Analysing cost and revenues

Similar documents
Analysing cost and revenues

Analysing costs and revenues

Preparing and using budgets

Model answers. Diploma pathway Advanced certificate Recording and Analysing Costs and Revenues (ECR) 2003 Standards

ACCA. Paper F2 and FMA. Management Accounting December 2014 to June Interim Assessment Answers

Osborne Books Tutor Zone. Elements of Costing. Answers to chapter activities

PTP_Intermediate_Syllabus 2012_Dec 2015_Set 2 Paper 8: Cost Accounting & Financial Management

Final Examination Semester 2 / Year 2011

MOCK EXAMINATION PRINCIPLES OF ACCOUNTS A-LEVEL PAPER 2

F2 PRACTICE EXAM QUESTIONS

ALL IN ONE MGT 402 MIDTERM PAPERS MORE THAN ( 10 )

PTP_Intermediate_Syllabus 2012_Jun2014_Set 1

(59) MANAGEMENT ACCOUNTING & BUSINESS FINANCE

Solution Paper 8 COST AND MANAGEMENT ACCOUNTING June Chapter 2 Material

BPC6C Cost and Management Accounting. Unit : I to V

FMA. Management Accounting. OpenTuition.com ACCA FIA. March/June 2016 exams. Free resources for accountancy students

December CS Executive Programme Module - I Paper - 2

COMMERCE & LAW PROGRAM DIVISION (CLPD) ANSWER KEY TO CS-EXECUTIVE DECEMBER-2014 (ATTEMPT) CODE-C SUBJECT : COST & MANAGEMENT ACCOUNTING

FINALTERM EXAMINATION Spring 2010 MGT402- Cost & Management Accounting (Session - 4) Solved by Mehreen Humayun vuzs Team.

Monday 29 November 2004 (afternoon) EXAMINATION

CS Executive Programme Module - I December Paper - 2 : Cost and Management Accounting

MID TERM EXAMINATION Spring 2010 MGT402- Cost and Management Accounting (Session - 2) Time: 60 min Marks: 47

Free of Cost ISBN : CMA (CWA) Inter Gr. II. (Solution upto June & Questions of Dec Included)

Standard Costing and Budgetary Control

FOR MORE PAPERS LOGON TO

Examinations for Academic Year Semester I / Academic Year 2015 Semester II. 1. This question paper consists of Section A and Section B.

COST ACCOUNTING INTERVIEW QUESTIONS

SECTION I 14,000 14,200 19,170 10,000 8,000 10,400 12,400 9,600 8,400 11,200 13,600 18,320

2014 EXAMINATIONS KNOWLEDGE LEVEL PAPER 3 : MANAGEMENT INFORMATION

Suggested Answer_Syl12_Dec2014_Paper_8 INTERMEDIATE EXAMINATION GROUP I (SYLLABUS 2012)

The budgeted information on the two business opportunities that Green Bush records are currently considering investing in is as follows:

Paper 8- Cost Accounting

Osborne Books Tutor Zone. Elements of Costing. Practice assessment 1

F2 FIA FMA. ACCA Qualification ACCA. Accounting. December 2012 Examinations. OpenTuition Course Notes can be downloaded FREE from

Analysing financial performance

SUGGESTED SOLUTION INTERMEDIATE M 19 EXAM

Please spread the word about OpenTuition, so that all ACCA students can benefit.

Analysing financial performance

Intermediate Management Accounting

PAPER 3 : COST ACCOUNTING AND FINANCIAL MANAGEMENT PART I : COST ACCOUNTING QUESTIONS

Write your answers in blue or black ink/ballpoint. Pencil may be used only for graphs, charts, diagrams, etc.

