-18. Further, it is submitted that variation in the figures shown in Balance 9

Sheet, Profit & Loss A/c and its notes to Financial statement for Financial Year 17-18 and the figures shown in formats of the petition, is due to following reasons. Particulars Financial statement Ref. Petition Ref. Note Amount Form No Amount ( Amount in Lakhs of `) Difference Employee Cost 11 1077.40 F4 1081.89-4.49 Remark Explanation 1 A & G Expenses 13 177.40 F5 172.90 4.50 Explanation 2 SLDC charges (excluding True Up charges for FY 2016-17) 9 1595.13 F1 1340.72 254.41 Explanation 3 1) The employee cost of ` 1081.89 Lakhs mentioned in Form F4 comprises of actual employee cost of ` 1077.40 Lakhs and training expenses of ` 4.48 Lakhs and difference of ` 0.01 due to rounding off. Further, the training expense ` 4.48 Lakh is shown in Form 4 as per standard format of the petition but the same is considered as A&G expenses and included in note 13 of financial statement. Therefore, actual Employee Cost of ` 1081.89 Lakhs as mentioned in Form F4 is claimed for true up. 2) The A & G expenses of ` 177.40 Lakh mentioned in Note 13 of Financial statement comprises of various A&G expenses of ` 172.90 Lakhs, the Banking charges of ` 0.02 Lakhs and the Training expenses of ` 4.48 Lakhs. The A&G expenses ` 172.90 Lakhs shown in form F5 are exclusive of banking charges and Training charges because the banking charges are shown in Form F8 and training charges are shown in Form F4. Therefore, A&G expenses of ` 172.90 Lakhs as mentioned in Form F5 are actual expenses claimed for true up. 3) The SLDC Charges comprises of Revenue from fee & Charges (i.e. from three Discoms & SEZ) and revenue from other charges (i.e. Scheduling & Operation, Connectivity & Application Processing Fees). The amount of ` 1340.72 Lakhs shown in Form F1 includes ` 254.42 Lakhs towards revenue 10

from 50% of Scheduling & Operation Charges. As per MPERC (Levy & Collection of Fee & Charges) Regulation 2004, (10.3), 50% of scheduling & operation charges are to be considered as earning and balance 50% is to be retained for infrastructure development. Accordingly, total Scheduling & Operation charges of ` 508.83 Lakhs are shown in two equal parts, 50% amount as earning in Form F1 (` 254.42 Lakhs) and 50% amount retained for capex (` 254.41 Lakhs). The amount of ` 1595.13 Lakhs shown in Note 9 of financial statement include ` 508.83 Lakhs towards revenue from total Scheduling & Operating Charges. An increase of ` 254.41 Lakhs in Note 9 of financial statement is due to accounting of 100% of Scheduling & Operating charges received during the Financial Year 17-18 of ` 508.83 Lakhs. Therefore, the amount of ` 1340.72 Lakhs as shown in Form F1, is actual earning for FY 17-18 claimed for true up. In view of above, expenses approved in ARR of FY 2017-18 vis -a -vis Actual expenses as per financial statement of FY 2017-18 are summarized below for Reconciliation / True- up in the ARR for FY 19-20. True up of FY 17-18 accounts with FY 17-18 Order : Expenses: Particular Expenses as allowed in ARR for FY 2017-18 Actual Expenses for FY 2017-18 ( Amount in Lakhs of `) Differences (Allowed-Actual) to be reconciled Employee Costs 1081.82 1081.89-0.07 Administration & general Expenses 113.16 172.90-59.74 Repairs & Maintenance Expenses 166.19 84.54 81.65 Interest & Finance Charges 0.00 0.02-0.02 Total 1361.17 1339.35 21.82 Income from other fee & charges: 11

