India: Preparing for the Ara Canal Water Productivity Improvement Project

Similar documents
Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Technical Assistance Report

Georgia: Preparing the Second Domestic Resource Mobilization Program

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

Mongolia: Developing an Information System for Development Policy and Planning

India: Supporting the Second West Bengal Development Finance Program

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund)

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

Mongolia: Development of State Audit Capacity

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project

Republic of Fiji: Supporting Public Financial Management Reform

Republic of the Philippines: Islamic Finance for the Philippines

Republic of the Maldives: Preparing Business Strategy for Port Development

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Islamic Republic of Pakistan: Update on Energy Sector Plan

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

Policy Coordination and Planning of Border Economic Zones of the People's Republic of China and Viet Nam

PROJECT PREPARATION TECHNICAL ASSISTANCE

Tuvalu: Supporting Reforms to Strengthen Fiscal Resilience and Improve Public Service Delivery

Republic of the Philippines: Supporting Capacity Development for the Bureau of Internal Revenue

MFF - Bihar Urban Development Investment Program (Facility Concept)

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Technical Assistance Report

ATTACHED TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Republic of Kazakhstan: Enhancing Insurance Market Efficiency and Outreach

Tuvalu: Outer Island Maritime Infrastructure Project

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3)

Republic of the Philippines: Institutionalizing Capital Market Reforms

Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms

Institutional Strengthening for Aviation Regulation

Uzbekistan: Preparing Sustainable Energy Investment Projects

Facilitating Small and Medium-Sized Enterprises Foreign Direct Investment Flows: An ASEAN+6 Case Study

Report and Recommendation of the President to the Board of Directors

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Georgia: Strengthening Domestic Resource Mobilization

Country Operations Business Plan. Maldives June 2018

Country Operations Business Plan. Timor-Leste March 2017

Establishment of the High-Level Technology Fund

Proposed Programmatic Approach, Policy-Based Loan, and Technical Assistance Loan Cambodia: Strengthening Public Financial Management Program

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Report and Recommendation of the President to the Board of Directors

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls

Technical Assistance Report

Report and Recommendation of the President to the Board of Directors

ASIAN DEVELOPMENT BANK

Strengthening Tax Policy and Administration Capacity to Mobilize Domestic Resources (Financed by the Japan Fund for Poverty Reduction)

Technical Assistance Report

Nauru Country Operations Business Plan. August 2015

Policy Paper. March Establishing the Project Design Facility

Republic of the Philippines: Support to Local Government Accountability Systems

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Report and Recommendation of the President to the Board of Directors

Equity Investment Satin Creditcare Network Limited Supporting Access to Finance for Women in Lagging States Project (India)

India: Madhya Pradesh Irrigation Efficiency Improvement Project

Proposed Policy-Based Loans, Grants, and Technical Assistance Grant Pacific Disaster Resilience Program

Armenia: Infrastructure Sustainability Support Program

Country Operations Business Plan. Armenia October 2015

Technical Assistance Report

Country Operations Business Plan. Fiji September 2017

Country Operations Business Plan. Nepal August 2018

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

ASIAN DEVELOPMENT BANK

Report and Recommendation of the President to the Board of Directors

Republic of Uzbekistan: Second Tashkent Province Water Supply Development Project

Country Operations Business Plan. Papua New Guinea August 2016

Country Operations Business Plan. Afghanistan November 2017

Establishment of the Leading Asia s Private Sector Infrastructure Fund

Country Operations Business Plan. Afghanistan November 2015

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)

Report and Recommendation of the President to the Board of Directors

ASIAN DEVELOPMENT BANK

Republic of the Philippines: Preparing the Road Sector Improvement Project

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2

Technical Assistance to the Islamic Republic of Pakistan for the Developing Social Health Insurance Project

Additional Cofinancing

ASIAN DEVELOPMENT BANK

Uzbekistan Country Operations Business Plan. Project Number: October 2017

People s Republic of China: Preparing Yangtze River Economic Belt Projects

Independent State of Samoa: Port Development Project

Country Operations Business Plan. Kazakhstan September 2018

Proposed Programmatic Approach and Policy- Based Loan for Subprogram 1 Republic of Fiji: Sustained Private Sector-Led Growth Reform Program

Report and Recommendation of the President to the Board of Directors

Periodic Financing Request Report. Islamic Republic of Pakistan: Punjab Irrigated Agriculture Investment Program (Tranche 4)

Country Operations Business Plan. Fiji October 2016

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors

Transcription:

Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being disclosed to the public in accordance with ADB s Public Communication Policy 2011.

