UPDATE ON THE LAO PDR: NAM THEUN 2 (NT2) HYDROELECTRIC PROJECT

UPDATE ON THE LAO PDR NAM THEUN 2 (NT2) HYDROELECTRIC PROJECT

Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries

The World Bank Nam Theun 2 Social and Environment Project (P049290)

Lao PDR World Bank Management Mission on the Nam Theun 2 Project AIDE MEMOIRE May 17-18, 2004

REVENUE AND EXPENDITURE MANAGEMENT

Project Name Nam Theun 2 (NT2) Hydropower Project and the Nam Theun 2 Social and Environment Project (NTSEP) Region

FINANCIAL PERFORMANCE AND PROJECTIONS OF LAO HOLDING STATE ENTERPRISE

Lao PDR World Bank Mission AIDE MEMOIRE April 1, 2002

The World Bank Guarantees

Nam Theun 2. Board Update: Project Progress during 2012 ADB. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Lao People s Democratic Republic: Strengthening the Capacity of the State Audit Organization

DECREE ON THE ENVIRONMENT PROTECTION FUND

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

Mongolia: Social Security Sector Development Program

ASIAN DEVELOPMENT BANK

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

PROJECT PREPARATORY TECHNICAL ASSISTANCE

A. Problems with Interim Compensation, Downstream Channel

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

PROJECT PREPARATORY TECHNICAL ASSISTANCE

ASIAN DEVELOPMENT BANK

10.0 NAM THEUN 2 ISSUES

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

EAP Task Force. EAP Task

ASIAN DEVELOPMENT BANK

MODEL CA DOMESTIC & EXPORT SALES [ ] HYDROELECTRIC POWER PROJECT CONCESSION AGREEMENT BETWEEN THE GOVERNMENT OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

PROJECT PREPARATION TECHNICAL ASSISTANCE

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

Fiji Agricultural Partnership Project (FAPP) Negotiated financing agreement


PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

Global Environment Facility Grant Agreement

Financing Agreement. (Strengthening Regional Cooperation for Wildlife Protection in Asia Project) between NEPAL. and

CTF-SCF/TFC.4/Inf.2 March 13, Joint Meeting of the CTF and SCF Trust Fund Committees Manila, Philippines March 16, 2010

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity PROGRESS REPORT THE PREPARATION

Ex-Ante Evaluation (for Japanese ODA Loan)

CBD. Distr. GENERAL. UNEP/CBD/ICNP/3/2 12 February 2014 ORIGINAL: ENGLISH

Technical Assistance Report

Cambodia: Rural Credit and Savings Project

LRTF Quarterly Report March 1, As of February 22, 2012, the LRTF status was as follows: USD million

Republic of the Maldives: Preparing Business Strategy for Port Development

Indonesia: Metropolitan Medan Urban Development Project

Ministry of Finance Republic of the Marshall Islands. Consultant Recruitment Announcement SEDeP Project Manager

ASIAN DEVELOPMENT BANK

Institutional Strengthening for Aviation Regulation

Mongolia: Development of State Audit Capacity

Vietnam: IMF-World Bank Relations *

OPERATIONS MANUAL BANK POLICIES (BP)

Joint Partnership Arrangement

Establishment of the High-Level Technology Fund

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

with GIZ for the Lao People's Democratic Republic 01 April 2018 Entity Support

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Cambodia: Water Resources Management Sector Development Program (Second Tranche)

with UNDP for the Republic of Congo 12 May 2016 NDA Strengthening & Country Programming

Program-for-Results Financing 1

By Thavichanh Thiengthepvongsa Deputy Director General Investment Promotion Department Ministry of Planning and Investment

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Policy for Providing Heavily Indebted Poor Countries Relief from Asian Development Fund Debt and Proposed Debt Relief to Afghanistan

Indicative Guidelines for Country-Specific Resource Mobilization Strategies

TA for Capacity Development in Hydropower and Mining Sector (P109736)

