All amounts are in US dollars, unless otherwise indicated.

Similar documents
Boto Gold Project Feasibility Study Conference Call

TSX: IMG NYSE: IAG IAMGOLD REPORTS 2013 RESERVES OF 10.1 MILLION OUNCES AND MEASURED AND INDICATED RESOURCES OF 23

Detour Gold Updates Life of Mine Plan for Detour Lake

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Saramacca Reserve Declaration

Côté Gold Project Feasibility Study Conference Call

Detour Gold Announces 2016 Operating Results and 2017 Guidance

US$1.98 Billion NPV & US$3 Million Capex (Phase 1)

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

IAMGOLD S PRE-FEASIBILITY STUDY FOR CÔTÉ GOLD PROJECT DEMONSTRATES LOW OPERATING COSTS AND ATTRACTIVE RETURNS

Kişladağ Update March 2018

Orezone Announces Positive Preliminary Economic Assessment

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT

IAMGOLD REPORTS SOLID THIRD QUARTER AND CONTINUES TO EXECUTE ON ITS TRANSFORMATIONAL STRATEGY

Detour Gold Reports Third Quarter 2018 Results

A Story of Transformation

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

Alio Gold Reports Second Quarter 2018 Results

Detour Gold Reports First Quarter 2018 Results and Provides Update on Mine Plan Assessment with Guidance Revisions for 2018

OSISKO UPDATES CANADIAN MALARTIC MINE PLAN

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER

Côté Gold Analyst Site Visit

Detour Gold Reports 2017 Fourth Quarter and Year-End Results

Argonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery

Marathon Gold Announces Substantial Improvements in Updated PEA with 44% Increase in Recovered Gold, at the Valentine Lake Gold Camp, Newfoundland

CANADA S INTERMEDIATE GOLD PRODUCER

Detour Gold Reports Fourth Quarter and Full-Year 2014 Results and Year-end 2014 Mineral Reserve and Resource Estimates

Marigold Life of Mine Plan

Detour Gold Receives Positive Pre-feasibility Study for Its Detour Lake Gold Project in Ontario

MCEWEN MINING ANNOUNCES UPDATED RESERVE & RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

Eldorado Gold Reports Results of Technical Studies

SECOND QUARTER 2018 RESULTS. August 10, 2018

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

Golden Star Announces Wassa Mine Feasibility Study Results

ASANKO GOLD REPORTS Q4 AND FULL YEAR 2017 RESULTS, PROVIDES 2018 GUIDANCE AND A 5-YEAR OUTLOOK

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016

KINROSS GOLD CORPORATION

McEWEN MINING REPORTS 2015 FIRST QUARTER OPERATING & FINANCIAL RESULTS

Detour Gold Reports Second Quarter 2018 Results and Reaffirms Guidance for 2018

Pretivm Reports Third Quarter 2018 Results

CANADA S INTERMEDIATE GOLD PRODUCER

TSX:AR CORPORATE PRESENTATION

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER

Argonaut Gold Announces Positive Feasibility Study for its Magino Project

Skouries Update March 2018

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

Allied Nevada Announces Hycroft Mill Expansion Feasibility Results Highlighted by Improved Projected Returns

Aura Minerals Announces Third Quarter 2012 Financial and Operating Results and Corporate Office Relocation in 2013

Cash Preservation Cost Reduction Disciplined Capital Allocation

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD.

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project

Detour Gold Reports Second Quarter 2017 Results

Northgate Minerals Reports Second Quarter Results

Marathon Gold Announces Positive PEA for the Valentine Lake Gold Camp, Newfoundland

YEAR END 2015 CONFERENCE CALL

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE

SAS REPORTS STRONG 2015 FIRST QUARTER RESULTS

Continental Gold Announces a Positive Feasibility Study for the Buriticá Project

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

Gold production for the quarter of 38,500 ounces with cash flow generation from operations of $18.9 million ( M ).