CURRENCY EQUIVALENTS as of 5 June 2018 Currency unit Indian rupee ( ) 1.00 = $0.01491 $1.00 = 67.0645 ABBREVIATIONS ADB Asian Development Bank BWRD Bihar Water Resources Department CCA cultivable command area ha hectare MOM management, operation and maintenance SCADA supervisory control and acquisition data TRTA transaction technical assistance NOTE In this report, $ refers to United States dollars. Vice-President Wencai Zhang, Operations 1 Director General Hun Kim, South Asia Department (SARD) Director Mio Oka, Agriculture, Natural Resources and Environment, SARD Team leader Team members Arnaud Cauchois, Principal Water Resources Specialist, SARD Brando Angeles, Associate Environment Officer, SARD Cynthia Pancracia Ceniza, Operations Assistant, SARD Rebekah Ramsay, Social Development Specialist, SARD Young Seo, Senior Counsel, Office of the General Rajesh Yadav, Senior Project Officer (Natural Resources and Agriculture), SARD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

CONTENTS Page TRANSACTION TECHNICAL ASSISTANCE AT A GLANCE I. THE ENSUING PROJECT 1 II. THE TECHNICAL ASSISTANCE 2 A. Justification 2 B. Outputs and Activities 2 C. Cost and Financing 3 D. Implementation Arrangements 3 III. THE PRESIDENT'S DECISION 4 APPENDIXES 1. Cost Estimates and Financing Plan 5 2. List of Linked Document 6

Project Classification Information Status: Complete TRANSACTION TECHNICAL ASSISTANCE AT A GLANCE 1. Basic Data Project Number: 52153-002 Project Name Preparing for the Ara Canal Water Department/Division SARD/SAER Productivity Improvement Project Nature of Activity Project Preparation Executing Agency Bihar Water Resources Department Modality Regular Country India 2. Sector Subsector(s) ADB Financing ($ million) Agriculture, natural Agricultural production 0.05 resources and rural development Irrigation 0.95 Total 1.00 qq 3. Strategic Agenda Subcomponents Climate Change Information Inclusive economic growth (IEG) Pillar 2: Access to economic opportunities, including jobs, made more inclusive Climate Change impact on the Project Medium qq 4. Drivers of Change Components Gender Equity and Mainstreaming Governance and Institutional development Some gender elements (SGE) capacity development (GCD) Knowledge solutions (KNS) Pilot-testing innovation and learning qq 5. Poverty and SDG Targeting Location Impact Geographic Targeting No Household Targeting No Rural High SDG Targeting Yes SDG Goals SDG2, SDG6, SDG7, SDG13 Qq 6. Risk Categorization Complex Qq 7. Safeguard Categorization Safeguard Policy Statement does not apply qq 8. Financing Modality and Sources Amount ($ million) ADB 1.000 Transaction technical assistance: Technical Assistance Special Fund 1.000 Cofinancing 0.000 None 0.000 Counterpart 0.545 Government 0.545 Total 1.545 qq Qq Source: Asian Development Bank This document must only be generated in eops. 04052018165205638136 Generated Date: 15-Jun-2018 10:22:37 AM