REPORT 2015/041 INTERNAL AUDIT DIVISION. Audit of the United Nations Mine Action Service of the Department of Peacekeeping Operations

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Integrated Safeguards Data Sheet (Initial)

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

Section 3.06 is deleted and the following is substituted therefor:

Viet Nam: Microfinance Development Program (Subprograms 1 and 2)

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

Section 3.07 is deleted and the following is substituted therefor:

Agenda item 18: Policies on the formal replenishment process

Team Leader: Srinivasan Palle Venkata, Evaluation Specialist ( Contact:

Public-Private Infrastructure Advisory Facility (PPIAF) Presentation to Financing Renewable Energy Projects Training Program October 11, 2012

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

LAO PDR NAM THEUN 2 HYDROELECTRIC PROJECT by Gráinne Ryder

Lao PDR World Bank Mission on the Nam Theun 2 Project and Related Matters AIDE MEMOIRE October 28 and 29, 2002

Development Strategy and Socio-economic Development Framework of Laos

RCI as Driver of Inclusive Growth

Mekong River Commission

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Nile Basin Trust Fund Grant Agreement

Loan Agreement. (Xiaolangdi Multipurpose Project: Stage II) between PEOPLE S REPUBLIC OF CHINA. and

Policy Paper. March Establishing the Project Design Facility

November 23, International Bank for Reconstruction and Development. Charter Establishing The Forest Carbon Partnership Facility

9.0 FINANCIAL EVALUATION OF POWER PROJECTS

ASIAN DEVELOPMENT BANK

Technical Assistance Report

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

PROJECT PREPARATORY TECHNICAL ASSISTANCE

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

GAMAS means Mongolia Customs Automated Data Processing

India: Karnataka Urban Development and Coastal Environmental Management Project

Development Credit Agreement

REPORT 2015/009 INTERNAL AUDIT DIVISION. Audit of a donor-funded project implemented by the International Trade Centre in Côte d Ivoire

FUNDING STRATEGY FOR THE IMPLEMENTATION OF THE GLOBAL PLAN OF ACTION FOR ANIMAL GENETIC RESOURCES

Environmental and Social Directive for Investment Project Financing. Bank Access to Information Policy Designation Public

Review of the Public Communications Policy of the Asian Development Bank: Disclosure and Exchange of Information

Transcription:

ASIAN DEVELOPMENT BANK UPDATE ON THE IMPLEMENTATION STATUS OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC NAM THEUN 2 HYDROELECTRIC PROJECT July 2005

ABBREVIATIONS ADB Asian Development Bank AFD Agence Française de Développement AIP Annual Implementation Plan CTA Common Terms Agreement DSRP Dam Safety Review Panel EIB European Investment Bank EMU Environment Management Unit EPF Environment Protection Fund GOL Government of Lao People s Democratic Republic GOLE Government of Lao People s Democratic Republic Engineer IDA International Development Association IFI International Financial Institution HCC Head Construction Contractor LTA Lenders Technical Advisor MIGA Multilateral Investment Guarantee Agency MOF Ministry of Finance NIB Nordic Investment Bank NTPC Nam Theun 2 Power Company Limited NT2 Nam Theun 2 Hydroelectric PIP Project Implementation Plan RMU Resettlement Management Unit THB Thai Baht WMPA Watershed Management and Protection Authority

CONTENTS Page Map I. Introduction 1 II. Financing 1 III. Project Launch 2 IV. Monitoring and Evaluation 2 V. Project Construction Activities 3 VI. Environmental and Social Aspects 4 VII. Lao PDR Environment and Social (LEnS) Project 6 VIII. Revenue Management 6 IX. Reporting on NT2 Implementation 7 Appendix 1. NT2 Final Project Financing Plan (June 2005) 8

This map was produced by the Map Design Unit of the World Bank. Reproduced with permission. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of the World Bank Group, any judgement on the legal status of any territory, or any endorsement or acceptance of such boundaries.