BATCH All Batches. DATE: MAXIMUM MARKS: 100 TIMING: 3 Hours. PAPER 3 : Cost Accounting

ABSA 205: Cost and Management Accounting I. Tutorial Exercises. Christos Minas PhD (Cand), FAIA, MSc, BA

THURSDAY, 9 MAY 1.00 PM 3.30 PM

Postal Test Paper_P8_Intermediate_Syllabus 2016_Set 4 Paper 8- Cost Accounting

SUGGESTED SOLUTION INTERMEDIATE M 19 EXAM

Management Accounting

SUGGESTED SOLUTION INTERMEDIATE N 2018 EXAM

MGT402 Cost & Management Accounting. Composed By Faheem Saqib MIDTERM EXAMINATION. Spring MGT402- Cost & Management Accounting (Session - 1)

RTP_Inter_Syl2012_Cost Accounting & Financial Management_Dec13

Osborne Books Tutor Zone. Elements of Costing. Practice assessment 2

P8_Practice Test Paper_Syl12_Dec2013_Set 1

2016 EXAMINATIONS ACCOUNTING TECHNICIAN PROGRAMME PAPER TC9: COSTING AND BUDGETARY CONTROL

Management Accounting

322 Roll No : 1 : Time allowed : 3 hours Maximum marks : 100

MOCK TEST PAPER 2 INTERMEDIATE (IPC): GROUP I PAPER 3: COST ACCOUNTING AND FINANCIAL MANAGEMENT SUGGESTED ANSWERS/ HINTS

MTP_Intermediate_Syl2016_June2018_Set 1 Paper 8- Cost Accounting

Method of Costing (II) (Process & Operation Costing, Joint Products & By Products)

Free of Cost ISBN : Appendix. CMA (CWA) Inter Gr. II (Solution upto Dec & Questions of June 2013 included)

Cost and Management Accounting

Please ensure your answers are written clearly, or marks may be lost. Do NOT open this paper until you are told to do so by the supervisor.

REQUIRED: a) Define and calculate the break-even point. Illustrate this by drawing a graph using the data given above.

(b) Flexible Budget For The Year Ended 31 May 2003

Revision of management accounting

Cost Accounting. Level 3. Model Answers. Series (Code 3016) 1 ASE /2/06

Write your answers in blue or black ink/ballpoint. Pencil may be used only for graphs, charts, diagrams, etc.

FOUNDATION EXAMINATION

MTP_Intermediate_Syllabus 2012_Jun2017_Set 1 Paper 8- Cost Accounting & Financial Management

Management Accounting

SUGGESTED SOLUTIONS. KE2 Management Accounting Information. March All Rights Reserved

2013 Accounting. Intermediate 2 Solutions. Finalised Marking Instructions

7 Solved Mid Term Papers of MGT402 BY.

Intermediate Financial and Management Accounting

MANAGEMENT INFORMATION

= Shs 16,000,000. (ii) Break Even point in Sales = Fixed Cost = 8,000,000 Contribution Margin Ratio (120,000,000/24,000,000)

Cambridge International Examinations Cambridge International Advanced Subsidiary and Advanced Level

INSTITUTE OF COST AND MANAGEMENT ACCOUNTANTS OF PAKISTAN

Suggested layouts for financial statements in National 5 and Higher Accounting courses

Answer to PTP_Intermediate_Syllabus 2012_Jun2014_Set 3

COURSE NAME: BUSINESS ACCOUNTING lb PAPER: THEORY

5_MGT402_Spring_2010_Final_Term_Solved_paper

PRACTICE TEST PAPER - 2 INTERMEDIATE (IPC): GROUP I PAPER 3: COST ACCOUNTING AND FINANCIAL MANAGEMENT

Cost Accounting Level 3

Answer to PTP_Intermediate_Syllabus 2008_Jun2015_Set 1

Institute of Certified Management Accountants of Sri Lanka

PAPER 3 : COST ACCOUNTING AND FINANCIAL MANAGEMENT PART I : COST ACCOUNTING Answer all questions.

