PL CBC PL/D Mieszka I Crossroads reconstruction

Similar documents
2002/ Sulechow by-pass

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ Project Title : Krimov Hora Sv.Šebestiána - Re-laying of Road I/7

03.03 Border crossing in Dorohusk / 1

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ

PL CBC PL/D Environmental disaster prevention Szczecin

01.02 National Bank of Poland/1

Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo

05.01 Strengthen environmental impact assessment

04.02 EAGGF EAGGF - p.1

STANDARD SUMMARY PROJECT FICHE PROJECT PREPARATION FACILITY FOR THE PHARE CBC PROGRAMME BULGARIA-GREECE

01.05 Tax administration/1

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ

Standard Summary Project Fiche. Project PL : Improved Tax Administration

STANDARD SUMMARY PROJECT FICHE. 1.2 Title: Upgrade of the Latvian Statistical System in accordance with EU requirements

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

STANDARD SUMMARY PROJECT FICHE Project Fiche Number: CZ

Neighbourhood Programme Romania - Serbia & Montenegro 2005 fiche for Project 3 Priority 3 Technical Assistance

Standard Summary Project Fiche Project Number

STANDARD PROJECT FICHE

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

SUMMARY PROJECT FICHE

Operational Programme INFRASTRUCTURE AND ENVIRONMENT The Ministry of Regional Development 20 October 2008,

STANDARD SUMMARY PROJECT FICHE

Standard Summary Project Fiche No. HU

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts

PROGRAM COMPLEMENT INTERREG III A / PHARE CBC GREECE - BOULGARIA

FINANCING MEMORANDUM

CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI

Standard Summary Project Fiche for the Transition Facility

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT

STANDARD SUMMARY PROJECT FICHE

PHARE 2004 STANDARD PROJECT FICHE

The INTERREG III Community Initiative

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

Ispa will have until 2006 an annual budget of about 1,040m (expressed in 1999 price).

STANDARD SUMMARY PROJECT FICHE

CBA of transport infrastructure projects in Germany

PHARE 2003 STANDARD SUMMARY PROJECT FICHE

Standard Summary Project Fiche. The project meets the following Accession Partnership priorities:

Standard Summary Project Fiche Project No. TR Twinning No. TR/2004/IB/EC/06

PHARE PROJECT FICHE. 2.3 Accession Partnership, NPIEU priority and Croatian Transport Development Strategy

STANDARD SUMMARY PROJECT FICHE

Standard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05

Annual Implementation Report 2015

European Legislation 1. Indicative-Regulation (EU) No 1299/2013 of the European Parliament and of the Council of 17 December 2013 on specific

SUMMARY PROJECT FICHE

PLAN OF MEASURES TO DRIVE GROWTH, COMPETITIVENESS AND EFFICIENCY

Local Government Budget Management System. 1.1 CRIS Number: 2006/ Twinning No: PL/06/IB/FI/02

Standard Summary Project Fiche

Annex 16 Template of Project Fiche for IPA programmes / component I - decentralised management

PROJECT FICHE. 2.2 Project purpose: To provide sustainable access to longer-term financing to SMEs at market conditions in Cyprus.

ACT ON TOLL MOTORWAYS. of October 27, 1994

ENVIRONMENT AND TRANSPORT

MEGAPROJECT Case Study

PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency

COMMISSION DECISION. C(2007)6376 on 18/12/2007

Effective as of 1 January 2007 Promulgated, SG, No 83 of 16 October 2007, amended, SG, No 53 of 10 June Section I. General Provisions

IPA National Programme 2010 for Albania Project Fiche 09 "Support to the Food Safety Infrastructure "

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY

Polish Roads Projects Financing

Programme number: Title: DUration:

Functioning and financing of national road management

National Agriculture and Rural Development Plan

Standard Summary Project Fiche IPA centralised programmes

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

STANDARD SUMMARY PROJECT FICHE - TRANSITION FACILITY

SUMMARY PROJECT FICHE

Annex C. The objectives of the 2003 Phare External Border Initiative for Romania are

Guidelines for brief feasibility study

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

Screening report Turkey

Prioritisation Methodology

THE ANALYSIS OF THE CONSTRUCTION COSTS OF TRANSPORT INFRASTRUCTURE PROJECTS

STANDARD SUMMARY PROJECT FICHE TRANSITION FACILITY

Attached we are sending you the JASPERS Independent Quality Review Report for the above mentioned project.