I. INTRODUCTION 1. This update reports on key developments relating to the Lao PDR Nam Theun 2 Hydroelectric 1 (NT2) project since the World Bank Board approval on 31 March 2005 and the Asian Development Bank (ADB) Board approval on 4 April 2005. The management of the two Banks have agreed that they will keep their respective Boards informed on the implementation of the NT2 project through joint reporting on an annual basis, starting February 2006, supplemented by semiannual updates. II. FINANCING 2. Following (a) the World Bank Board approval of the International Development Association (IDA) Partial Risk Guarantee, the Multilateral Investment Guarantee Agency (MIGA) Guarantees, and the IDA Grant to the Government of Lao PDR (GOL); and (b) ADB Board approval of the private sector loan from its ordinary capital resources (OCR) facility to the Nam Theun 2 Power Company Limited (NTPC), the Political Risk Guarantee, and the public sector loan (OCR) to GOL in connection with the NT2 project, a total of US$1,450 million equivalent (excluding bonding facilities) in US dollars and Thai baht have been committed by various financing partners 2 to fund the base project cost of US$1,250 million, plus an additional US$200 million for contingency. Appendix 1 shows the final financing plan for the NT2 project, depicting the contribution of various financing partners. 3. The IDA Partial Risk Guarantee (covering US$42 million of principal) and the IDA Development Grant Agreement (US$20 million) to the GOL for the Nam Theun 2 Social and Environment Project (NTSEP) became effective on 10 June 2005; the MIGA Guarantee for debt (US$85.6 million, covering US$42 million of principal) and the MIGA Guarantee for equity (US$5 million) became effective on 14 June 2005 and 17 June 2005, respectively. 3 The ADB direct loan (US$50 million) and ADB Political Risk Guarantee (covering US$42 million of principal) became effective on 10 June 2005, while the ADB public sector loan to the GOL (US$20 million) became effective on 14 June 2005. As expected in such large private project financings, there were over three hundred conditions precedent to be met by NTPC before the lenders would allow disbursements under their loans. NTPC completed such requirements, with a few limited waivers, by 10 June 2005. On 15 June 2005, subsequent to financial close, all of the commercial, bilateral and multilateral lenders and guarantors allowed NTPC to make its first drawdown on the several debt facilities. 4. Completion of the NT2 project financing entails a number of firsts. NT2 project is the largest ever foreign investment in the Lao PDR, the world s largest private sector cross-border power project financing, the largest private sector hydroelectric project financing, and one of the largest internationally-financed independent power producer (IPP) projects in Southeast Asia since the 1997 financial crisis. 1 It may be noted that the IDA Lao PDR Environment and Social (LEnS) project, which complements NT2, is being presented to the World Bank Board of Executive Directors on 30 June 2005, under streamlined procedures. 2 The Agence Française de Développement (AFD), the Nordic Investment Bank (NIB) and the European Investment Bank (EIB), Export Credit Agencies (Coface, GIEK and EKN), nine US dollar commercial lenders and seven Thai baht commercial lenders. 3 As part of NTPC s optimization of the financing plan, the IDA PRG, the MIGA PRGs and the ADB PRGs were each lowered to US$42 million, based on actual requirements, as shown in Appendix 1.

