European Update. 1 st October 2015

Similar documents
European Workgroup. European Workgroup 3 rd April 2014

EU Codes Legal Roadmap

European Update. 5 January 2017

EU Capacity Regulations Capacity Allocation Mechanisms with Congestion Management Procedures

EU Harmonisation of Maintenance Publications at Interconnections Points

Joint European Standing Group Meeting 29

UNC 0680: UNC Changes as a Consequence of no deal United Kingdom Exit from the European Union. UNC Modification

IME3 Compliance for Allocations

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Applicable from 1 October 2017

Interconnector (UK) Limited. Charging Methodology Statement related to the IUK Access Agreement and IUK Access Code Applicable from 1 February 2016

Developing the internal energy market further - the European Network Codes

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Applicable from 1 August 2017

Interconnector (UK) Limited. Charging Methodology Statement related to the IUK Access Agreement and IUK Access Code Applicable from 1 February 2017

NTS Exit Regime Daily Processes Overview

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 10 Applicable from 01 June 2018

Draft Outline of the 2016 Work Programme

UNC European Workgroup Minutes Thursday 06 February 2014 Energy Networks Association, 52 Horseferry Road, London SW1P 2AF

Gas Target Model Follow up - CEER Work on Incremental Capacity

Variation Request. Modification 0510 Reform of Gas Allocation Regime at GB Interconnection Points

UNC 0686 (Urgent): Removal of the NTS Optional Commodity Rate with adequate notice. UNC Modification

Addressing under-allocation of flows from BBL arising from misalignment of reference conditions

Quarterly System Entry Capacity (QSEC)

EU CODES - MODIFICATION CORE LEGAL DRAFTING - EXPLANATORY TABLE. European Interconnection Document (EID)

Joint European Stakeholder Group. Thursday 28 January 2016: Meeting 9

UNC Workgroup 0597 Minutes Rules for the release of incremental capacity at Interconnection Points Tuesday 13 December 2016

UNC Text Allocation Register

GMARG Meeting. Tuesday 18 th October 2018

The Entry Capacity Substitution Methodology Statement

Capacity Allocation and Congestion Management (CACM) Code Overview

Transmission Workgroup Minutes Thursday 05 January 2012 Elexon, 350 Euston Road, London NW1 3AW

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 11 Applicable from 01 September 2018

Vision Paper LT UIOLI

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 14 Applicable from 22 November 2018

The Entry Capacity Substitution Methodology Statement

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 15 Applicable from 01 January 2019

Entry Capacity Substitution Methodology Statement

Report for Modification Panel January 2006 Transmission Workstream

EUROPEAN COMMISSION DIRECTORATE-GENERAL POR ENERGY

CHAPTER II INTERCONNECTION AGREEMENTS

Operational Forum Meeting

2011 Work Programme of the Agency for the Cooperation of Energy Regulators

Tariff for Virtual Reverse Flow Product at Moffat

CMP291. Garth Graham for SSE Generation Ltd. CUSC Panel 23 rd February 2018

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

CAM Modification 500. CAM-CMP Development Workgroup 2

ECCAF Meeting 5. Teleconference 29 June 2014; 10:00 11:00. Revised Version

The Model of Implicit Capacity Allocation in the Baltic States

Operational Forum Meeting

We appreciate your feedback

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

EASEE-gas. European Association for the Streamlining of Energy Exchange gas

Interconnector (UK) Limited. Charging Statement related to the IUK Access Agreement and IUK Access Code Issue 12 Applicable from 01 October 2018

London Borough of Barnet Pension Fund. Communication Strategy (2018)

ICE Endex UK Gas update. June 2015, London

Publishing date: 21/09/2016 Document title: Implementation Monitoring Report on Congestion Management Procedures - Update 2016

ENTSO-E Network Code on Electricity Balancing

Supplier Charges in the Capacity Market

BEPS Action 4. Webinar. 6 July 2016

GMARG Meeting. Ashling Hotel, Thursday 20 th August 2015

Review of Registered Charites Compliance Rates with Annual Reporting Requirements 2016

Roadmap to the French Balancing Target System

Balancing Arrangements Review of Platform Options

Inclusion and Amendment of Entry Incremental Capacity Release NPV test in UNC

Public Consultation of the General Terms and Conditions of PRISMA Platform

FDD FIRM STORAGE SERVICE NORTHERN NATURAL GAS COMPANY

CODE MODIFICATION PROPOSAL No 0230 Amendment to the QSEC and AMSEC Auction Timetables Version 2.0 Date: 15/10/2008. Non Urgent

Smart Metering Entity (SME) Licence Order Working Group

Energy Balancing Credit Risk Management. An Overview

System Management Principles Statement. Compliance report Summary of balancing actions and breaches Performance compared to last year

