Power Sector Vulnerability Assessment

Similar documents
OVERVIEW OF THE MACRO-ECONOMIC SITUATION IN TUNISIA. October 2015

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Tidal financing Lessons from offshore wind

INVESTMENT OPPORTUNITIES in Central Asia Power Sector

The WB Clean Technology Fund MENA Renewable Energy Program

IFC s Project Financing of Concentrated Solar Power Plants

THE MOROCCAN RENEWABLE ENERGY MARKET OPPORTUNITIES FOR INVESTORS IN MOROCCO. - May 5th,

AfDB s Activities in Infrastructure Finance (Private Sector)

ECONOMIC AND FINANCIAL CRISIS ON POWER SECTOR INVESTMENTS IN LCR

Viet Nam GDP growth by sector Crude oil output Million metric tons 20

Morocco s experience in financing solar projects

Role of Private Sector in the growth of Power Infrastructure in South Asia. Mukunda Paudyal, Joint Secretary, Investment Board, Government of Nepal

Investor presentation

Power Sector Financial Vulnerability Assessment Impact of the Credit Crisis on Investments in the Power Sector Hashemite Kingdom of Jordan

Electricity Sector Regulatory Developments, Opportunities and Challenges

HONDURAS. 1. General trends

Economic Profile of Bhutan

World Bank IBRD and IDA Guarantees: A Triple A Risk Mitigation

The World Bank Guarantees

The World Bank. East Asia. Assessing the Potential Impact of the Credit Crisis on the Power Sector. Background Presentation Material

IFC Overview: WBG Risk Mitigation Solutions for Myanmar Infrastructure Projects. June 3, 2015

CTF Portfolios Analysis

9M 2012 IFRS FINANCIAL RESULTS

Regional Liquidity Support Facility Mitigating risks for private investments in Renewable Energy in Sub-Sahara Africa.

World Bank s Energy Infra-SAP: The Case of Vietnam. ESMAP Knowledge Exchange Forum, London November 30 th 2017

MARKET BRIEF. How far has the energy and infrastructure finance market come in 10 years?

Investor presentation. December 2018

Regulatory Overview Tunisia

WBG Infrastructure Response to the Crisis

Opening slide. Good morning Ladies and Gentlemen,

Leading provider of comprehensive energy services

measured by a three-year average of the World Banks Country Policy and Institutional Assessment (CPIA)

INCREASING THE RATE OF CAPITAL FORMATION (Investment Policy Report)

The role of multilateral development banks as enabler for new power generation technologies

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

The analysis and outlook of the current macroeconomic situation and macroeconomic policies

MENA Infrastructure: Opportunities and Challenges. DIFC Economics Workshop Adil Marghub December 2009

THE FUTURE OF INFRASTRUCTURE FINANCE IN MEASA

PUBLIC DEBT MANAGEMENT. The Tunisian experience

Preparing Renewable Energy Power Purchase Agreements in the Middle East and North Africa: Questions to Ask

Eskom 2018/19 Revenue Application

The North Africa Steel Markets: Recent Developments & Their Impact On Growth

Wind Project Financing. Targets, Barriers & Challenges, Elements of Financing, Recommendations for Financing

JBIC Financial Facilities for Coal Fired Power Plant Project

FINANCIAL RESULTS PRESENTATION

Investor presentation

GEK - TERNA GROUP. Group presentation

INTERNATIONAL DEVELOPMENT ASSOCIATION INTERNATIONAL MONETARY FUND NEPAL. Joint Bank-Fund Debt Sustainability Analysis

Renewing Ireland's Energy European Investment Bank

Spanish Regulation & Latam

Monthly Outlook. June Summary

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND UGANDA. Joint World Bank/IMF Debt Sustainability Analysis Update

PPAs and Tariff Design

Algeria economic review Investment oportunities. Tokyo November 2015

Thanks to 36 billion invested between 2007 and 2008 and to the Company s international and diversification policy

KEYNOTE SPEECH Deputy Governor of Bank Indonesia, Bp. Perry Warjiyo Ph.D at BNP Paribas Economic Outlook 2016 Jakarta, 23 March 2016

October/2013. Growth. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

INTERNATIONAL DEVELOPMENT ASSOCIATION AND INTERNATIONAL MONETARY FUND RWANDA. Joint IMF/World Bank Debt Sustainability Analysis