2 III. PROJECT LAUNCH 5. A project launch workshop was held on 6 9 June 2005 in Lao PDR to bring together representatives of the GOL, financial institutions and their professional advisors, and management and shareholders of NTPC to discuss and agree on a structure for effective project implementation and oversight. Following the workshop, a project site visit took place on 10 12 June 2005 providing an opportunity for representatives of the international financial institutions (IFIs) to observe the progress of construction works and to visit some villages that will be affected by the project. 4 6. Based on the critical importance of ensuring timely implementation, the IFIs have decided to give priority to field-based supervision with regular supervision visits from headquarters personnel. To coordinate with technical specialists from the GOL, NTPC, and the Head Construction Contractor (HCC) on an ongoing basis, field-based staff are being deployed by ADB (hydropower specialist in Vientiane and a resettlement/social development specialist in Bangkok), World Bank (resettlement specialist in Bangkok and environment specialists in Bangkok and Vientiane), and Agence Française de Développement (AFD) (infrastructure specialist in Vientiane). Based on agreement among the concerned parties, arrangements for technical monitoring and reporting by NTPC, the GOL Engineer (GOLE), the Lenders Technical Advisor (LTA) and the Dam Safety Review Panel (DSRP) have also been put in place. The GOLE would visit the project site once every quarter (timed to overlap with the periodic visits of the DSRP), with additional visits as required in the interim, and is also considering stationing a full-time engineer on site to ensure careful oversight and prompt attention to problems as they may occur. 7. A schedule of supervision missions and site visits was also agreed at the project launch. NTPC would expect quarterly supervision missions from the LTA and the IFIs, supplemented by monthly visits by IFI field-based staff which would also be open to all lenders and advisors. It was also agreed that IFI staff would undertake additional ad hoc field visits (together or separately), in special circumstances, if there are any urgent/serious issues to be addressed. NTPC proposed that all supervision missions, including those of the various independent monitoring and advisory agencies (DSRP, GOLE, International Advisory Group (IAG), Independent Monitoring Agencies, and Panel of Environmental and Social Experts), take place concurrently, to the extent possible, to minimize the disruption to project implementation. All entities involved in supervision have agreed to try to combine their missions to the extent possible. IV. MONITORING AND EVALUATION 8. NTPC has agreed to a common framework of conditionality and a common set of principles and requirements that govern implementation of the project. This framework is laid out in the Common Terms Agreement (CTA, May 2005) agreed among all key parties including NTPC and the financing institutions involved in the project. Although IDA is not formally a party to the CTA, it is under the terms of the CTA a beneficiary party of Schedule 11 of the CTA which defines the environmental and social obligations of NTPC. The CTA sets forth the terms of reference for the LTA to monitor the project on behalf of all of the commercial, bilateral and multilateral lenders. The LTA contract was signed on 20 May 2005. Funded by NTPC, but 4 During this site visit, participants also toured the ADB-supported 210MW Theun-Hinboun hydropower facility, owned and operated by the Theun-Hinboun Power Company.

3 managed on behalf of all the financial institutions by the Intercreditor Agent (ICA), this contract will provide regular oversight by qualified consultants on all key aspects of the dam project throughout the construction and operational phases of the project until the commercial loans are fully repaid in 2017. In addition, public expenditure reform and NT2 revenue management arrangements will be supervised separately by a joint World Bank-ADB team as an integral part of the project. 9. Under the CTA, the World Bank was appointed the Representative IFI on behalf of the IFIs (the international and bilateral development and export credit agencies). In this role, it is responsible to ensure prompt attention to issues of concern to the IFIs, especially on technical, environmental and social measures, and to ensure that their views are consolidated and expressed in a timely manner to NTPC. In turn, NTPC will be preparing monthly progress reports (the first one issued in June 2005 covering May 2005) covering construction, construction-related environmental and social obligations of the HCC and the environmental and social responsibilities of NTPC and the GOL. In addition, NTPC will prepare more comprehensive semi-annual project progress reports (including a section on environmental and social aspects) that will be made public in accordance with the terms of the Project Agreement. V. PROJECT CONSTRUCTION ACTIVITIES 10. The Nam Theun River is expected to be diverted in early 2006, which will enable construction of the dam; impounding of the reservoir will start in 2008 and NT2 commercial operations are planned to start in late 2009. Preliminary construction activities (PCAs), which have been necessary to give a head start to the project in order to meet its tight deadlines, started as early as December 2003. These activities included site mobilization; construction of access roads and worker s residences; establishment of aggregate quarries and cement batching plant; unexploded ordnance clearance; excavations for key components like the dam, river diversion tunnel, intake channel, access tunnel, power house; and design of the downstream channel (see Map). Five subcontracts three for civil works and two for electromechanical systems were signed and the head construction contract came into force on 15 May 2005. With the achievement of the financial close in mid-june, the HCC will progress into the main construction activities, in line with the Project Implementation Plan (PIP) and the Annual Implementation Plan (AIP). Currently, the site work force numbers about 2,300 of which 80 percent are Lao nationals. This number would increase to about 4,000 by the end of 2005. With the oncoming wet season, surface construction activity will slow down, but work will continue at normal pace inside the tunnels. 11. Environmental, safety and health management measures, including erosion and sediment control, water quality monitoring, hazardous material and waste management, road safety, disease prevention and medical emergency have been effectively put in place. Of the US$19 million spent on preliminary construction activities so far, about US$3 million has been spent on environmental and social measures. The operation for salvaging timber from the reservoir area will be significant, amounting to about 770,000 cubic meters. With the help of international consultants, a salvage logging plan is currently under preparation, after which contracts are expected to be awarded within this calendar year to two or more companies to accomplish the task.