I. THE ENSUING PROJECT 1. The project is aligned with India s priority agenda to improve water use efficiency and water productivity in the irrigation sector to double farmers income and reduce the country water stresses. It also contributes to the implementation of Bihar agriculture road map 2017 2022. The project will support the modernization of the Ara canal system, 202,000 hectares (ha) cultivable command area, which comprises about 700 kilometers of unlined canals built in the 1870s. The modernization strategy of the Ara canal system follows the framework for modernization of majorand medium-sized irrigation that was elaborated for the Government of India under the Asian Development Bank s financed Scoping Study for a National Water Use Efficiency Improvement Support Program. 1 2. The Ara canal system performance was assessed through the Food and Agriculture Organization rapid appraisal process. The results generally reflected a low level of water delivery services and a below-average overall performance. Due to deferred maintenance, the system is in poor physical condition. Damaged canals and control structures as well as outdated designs, equipment and procedures resulted in significant conveyance and distribution water losses. Weak management and operation by the Bihar Water Resources Department (BWRD) further hampers the overall performance of the system. There are large inequities in water distribution. Farmers located at the head of the canals waste plentiful amount of water. This reduces canal water availability for farmers located at the middle and tail of the canals. Therefore, most irrigation at the tail of the canal relies exclusively on costly groundwater pumping. The system average water use efficiency was estimated at 35% with irrigation water not reaching 50% of the command area. 3. The project will provide solutions to two key constraints of Ara main canal system performance: (i) inadequate irrigation infrastructure; and (ii) inadequate system management, and operation and maintenance (MOM). The project will also provide agriculture and marketing support services to help farmers maximize project benefits. The proposed project outcome will be: higher irrigation efficiency, agricultural water productivity and climate resilience in the Ara canal system. The proposed project outputs are: (i) Ara canal system irrigation infrastructure modernized; (ii) more efficient and sustainable management, operation and maintenance for the Ara canal system established; and (iii) farmers capacity for on-farm water productivity improvement enhanced. The project will be aligned with the following impacts: (i) India farmers income doubled by 2022; 2 (ii) Bihar State objective to have at least one food item in every Indian plate by 2022 achieved; 3 and (iii) resilience of farmers in the project area to ongoing and uncertain future climate change increased. 4 4. Total investment cost is tentatively estimated at $503 million including $352 million to be financed from ADB s regular ordinary capital resources and $151 million to be financed by the Government of Bihar. The transaction technical assistance (TRTA) and ensuing project are proposed for approval in 2018 and 2020, respectively, as listed in the country operations business plan, 2018 2020 for India. 5 1 ADB. 2014. Support for the Implementation of the National Water Mission by State Governments in India: Scoping Study for a National Water Use Efficiency Improvement Support Program. Manila. 2 Government of India, NITI Aayog. 2017. Three Year Action Agenda (2017 2018 to 2019 2020). New Delhi. 3 Government of Bihar. 2017. Agriculture Road Map (2017 2022). Patna. 4 Government of Bihar. 2015. Bihar State Action Plan on Climate Change Building Resilience through Development. Patna. 5 ADB. 2017. Country Operations Business Plan: India, 2018-2020. Manila.

2 II. THE TECHNICAL ASSISTANCE A. Justification 5. In December 2016, the Government of Bihar approached ADB for funding support. ADB noted that the modernization envisaged by BWRD was limited, with focus on improving conveyance efficiency through canal lining. In October 2017, BWRD recruited Tractebel Engineering Private Limited under a lump sum contract to prepare a modernization plan for the Ara canal system that would follow the framework for modernization of major- and medium-sized irrigation that was elaborated under the ADB-financed Scoping Study for a National Water Use Efficiency Improvement Support Program. The Tractebel Engineering Private Limited proposed project concept was reviewed by ADB reconnaissance mission and several technical and institutional improvements identified and agreed with BWRD. The project concept was therefore expanded to include a balance of engineering works including conjunctive use and pressure pipes for smaller flows, measures for improved MOM, and agriculture support. 6. The proposed TRTA is required to develop the project concept to feasibility study level and meet project readiness criteria for loan approval. 6 The TRTA will (i) develop feasibility design of the proposed project; (ii) review the technical and economic viability of the proposed project; (iii) evaluate safeguards requirements and prepare associated approval documents and implementation plans; (iv) prepare advance detailed design for 30% of the works, expected to be the main and branch canals prism re-sectioning and lining, as well as bidding documents for these works; (v) prepare design build operate (DBO) contracts for the management supervisory control and data acquisition system and also for the pressure-pipe systems; (vi) prepare consulting package(s) for detailed design, construction supervision and project implementation support; (vii) assist in preparation of loan documentation; and (viii) support implementation startup. B. Outputs and Activities 7. The major outputs and activities are summarized in Table 1. The TRTA team is expected to be mobilized in July 2018. Table 1: Summary of Major Outputs and Activities Major Outputs Delivery Dates Key Activities with Milestones 1. Feasibility design, technical and economic feasibility and safeguards December 2018 1.1 Expanded studies and groundwater modelling 1.2 Additional surveys including tube well pumping survey 1.3 Stakeholder consultations and Awareness 1.4 Additional engineering design including balancing storage, dedicated flow measurement structure, pressurized pumping systems, electric and solar energy, and SCADA 1.5 Institutions and MOM 1.6 Technical and economic feasibility 2. Detailed design for 30% of works with bidding documents, and DBO bidding documents for 2.1 August 2018 2.2 February 2019 1.7 Safeguards assessment and plans 2.1 Detailed design for main and branch canals prism re-sectioning and lining, and bidding documents 2.2 DBO bidding documents for SCADA system 6 The TA will be posted in the business opportunities section of ADB s website in June 2018.