Brexit and electricity interconnectors. Jason Mann

CODE MODIFICATION PROPOSAL No 0262 Treatment of Capacity affected by Force Majeure Version 4.0 Date: 18/08/2009. Non Urgent

FGO Change and Contract Management

Joint European Standing Group (JESG) Requirements for Generators Tech Sub Group Issues

ACER. The Director. Ljubljana, 1 8 March 2015 ACER-AP-DH-ss Mr. Malcolm Webb CEO, Oil and Gas UK

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

Distribution Group Study Process. August 26, 2014

RESPONSE TO ACER'S CONSULTATION ON TARIFFS

PASSENGER REJECTION REDUCTION INITIATIVE KIRK PEREIRA. 24 th April 2018

Payments Services: Regulatory Timeline. February 2017

Demand assessment report for incremental capacity between Republic of Ireland [Gas Networks Ireland]

Firm Frequency Response Market Information for Apr-16

Balancing Network Code. Implementation and Effect Monitoring Report ENTSOG A FAIR PARTNER TO ALL!

Gas Networks Ireland Transmission Tariffs and Tariff Information 2018/19

MOFFAT DESIGNATED ARRANGEMENTS NTS EXIT POINT AT MOFFAT

Consultation on Capacity Methodology Statements. Conclusions Report

Regulatory framework for crossborder redispatching and countertrading

UPDATE ON ELECTRICITY BALANCING

Report on the system balancing actions and related procurement activities in the GASPOOL market area in the gas year 2015/2016

P344 Project TERRE implementation into GB market arrangements

Present: Philippe de LADOUCETTE, President, Olivier CHALLAN BELVAL, Hélène GASSIN and Jean- Pierre SOTURA, Commissioners.

Report from the Board

Integrated Single Electricity Market (I-SEM)

View on the perspective on Regional Gas Market Development in Eastern Baltic Region

Gas markets in the Energy Community. Janez Kopač Director

Grid Code Workgroup Consultation Response Proforma

18 April 2016 Draft for consultation

Taxing times Indirect tax forum

Reactive Power Market Tender Development Initial Proposals

ScottishPower Energy Management Limited 27 May CUSC Modification Proposal CMP264 Embedded Generation Triad Avoidance Standstill (EGTAS)

ASX S APPROACH TO RELEASE MANAGEMENT

Transcription:

European Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 1 st October 2015

1. General Update 2

Code Status Update

Go Live Go Live Compliance Go Live Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Gas Codes Timeline Status of Development of European Gas Network Codes Future dates are subject to change Dates shown in italics are best approximations based on current understanding. It has been necessary to 'round' some dates for the benefits of the diagram KEY Activities undertaken by ACER Activities undertaken by ENTSOG Activities undertaken by European Commission Network Code / Guideline TODAY 2015 2016 2017 Congestion Management Principles (CMP) Capacity Allocation Mechanisms (CAM) Balancing Interoperability & Data Exchange Tariffs ACER Review Comitology (duration unknown) Incremental ACER Review Comitology (duration unknown)

Road Map 2013 2014 Phase 1a From Oct 2013 CMP CAM Balancing Interoperability Tariffs Other Surrender process (UNC Mod 0449) 2015 Phase 1b From Oct 2014 Phase 2a 1 st Oct 2015 LTUIOLI & enhanced provision of data to ENTSOG platform Gas Day Allocations reform, Ancillary agreements, Interconnection agreements Other EU legislation REMIT Phase 2b on or before 1 st Nov 2015 CAM Cross-border nominations etc. 2016 2017 Phase 3 May 2016 Phase 4 Late 2017 Incremental capacity auctions at IPs (TBC) TSO-shipper data exchange, common units & gas quality reporting Implementation of tariff arrangements at IPs (2017) Additional transparency requirements 2018

2. EU Code Updates

EU Tariffs Code Update October 2015

EU Tariffs Code Expected Timeline 14-15 October: Madrid Forum 20 October: Informal Member State Meeting 14-15 December(?): Informal Member State Meeting Feb/March 2016(?): 1 st Comitology meeting May 2016(?): 2 nd Comitology meeting Possible 3 rd comitology meeting

EU Tariffs Code Expected Timeline priority setting framework guidelines network code ACER reasoned opinion comitology entry into force * These dates are estimates; it is unclear whether any activity will take place in August 9

Scheme for Comitology * AM absolute majority; QM qualified majority ** Reasons for opposing the draft: 1. exceeds implementing powers set in basic act 2. is not compatible with basic act aim/content 3. disrespect of subsidiarity/proportionality principles 10