4 VI. ENVIRONMENTAL AND SOCIAL ASPECTS 12. The implementation of the project s environmental and social safeguards aspects is progressing satisfactorily. The major events that have taken place since Board approval are summarized below: (i) (ii) (iii) (iv) (v) The Concession Agreement, including its Schedule 4 related to environmental and social obligations and plans, has been amended to include all agreed environmental and social safeguard obligations of NTPC, and is consistent with the legal agreements of IFIs. 5 The Project Implementation Plan (PIP) has been finalized. Draft versions were reviewed and the final PIP was found satisfactory by the IFIs. The PIP further elaborates the implementation arrangements contained in the safeguard documents and Schedule 4 of the Concession Agreement. The preparation of the AIP for 2005 2006 is, however, slightly behind schedule. A draft version provided to the IFIs on 15 June 2005 is expected to be finalized by 15 July 2005. The NTPC has confirmed that the main construction activities will commence only after a satisfactory AIP is finalized. The core staff needed by GOL and NTPC have been recruited. The Environment Management Unit (EMU), the Resettlement Management Unit (RMU) and the Watershed Management and Protection Authority (WMPA) are now operational, and the core technical, administrative and financial staff have been hired or contracted; however, the selection of long-term technical advisors for GOL (EMU, RMU and WMPA) are behind schedule by one to three months due to a delay in initiating recruitment. The Head Construction Contractor's Environmental Monitoring and Management Plan (HCCEMMP), including the main plan and 10 sub-plans, has been endorsed by GOL and NTPC. The HCCEMMP is consistent with Schedule 4 of the Concession Agreement and the PIP. In addition, 24 Site-specific Environmental Plans (SSEPs) have been prepared by the head contractor and are currently being reviewed by NTPC and GOL. Pre-construction activities. To date, no significant non-compliance has been reported. However, the LTA s visit in March 2005 highlighted three areas where greater attention was required during the construction phase: (i) erosion control; (ii) improving catering facilities to the workforce to prevent poaching of wildlife; and (iii) proper storage of hazardous materials including oil. NTPC has initiated corrective actions for all three of these areas. (vi) Conservation programs including wildlife management are progressing satisfactorily. The WMPA has completed the demarcation of 235 km of the southern boundary of the NT2 watershed, the first of its kind in Lao PDR. WMPA has contracted the Wildlife Conservation Society (WCS), an international operational nongovernmental organization, to assist them in undertaking a 5 The main provisions of the Concession Agreement, including Schedule 4 (Environmental and Social obligations), have been publicly disclosed through the NTPC and GOL websites. These are: www.namtheun2.com and www.poweringprogress.org, respectively.