3 Major Outputs Delivery Dates Key Activities with Milestones SCADA and 30% CCA equipped with pressurized pumping systems 2.3 February 2019 2.3 DBO bidding documents for pressurized pumping systems 3. Consulting packages terms of reference, loan documentation and implementation start up 3.1 September 2018 3.1 Consulting package(s) for detailed design of remaining works, construction supervision and project implementation support 3.2 Assist in preparation of loan documentation 3.3 Support implementation start-up 3.2 December 2018 3.3 December 2018 CCA = cultivable command area, DBO = design build operate, MOM = management, operation and maintenance, SCADA = supervisory control and acquisition data. Source: Asian Development Bank. C. Cost and Financing 8. The TRTA is estimated to cost $1,545,000 of which $1,000,000 will be financed on a grant basis by ADB s Technical Assistance Special Fund (TASF-other sources). The government will finance and administer $545,000 separate from ADB s fund flow. The government was informed that approval of the TA does not commit ADB to finance any ensuing project. The key expenditure items are listed in Appendix 1. D. Implementation Arrangements 9. ADB will administer the TRTA and will be responsible for selection, supervision and evaluation of consultants, and procurement of surveys financed by ADB under the TRTA. 10. The implementation arrangements are summarized in Table 2. Table 2: Implementation Arrangements Aspects Arrangements Indicative implementation period July 2018 to August 2019 Executing agency Asian Development Bank Implementing agencies Bihar Water Resources Department Consultants To be selected and engaged by ADB Individual: individual selection International, 31 person-months $809,000 Procurement To be procured by consultants Request for quotations 4 contracts $75,000 Disbursement The TRTA resources financed by ADB will be disbursed following ADB's Technical Assistance Disbursement Handbook (2010, as amended from time to time). Asset turnover or disposal Not Applicable arrangement upon TA completion ADB = Asian Development Bank, TRTA = transaction technical assistance. Source: Asian Development Bank. 11. Consulting services. ADB will engage the consultants following the ADB Procurement Policy: Goods, Works, Nonconsulting and Consulting Services (2017, as amended from time to time) and its associated project administration instructions and/or staff instructions. 7 The 7 Terms of Reference for Consultants (accessible from the list of linked documents in Appendix 2).

4 consultants will procure (i) remote sensing satellite surveys, (ii) land acquisition and resettlement census surveys and agro-socioeconomic surveys. 12. Detailed engineering design. The detailed engineering design for works at least 30% of the value of the ensuing loan will be exclusively financed by the Government of Bihar prior to project approval. The Government of Bihar has requested Tractebel Engineering Private Limited to undertake these tasks through a variation to the existing contract with increase in contract amount. III. THE PRESIDENT'S DECISION 13. The President, acting under the authority delegated by the Board, has approved the provision of technical assistance not exceeding the equivalent of $1,000,000 on a grant basis to the Government of India for Preparing the Ara Canal Water Production Improvement Project, and hereby reports this action to the Board.

Appendix 1 5 COST ESTIMATES AND FINANCING PLAN ($ 000) Item Amount in USD A. Asian Development Bank a 1. Consultants a. Remuneration and per diem i. International consultants 680.0 b. Out-of-pocket expenditures i. International and local travel 80.0 ii. Goods (car rental) 30.0 iii. Reports and communications 5.0 iv. Miscellaneous administration and support costs b 14.0 2. Surveys 75.0 3. Training, seminars, and conferences a. Facilitators 3.0 b. Venue rental and related facilities 5.0 c. Participants 13.0 4. Contingencies 95.0 Subtotal (A) 1,000.0 B. Government of Bihar 1. National consultants 466.5 2. Miscellaneous administration and support costs 19.0 3. Local travel 6.3 4. Vehicle and office equipment rental 31.7 5. Office space rental and related costs 21.5 Subtotal (C) 545.0 Total 1,545.0 Note: The transaction technical assistance (TRTA) is estimated to cost $1,545 million, of which contributions from the Asian Development Bank are presented in the table above. The government will provide counterpart support in the form of national consultants and associated logistic cost. The value of government contribution is estimated to account for 35.3% of the total TA cost. a Financed by the Asian Development Bank s Technical Assistance Special Fund (TASF-other sources). b Includes $8,000 for support staff, $3,000 for stationaries and other consumable, and $3,000 for office equipment rental. Source: Asian Development Bank estimates.

6 Appendix 2 LIST OF LINKED DOCUMENT http://www.adb.org/documents/linkeddocs/?id=52153-002-tareport 1. Terms of Reference for Consultants