Voting to Determine GC Opinion Old Voting before 31/10/14 weighted votes Legal Basis: Art. 16(5) TEU, Art. 3(3) of Protocol No 36 on Transitional Provisions Qualified majority is achieved with 255 votes (out of the total of 345), expressed by a majority of MSs (at least 14 delegations) Protocol No 36 was amended by Croatia Accession Treaty: qualified majority is achieved with 260 votes (out of the total of 352) A delegation may request that MSs constituting the qualified majority represent min. 62% of EU population New Voting as from 1/11/14 double majority Legal Basis: Art. 16(4) TEU Qualified majority is defined as at least 55% of MSs (i.e. 16) comprising min. 65% of EU population; blocking minority must include min. 4 MSs, failing which the qualified majority shall be deemed attained Sequence of questions to determine GC opinion: 65% threshold met? Yes positive; No next question Min. 4 MSs in blocking minority? Yes negative; No positive Until 31/3/17, a MS can request to apply old voting 11

BAL NC: recommended vs. voted 12

BAL NC: Intensive Work Post Re-Submission Number of versions post ACER s recommendation 13 versions of which ENTSOG was aware Work with translators Separate meeting with DGT after the Pre-comitology meeting Answers to 63 written queries Dedicated discussions with the EC and ACER representatives To consider the MS feedback received at the Pre-comitology meeting and ENTSOG comments on the version post inter-services consultation To consider the remaining issues from the Note regarding the changes made at and after the 1 st Comitology meeting To consider the MS feedback received ahead of the 2 nd Comitology meeting Informal ENTSOG reaction on intermediate version with MS comments 2 working days 13

Other NCs: Approach for Application Date TAR NC is the first NC for which the FG specifically envisaged the particular date for its application (i.e. 1/10/17) All the previous NCs (re-)submitted to ACER did not indicate a specific application date it was inserted at the Comitology stage INT NC BAL NC CAM NC Specific application date should be placed within the Comitology Procedure 14

Other NCs: Implementation Timescales action CAM NC calculation of timings BAL NC calculation of timings INT NC calculation of timings Committee opinion 15-Apr-13 81 day after comitology 1 2-Oct-13 83 days after comitology 1 4-Nov-14 116 days after comitology 1 adoption 14-Oct-13 182 days after comitology 2 26-Mar-14 175 days after comitology 2 30-Apr-15 177 days after comitology 2 publication 15-Oct-13 183 days after comitology 2 27-Mar-14 176 days after comitology 2 1-May-15 178 days after comitology 2 entry into force 4-Nov-13 20 days after publication 16-Apr-14 20 days after publication 21-May-15 20 days after publication application date 1-Nov-15 24 months to implement 1-Oct-15 17,5 months to implement 1-May-16 11 months to implement If 1/10/17 per TAR FG is kept, there will be only 9 months to implement the TAR NC 15

TAR NC Proposal: Calculated Date TAR NC Version initial draft NC 30/5/14 refined draft NC 7/11/14 submitted NC 26/12/14 re-submitted NC 31/7/15 TAR NC Text This Regulation shall apply as from 1 October 2017 or as from the date calculated as eighteen months as from the entry into force, whichever date is the later. This Regulation shall apply as from whichever of the following dates is the later: (1) 1 October 2017; or as from (2) the first day of the month following the date calculated as eighteen twenty four months as from the entry into force, whichever date is the later. = refined draft NC Without prejudice to Articles 6(5), 14(2), 15(4), 41(1) and 44(3), Tthis Regulation shall apply as from whichever of the following dates is the later: (1) 1 October 2017; or (2) the first day of the month following the date calculated as twenty- four months as from the entry into force. This approach is aligned with ENTSOG s approach for the previous NCs 16

EU Incremental Amendment Update

Incremental Amendment ACER launched consultation on revisions to CAM NC Consultation ran from 17 July to 31 August ENTSOG has now received revised draft amendment from ACER ENTSOG Incremental Group shall consider latest version at next meeting on 23 September. Consideration still required concerning how incremental is offered at same time as available where former uses an alternative allocation mechanism Concerns remain about closeness of auction timings between annual and quarterly products

Interoperability Code: Reference Conditions at the Moffat IP Interoperability Code establishes harmonised reference conditions of 0 o C (vol) / 25 o C (CV) ( 0/25 ) for IPs from 1 st May 2016 Article 13(3) of this Code permits the use of other reference conditions where one MS is connected to only one other MS National Grid NTS wrote to Ofgem on 3 rd August 2015 requesting approval to continue with 15/15 reference conditions at the Moffat IP Ofgem granted such approval on 18 th September 2015 National Grid NTS understands that the NI and RoI NRAs also intend to grant such approval to their TSOs

