DEVELOPMENT & INFRASTRUCTURE SERVICES COMMISSION PUBLIC WORKS SERVICES INFORMATION REPORT- PWS

Similar documents
SAFETY MANAGEMENT SYSTEMS (SMS) IMPLEMENTATION PERSPECTIVES

INFORMATION REPORT Corporate Services Commission, Financial Services. Newmarket, ON L3Y 4X ext.

Use of QRM to Quantify Particulate Contamination Risks

Job Safety Analysis Preparation And Risk Assessment

Risk Management Framework

RISK MANAGEMENT GUIDELINES

Why Should Our Town Have an Audit? Jackie Nielson

Risk assessment Policy and Procedures

APPENDIX D Examples of Significant Deficiencies and Material Weaknesses

Hazard Identification and Risk Management Element June 2018

Documentation Control. Hazard Identification, Risk Assessment and Management Procedure. (This document is linked GG/CM/007- Risk Management Policy)

28 July May October 2016

FOOD SAFETY RISK ANALYSIS

PANAMA MARITIME AUTHORITY

Risk Assessment Avoiding the Low Probability High Severity Event

USF System Compliance & Ethics Program. Risk Assessment Process. Enterprise-Wide Risk Assessment

Information on Risk Assessments and Guidance on the Completion of KeeleSU General Risk Assessment Form

Archery Victoria is mindful of the risks associated with conducting archery activities and events at club level.

A Holistic Approach to Risk Management. Dono Tong & Jeff Chan

YACHTING AUSTRALIA. Club Risk Management Template. A Practical Resource for Clubs and Centres

Enterprise Risk Management Program

2.2 For Board Members to approve the five high risks the Trust is facing:

THE AGENCY'S HEALTH AND SAFETY MEASURES

Hazard Prevention Program. Regulation 19

PROHSP6 Control health and safety risks

Bournemouth Primary MAT Risk Management Policy

Risk Management Policy and Framework

PROJECT RISK ASSESSMENT FORM

Risk Workshop Session 1. Malcolm Leinster

Hazard Identification, Risk Assessment and Control Procedure

Note: This policy incorporates key elements of the former Risk Taking and Assessment Policy (SO-0080).

Fraud Risk Management

Australian Masters Athletics Inc..

Risk Assessment Policy

Event Risk Management Plan

1 Rare Hazard event is not likely to occur within 100 years. 2 Occasional Hazard event is likely to occur within 100 years

Classification Based on Performance Criteria Determined from Risk Assessment Methodology

RPM HSE PERFORMANCE PLAN

Risk Management Relevance to PAS 55 (ISO 55000) Deciding on processes to implement risk management

Risk Management Framework. Metallica Minerals Ltd

4.13b General Fieldwork Risk Assessment 25 January 2013

CNAM Risk Management for Utility Managers

An Update On Association Policies, Health Checks & Guidelines To A Safer Hockey Association. Lauren Woods Member Engagement & Operations

RISK AND BUSINESS CONTINUITY MANAGEMENT

RISK REGISTER POLICY AND PROCEDURE

P S A B & S C H O O L B O A R D F I N A N C I A L R E P O R T I N G

LINC Logistics LLC - Corporate Office Issue: Version 3.1 Procedures Manual SUBJECT: Section 1.0 BUSINESS CONTROL Date: March 13, 2013

Risk Management Framework

Effective Audit Planning Resources - Templates Table of Contents

TOWN OF CAPE ELIZABETH, MAINE. Reports Required by Government Auditing Standards. For the Year Ended June 30, 2017

Risk Management at Central Bank of Nepal

SUPPLY OF PEST CONTROL SERVICES

Risk Analysis and Management. May 2011 ISO 14971

Risk Management Framework. Group Risk Management Version 2

RECENT CHANGES IN STANDARDS ON AUDITING

Optimal Incentive Contract with Costly and Flexible Monitoring

Kidsafe NSW Risk Management Plan. August 2014

Date: Version: Reason for Change:

WORK HEALTH AND SAFETY REFRESHER

POLICY RISK MANAGEMENT AND REPORTING. Introduction

Hazard Vulnerability Assessment for Long Term Care Facilities

GUIDELINE ACTIVITY RISK MANAGEMENT GUIDELINE

Steps to join the Managing Operational Risk Webinar for computers and laptops

Topic RISK MANAGEMENT Procedure Category Risk Management Updated 07/2011

Contractor Management Procedure

Risk Evaluation. Chapter Consolidation of Risk Analysis Results

Technical risk assessment and CCS

How to Compile and Maintain a Risk Register

Contract HSE Management/Part I

HACCP MANUAL. Nationwide Pest Control (NWPC) HACCP Manual. Rev. No.: 01 Rev. Date: 20/02/2018

An Introductory Presentation for ECU Staff

GREATER SHEPPARTON CITY COUNCIL MINUTES FOR THE GREATER SHEPPARTON CITY COUNCIL SPECIAL COUNCIL MEETING HELD ON TUESDAY 6 JUNE, 2017 AT 5.

E14 RISK MANAGEMENT FOR RAILWAY OPERATIONS

GREATER SHEPPARTON CITY COUNCIL AGENDA FOR THE GREATER SHEPPARTON CITY COUNCIL SPECIAL COUNCIL MEETING TO BE HELD ON TUESDAY 6 JUNE, 2017 AT 5.

Organizational Risk Assessment GOAL. What is a Risk Assessment 9/21/2018

The Parks Theatre. Centre Agreement Terms & Conditions

Risk Management Strategy

Risk Assessment Procedure

Foresters Whole Life Insurance STATEMENT OF POLICY COST AND BENEFIT INFORMATION. Life Insurance Illustration

Foresters Whole Life Insurance STATEMENT OF POLICY COST AND BENEFIT INFORMATION. Life Insurance Illustration

Risk Management Report Guidelines for Diploma and Advanced Diploma of OHS/WHS

BROWARD COUNTY, FLORIDA. REPORTS IN ACCORDANCE WITH GOVERNMENT AUDITING STANDARDS AND CHAPTER , RULES OF THE AUDITOR GENERAL September 30, 2016

RISK ASSESSMENT AND ITS MANAGEMENT IN MINING INDUSTRY

Step 5 INSTRUCTIONS FOR USING RISK ASSESSMENT TEMPLATE. Step 6. Step 1. Step 2. Step 3. Step 4. Complete Section 3 Emergency Response Plan

Risk Management Policy and Procedures.

Risk assessment concept and practical guidance

Challenges of implementation. a regulatory perspective

METHODOLOGY TO IDENTIFY SPIS- REGULATOR

Trust Deed. AMP Wealth Management New Zealand Limited. Manager. The New Zealand Guardian Trust Company Limited. Supervisor.

NZ Transport Agency Page 1 of 23

USE AGREEMENT BETWEEN <OWNER> AND ORANGE COUNTY. THIS AGREEMENT (the Agreement ), is entered into by and between

What Makes Risk Management Work?

Nagement. Revenue Scotland. Risk Management Framework. Revised [ ]February Table of Contents Nagement... 0

Risk Assessment and Plan OUTDOOR ACTIVITIES, EVENTS & CAMPS

Our responsibility is to express an opinion on these Ind ASfinancialstatements based on our audit.

Hazard Assessment, Analysis and Control

client user GUIDE 2011

Making the Most of Catastrophe Modeling Output July 9 th, Presenter: Kirk Bitu, FCAS, MAAA, CERA, CCRA

Procedure: Risk management

Integrated Risk Management Framework Sept Page 1 of 17

Transcription:

~1 Newmarket TOWN OF NEWMARKET 395 Mulock Drive www.newmarket.ca P.O. Box 328 info@newmarket.ca Newmarket, ON L3Y 4X7 905.895.5193 June 22, 2015 DEVELOPMENT & INFRASTRUCTURE SERVICES COMMISSION PUBLIC WORKS SERVICES INFORMATION REPORT- PWS 2015-37 TO: COPY: SUBJECT: ORIGIN: Mayor Members of Council Bob Shelton, P.Eng., CAO Peter Noehammer, P.Eng, Commissioner, Development & Infrastructure Risk Assessment - DWQMS Director, Public Works Services In accordance with the Procedure By-law, any Member of Council may request this Information Report be placed on an upcoming Committee of Whole Agenda for discussion through the Clerk. PURPOSE The purpose of this report is to provide the Owner (Mayor, Council, CAO) and Top Management a summary of the Town's Risk Assessment Procedure as part of the Water Quality Management Standard. The notion to bring this forward to members of Council was suggested during the Standard of Care Training by Brian Jobb Manager, Walkerton Clean Water Centre Training Institute COMMENTS Elements 7 and 8 of the Drinking Water Quality Management Standard (DWQMS) require that municipalities complete Risk Assessments for their drinking water systems, then implement and document the means by which they manage those risks. Potential hazards and hazardous events are identified, and for each, the level of risk is assessed. A structured approach is established to ensure that the areas of highest risk are identified. This task includes the following steps: Identify potential hazardous events and hazards and that could affect drinking water safety; Assess the risk associated with the occurrence of a hazardous event;