5 baseline biodiversity assessment, and is also strengthening its patrolling and monitoring capability. The WCS-led survey of Asian elephants is ongoing and a management plan will be prepared at the end of the year. (vii) (viii) (ix) (x) Detailed village planning has started for the first group of nine villages that will be resettled during the 2005 2006 dry season. The emerging lessons from the pilot resettlement village in the Nakai Plateau are promising. Many households that moved into the pilot village in the last three years have already surpassed the household income target just from the sale of their agricultural produce. They are not yet self sustaining, however, as agricultural inputs are still being subsidized by the project. The subsidies and transitional assistance are to be phased out gradually as the full range of options under the livelihood program falls into place. Markets are limited to local and particularly project demand, and a more extensive marketing system has yet to develop. Detailed resettlement plans are now being prepared, in accordance with the policy framework contained in the Social Development Plan, for project construction lands (project lands) for IFI approval before their implementation. Baseline studies including socioeconomic surveys and consultation, inventory of lost assets, and valuation, have been completed for all project lands that will involve land acquisition impacts. Provisional compensation for loss of crops, caused by preliminary construction activities, has been provided until the full implementation of the resettlement plans commence. The selection of independent monitoring agencies for EMU, RMU and WMPA has begun, and is expected to be completed in the next three months. Attention was drawn at the Board discussions to the importance of addressing the environmental and social issues relating to the Theun-Hinboun Hydropower Project, an ongoing project that commenced commercial operations in 1998 and involved GOL, ADB and private financiers. It may be noted that a ten-year mitigation and compensation program (MCP) was agreed upon in June 2000 and an Environmental Management Division (EMD) established within the project entity in 2001 to implement it. The MCP is a comprehensive plan and takes a participatory approach towards its implementation. The EMD is addressing the issues raised in the MCP dealing with 3,000 families in 57 villages. A detailed fisheries study was completed in late 2004 and the project entity also conducted several erosion and sedimentation studies for downstream areas. The project authorities report that compensation for land loss due to riverbank erosion has been already disbursed while other claims are being handled through direct consultations with project affected persons. An independent review of implementation of MCP is planned every two years, with the first one undertaken at end-2004. GOL is also making available periodic status and progress reports on the above activities. Appropriate information will be included in the annual implementation report/semi-annual updates prepared for the Boards of the ADB and the World Bank, so that progress can be monitored.