Budget & Budgetary Control

CERTIFICATE IN MANAGEMENT ACCOUNTING

FOUNDATION EXAMINATION

MARK SCHEME for the October/November 2014 series 9706 ACCOUNTING

MANAGEMENT ACCOUNTING

Answer to MTP_Intermediate_Syllabus 2012_Jun2017_Set 1 Paper 8- Cost Accounting & Financial Management

b Multiple Choice Questions: 1 The scarce factor of production is known as: d a) Key factor b) Limiting factor c) Critical factor d) All of the above

B.Com II Cost Accounting

You were introduced to Standard Costing in the earlier stages of your studies in which you understood the following;

PAPER 8- COST ACCOUNTING


TOPPER S INSTITUTE [COSTING] RTP 16 TOPPER S INSTITUE CA INTER COST MGT. ACCOUNTING - RTP

PTP_Intermediate_Syllabus 2008_Jun2015_Set 3

PAPER 3 : COST ACCOUNTING AND FINANCIAL MANAGEMENT PART I : COST ACCOUNTING QUESTIONS

Transcription:

Osborne Books Tutor Zone Analysing cost and revenues Chapter activities answers Osborne Books Limited, 2013

2 a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e 1 An introduction to cost accounting 1.1 Explanation A cost which remains unchanged over a range of output levels A cost that cannot be identified with each unit of output A unit of output to which costs can be charged A cost which is neither a material cost nor a labour cost A cost which varies directly with output The total of all direct costs Term Fixed cost Indirect cost Cost unit Expense Variable cost Prime cost 1.2 Fixed Cost: (b), (c) and (f) Variable Cost: (a), (d), (e) and (g) 1.3 (a), (c), (d), (f) and (g) are true. 1. Production ( factory ) costs Non-production ( warehouse & office ) costs Direct Costs Indirect Costs Administration Selling and Finance (overheads) Indirect Costs Distribution Indirect Costs (overheads) Indirect Costs (overheads) (overheads) Materials (c) (j) (l) (m) Labour (b) (e) (k) (i) Expenses (f) (a) (h) (d) (g)

c h a p t e r a c t i v i t i e s a n s w e r s 3 2 Materials costs 2.1 The method used is last in first out (LIFO). 2.2 (a) The Economic Order Quantity (EOQ) for RX3 is 1,500kg working: [(2 x 225,000 x 2.50) / 0.50] (b) and (c) Receipts Issues Balance Date Qty Cost per kg Total cost Qty Cost per kg Total cost Qty Total cost (kg) (kg) (kg) Balance 20 Nov 150 20 21 Nov 1,500 1.616 2,2 1,650 2,66 22 Nov 1,000 1.615 1,615 650 1,09 25 Nov 1,500 1.620 2,30 2,150 3,79 30 Nov 1,800 1.618 2,912 350 567 2.3 Receipts Issues Balance Date Qty Cost per kg Total cost Qty Cost per kg Total cost Qty Total cost (kg) (kg) (kg) Balance 1 Sept 80 2,00 2 Sept 500 5.120 2,560 980,960 Sept 1,500 5.100 7,650 2,80 12,610 5 Sept 00 5.000 2,000 2,080 10,610 7 Sept 1,000 5.102 5,102 1,080 5,508 Working: 7 September: 80kg at 5.000 + 500kg at 5.120 + 20kg at 5.100 total 1,000kg + 5,102

a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e 2. kg Re-order level (1) 650 Maximum inventory level (2) 2,150 Average inventory level (3) 1,150 Workings: (1) 150 + (50 x 10 days) = 650 (2) 150 + 2,000 = 2,150 (on arrival of order) (3) [(max 2,150 min 150) / 2] + 150 = 1,150 3 Labour costs 3.1 (a) 20,500 (b) 19,000 (c) Debit Credit Work in Progress 19,000 Overheads 1,500 Wages Control Account 20,500 (d) 11.875 3.2 Employee Number Payment methods (a) (b) (c) 1 508.00 6.25 555.50 2.00 20.00 526.00 3 60.00 315.00 380.00 92.00 30.50 535.00

c h a p t e r a c t i v i t i e s a n s w e r s 5 3.3 Employee: P. Boyd Profit Centre: Plastic extrusion Employee number: K089 Basic pay per hour: 15.00 Hours spent Hours worked Notes Basic rate Overtime Total pay on production on indirect work premium Monday 7 105.00 0 105.00 Tuesday 3 9am 1pm 105.00 0 105.00 setting up equipment Wednesday 8 120.00 7.50 127.50 Thursday 6 2 10am 12am 120.00 7.50 127.50 cleaning of machinery Friday 6 1 3 pm weekly 105.00 0 105.00 meeting Saturday 60.00 30.00 90.00 Sunday 2 30.00 30.00 60.00 Total 36 7 65.00 75.00 720.00