Public Works Services Report 2015-37 June 22, 2015 Page 2 of 3 Rank the hazardous events according to the associated risk; Identify control measures that we have in place to address the hazards and hazardous events; Identify critical control points; Establish critical control limits for each critical control point; Ensure that the risk assessment is kept current; and, Document the risk assessment process and outcomes. For the complete procedure, please see attached Appendix?a of the DWQMS Operational Plan. The Risk Assessment is facilitated by developing a Risk Assessment Table which documents each of the above steps, recommended action, and Emergency Procedures. The Risk Assessment process is an ongoing activity. Every twelve months, the information is checked so that it is up-to-date and valid when used in the Risk Assessment for the following year. The Risk Assessment must be completely redone every 36 months at a minimum, unless changing conditions indicate that it should be done more frequently. As required by the DWQMS, a Communication Procedure has been developed to ensure that the Owner, Top Management, Operating Authority, Service Suppliers and the Public are educated through suitable means on the Quality Management System and are also informed of any changes that affect the nature or effectiveness of the Operational Plan. The reporting of any changes to the Risk Assessment will now be communicated to each party as part of the annual Management Review submitted to Council every March. BUSINESS PLAN AND STRATEGIC PLAN LINKAGES Living Well: Through the Management of Proactive Maintenance Programs, compliance of legislative and regulatory requirements, the identification and prevention of hazardous events ensure the delivery of safe drinking water to our community. BUDGET IMPACT The water rate portion of the operating and capital budget provides the funding allocated for the regulatory requirements under the Safe Drinking Act.

Public Works Services Report 2015-37 June 22, 2015 Page 3 of 3 CONTACT For more information on this report, contact: Bill Wilson, Manager Water/Wastewater, Public Works Services ext 2553. Bill Wilson, Manager, Water/Wastewater Public Works Services Chris Kalimootoo, P.Eng Director, Public Works Services I Peter Noehammer, P.Eng Commissioner, Development & Infrastructure Services Attached: Risk Assessment Procedure Appendix 7a of the DWQMS Operational Plan

APPENDIX 7a: RISK ASSESSMENT PROCEDURE PURPOSE: The purpose of the Risk Assessment Procedure is to define the method used to assess and rank risks to the W DS, and to identify Critical Control Points. The procedure will describe how to:./ Identify and ra nk potential haza rd s within the WDS./ Identify control mea sures to address hazards./ Identify Critical Control Points and associated methods of monitoring and controlling them DEFINITIONS Consequence - the potential impact to public health and/or operation of the drinking water system if a hazard or haza rdous event is not controlled. Control M easure - includes any processes, physica l steps or other practices that have been put in place at a drinking water system to prevent or reduce a ha za rd or hazardous event before it occurs. Critical Control Point (CCP)- an essential st ep or point in the subject syst em at wh ich cont rol ca n be applied by the Operator t o prevent or eliminate a drinking water hea lth haza rd or reduce it to an acceptable level. Detectability - the ability t o identify or detect a hazard or hazardous event. Hazard- is a source of danger or a property that may ca use drinking water to be unsafe for human co nsumption. The hazard may be biological, chemical, physica l or rad iological in nature. Hazardous Event - is an in cid ent or situation that can lead to the presence of a hazard. Likelihood - the probability of a haza rd or hazardous event occurring SCOPE: This Risk Assessment Procedure is applicable to all processes and activities within the control of the Operating Authority of the Newmarket WDS.