The revenue from other fee & charges, comprising of Scheduling & Operation Charges, Connectivity Charges, Application Processing fee & Other Income allowed by the Commission for the FY 2017-18 was ` 277.50 Lakhs, the actual income works out to ` 365.94 Lakhs as given below : Particular Income as allowed in ARR for FY 2017-18 Actual income for FY 2017-18 ( Amount in Lakhs of `) Differences (Allowed-Actual) to be reconciled 50% of Scheduling & Operating Charges. 254.42 19.58 274.00 Connectivity Charges 16.00-16.00 Application Charges 96.45-96.45 Sub Total 274.00 366.87-92.87 Other miscellaneous receipts as mentioned in Form F2 3.50-0.93 4.43 TOTAL 277.50 365.94-88.44 Net amount to be reconciled & adjusted in ARR of FY 2019-20 works out to (21.82 (-88.44) ) i.e. ` 110.26 Lakhs. 12. (a) Additional submission on Transmission capacity for FY 2017-18 It is submitted that as per Bulk Power Transmission Agreement between MPPTCL and Western Central railway for 200MW has been executed on dated 07.10.2016. As per BPTA, MPPTCL has considered 200MW transmission capacity to Railway w.e.f 22.01.2016. Now as per supplementary agreement executed on 18 th December 2017 transmission capacity has been extended to 270 MW to Railway. Accordingly, excess amount recovered from Discoms & SEZ Indore has been work out and adjusted with ARR for FY 2019-20 with WCR, Jabalpur. (a) For FY 2017-18 The Annual SLDC Fee and charges for the FY 2017-18 was ` 6279.484 Per MW. Accordingly, Annual SLDC Fee and Charges for WCR w.e.f 18.12.2017 to 31.03.2018 for (enhance capacity 270 MW- 200 MW)= 70 MW is 70MW*6279.484*103days/366 = ` 1.237 lakhs. The details of allocation of ` 1.237 lakhs in to Discoms & SEZ, Indore, which is required to be paid by WCR, Jabalpur as given below:- 12

(` in lakhs) Allocation of ` 1.237 lakhs (which is required to be paid by WCR, Jabalpur) in to Discoms & SEZ in to transmission capacity approved by Hon'ble Commission in SLDC order dated 26.04.2017 Particular East Discom West Discom Central Discom SEZ, Indore Total Transmission capacity allocated as per MPERC order dated 26.04.17. 4562.21 5846.29 4859.94 40 15308.44 % Allocation 29.80 38.19 31.75 0.26 100.00 Allocation of ` 1.237 lakhs in to above allocation % 0.369 0.472 0.393 0.003 1.237 Excess amount Received from Discoms and SEZ Indore will be adjusted with WCR for ARR FY 2019-20 0.369 0.472 0.393 0.003 1.237 (b) For FY 2018-19 Sr.No Particular East Discom West Discom Central Discom SEZ, Indore (` in lakhs) WCR Total 1 Annual SLDC Charges (` in lakhs) 1199.54 2 Transmission capacity allocated as per MPERC order dated 22.05.18 4857.35 6224.49 5174.34 40 200 16496.18 3 % Allocation 29.45 37.73 31.37 0.24 1.21 100 4 Annual SLDC Charges allocated as per MPERC order dated 22.05.18 353.21 452.62 376.26 2.91 14.54 1199.54 5 Transmission capacity as MYT order dated 26.04.17, BPTA with WCR & Supplymentry Agreement with WCR, Jabalpur 4857.35 6224.49 5174.34 40 270 16566.18 6 % Allocation 29.32 37.58 31.23 0.24 1.63 100 7 Annual SLDC cahrges allocated as per MYT order dated 26.04.17 & BPTA with WCR, Supplymentry Agreement with WCR, Jabalpur in above 351.705 450.787 374.616 2.879 19.553 1199.54 13

allocation % 8 (Excess amount)/short Recoverd (7-4)=8 for FY 18-19 -1.505-1.833-1.644-0.031 5.013 0.000 The summary of adjustment of excess amount recovered from East Discom, West Discom, Central Discom, & SEZ, Indore and short amount recovered from Western Central Railway, Jabalpur with ARR for FY 2019-20 as given below:- Adjustment of (Excess Amt)/Short Recovered with ARR 19-20 Sr.No Particular 1 2 3 4 East Discom West Discom Central Discom SEZ, Indore (` in lakhs) WCR Total SLDC Charges for ARR 2019-20 (As filled in Pettion Form F-1) 413.753 530.207 440.754 3.407 22.999 1411.120 Adjustment of (Excess Amt)/Short Recovered for FY 17-18 with ARR 19-20 -0.369-0.472-0.393-0.003 1.237 0.000 Adjustment of (Excess Amt)/Short Recovered for FY 18-19 with ARR 19-20 -1.505-1.833-1.644-0.031 5.013 0.000 Net Amount to be payable for FY 2019-20 (1+2+3)=(4) 411.879 527.902 438.717 3.373 29.249 1411.120 14