6 VII. LAO PDR ENVIRONMENT AND SOCIAL (LEnS) PROJECT 13. The GOL and the World Bank have completed negotiations of this project, which is being presented to the World Bank Board of Executive Directors on 30 June 2005, under streamlined procedures. This project is designed as a complementary activity to the NT2 project, capitalizing on opportunities to scale-up policy and capacity initiatives. Specifically, the project will: (i) apply the lessons learned during preparation of the NT2 project to other development projects, with special emphasis on hydropower development; (ii) address cumulative impacts of river basin development in Nam Theun/Nam Kading Basin; (iii) strengthen the legal and institutional framework for resettlement and enable its implementation; and (iv) help maintain the integrity of other protected areas in the country. Under the ADB s Lao Environment and Social Program Loan, ADB and the World Bank have been working with the GOL in preparing the Decree for establishing the Environment Protection Fund (EPF) and the Resettlement Decree. 6 Prior to Lao PDR Environment and Social Project (LEnS) negotiations, the GOL issued the National Policy on Environmental and Social Sustainability of the Hydropower Sector, and the Decree for establishing the EPF. The National Policy aims to adapt and tailor the environment and social safeguard principles developed under the NT2 project to the hydropower sector as a whole, thus enabling procedures to be streamlined and institutionalized. The National Policy also establishes target dates for completing specific actions, which are dated covenants for this project. The ADB and the World Bank are collaborating with GOL in the establishment and operation of the EPF. The EPF is the implementing agency for LEnS, and the project will assist in its development to become a competent and skilled organization and thereby qualified to receive and effectively allocate NT2 revenues to environmental management activities from 2009 onwards. VIII. REVENUE MANAGEMENT 14. The Ministry of Finance (MOF) is setting up a Steering Committee for the Public Expenditure Management Strengthening Program (PEMSP), to be chaired by the Vice Minister of Finance, with membership including the heads of the Budget, Accounting, Treasury, Fiscal Policy, Inspection and Personnel Departments. The first meeting of the Steering Committee is planned for July 2005. The MOF is also proposing the establishment of a Coordination Committee comprising representatives of financing partners supporting implementation of PEMSP that would meet shortly after the first Steering Group meeting. MOF has further indicated that donor representatives would be invited to this meeting. 15. MOF has also suggested that a joint mission, with donor representatives and project managers responsible for project work scheduling, be undertaken in September 2005 to coordinate the activities in the PEMSP work plan for FY2006 (October 2005-October 2006). Regarding technical assistance, MOF has received applications and prepared a short list for hiring a Technical Advisor and a Capacity Building Advisor. In addition, MOF has proposed recruitment of a national program assistant to support the Steering Committee s Secretariat. IDA has agreed that this can be funded through the ongoing IDA Financial Management Capacity Building Credit. 16. With regard to the reporting framework for NT2 revenue management, the Government is expected to start the process of selecting an appropriate Supreme Audit Institution partner 6 A draft Resettlement Decree was prepared by the Science, Technology and Environment Agency (STEA) with assistance provided by the ADB, drawing in large part on the NT2 experience. Its enactment is a condition of effectiveness for the LEnS Project.

7 soon to ensure that the Audit Peer Review is undertaken in FY2006 as foreseen under the NT2 revenue management arrangements. 17. The objectives of the Public Expenditure Review (PER) scheduled for FY2006 have been discussed with the MOF and are expected to be finalized shortly. Thereafter, this key component of public expenditure reform will be launched. The Public Expenditure Tracking Survey (PETS) is already underway. Following the completion in November/December 2004 of rapid data assessment, the survey instruments were developed and pilot-tested in May 2005. The survey is expected to take place during October December 2005. IX. REPORTING ON NT2 IMPLEMENTATION 18. The first joint annual report on NT2 Implementation prepared by the staff and management of ADB and the World Bank for their respective Boards, is planned for February 2006 and will be followed by a semiannual update.

8 Appendix 1 NT2 FINAL PROJECT FINANCING PLAN (JUNE 2005) Project Financing Plan US$ Million THB Million Total US$ million equivalent (@ THB 40: 1 US$) Export Credit Agency Facility - COFACE (France) - EKN (Sweden) - GIEK (Norway) 200.00 136.00 29.00 35.00 200.00 136.00 29.00 35.00 IDA PRG Facility 42.00 42.00 ADB OCR Facility 50.00 50.00 ADB PRG Facility 42.00 42.00 MIGA PRG Facility 42.00 42.00 AFD Facility 30.00 30.00 NIB Facility 34.00 34.00 Proparco Facility 30.00 30.00 Thai Exim Facility 30.00 30.00 THB Commercial Bank Facility 20,000.00 500.00 Total Long-Term Debt 500.00 20,000.00 1,000.00 - Tranche A 450.00 18,000.00 900.00 - Tranche B 50.00 2,000.00 100.00 Private Equity 332.74 190.54 337.50 GOL Equity** - ADB Loan - AFD Grant - EIB Loan - IDA Grant - GOL Contribution (clause 19.1 of CA) 112.50 16.10 6.20 41.00 20.00 29.20 112.50 Total Equity 445.24 190.54 450.00 - Tranche A - 345.24-190.54-350.00 - Tranche B - 100.00-100.00 Total Base and Contingent Financing 945.24 20,190.54 1,450.00