Connecting Europe: Trans-European Networks [ :25]

Regional Policy in the Czech Republic in the Period Around Its Accession to the European Union

Annual Implementation Report 2017

Polish Roads Projects Financing

German Working Group within the AEBR. Implementation proposals for INTERREG A

11080/13 HKE/DOS/vm DGG 3B

SUMMARY PROJECT FICHE

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of 2008

SUMMARY PROJECT FICHE. 1. BASIC INFORMATION 1.1 Title: Measures to develop the operational capacity of the Department of Customs & Excise.

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1

DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT PARTNERSHIP AGREEMENT OF THE

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

Getting you there. GCF country programme development guide. Turning aspirations into actions preparing country programme

VOLTA RIVER AUTHORITY

32 nd Street Corridor Improvements

Financing Megaprojects In The Rail Sector. Andreas Klocke, Head of KfW Regional Office, Bangkok

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.

WP1: Synthesis report. Task 3 Country Report Luxembourg

Project Fiche IPA National programmes / Component I

Heads of Terms of the Design Agreement for the Moscow Kazan Section of the Moscow Kazan Ekaterinburg High-Speed Railway Line

E.WA.R.U. Efficient WAter Resource Use ANNEX N.8 PROJECT FINANCING DRAFT REPORT

Process of strategic planning in the context of regional development EU legislation and best practises from the Member States

Purpose. 2 Third Crossing Business Plan

Transcription:

PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction 1. Basic Information 1.1.Desiree Number: PL01.08.11 1.2. Title: Re-construction of crossroads: Mieszka I, Dabrowskiego, Piast?w, Boh. Warszawy, Powst. Wielkopolskich in the path of the national road no 13. 1.3. Sector: Infrastructure 1.4. Location: Szczecin, Westpomeranian Voivodship, Poland, Distance form Polish - German border: about 7 km. 2. Objectives 2.1. Wider Objective Creation of new, more safe road infrastructure of direct influence on cross border traffic in this priority area in order to use innovation potential of the region, meant particularly as supplement of the trans- European networks, as well as improvement of the supra-regional and internal infrastructure in the region. 2.2. Immediate Objectives - increase of travelling speed - shorter time needed to reach the border crossing point - lower operation costs of vehicles - fewer number of road accidents - lower level of combustion gases emission - lower level of noise propagation - lower maintenance costs of the road - creation of jobs during construction - creation of transportation system in the border area - improvement of traffic parameters on the modernised part of the road - improvement of natural environment - improvement of traffic safety - better travelling standards - tourism development 2.3. Accession Partnership and NPAA priority The investment is in compliance with the objectives defined in the Accession Partnership in the field of trans-european networks development of EU standards. In the Accession Partnership, in the medium term objectives concerning transportation it is stated: Completion of harmonisation works and strengthening administrative and executive capabilities in road transportation (access to market, safety on roads...)ö. This project is in compliance with this priority. It also is in compliance with the main priority in the field of transportation defined in the National Plan for the Adoption of the Aquis, i.e. continuation of modernisation and extension of the transportation infrastructure, with particular consideration focused on border crossing points and access to them. In the NPAA the medium term priority 3.4.4.2 states: Modernisation of transportation infrastructure in orde to integrate it in future in the system of trans-european networks. 2.4. Contribution to National Development Plan and Joint Programming Document (JPD) Phare CBC / Interreg III A Re-construction of the given crossroad, is one of many actions undertaken in order to improve supraregional and internal infrastructure of Euroregion Pomerania in the field on transportation infrastructure (roads, railways, air transport), with special consideration focused on centrally located centres, industrial areas, tourist attractions, improvement of beorder crossing ponts capabilities and on better safety in border regions. Development Strategy of the Westpomeranian Voivodship determines, as primary priority, TRANSPORTATION AND COMMUNICATION: Better access of goods and services in the whole region via transportation network, improvement of transportation and communication services and bigger safety of transportation and communication is possible only if transportation network of our region becomes compatible with transportation networks of our neighbours. Joint Programming Document (JPD) Phare CBC / Interreg III A, in the Priority B: Improvement of transportation and tourist infrastructure states the necessity to undertake actions aimed at... improving supra-regional and internal infrastructure of the Region in the field of transportation infrastructure,... with PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.1