PRAYER The petitioner most respectfully prays that the Hon ble Commission be pleased to:- i. Accept and pass Fee and Charges of State Load Despatch Centre Jabalpur for FY 2019-20 as ` 1521.38 Lakhs towards revenue expenditure. ii. Issue suitable order for distribution of the Fee and Charges among the licensees using the intra-state transmission system as specified by the state commission. iii. Kindly consider Adjustment of (Excess Amt)/Short Recovered from Three Discoms, SEZ Indore & Western Central Railway for FY 2017-18 & FY 2018-19 with ARR 19-20. iv. Condone any inadvertent omissions/ errors/ short comings and permit SLDC to add /change/ modify /alter this petition and make further submissions as may be required at later stage. v. Pass any other relief which Hon ble Commission may deem fit and proper and necessary in the facts and circumstances of the case. Place: Jabalpur. ( R.K. Gupta ) Dated : Superintending Engineer (LD: E&T) State Load Despatch Centre, Jabalpur PETITIONER 15

FORMS AND ANNEXURES 16

Annexure-I METHEDOLOGY AND ASSUMPTIONS ADOPTED FOR VARIOUS COMPONENTS OF SLDC FEE AND CHARGES PROPOSAL Main components of the proposal for levy & collection of fee and charges by SLDC are summarized below: 1. REVENUE FORM FEE & CHARGES (FORM F1) : The total fee & charges is shown as the revenue from, 3 Distribution Companies, Special Economy Zone (SEZ) Indore & WCR towards SLDC Fee & Charges and revenue from Short Term Open Access Customers towards other charges i.e. Scheduling & Operation charges, Connection & Application processing fee. The total Fee and Charges have been divided among the licensees (long term customers) using the intrastate transmission system in proportion to their allocated transmission capacity to Three Discom, SEZ Indore & WCR as mentioned in MPERC order dated 26.04.2017 regarding reallocation of Transmission capacity under MYT order for FY2016-17 to FY 2018-19 on account of allocation of 200MW power to Indian Railways (Deemed License) and as per Hon ble Commission order dated 30.05.2018,transmission capacity for WCR has been considered 270 MW. The Full capacity of Generation is considered for the Generating companies falling under the jurisdiction of State control area of Madhya Pradesh.. 2. INCOME FROM OTHER INCOME (FORM F2) : A lump sum provision of ` 5.00 lakh has been considered in Form F2, for FY 19-20, towards interest on Flexi-fix Current Account, recoveries of transport facility, Rental for Staff quarter/water charges, recovery for telephone charges & Misc income, however, Interest on flexi-fix Current Account with Bank is only consider from State Bank of India only because Union Bank of India is not giving interest on Current Account from Aug-16. 3. THE DETAILS OF ENTITIES USING SERVICES OF SLDC (FORM F3) : The details of Generating Companies, transmission & Distribution licensees are shown in form F3. Also, the Circuit Kms of EHV lines of MPPTCL as on 31 st March 2018 17

spread in Madhya Pradesh State is shown as 33270.40. The circuit kms of EHV lines of M/s Kalpataru Satpura Transco Pvt Ltd. as on 31 st March 2018 spread in Madhya Pradesh state is shown as 480.072. 4. EMPLOYEE COST AND PROVISIONS (FORM F4) : (a) The employee cost for FY 19-20 has been worked out for the working strength at SLDC & Sub-LDCs as on 30-09-2018. No provision is made for vacant posts of SLDC and Sub LDCs. However, projection towards one Executive Trainee is considered for FY 2019-20 which is likely to posted in SLDC in the month of November-2018. The projection has been made on the basis of actual basic pay & Grade pay drawn by officer & employee for the month of Septmebr-18 plus one increment for the month of July-19 for FY 19-20 and applicable allowance thereon. (b) Further, it is submitted that the as per Chief Engineer (HR &A), MPPTCL Order No. म.प र.प.ट.क.ल./ई-6/41 1 6 dated 29.12.2017, 7 th Pay commission has been implemented from 1 st January 2016. Accordingly, New pay structure has been implemented from the month of Jan-18 and wage revision arrears for the period 01.01.2016 to 31.12.2017 shall be paid in 36 installments. Accordingly, the projection of wage revision arrears for FY 2019-20 has been considered as actual installment is being paid in the FY 2018-19. (c) The detail of sanctioned, working and vacant position in SLDC as on 30-09- 2018 is Annexed as Annexure OC1. Other main assumptions made for employee expenses are as follows:- (i) The provision for vacant posts is not considered, necessary adjustment for the same shall be made at a later date, if the vacant post are filled up during Ensuing Year. 18