Jordan Country Brief 2011

Paving the Way for Public-Private Partnerships in Sub-Saharan Africa Cameroon s Power Sector Example: Kribi 216 MW Gas-fired Power Plant

Clean Technology Fund (CTF) Proposal for CTF 2.0

PPI data update note 21 March 2009

SALES AND HIGHLIGHTS 2017 FIRST QUARTER

Eskom Upington CSP Case Study Preliminary insights

Key Elements of a Wind / Solar PPP. Cathy Oxby Commercial Director Mob:

LAO PEOPLE'S DEMOCRATIC REPUBLIC

Financial information as of September 30, 2015

Outlook 2013: China. Growth expected to accelerate again

Institutional and Financial Aspects of a Rural Electrification Experience : Case of TUNISIA. Ahmed Ounalli(*)

FINANCIAL ANALYSIS: PROJECT 1

GEK TERNA GROUP. Group presentation

Introduction to TUNISIA

International Monetary and Financial Committee

ENERGY COUNTRY REVIEW. Tunisia. keyfactsenergy.com

Portugal Q Portugal. Lisbon, April 26th 2012

THE REFORM OF THE SPANISH POWER SYSTEM: TOWARDS FINANCIAL STABILITY AND REGULATORY CERTAINTY

Economic ProjEctions for

Malta: Sustaining rapid growth. necessitates strong investment

COMPANY OVERVIEW. US$812mn. Largest Energy Generator in Chile 5,063MW 531 MW 100% 11 Years. US$2.2bn. BBB-/Baa3 66.7% of installed capacity

Africa Business Forum, Energy Industry Session

AfDB support to Egypt, Tunisia and Morocco

Recent Economic Developments

VERBUND AG,

Investor Conference Call FY March 2018»

Cambodia. Impacts of Global Financial Crisis

Nigeria Power Series - Part 2: Unlocking Financing for Developing Independent Power Projects in Nigeria

Egypt Resilience and Potential

Jenin Power Plant Project. Project Fact Sheet

Economic Update 4 July 2017

Company Overview Market Overview and Business Strategy Financial Overview Development Key Takeaways

Now, please join me in slide 3 to begin. Let s start with the highlights for the period:

Water Security and Dams Rehab. Workshop

On 13 November 2018 you made a request to the Reserve Bank under section 12 of the Official Information Act (the OIA) seeking:

Meeting the Infrastructure Challenge: The Case for a New Development Bank

Indonesia Quarterly Economic Update Battening down the hatches

Leveraging Private Investment for Climate-Related Activities. CCXG Global Forum, OECD

Perspective on Financing Wind Energy Projects. June 16, 2016

KENYA S PPP EXPERIENCE AND PIPELINE PROJECTS

SME Monitor Q aldermore.co.uk

HONDURAS. 1. General trends

Transcription:

1 Power Sector Vulnerability Assessment Impact of the Credit Crisis on Investments in the Power Sector: the Case of Tunisia

Macro Update on Crisis: Moderate Impact 2 The effects of the global crisis on Tunisia s economy are real but remain relatively moderate: GDP started to slow down at the end of 2008, resulting in a 4.5% growth, against 6.3% in 2007 Expected GDP growth will be around 3.0-3.5% in 2009, instead of 5-6% initially planned Growth would rise to a 3.5-4.0% range in 2010, and back to the 5-6% trend from 2011 on Exporting industries, including textile, footwear, electrical engineering, mechanical engineering, etc., have been the most impacted: exports declined by over 20% in the first half of 2009 Tourism and workers remittances were also impacted, but showed resilience The agriculture (about 10% of the GDP) will benefit from favorable climatic conditions As an illustration of the moderate impact of the crisis on Tunisia, the country s sovereign spread briefly increased to over 600bp in December 2008, but is now back to below 200bp. Similarly, the main agencies reaffirmed the investment grade rating of Tunisia (BBB/Baa2*), with stable outlook One particular issue for the Tunisian economy in general, and future power demand in particular, lies in the few mega-projects announced by investors from the Gulf before the crisis (Sama Dubai-Tunis Lac Sud, Boukhater-Tunis Sports City, Cité des Roses, Zone Balnéaire de Korbous, Port Financier de Tunis, etc.). Significant delays are expected for a number of these projects, and cancellations are possible, but it is very difficult at this point to predict what will really happen and what the actual timetable will be 700 600 500 400 300 200 100 0 1/1/2003 Tunisia: Sovereign spread (basis points over US Treasuries, source: WB) 1/1/2004 1/1/2005 1/1/2006 1/1/2007 1/1/2008 1/1/2009 1/1/2010 1/1/2011 * Standard & Poor s/moody s