6 a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e Expenses.1 (a), (e) and (f) Variable; (b) Semi-variable; (c), (d) and (g) Fixed.2 (a) Cost per month Output per month (units) Data provided 65,000 11,500 95,000 19,000 Difference 30,000 7,500 Variable cost per unit.00 Fixed cost per month 19,000 (b) Variable costs 51,200 Fixed costs 19,000 Total costs 70,200.3 (a), (c), (d), (e) and (f) are true.. Batches produced and sold 3,200 3,500,000 Sales revenue 6,000 70,000 80,000 Variable costs: Direct materials 12,800 1,000 16,000 Direct labour 16,000 17,500 20,000 Overheads 9,600 10,500 12,000 Semi-variable costs: 17,800 18,250 19,000 Variable element,800 5,250 6,000 Fixed element 13,000 13,000 13,000 Total cost 56,200 60,250 67,000 Total profit 7,800 9,750 13,000 Profit per batch (to three decimal places) 2.38 2.786 3.250

c h a p t e r a c t i v i t i e s a n s w e r s 7 5 Overheads 5.1 (a) Overhead Basis Total Manufacturing Finishing Stores Rent Area,000 2,000 1,000 1,000 Indirect Labour Allocation 7,00 2,500 1,500 3,00 Depreciation NBV NCA 1,200 600 200 00 Other Property o/h Area 2,00 1,200 600 600 Sub Total 15,000 6,300 3,300 5,00 Stores Reapportioned,050 1,350 (5,00) Totals 15,000 10,350,650 0 (b) 6.7 10,350 / 1,600 hours = 6.7 per direct labour hour. (c) 1,293 over absorbed. ( 6.7 x 1,900) 11,000 = 1,293 5.2 Staff canteen costs Buildings insurance Power for plant Heating and lighting Staff uniform costs Maintenance of plant Rent and rates Net book Number of Area of Power value of plant employees cost centres consumption of plant

8 a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e 5.3 Basis Assembly Finishing Maint ce Stores Admin Totals Depreciation of plant and equipment NBV 153,98 81,66 0 0 0 235,50 Power for production machinery KwH 30,912 96,288 0 0 0 01,200 Rent and rates Sq mt 39,00 28,565 15,760 9,56 5,319 98,500 Light and heat Sq mt 17,2 12,632 6,970,182 2,352 3,560 Indirect labour Allocate 0 0 67,00 55,300 151,650 27,350 Totals 515,720 218,951 90,130 68,938 159,321 1,053,060 Reapportion Maintenance 76,611 13,519 (90,130) 0 0 0 Reapportion Stores,810 2,128 0 (68,938) 0 0 Reapportion General Admin 95,593 63,728 0 0 (159,321) 0 Total overheads to production centres 732,73 320,326 0 0 0 1,053,060 5. Statement (g) (Budgeted overhead costs divided by budgeted direct labour hours) shows the correct calculation of the overhead absorption rate when based on direct labour hours.

c h a p t e r a c t i v i t i e s a n s w e r s 9 6 Methods of costing 6.1 Job Batch Service Process Costing Costing Costing Costing (a) (b) Manufacturing paper clips Manufacturing fire engines to individual specifications (c) Running a nursing home (d) Manufacturing cleaning chemicals (e) Rewiring commercial buildings (f) Printing text books (g) Operating an oil refinery 6.2 Normal loss (with scrap value) Abnormal gain Abnormal loss Process Account Normal Loss Abnormal Loss Account or Gain Account Debit Credit Debit Credit Debit Credit 6.3 (a) Weight (kg) Value per kg Total Value Normal Loss 12,000 1.30 15,600 Abnormal Gain 1,000 5.5 5,50 Finished Product 109,000 5.5 59,050 Value of finished goods and abnormal gain is based on expected figures: ( 60,200 15,600) / 108,000 kg = 5.5 per kg (b) If the amount received from the actual 11,000 kg scrap is 1.30 per kg, the balance in the abnormal gain account will be a credit of,150. Working: (Gain 5,50 (1,000 kg x 1.30)) =,150