special consideration focused on centrally located centres.... Actions foreseen in the execution strategy of this priority comprise of the modernisation of the existing roads, and SWOT analysis of the Region included in the document, shows weakness of ring roads and access roads resulting in the bottlenecks on the supra-regional roads in the cities. Mieszka I Street, in the path of the national road no 13 drives an essential part of the traffic from the border crossing points in Kolbaskowo, Lubieszyn i Rosówek. Modernisation of this road will result in liquidation of the bottleneck (item 3.6.2.1. Road networks JPD). Transportation infrastructure plays an important role in reducing regional disparities in the economic development. That is why one of the priorities of the policy concerning to the construction of the national connections, identified in the National Development Plan (an Annex to NPAA), is Integration of Polish Economy through modernisation and development of transportation networks. Thus, priority actions concentrate on transportation infrastructure included in the Trans-European Networks and will be supplemented by the actions undertaken in the regions, as contribution to the construction of economic and social links in the country. They are defined according to the priority: Strengthening development potential in the regions and combating marginalisation of some regions. One of the suggested measures is Development and modernisation of the infrastructure to strengthen competitiveness. The project is in compliance with the provisions of the National Development Plan. The project also reflects priorities set in the Development Strategy of the Westpomeranian Voivodship in the field of connections with the neighbouring regions and countries, which will allow for faster development of the region. 2.5. Cross Border Impact The investment is located in the border region. National road no 13 drives road traffic out of Szczecin to border crossing points in Kolbaskowo - Pomellen and Rosówek. Execution of this project will improve traffic parameters on the a.m. part of the road. Technical parameters will be adjusted to the growing traffic. Road capacity will improve, time needed to reach Szczecin from the border crossing point will be shorter. Border transportation will be more fluent, which will influence economic, scientific and tourist exchange. The project is strictly related to the JPD priority: infrastructure and the measure concerning development of the integrated regional transport and communication networks. 3. Description 3.1. Background and justification The investment will form final solution of transportation system in the border area. Well balanced and dense road network, as well as sufficient number of border crossing points will secure proper economic and tourist development of the whole region. The project of modernisation national road no 13 has been elaborated based on the assessment of transportation conditions of the border region. National road no 13 is a very important element of the border transportation network. It drives the whole traffic from two border crossing points, has direct connection to Motorway A-6 and national road no 10, connecting Szczecin with the border crossing point in Lubieszyn. This stage of investment is continuation of earlier projects and its execution will solve problems with the cross border traffic entering the city from the border crossing points in Kolbaskowo, Rosówek and Lubieszyn. 3.2. Linked activities Extension of transportation infrastructure in the Westpomeranian Voivodship comprised of several road investments of great importance to the improvement of transportation system, executed in past years. These projects were or are co-financed by Phare and the World Bank. Below there are listed projects directly connected to the given investment: - Contract PL 9604-01-04 Modernisation of the national road no 13 from the road viaduct over Polish Rail line to Milczanska St., 2 MEUR, the project has been completed, - Contract PL 9802-01-06 Modernisation of the national road no 13 from Milczanska St. to Krakowska St., 2,5 MEUR, the project is in the final stage of execution, - Contract Phare 99 Modernisation of the national road no 13 from Krakowska St. to the city boundaries, 2,5 MEUR, the project has been commenced. - Modernisation of the national road no 13 Szczecin - Kolbaskowo from km 6+271 to km 13+561 (beyond the city boundaries, - an investment financed by the World Bank: Construction of the bridge over Regalica River in Szczecin. This project comprises of 7 contracts. PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.2