Quick Public Action 3 The government took quick action to support the economy, with a macro stimulus package and direct support to certain affected sectors and agents (notably exporting firms) Fiscal measures include a 20% increase in public investment. Additional spending of TND 700m was approved by the parliament in July 2009, to be directed toward infrastructure projects from 2010 on Monetary measures include easing of the policy rate (TMM) by the central bank: almost 100bp during the first quarter of 2009 (see graph) Other measures include a number of reforms intended at facilitating business and foreign trade (trade tariffs, norms, business registry, urban code, financial sector, service sector, etc.) The government also decided to reduce domestic debt financing and increase external borrowing from official sources, in order not to crowd out the private financial sector in Tunisia. In the first half of 2009, Tunisia raised USD 600m from official sources, including USD 250m from the World Bank, for an Integration & Competitiveness DPL 7% 6% 5% 4% 3% 2% 1% 0% Tunisia: Reference interest rate (TMM) (source: BCT) Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10

And Preserved Fiscal Space 4 The fiscal position improved in 2008: The fiscal deficit fell from 3.0% in 2007 to 1.2% of GDP The public debt ratio declined from 50.7% to 47.5% of GDP The fiscal deficit is expected to reach 3.8% of GDP in 2009, which remains acceptable in the current global economic: Expenditure will be boosted to support the economy However, growth of fiscal revenues should remain slightly positive In addition, subsidies will be slightly reduced, thanks to the decline of world commodity prices The government intends to continue its proactive public debt management. Once the crisis subsides, fiscal consolidation is expected to bring back the public debt-to-gdp ratio to a declining path The external position of Tunisia remains comfortable, with reserves level of USD 9.5bn at end July 2009, i.e. around 4.2 months of imports Tunisia: Fiscal deficit (% GDP, source: official data, IMF, WB) Tunisia: External debt (% GDP, source: official data, IMF, WB) 0.0-0.5-1.0-1.5-2.0-2.5-3.0-3.5 80 70 60 50 40 30 20 10 0-4.0 2001 2002 2003 2004 2005 2006 2007 2008 2009(e) 2004 2005 2006 Public debt 2007 Total debt 2008 2009(e)

Power Sector Structure: A Dominant Utility, a Major IPP 5 According to law 96-27, introduced in March 1996, private operators are entitled to produce electricity under public concessions The vertically integrated utility Société Tunisienne de l Electricité et du Gaz (STEG), which was established in 1962, still generates approximately 70-75% of Tunisia's power, and has a monopoly over transmission and distribution (of electricity and gas) Tunisia's first and main independent power producer (IPP) is a 471 MW combined cycle gas turbine (CCGT) plant, owned and operated by the Carthage Power Company (CPC), in Radès. It was commissioned in 2002. CPC is owned by Marubeni and BTU Ventures, a private equity group The second and only other IPP to date in Tunisia is a small 30 MW gas fired unit, that was commissioned in El Bibane by CME Energy in 2003. It was designed to burn associated gas from an oil field STEG's transmission network is connected to Algeria (a new 400 kv line is under construction to reinforce the link). Interconnection with Libya would allow for the possible extension of the synchronous zone with Machrek countries. A link between Tunisia and Italy is also being considered (as part of the Elmed project)

Demand: Steady Growth Confirmed 6 During the past two decades, the GDP of Tunisia grew by around 5% per year on average Power demand grew by more than one percentage point above GDP until 2002 (6.2% vs. 4.8% during 1990-2002) In recent years, power demand started to grow at a much reduced pace (around 4.5% p.a.), as a result of the country s efforts to promote energy conservation The government s forecast for the 11 th Development Plan was 5.4% for power demand growth over 2007-2011, in line with GDP trend Then, for the 12 th Plan, for the period 2012-2016, power demand growth was expected to jump at 7.7% p.a., thanks to the mega-projects and the subsequent economic push (housing, tourism, business ) that would have caused the extra 2% of growth over the 11 th Plan power forecast More cautious forecast is currently being considered, taking into account the global economic slowdown and the probable delays in several mega-projects: the trend for power demand growth is more likely to remain in the current 5-6% interval 10% 9% 8% 7% 6% 5% 4% 3% 2% 1% 0% Tunisia - GDP and Power Growth (source: Ministry of Energy, IMF, WB) Power (actual) Power (plans) Power (forecast) GDP 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998