Forward Looking Statement

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

A $100 per ounce decline in the gold price would reduce the reserves by approximately 3.3% or 310,000 ounces.

Acquisition of Trelawney Mining and Exploration Enhancing our Future Growth Profile

International Tower Hill Mines Announces Livengood Gold Project Feasibility Study Results

McEWEN MINING ANNOUNCES POSITIVE FEASIBILTY STUDY FOR EL GALLO PHASE II, MEXICO

Empowering People, Extraordinary Performance

Q4 and Year End 2012 Conference Call. ArgonautGold.com

June 19, 2014 News Release Updated Feasibility Study for Brucejack Project Confirms Positive Economics

UPDATED MARIGOLD LIFE OF MINE PLAN CONFIRMS NEAR-TERM PRODUCTION GROWTH AND ROBUST ECONOMICS

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING

PURE GOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR THE MADSEN-RED LAKE GOLD DEPOSIT

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

New Drilling Results and Mineral Resource Update for Certej Deposit Gold Resources Increase by 1,570,000 ounces

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION

Dalradian Resources Reports Positive Preliminary Economic Assessment for the Curraghinalt Gold Project in Northern Ireland

Media Announcement (For Immediate Release)

First Quarter 2012 Results

Kişladağ Expansion Project

Lamaque Update March 2018

Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces

TSX-V:TGM March 2016

Q Results. Conference Call. October 26, Kışladağ, Turkey

NEWS RELEASE ROXGOLD DELIVERS RECORD GOLD PRODUCTION AND CASH FLOW IN FIRST QUARTER 2018; ANNOUNCES INCREASE IN FULL YEAR PRODUCTION GUIDANCE

2014 First Quarter Highlights

PRESS RELEASE. Banro Announces Record Q Production and Revenue Results

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

LUNDIN GOLD RECONFIRMS PROJECT SCHEDULE AND LOWERS ALL-IN SUSTAINING COST ESTIMATE TO US$583 PER OUNCE FOR ITS FRUTA DEL NORTE GOLD PROJECT

Transcription:

TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD S FEASIBILITY STUDY FOR BOTO GOLD DELIVERS SIGNIFICANTLY IMPROVED PROJECT ECONOMICS 23% After-tax Internal Rate of Return Payback 3.4 years Net Present Value $261 million All amounts are in US dollars, unless otherwise indicated. Toronto, Ontario, October 22, 2018 IAMGOLD Corporation ( IAMGOLD or the Company ) today announced positive results from a Feasibility Study ("FS") for its Boto Gold Project (the Project ) in Senegal, West Africa. The results outline an economically robust project with an anticipated low cost of production and long operating life. The FS demonstrates a significant economic and operational improvement compared to the Pre-feasibility Study ( PFS ) results announced in February of this year. The FS will be used to support an application for a mining concession in the fourth quarter of 2018. PROJECT HIGHLIGHTS (100% BASIS) Proven and Probable Reserves ( P&P ) increased by 0.51 million ounces to 1.93 million ounces grading 1.71 g/t Au versus the P&P Reserves from the PFS Indicated Resources (including Reserves) of 2.49 million ounces grading 1.61 g/t Au Mine Life of 12.8 years with mill throughput of 2.75 million tonnes per annum Life of Mine ( LOM ) average annual production of 140,000 ounces averaging 160,000 ounces annually during the first six years LOM cash costs of $714/oz and all-in sustaining costs of $753/oz After-tax Internal Rate of Return of 23%, with a payback period of 3.4 years Net Present Value of $261 million (6% discount rate) at a gold price of $1,250/oz Initial capital expenditures of $254 million Steve Letwin, President and CEO of IAMGOLD, said Boto Gold has evolved from a grass roots exploration discovery to a robust development project with nearly 2 million ounces in reserves. I congratulate the team for their success in improving the project economics by as much as they have. The 23% after-tax IRR and the 151% increase in the NPV at a lower gold price assumption are marked improvements from those reported in the pre-feasibility study. This is a solid, low-cost project which is expected to deliver 140,000 ounces annually, on average, for nearly 13 years. While a final investment decision is yet to be made, and there is still permitting work to be done, we re looking at a high-value project that adds to IAMGOLD s already impressive growth profile. The FS was completed jointly by IAMGOLD and Lycopodium Minerals Canada Ltd ( Lycopodium ), with inputs from technical studies completed by Specialist Consultants. The FS represents a comprehensive study of the technical and economic viability of a mineral project that has advanced to a stage where a preferred mining method is established and an effective method of mineral processing is determined. A technical report summarizing the FS will be filed on SEDAR tomorrow.