(ii) The present rate of DA to Central Government employee is 9% w.e.f July 2018, State government and MPPTCL employee is 7% w.e.f from January 2018. On the basis of above and expected nominal increase in DA during 2019-20, the rate of D.A. has been taken as 12% for first sixth month and 14% for next six month of the FY 2019-20. (iii) Medical reimbursement for Ensuing Year has been considered @500/- pm per employee. (iv) Company Contribution for National Pension Scheme (NPS) @ 10% of Basic plus Grade pay plus DA is being contributed by the company for officers/employees who have been appointed in Company Cadre. Accordingly NPS provision is made in Employee Cost Projection for ensuing year, (v) The company contribution @ 13.00% (12% Plus Administrative charges) on salary of contract employee is also consider in employee cost for ensuing year towards Provident Fund of Contract Employee. (vi) The projection towards training expenses have been made considering training requirements for SCADA/EMS, Wide Area Management PMU s based, Unified real time Dynamic measurement system (URTDSM), Renewable Energy Management Centre (REMC), Wide Band Communication Systems, IT & Computer systems, Cyber Security and Information Security Management System (ISMS), RE forecasting etc. Accordingly, lumsum projection for training & certification fees for specialist level and management level training programs has also been made during FY 2019-20 (vii) The provision towards Ex-Gratia/bonus for ARR for Ay 2019-20 is not considered, however, it is requested to Hon ble commission kindly consider, if it is required to pay by SLDC in True- up process for FY 2019-20. Hon ble Commission in the order for SLDC fee & charges for the previous years has not allowed provisions for Ex-Gratia/bonus, no such provisions are made in ARR for FY 19-20 19

(viii) Terminal benefits have not been considered in the ARR as per directives of MPERC in the order for SLDC Fee & charges petition for the FY 2006-07. 5. ADMINISTRATION & GENERAL EXPENSES: The A&G expenses for the Ensuing Year have been worked out considering the following:- (i) (ii) Rates & Taxes:- At present Sub-LDC Bhopal (Back-up SLDC has paid municipal Tax for FY 2017-18 & FY 2018-19. Accordingly, projection towards expenditure for municipal tax is considered for FY 2019-20 with 5% escalation. Insurance: A lump sump provision of ` 0.22 Lakhs has been made towards insurance charges during ensuing year. (iii) Telephone Expenses: The communication facilities provided through common pool services are not considered. However, the expenses towards additional communication facility whose payment is made directly from SLDC/Sub LDC officers are included. The details of the proposed expenses are annexed herewith as Annexure AG1. (iv) Consultancy Charges: The projections towards consultancy charges have been kept for obtaining consultancy services regarding Information Security Management System (ISMS), energy Audit & preparation of scheme for upcoming projects like Wide Area Management System (WAMS)/Wide band Communication system/ Renewable Energy Management System related works, and for building renovation & modernization activity. (v) Travel expenses: The SLDC official are required to travel for various meeting like OCCM (WRPC & State), RPC, Protection Committee, for hearing MPERC, CERC, Appellate Tribunal & Court cases. The traveling is also required for works related with implementation of various project and attending faults in systems & equipments. The projections towards travel expenses has been taken considering increased travel due to implementation of various new projects like Master telecom project, URTDSM project/remc project and for various levels of system operation trainings. 20