PROCEDURE : 1. Hazard/Hazardous Event Identification a. The Water/Wastewater Supervisor (O.R.O) shall assemble a Risk Assessment Team to disc uss and identify all potential hazards to the Newmarket WDS. The Risk Assessment Team for 2013/2014 consists of the Water/Wastewater Superviso r/0.r.o, one (1) Water/Wastewater Administrative support staff, and 3 certified Water/Wastewater operators. b. A review of each process within the WDS must be completed to identify initiating events and subsequent hazards that could be a potential threat to the security of the WDS. c. To identify init iating events, haza rdous events, and threats, consideration should be given to: All aspects of the work Both routine and non-routine activities Any foreseeable unusual co nditions d. Fo r each haza rd, the consequences that could occur as a re sult of the hazard must be identified. e. For each haza rd, the control mea sures that are in place to prevent the haza rd or hazardous event from occurring shall be identified. f. Information rega rding the Risk Assessment process shall be recorded in the DWQMS Ri sk Assessment Outcomes Table (Appendix Ba} 2. Ranking Risk a. Each hazard ident ified shall be ranked by the Risk Assessment Team according to the following criteria and are further outlined in the tables. "Likelihood" is the probability/like lihood of a hazard or hazardous event occurring (Table 1) "Severity" is the potential impact to public hea lt h or impact on opera tions if the ha za rd or hazardous event occurs (Tab le 2) "Detectability" is the ability to id entify or detect a haza rd or hazardous event

Table 1: Likelihood ofa Hazardous Event Occurring Description Likelihood of a Hazardous Event Occurring Rating Rare May occur in exceptional circumstances. 1 Unlikely Could occur at some time- historically less than once every 5-10 years. 2 Possible Might occur at some time or the event shou ld occur at some time - more than 3 once per year. Likely Will probably occur in most circumstances - occurs monthly to quarterly 4 Very likely Is expected to occur in most circumstances - occurs more frequently than 5 monthly Insignificant Minor Moderate Major Catastrophic Insignificant impact, little disruption to normal operations, low increase in normal operations costs Minor impact for sma ll portion of the population, some manageable operational disruption, some increase in operational costs Minor impact for larger population, significant modification to normal operation (manageable), operational costs increased, increased monitoring Major impact for small population, systems significantly compromised, high level of monitoring required M ajor impact for large population. Complete failure of esse ntial systems/services. 1 2 3 4 5 Table 3: Detectability ofhazardous Event Occurring 1Description Detectability of a Hazardous Event Occurring Rating Very Moderately Normally Poorly Easy to detect through routine monitoring, YR SCADA, feedback from others 1 Problem can be detected promptly through routine field testing, feedback from others Part of annual samp ling program (i.e. weekly samples, quarterly sa mples) 3 Not normally detected before problem becomes evident. 4 Un Cannot detect. 5 Risk = Likelihood+ Conseq uence+ Det ectability Highest Risk= 15 (5 + 5 + 5) Critical Control Points (CCPs) may be initiated if rating va lue is :2:10 2

3. Critical Control Points (CCP) a. All haza rds or hazardous events which have an overall risk rating of 10 or great er shall be identified as critical on the Risk Assessment Outcomes Table (Appendix Ba). b. The process step associated with high risk with co ntrol shall be designated as a CCP. c. All haza rd s or hazardous events which have no co ntrols shall not be identified as CCPs. d. The Risk Assessme nt Tea m may add or remove CCPs upon discussion, depending on the level of control and internal decisions. These changes shall be noted in the "Comments" column and added t o the table of revisions for the Ope rational Plan. e. For each CCP, t he following information shall be reco rded into the Risk Assessment Table: Reference to monitoring measures, a description as to what is being monitored and t o indicate that the process step is w ithin specified CCLs Referen ce t o response procedures to describe the response to deviation from CCLs, including reporting and recording of information, and the reliability and redundancy of equipment. f. If required, the Risk Assessme nt Team, with support from Operations staff shall draft response procedures t o address deviations from CC Ls 4. General a. Supporting notes and comments, as required, shall be recorded in t he Risk Assessment Outcomes Table b. The QMR shall ensure that relevant information is circulated to all members of the Risk Assessment Team c. The QMR shall ensure that an annual review of the Risk Assessment is completed, and ensure information and assumptions remain cu rrent and valid. d. Every thirty six (36) months from 1 August 2009, the QMR sha ll ensure a new Risk assessment is conducted. e. The completed Risk Assessment shall be made accessible to Top M anagement. REFERENCES: n/a