FS HIGHLIGHTS (100% BASIS) Project Economics and Key Parameters Mining Capacity 18.2 Mtpa Milling Capacity 2.75 Mtpa LOM Average Annual Gold Production 140,000 oz LOM Average Recovery Rate 89.5% Mine Life 12.8 years LOM Average Total Cash Costs $714/oz LOM Average AISC $753/oz Average Grade 1.71 g/t Au Average LOM Strip Ratio 5.8:1 Estimated Capital Expenditure Initial Capital $254 million Sustaining Capital $66 million Gold Price Assumption used in financial analysis $1,250/oz After-tax NPV (6%) $261 million After-tax IRR 23.0% Payback Period 3.4 years /US$ exchange rate of 1:1.20; Oil price of $75 per barrel. MINERAL RESOURCES The Mineral Resource estimate used as the basis for the study is summarized below. Classification Tonnes Mineral Resource Statement May 8, 2018 Grade (g/t Au) Contained Ounces Attributable Contained Ounces Indicated 48,045 1.61 2,487 2,238 Inferred 2,483 1.80 144 130 Notes: 1. CIM Definition Standards were followed for classification of Mineral Resources. 2. Mineral Resources are inclusive of Mineral Reserves. 3. Cut-off grades used to report mineral resources vary from 0.37 g/t Au and 0.51 g/t Au depending on alteration profile. 4. Mineralized Resources are reported within optimized constraining shells. 5. Mineral Resources are estimated using a long-term gold price of $1,500 per ounce. 6. Attributable is a representation of dividends calculated as 90% for IAMGOLD, with 10% to the government of Senegal. 2

MINERAL RESERVES The tonnes, grades, and classification of the Mineral Reserves captured within the FS mine plan are summarized below. Classification Mineral Reserve Statement - Aug 30, 2018 Tonnes Grade (g/t Au) Contained Ounces Attributable Contained Ounces Probable 35,060 1.71 1,926 1,733 Proven & Probable 35,060 1.71 1,926 1,733 Waste within Designed Pit 204,335 Total Tonnage within Designed Pit 239,397 Notes: 1. CIM Definition Standards were followed for classification of Mineral Reserves. 2. Reserves estimated assuming open pit mining methods. 3. Reserves are based on a gold price of $1,200/oz. 4. Cut-off grades varied between 0.46 g/t Au and 0.63 g/t Au depending on alteration profile and pit area. 5. Average process recovery of 89.5%. 6. Mining costs ($/t processed): $13.01/t. Processing costs: $15.04/t. G&A (Include refining cost): $4.22/t. 7. Attributable is a representation of dividends calculated as 90% for IAMGOLD, with 10% to the government of Senegal. MINING AND PROCESSING The FS confirms the preferred development approach to be a conventional truck and shovel open pit mining operation with a mineral processing circuit incorporating primary crushing, grinding, and cyanide leaching, followed by gold recovery using carbon-in-pulp, stripping and electrowinning. Open pit mining includes approximately 14 Mt of waste stripping and 2 Mt of ore stockpiling in preproduction mining during a fifteen month pre-production period followed by 12.8 years of production mining along with stockpile reclaim. Maximum mining rate is 33 Mt per annum. The average ore grade is 1.71 g/t Au and the LOM stripping ratio is 5.8:1. Future Work The FS will be used to support an application for a mining concession to be submitted in the fourth quarter of 2018, with approval expected in the first half of 2019. In the interim, the project team will continue to optimize aspects of the project design and complete an infrastructure condemnation drilling program. The exploration team has worked to consolidate additional exploration concessions near the Boto Gold Project, and will conduct ongoing exploration to expand resources in proximity to the resource pits, and identify and evaluate high priority exploration targets for additional mineral resources. Qualified Persons The FS was prepared by IAMGOLD and Lycopodium and incorporates the work of IAMGOLD, Lycopodium and Specialist Consultants Qualified Persons (QPs) (as defined under National Instrument 43-101). QPs are independent of IAMGOLD and have reviewed and approved this news release. IAMGOLD QPs are not independent of IAMGOLD and have reviewed and approved this news release. The areas of responsibility for each QP involved in preparing the FS, upon which the technical report will be based, are: Lycopodium QPs N. Lincoln, P. Eng., Summary, introduction, project infrastructure, reliance on other experts, metallurgical testing and mineral processing, recovery methods, overall capital and plant operating costs 3