Execution of next stages of the investment on the national road no 10 will result in faster harmonisation of Szczecin road infrastructure to the EU requirements in transportation policy and municipal infrastructure. Since the scope of the whole investment is very wide, it is being executed in stages: STAGE I construction of the northern road viaduct contract was executed in 1997 and financed by the state and city budgets, STAGE II the contract was executed and co-financed by PHARE CBC 96 and the city. Old road viaduct was demolished, two new viaducts over the railway and the northern road to Milczanska St. (1,1 km long) were constructed. The underground infrastructure was replaced. STAGE III modernisation of Mieszka I St. from Milczanska St. to Krakowska St., 1,5 km long and construction of a roundabout by Poludniowa, Krakowska and Cukrowa Streets. STAGE IV modernisation of Poludniowa St. from a roundabout by Poludniowa, Krakowska and Cukrowa Streets to a roundabout by Poludniowa st., Autostrada Poznanska St. and part of Autostrada Poznanska St. to the city boundaries of Szczecin (1,4 km long). Contract amounted to 3,4 MEUR, out of which 2,5 MEUR was Phare CBC 99 contribution. Contract execution should be completed within 14 months. The works were commenced in February 7 th, 2001. STAGE V modernisation of the southern road on a distance from Milczanska St. to the crossroad with Piastów Av. Modernisation of the crossroad of Piastów Av., Powstanców Wielkopolskich St., Dabrowskiego St. and Mieszka I St. A application for a grant from Phare CBC 2001 was submitted. 3.3. Results The project will result in: * re-construction of the part roadway in Mieszka I St. from the road viaduct to Milczanska St. - street class g 2/2, 0,8 km long, 2 roadways x 3,5 m wide, pavement - 2,0 m wide, cycling path - 2,5 m wide. * re-construction of the crossroads of Boh. Warszawy St., Dabrowskiego St., Piastów Av., Powst. Wielkopolskich St., Mieszka I St.. Two-roadway streets will be built of 7 m width. In Dabrowskiego St. - one - roadway street in two directions of three lanes and width of 10,5 m. * construction of the separate tramway line; length - 350 m, * re-construction of underground infrastructure (gas lines, water pipelines, power cables, heating, telephone and tele-technical cables). After the year 2001 there is planned another STAGE VI re-construction of the railway viaduct over Poludniowa St. with the final re-construction of a road outline before and beyond the viaduct. The final result of the whole investment will be comletely modernised city part of the national road no 13, which will be connected with already modernised in 1998,by the Directorate General for Public Roads, part of this road leading to the State border and border crossing point in Kolbaskowo. 3.4. Outputs As a result of the Contract, the last part of the national road no 13 will be modernised and open for public. Its parameters will be adjusted to growing traffic and to carry bigger weights. Traffic on the city part of the road and from the city boundaries to Kolbaskowo will be improved. The modernised road will be an important element of the border and regional transportation system in the Westpomeranian Voivodship. Project execution will improve traffic parameters on the modernised distance of the road. Its capacity and travelling speed will increase. Operational costs of vehicles, pollution level and number of accidents will decrease. Faster and safer road connection will influence trade, industry and tourism development. 3.5. Inputs The investment comprises of the modernisation of 0,8 km of the south roadway of Mieszka I St. from the road viaduct over railway line to Milczanska St. The crossroad of Mieszka I, Dabrowskiego, Piastów, Bohaterów Warszawy and Powstanctów Wielkopolskich Streets will be re-constructed. Project location is shown on the enclosed map. During project execution 40 jobs will be created (number of jobs was calculated as annual equivalent of full time jobs). 4. Institutional Framework 4.1. On the regional level: - The City of Szczecin Executive Board in the name of the City of Szczecin (Beneficiary) Address: 70-456 Szczecin, 1, Armii Krajowej Sq. - contract will be signed by: The City of Szczecin Executive Board in the name of the City of Szczecin PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.3