1 0 a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e 6. Description kg Unit Total Description kg Unit Total cost cost cost cost Material AH1 700 1.30 910 Normal loss 75 1.00 75 Material AH3 500 1.60 800 Output 1,25 11.00 15,675 Material AH5 300 0.0 120 Labour 5,760 Overheads 8,160 1,500 15,750 1,500 15,750 7 Marginal and absorption costing 7.1 (a), (d) and (f) Marginal costing; (b), (c) and (e) Absorption costing 7.2 Statement of Profit or Loss Absorption Costing Sales 750,000 Direct Materials 20,000 Direct Labour 300,000 Fixed Overheads 120,000 Total Cost of Production 660,000 Less Closing Inventory 165,000 Cost of Sales 95,000 Profit 255,000

c h a p t e r a c t i v i t i e s a n s w e r s 1 1 Statement of Profit or Loss Marginal Costing Sales 750,000 Variable Materials 20,000 Variable Labour 300,000 Variable Cost of Production 50,000 Less Closing Inventory 135,000 Variable Cost of Sales 05,000 Fixed Costs 120,000 Profit 225,000 7.3 Prime (Direct) Cost 16,000 Opening inventory of raw materials 20,000 Opening inventory of raw materials 20,000 Purchases of raw materials 88,000 Closing inventory of work in progress 38,000 Closing inventory of raw materials 22,000 Direct labour 60,000 Raw materials used in manufacture 86,000 Opening inventory of work in progress 20,000 Direct labour 60,000 Factory cost 188,000 Prime (Direct) Cost 16,000 Closing inventory of raw materials 22,000 Manufacturing overheads 2,000 Manufacturing overheads 2,000 Factory cost 188,000 Raw materials used in manufacture 86,000 Opening inventory of wk in progress 20,000 Purchases of raw materials 88,000 Closing inventory of wk in progress 38,000 Factory cost of goods manufactured 170,000 Factory cost of goods manufactured 170,000

1 2 a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e 7. Statement of Profit or Loss Absorption Costing Sales 1,000,000 Opening Inventory 210,000 Direct Materials 270,000 Direct Labour 180,000 Fixed Overheads 180,000 Cost of Sales 80,000 Profit 160,000 Statement of Profit or Loss Marginal Costing Sales 1,000,000 Opening Inventory 150,000 Variable Materials 270,000 Variable Labour 180,000 Variable Cost of Sales 600,000 Fixed Costs 180,000 Profit 220,000

c h a p t e r a c t i v i t i e s a n s w e r s 1 3 8 Aspects of budgeting 8.1 Budget Budget Actual Variance A F Sales 155,000 19,500 5,500 Direct Materials 3,200 36,200 2,000 Direct Labour 1,200 2,100 900 Production Overheads 25,600 25,500 100 Administration Overheads 10,200 10,50 250 Selling and Distribution Overheads 18,800 20,100 1,300 8.2 Original Budget Budget Flexed at Budget Flexed at 75% Activity level 120% Activity level Number of Units 120,000 90,000 1,000 Sales,920,000 3,690,000 5,90,000 Direct Materials 1,320,000 990,000 1,58,000 Direct Labour 1,800,000 1,350,000 2,160,000 Overheads 1,300,000 1,300,000 1,300,000 Profit from operations 500,000 50,000 860,000 8.3 (b), (d), (e) and (f) are true. 8. Flexed Budget Actual Variance (F), (A) or 0 Volume sold 19,000 19,000 Sales revenue 1,16,000 1,160,000,000 A Less costs: Direct materials 291,000 290,000 1,000 F Direct labour 65,600 50,000 15,600 F Overheads 210,000 218,000 8,000 A Profit from operations 197,00 202,000,600 F