R. McIsaac P. Eng. (Knights Piésold), Tailings and water management Specialist Consultants QPs P. Daigle, P.Eng. (AGP Mining Consultants) Summary, accessibility, geological setting, deposit type, exploration, drilling, sample preparation and analysis and security, data verification, mineral resource estimate G. Zurowski, P. Eng. (AGP Mining Consultants), Summary, mine design, mine capital and operating costs, reserve estimate R. Thomas, MAusIMM CP Geotech (Absolute Geotechnics Consultant), Open pit geotechnical IAMGOLD QPs M. Lanctot, Ing., Summary, property description, historical setting, permitting, financial analysis and adjacent properties The information in this news release was reviewed and approved by Craig MacDougall, P.Geo., Senior Vice President, Exploration for IAMGOLD. Mr. MacDougall is a Qualified Person as defined by National Instrument 43-101. CONFERENCE CALL A conference call will be held on Tuesday, October 23, 2018 at 8:30 a.m. (Eastern Daylight Time) for a discussion with management regarding the results of the feasibility study for the Boto Gold Project. A webcast of the conference call will also be available through IAMGOLD`s website - www.iamgold.com. Conference Call Information: North America Toll-Free: 1-800-319-4610 or 1-604-638-5340. A replay of this conference call will be accessible for one month following the call by dialing: North America toll-free: 1-800-319-6413 or 1-604-638-9010, passcode: 2697#. Forward-Looking Information All Mineral Reserve and Mineral Resources estimates reported by the Company were estimated in accordance with the Canadian National Instrument 43-101 and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards (May 10, 2014). These standards differ significantly from the requirements of the U.S. Securities and Exchange Commission. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. This document contains "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as "forward-looking statements" are made as of the date of this document. Forward-looking statements relate to future events or future performance and reflect current estimates, predictions, expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the estimated amount and grade of Mineral Resources and Mineral Reserves; (ii) the FS representing a viable development option for the Project; (iii) estimates of the capital costs of constructing mine facilities and bringing a mine into production, of sustaining capital and the duration of financing payback periods; (iv) the estimated amount of future production, both produced and metal recovered; and, (v) estimates of operating costs and total costs, net cash flow, net present value and economic returns from an operating mine. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "envisages", "assumes", 4