Address: 70-456 Szczecin, 1, Armii Krajowej Sq. - institution responsible The City of Szczecin Executive Board in the name of the City of Szczecin Address: 70-456 Szczecin, 1, Armii Krajowej Sq. - monitoring over project execution: the European Commission, Implementing Authority Phare CBC, beneficiary - reporting: Beneficiary 4.2. The project will not change institutional framework described above. 4.3. Not applicable 4.4. Contract Engineer will be selected in tender. Tender procedures will be arranged simultaneously with the tender to select Contractor. The City of Szczecin will be an Employer. After investment is completed the City of Szczecin will operate it. The modernised road will be a public property and will open for public as toll free of general access. 5. Detailed Budget in MEUR Phare Support 2001 Investme nt Support Institution Building Contract 1 Sewage treatment plant 2,0 - Total Phare (=I+IB) National Cofinancin g* IFI* PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.4 TOTAL 2,0 0,875 2,875 Total 2,0-2,0 0,875 2,875 6. Implementation Arrangements 6.1. Implementing Agency: The Implementing Authority for Phare Cross Border Co-operation Programme Krucza 36 Street; 00-522 Warsaw telephone: +48 22 695 99 10-11; fax: +48 22 695 99 12-13 e-mail: Phare@wwpwp.it.pl 6.2. Twinning Not applicable 6.3. Non-standard aspects DIS Manual procedures will be followed during whole tendering process. 6.4. Contracts There will be one contract signed for the total value of 2,875 MEUR. 7. Implementation Schedule 7.1. Start of tendering / call for proposals: IV quarter 2001 7.2. Start of project activity: III 2002 7.3. Project Completion: IV 2004. 8. Equal Opportunity The only criteria of staff selection will be their qualifications and professional experience. Both women and men will be granted equal opportunities to be employed in the project. Designing and construction works are contracted in tenders, where experience and financial terms matter. Based on so far executed projects, one may state that women are particularly well represented during designing and supervision. Employment structure will show women participation. 9. Environment The environment impact analysis was elaborated in 1998. It comprises of main and most essential environment elements: - geological environment,