(vi) Hiring of Vehicle: Presently five number vehicle are hired for SLDC i.e. one for Chief Engineer (SLDC), one for Additional Chief Engineer /SE (Operation), one for SE(LD:E&T) and one each for Backup SLDC, Bhopal & Sub-LDC Indore. Accordingly, the projection towards hiring of five number vehicle is considered for FY 2019-20. (vii) Security / Service Charges: SLDC has already been provided with two armed security guards round the clock deployed through outsourcing. Similarly, one Unarmed security guards round the clock is deployed at Backup SLDC/ Sub- LDC Bhopal. The projection towards security charges for ensuing year has been considered on the basis of prevailing wages for skilled workers for SLDC and unskilled workers for Backup-SLDC / Sub-LDCs Bhopal. (viii) Fee and Subscriptions Books and Periodicals: - The projection for the FY 2019-20 is taken Rs 2.00 lakhs. The projection is taken mainly the amount towards MPERC Fee and incidental charges if required to pay WRPC charges. (ix) Stationery Expenses: The stationery expenses has been worked out considering the future increase in requirements due to Generation of various reports, increased responsibilities of Capital works, ABT/OA, EA, regulatory & legal issues etc. (x) Electricity Expenses: - The projection towards Electricity expense for SLDC, Back-up SLDC, & Sub-LDc Indore of ` 108.35 laksh has been taken as actual expenditure of SLDC and Back-up SLDC Bhopal up to April-18 to Sep-18and tentative for period Oct-18 to March-19 plus 5% increase there on and ` one lakh per month for sub-ldc, Indore. (xi) Work Outsource Expenses:- The SLDC has taken services of Seven no of computer operators (5 in highly Skill and 2 in skill category and out of highly skill computer operators 3 operators are working in shift) through Man Power supplier Contract so that the projection towards outsource of Seven no of computer operators for the FY 2019-20 is considered in A&G expenses. 21

(xii) Entertainment expenses: The entertainment expenses have been worked out considering the requirements due to increased responsibilities of SLDC. (xiii) Legal Expenses: The legal expenses have been worked out considering various legal issues and regulatory matters. 6. REPAIR & MAINTENANCE EXPENSES (FORM F6): The Repair & Maintenance projections for Ensuing Year have been worked out considering the R&M expenses of SLDC, Sub-LDC Indore & Backup SLDC Bhopal. The R&M projection include maintenance charges of SCADA/EMS, Wideband Communication system, URTDSM system, ABT, OA and MIS system, maintenance of Auxiliary Power Supply system comprising of UPS, battery banks and Diesel Generator Sets, Air Conditioning plant and split air conditioners, CCTV based surveillance system, maintenance of office equipment, maintenance of building & system support services and the house keeping of backup SLDC building at Bhopal and new Sub-LDC building at Indore are considered in R&M expenses for FY19-20. 7. PROVISION FOR DEPRECIATION (FORM F7) / ASSETS NOT IN USE (FORM F7A) : As per GoMP notification No. 292 dated 12 th June 2008 regarding final opening balance sheet of MPPGCL, MPPTCL, Discoms and residual MPSEB, the assets of SLDC (` 242.80 as on 1 st June 2005) are included in the assets of MPPTCL and no separate balance sheet is notified for SLDC. As per order passed by MPERC for SLDC fee & Charges for FY 2007-08, the expenses towards Depreciation, Interest on Loan, Return on Equity (ROE) & Income tax shall be payable based on actual equity employed by SLDC/allocated to SLDC. The provisions for Depreciation, ROE & Income Tax were not allowed for FY 2008-09. Accordingly, no provisions are made for ROE, Depreciation & Income Tax in the ARR for FY 2019-20. However to have a tentative assessment, the depreciation on SLDC assets is worked out based on the assets identified by the GoMP and the assets added 22

subsequently. The depreciation has been worked out as per depreciation rates notified by Central Electricity Regulatory Commission notification dated 19-01-09 and GOI, Ministry of Corporate Affair and General, Circular No.51/23/2011-CL-III dated 31-05- 11. The ROE has been calculated with normative debt to equity ratio as 70:30. 8. INTEREST & FINANCE CHARGES (FORM F8): The interest and finance charges comprises of only one component i.e. Interest on working capital. The Capex requirement of SLDC shall be met from 50% amount of Scheduling & Operation charges retained for infrastructure development of SLDC as per MPERC (Levy and Collection of Fee and Charges by State Load Despatch Centre) Regulations, 2004. 9. TARIFF FORMS (FORM T1A, T1B, T1C): The proposed fee and charges are indicated in the form T1b & T1c. 10. SUMMARY FORMS (FORMS S1 TO S6): These forms have been prepared on the basis of information derived from forms F1- F15. In the reasonable return (Form S5), the equity is calculated based on normative debt to equity ratio as 70:30. ***** 23