"intends", "strategy", "goals", "objectives" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements. All forward-looking statements are based on IAMGOLD's or its consultants' current beliefs as well as various assumptions made by them and information currently available to them. The most significant assumptions are set forth above, but generally these assumptions include: (i) the presence of and continuity of metals at the Boto Project at estimated grades; (ii) the geotechnical and metallurgical characteristics of rock conforming to sampled results; including the quantities of water and the quality of the water that must be diverted or treated during mining operations; (iii) the capacities and durability of various machinery and equipment; (iv) the availability of personnel, machinery and equipment at estimated prices and within the estimated delivery times; (v) currency exchange rates; (vi) metals sales prices and exchange rate assumed; (vii) appropriate discount rates applied to the cash flows in the economic analysis; (viii) tax rates and royalty rates applicable to the proposed mining operation; (ix) the availability of acceptable financing under assumed structure and costs; (x) anticipated mining losses and dilution; (xi) metallurgical performance; (xii) reasonable contingency requirements; (xiii) success in realizing proposed operations; (xiv) receipt of permits and other regulatory approvals on acceptable terms; and (xv) the fulfillment of environmental assessment commitments and arrangements with local communities. Although management considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Many forward-looking statements are made assuming the correctness of other forward looking statements, such as statements of net present value and internal rates of return, which are based on most of the other forward-looking statements and assumptions herein. The cost information is also prepared using current values, but the time for incurring the costs will be in the future and it is assumed costs will remain stable over the relevant period. By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. We caution readers not to place undue reliance on these forward-looking statements as a number of important factors could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates assumptions and intentions expressed in such forward-looking statements. These risk factors may be generally stated as the risk that the assumptions and estimates expressed above do not occur as forecast, but specifically include, without limitation: risks relating to variations in the mineral content within the material identified as Mineral Resources and Mineral Reserves from that predicted; variations in rates of recovery and extraction; the geotechnical characteristics of the rock mined or through which infrastructure is built differing from that predicted, the quantity of water that will need to be diverted or treated during mining operations being different from what is expected to be encountered during mining operations or post closure, or the rate of flow of the water being different; developments in world metals markets; risks relating to fluctuations in the Canadian dollar relative to the US dollar; increases in the estimated capital and operating costs or unanticipated costs; difficulties attracting the necessary work force; increases in financing costs or adverse changes to the terms of available financing, if any; tax rates or royalties being greater than assumed; changes in development or mining plans due to changes in logistical, technical or 5

other factors; changes in project parameters as plans continue to be refined; risks relating to receipt of regulatory approvals; delays in stakeholder negotiations; changes in regulations applying to the development, operation, and closure of mining operations from what currently exists; the effects of competition in the markets in which IAMGOLD operates; operational and infrastructure risks and the additional risks described in IAMGOLD s Annual Information Form filed with SEDAR in Canada (available at www.sedar.com ) for the year ended December 31, 2017 and in the Corporation's Annual Report Form 40-F filed with the U.S. Securities and Exchange Commission on EDGAR (available at https://www.sec.gov/edgar/searchedgar/companysearch.html. IAMGOLD cautions that the foregoing list of factors that may affect future results is not exhaustive. When relying on our forward-looking statements to make decisions with respect to IAMGOLD, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. IAMGOLD does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by IAMGOLD or on our behalf, except as required by law. About IAMGOLD IAMGOLD (www.iamgold.com) is a mid-tier mining company with four operating gold mines on three continents. A solid base of strategic assets in North and South America and West Africa is complemented by development and exploration projects and continued assessment of accretive acquisition opportunities. IAMGOLD is in a strong financial position with extensive management and operational expertise. For further information please contact: Ken Chernin, VP Investor Relations, IAMGOLD Corporation Tel: (416) 360-4743 Mobile: (416) 388-6883 Laura Young, Director, Investor Relations, IAMGOLD Corporation Tel: (416) 933-4952 Mobile: (416) 670-3815 Martin Dumont, Senior Analyst Investor Relations, IAMGOLD Corporation Tel: (416) 933-5783 Mobile: (647) 967-9942 Toll-free: 1-888-464-9999 info@iamgold.com Please note: This entire news release may be accessed via fax, e-mail, IAMGOLD's website at www.iamgold.com and through CNW Group s website at www.newswire.ca. All material information on IAMGOLD can be found at www.sedar.com or at www.sec.gov. Si vous désirez obtenir la version française de ce communiqué, veuillez consulter le http://www.iamgold.com/french/accueil/default.aspx. 6