3. UNC Modification Plans

Phase 2 UNC Modifications Timescales EU Network Code Area of change Status Next Steps UNC Consultation Gas Balancing (BAL) Information Provision (489) Ofgem approved Implementation Complete Capacity Allocation Mechanism (CAM) " Nomination Process at IPs (493) Ofgem approved Implementation Complete " SMP Buy & Sell (494) Ofgem approved Implementation Complete " " Corrections to the EID arising From implementation of Modifications 0493/0500 (547S) Mod Panel decision to Implement Complete Gas Day change (461) Ofgem approved Implementation Complete CAM / CMP Compliant Capacity Auctions (500) Bacton split (501V / 501AV / 501BV / 501CV) Reduction Of the Minimum Eligible Quantity (100,000kWh) For European IP Capacity (05456S) Ofgem approved Implementation Complete Ofgem approved 501V Implementation Mod Panel decision to Implement Complete Complete Interoperability & Data Exchange (INT) " " Reform of Allocations (0510) withdrawn variation now 510V Harmonisation of Reference Conditions (0519) Enabling EU Compliant Interconnection Agreements (0525) Ofgem approved Implementation Complete Ofgem approved Implementation Complete Ofgem approved Implementation Complete

EU Gas Quality Harmonisation: CEN Standard Update

EU Gas Quality Harmonisation Update On 18 th September, BSI submitted a no vote from the UK to CEN in respect of the proposed adoption of the H-gas quality standard Main BSI supporting rationale: Lack of clarity about EC implementation proposals All network points or IPs only? Flexibility to permit gas entry / offtake outside CEN limits? Uncertainty about how oxygen and carbon dioxide relaxations could be applied Lack of evidenced case for UK to adopt it Potentially detrimental to UK and Ireland s security of supply as some UKCS gas sources could be stranded Interoperability Code already provides an appropriate process to address gas quality related barriers to trade

CEN Standard: NTS Considerations Given the lack of clarity, National Grid NTS agrees that the adoption of the standard at this time should not be supported No NTS asset integrity issues have been identified with adoption of the standard If the standard were to be adopted, National Grid NTS current preference is for application to all System Points Less risk of gas being delivered above such limits to IPs as a result of different contractual limits at other System Entry Points Greater risk that the position would be complicated by sensitive sites if application is not universal

CEN Standard: Expected Next Steps September 2015: Votes of national standardising bodies submitted 20 th October 2015: Informal member state meeting to discuss implementation DECC would welcome stakeholder views End of 2015: Adoption as CEN Standard (if approved by member states) 2016: Amendment process to INT Code

EU Phase 2 Implementation Update

Contractual Update Ofgem approval received for: Moffat Interconnection Agreement Moffat Tripartite Agreements IUK Interconnection Agreement BBL Interconnection Agreement

Systems Update At the time of writing, National Grid NTS and its adjacent TSOs remain on track for go-live of the new arrangements from 1 st October 2015 Final User Assurance Testing with GNI and Single Sides Nomination testing with BBL is being conducted w/c 21 st September All National Grid system code needed for 1 st October go live has been deployed Testing of the kwh/d schema with PRISMA has commenced; code to be deployed mid-october

Systems Update For a temporary period from 1 st October, no IP renominations will be possible on Gemini whilst the matching cycle is in progress (until Users have received Confirmed Quantities in Gemini) This time period varies by IP & is required to allow the system to match nominations From testing with IUK and BBL, this tends to be window of 15 minutes maximum past the hour From testing with GNI/PTL, this tends to be a window of 35 minutes maximum past the hour for the Moffat IP Initial nominations will not be affected, nor will a first renomination submitted within day amending a D-1 initial nomination

Systems Update National Grid NTS are working with Xoserve to resolve this issue Currently we are expecting to implement a solution into Gemini within a few weeks of go live subject to technical analysis We will keep you updated on progress via the EU Codes implementation webpage

Systems Update SSN & DSN Duplicates PTL have developed their systems to allow SSN & DSN duplicates to be placed for the same gas day This has not been implemented by any other TSO (and for at least one (IUK) such nominations would be rejected) For clarity this functionality has not been implemented in Gemini and so cannot currently be undertaken We are reviewing this issue with the Regulators and will keep you informed of progress

EU Webpage

EU Webpage EU Implementation webpage up and running: A good source for an overview of changes and recent communications and updates. http://www2.nationalgrid.com/uk/industryinformation/europe/eu-project---implementationinformation/ Recent additions: EU Legal Roadmap (also circulated via JO) EU Implementation Q & A (we shall keep as a live document that is updated as more queries come in) 33

Future Topics

Future Topics Topic Area Provisional Date Tariffs Code Monthly updates whilst progressing through comitology Incremental Code Monthly updates whilst progressing through comitology