- soil and underground water, - elements of landscape and flora, - air protection, - water and sewage management, - acoustic climate. The environment impact analysis is enclosed to the fiche. Conclusions of the analysis show, that planned investment will not influence environment negatively and in some aspects (emission of combustion gases) will improve present conditions. 10. Rates of return Financial and economic analysis was elaborated in 2000. FIRR = 30,56% ERR = 35,49% The feasibility study was elaborated in 2000. All three documents are enclosed to the fiche. 11. Investment criteria 11.1. Catalytic effect Modernisation of the whole national road no 13 is an element of complex solution of the transportation system in the border area. Without additional financial support (for example Phare CBC) it is not possible to improve transportation system in the region fast. The investment will contribute to the economic and tourist development. Efficient transport connection of the region with the border crossing point will increase trade and cultural exchange between Poland and Germany. It will also be a base for further economic development, which will facilitate establishment of new investments and creation of new jobs. Execution of next stages of investments on the national road no 10 will result in faster harmonisation of Szczecin road infrastructure to the EU requirements of transportation policy and municipal infrastructure. 11.2. Cofinancing The project is supported by the state from own budget. Polish partner financed designing, land purchase and development of the construction site. It is planned to co-finance construction works in the amount exceeding 25% of the investment costs. 11.3. Additionality Phare co-financing does not displace financing from the City budget. Without external financing contract execution would not be possible. 11.4. Project readiness and size The City of Szczecin is ready to execute the contract. Design works have been completed. Environment impact analysis, financial and economic analysis and feasibility study have been elaborated. Ownership issues are settled and construction permit is granted. Financing, being the contribution of Polish side is secured. The investment fulfils requirements as far as project size is concerned. Total cost amounts to 2,875 MEUR. Phare co-financing applied for by the City of Szczecin amounts to 2,0 MEUR. 11.5. Sustainability The project finally solves transportation system in the border region. It will be sufficient to carry growing traffic during whole calculation period considered in the financial and economic analysis. Designing and construction will be executed according to the regulations in force. The project is in compliance with the EU standards and norms. Modern materials and technologies will be used, which will guarantee long term, without break-down operation. According to tender documents, contractor has to obtain Employer s approval referring to materials and technologies used. Quality Guarantee Programme has been introduced. Contractor has to provide long term guarantee for construction works executed. After the investment is completed the City of Szczecin will finance all maintenance costs. 11.6. Compliance with state aids provisions Project execution follows European Agreement provisions on the state aid. 11.7 Contribution to National Development Plan and JPD Project of modernisation the national road no 13 in Szczecin is in compliance with the assumptions defined in the National Development Plan. Joint Programming Document (JPD) Phare CBC / Interreg III A, in the Priority B: Improvement of transportation and tourist infrastructure states the necessity to undertake actions aimed at... improving supra-regional and internal infrastructure of the Region in the field of transportation infrastructure,... with special consideration focused on centrally located centres.... Actions foreseen in the execution strategy of this priority comprise of the modernisation of the existing roads, and SWOT analysis of the Region PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.5

included in the document, shows weakness of ring roads and access roads resulting in the bottlenecks on the supra-regional roads in the cities. The National Development Plan foresees Strengthening development potential in the regions and combating marginalisation of some regions. One of the suggested measures is Development and modernisation of the infrastructure to strengthen competitiveness. This shows that the project is in compliance with the provisions of the National Development Plan. 12. Conditionality and sequencing - Tender documents, - Tender procedures, - Selection of a Contractor, - Construction works. PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.6

Annex 1: Logframe Date of drafting: October 2000 Planning period: I 01 IV 04 Project number: PL01.08.11 Project title: Re-construction of the crossroads Total budget of the project Total EUR 2,875 MEUR of Mieszka I, Dabrowskiego, Piastów, Phare EUR: 2,0 MEUR: Bohaterów Warszawy, Powst. Wielkopolskich Streets in the path of the national road no 13 Wider objective Indicators of Achievement) Sources of information Assumptions and Risks Creation of new, more safe road infrastructure of direct influence on cross border traffic in this priority area in order to use innovation potential of the region, meant particularly as supplement of the trans- European networks, as well as improvement of the supra-regional and internal infrastructure in the region. - travelling time, - amount of traffic in the border region - number of road accidents - general measurement of traffic by Main Directorate for Public Roads - statistic data (GUS) - monitoring of the natural environment by Voivide administration, Environment Protection Dept. - statistic data by Customs Office - changes in EU and national law and policy on transportation Immediate Objectives Indicators of Achievement Sources of information Assumptions and Risks - - creation of transportation system in the border area - improvement of traffic parameters on the modernised part of the road - travelling time - number of road accidents - level of combustion gases emission - level of noise emission - general measurement of traffic by Main Directorate for Public Roads - statistic data (GUS) - monitoring of the natural environment by - delays in contracting procedures - difficulties in co-ordination of actions and good project management - increase of travelling speed and comfort - shorter time needed to reach the border crossing point - lower operation costs of vehicles - fewer number of road accidents - lower level of combustion gases emission - lower level of noise emission - lower maintenance costs of the road - creation of jobs during construction - cost of travelling per unit - number of new jobs during construction National Inspectorate for Environment Protection - statistic data by Customs Office Results/Outputs Indicators of Achievement Sources of information Assumptions and Risks As a result of the Contract, the last part of the national road no 13 will be modernised and open for public. Its parameters will be adjusted to growing traffic and to carry bigger weights. Traffic on the city part of the road and from the city boundaries to Kolbaskowo will be improved. The modernised road will be an important element of the border and regional transportation system in the Westpomeranian Voivodship. - compliance with Contract Documents - compliance with the work plan - better traffic flow - the City of Szczecin will document work progress and its compliance with the work plan and contract documentation - Regional Development Strategy and JPD - availability of financial resources on time - credibility of the contractor and subcontractors - qualifications of an Engineer Activities Inputs Sources of information Assumptions and Risks PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.7