1 a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e 9 Short-term decisions 9.1 Calculation method Fixed costs divided by contribution per unit Selling price per unit minus variable costs per unit Sales volume minus break-even sales volume (Fixed costs plus target profit) divided by CS ratio (Sales minus variable costs) divided by sales Performance indicator (e) (a) (g) (b) (c) 9.2 (a) 1,500 (b) 20%; break-even 750 (c) Sales (bottles) 2,000 per week 3,000 per week Sales Income 1,000 1,500 Variable Costs 800 1,200 Fixed Costs 150 150 Profit 50 150 (d),000 9.3 (a) 0%; break-even 10,000 (b) 60% (c) Sales Income 20,000 30,000 Variable Costs 12,000 18,000 Fixed Costs,000,000 Profit,000 8,000 (d) 35,000

c h a p t e r a c t i v i t i e s a n s w e r s 1 5 9. (a) Tables Chairs Total Sales Income 0,000 32,000 72,000 less variable costs 20,000 20,000 0,000 Contribution 20,000 12,000 32,000 less fixed costs 25,000 Profit 7,000 (b) The contribution per table: 100 The break-even point in numbers of tables per month: 250 Tables needed to be made and sold to achieve the current profit level: 320 per month

1 6 a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e 10 Long-term decisions 10.1 Description Name of Key Term The length of time that it would take to get back the initial investment in a project The difference between the present value of the total cash inflows and total cash outflows of a project The system that converts cash flows that occur at various points in time to their present value by taking account of the time value of money The rate which when used to discount the cash flows in a project results in a net present value of zero The result of comparing the present value of the total cash inflows and total cash outflows of a project when the outflows are greater than the inflows (c) (e) (d) (b) (a) Payback period Net present value Discounted cash flow Internal rate of return Net present cost 10.2 (a) Project A Year 0 Year 1 Year 2 Year 3 Year 000 000 000 000 000 Net Cashflows 90 0 60 5 0 PV Factors 1.000 0.909 0.826 0.751 0.683 Present Values (to nearest 000) 90 36 50 1 0 Net Present Value (to nearest 000) 37 (b) Project B Year 0 Year 1 Year 2 Year 3 Year 000 000 000 000 000 Net Cashflows 90 30 30 30 30 PV Factors 1.000 0.909 0.826 0.751 0.683 Present Values (to nearest 000) 90 27 25 23 20 Net Present Value (to nearest 000) 5

c h a p t e r a c t i v i t i e s a n s w e r s 1 7 (c) (d) (e) The project which is better in terms of net present value is project A Project A: 1 year, 10 months Project B: 3 years, 0 months The project which is better in terms of payback period is project A 10.3 (a) Year Detail Cash Flow Discount Factor Present Value 0 Purchase and Installation 1,750 1.000 1,750 1 Savings 500 0.909 55 2 500 0.826 13 3 500 0.751 376 500 0.683 32 5 500 0.621 311 Net Present Value 17 (b) The payback period for the project in years and months is: 3 years, 6 months. 10. (a) Year 0 Year 1 Year 2 Year 3 000 000 000 000 Capital expenditure 1,170 Sales income 650 760 790 Operating costs 110 130 10 Net cash flows 1,170 50 630 650 PV factors 1.0000 0.8696 0.7561 0.6575 Discounted cash flows 1,170 70 76 27 Net present value 203 The net present value is positive. (b) The payback period is 2 Years and 0 Months.

1 8 a n a l y s i n g c o s t s a n d r e v e n u e s t u t o r z o n e 10.5 (a) The discount factor that results in a net present value of zero 10.6 Compound interest table for each given percentage: 6% 10% 1% Year 0 1.00 1.00 1.00 Year 1 1.06 1.10 1.1 Year 2 1.12 1.21 1.30 Year 3 1.19 1.33 1.8 Applying the factors from the table into the net cash flows (in 000s): 6% 700 + 200 + 300 + 350 1 1.06 1.12 1.19 = 700 + 188.68 + 267.86 + 29.12 = 50.66 net present value 10% 700 + 200 + 300 + 350 1 1.10 1.21 1.33 = 700 + 181.82 + 27.93 + 263.16 = 7.09 net present value 1% 700 + 200 + 300 + 350 1 1.1 1.30 1.8 = 700 + 175. + 230.77 + 236.9 = 57.30 net present value Conclusion The given percentage which is closest to the internal rate of return for this project is 10%, ie the percentage at which the project breaks even (ie NPV is closest to zero).