- modernisation of the national road no 13 from Milczanska St. to Boh. Warszawy St. - qualifications of employed persons (management, supervision, designing, constructing) - quality of used materials, equipment and machinery - contracts signed before works are commenced - changes among proposed staff - lack of work co-ordination Annex 2-4: Implementation, contracting and disbursement schedules (Date of Drafting) October 2000 (Planning Period) IV 01 IV 04 (Budget Allocation Cost Estimate) (in MEUR) (PLANNED) IV I II '02 III '02 IV I '03 II 03 III 03 IV 03 I 04 II 04 III 04 IV 04 01 '02 02 I II III IV V VI VII VIII IX X XI XII XIII Implementation schedule D D D C I I I I I I I I I Contracting schedule 2 2,0 Disbursement schedule 0.5 1,0 1,5 2,0 2,0 Legenda: D = design of sub-projects / C = tendering and contracting / I = contract implementation and payment PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.8

Annex no 5 REFERENCE TO THE FEASIBILITY STUDY Feasibility study of the project has been elaborated. It does not only refer to the technical parameters (location of the road in plan and profile, determination of the capacity and surface bearing capacity, etc.), but also to the environment and social impact and determination of the feasibility of the project. Following complex studies are included in the analysis: - conceptual design, - environment impact analysis, - financial and economic analysis, - preliminary cost estimation of the project. Based on the detailed analysis the necessity of executing the investment was proved. The investment is in compliance with the Master Plan for Land Development. There is no negative impact on environment. Technologies to be used minimise negative influence of the road traffic on the environment. Some factors will even be improved, like emission of combustion gases or noise propagation. Better traffic flow will generate creation of inter-regional links through better accessibility of schools, trade, etc. Better co-ordination of the road in plan and profile, as well as technologies and materials used will result in achieving parameters meeting EU requirements for regional connections. Preliminary cost estimation places the project on the level accepted by financial institutions. Conclusions of the environment impact analysis: 1) Acoustic analysis of the part of Mieszka I St. showed, that execution of this project, due to fluent traffic flow, will not change the level of noise emitted by road traffic. 2) Excessive noise may affect buildings located in Mieszka I St., of numbers 90, 91, 94, 95, 96, 102, 104, 106 (higher level of noise occurs on higher floors). 3) Proposed in the project part change in the location of the south roadway and its moving away from residential buildings is recommended from the acoustic point of view. However, despite of these actions, the existing buildings will still be (but less) affected by arduous noise. 4) Moving southern roadway away from residential buildings will periodically limit noise propagation in its proximity, but planned growth of road traffic in the coming years will result in exceeding levels accepted. Conclusions of the financial and economic analysis: 1. FIRR = 30,56%. Present net value NPV amounts to zero when discount rate equals to 30,56%, which proves necessity to execute the project. 2. ERR = 35,49% 3. High level of discount rate resulted from substantial growth of travelling time, which in consequence results in lover time costs for passengers and lover operation costs of vehicles. 4. Conditions of transit traffic will be improved. 5. Road capacity and travelling speed will increase. 6. travelling costs on comparable distance will decrease, which may result in tourism and industry development. 7. Emission of toxic combustion gases will decrease due to better traffic flow. 8. Noise emission level will decrease. PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction p.9