GWh GWh Generation: Gas Domination 7 STEG accounts for a little over 70% of local supply, and CTC for about 20%. The remaining 7-8% come mostly from self generators (including cogenerators), and marginally from El Bibane IPP. Net exchanges with Algeria are very limited Natural gas accounts for over 90% of power generation (gas supply is 60% local and 40% from Algeria), most of the balance being heavy fuel oil. Hydropower typically accounts for less than 1% of generation, and wind for less than 0.5% Both conventional steam and combined cycle plants represent 40-45% of the electricity delivered to the grid, while open cycle turbines account for 10-15% Tunisia - Power Supply by Technology (source: STEG) Tunisia - Power Supply by Producer (source: STEG) 16,000 16,000 14,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 Self-producers OCGT CCGT Steam Hydro + Wind 12,000 10,000 8,000 6,000 4,000 2,000 Self-producers IPPs STEG 0 0 2002 2003 2004 2005 2006 2007 2008 2002 2003 2004 2005 2006 2007 2008

Capacity: Relatively Modern Fleet 8 At the end of 2009, total installed capacity will reach 3.3 GW STEG s capacity will be 2.9 GW: About 120 MW based on renewable energies (hydro and wind), everything else gas or oil-fired 1,100 MW of conventional baseload steam cycle units, in Sousse (gas) and Radès (two plants, one fuel oil-fired, one natural gas-fired) One combined cycle baseload plant in Sousse (400 MW) Several open cycle mid merit and peaking gas turbines, totaling 1,300 MW and including 5 recently commissioned 120 MW machines (Thyna 1 in 2004, Feriana 1 and La Goulette in 2005, Thyna 2 in 2007, Feriana 2 in 2009) The two gas-fired IPPs account for just under 0.5 GW: Carthage Power (471 MW) El Bibene (27 MW) Capacity (2009) MW STEG 2,851 Hydro 62 Steam 1,090 Sousse A, Radès B, Radès Fuel OCGT 1,280 CCGT 364 Sousse CC Wind 55 Sidi Daoud IPPs 498 Carhage Power 471 CCGT El Bibane 27 OCGT Total 3,349

2002 2004 2006 2008 2010 2012 2014 2016 MW Generating Investment Plan: Ambitious Program Tunisia s reserve capacity is adequate, but demand is growing steadily, so capacity will have to keep up One 120 MW OCGT to be commissioned in 2009 (Feriana 2) Another, identical OCGT in 2010 (Thyna 3), together with two wind farms near Bizerte, totaling 120 MW (Kchabta and Métline, financed by Spanish soft loans and local banks) Beyond 2010: Two major Steg projects: Ghannouch (400 MW CCGT, under construction, 2011) and Sousse (400 MW CCGT, 2013) A new IPP planned in Bizerte (400 MW CCGT, 2014-2015) The Elmed project, with a domestic component of 400 MW (CCGT or coal), would come on line around 2016 This program is based on the 11 th and 12 th Plans growth rates for demand (5.4% p.a. to 2011, 7.7% p.a. for 2012-2016). It implies approximately 150 MW p.a. of new capacity to 2011, and 270 MW p.a. thereafter In STEG s initial projections, the mega-projects would have accounted for an additional 1,000 MW of demand in the next 5-7 years, so that total needs for the country reached almost one 400 MW CCGT per year in total Taking into account slower deployment of the mega-projects, one can assume, as already stated, that demand growth will stay around 5-6% per year, i.e. just below 200 MW per year, or one standard 400 MW CCGT every two years In summary, Tunisia s investment plan for new generation is well suited to demand forecast, with some flexibility that would allow reasonable delay in project development Tunisia: New Capacity (source: STEG) MW 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 STEG Hydro Steam -55 CCGT 400 400 OCGT 118 241 117 126 126 Wind 9 36 120 IPPs Existing IPPs 27 Bizerte 400 Elmed (domestic tranche) 400 Total 36 118 241-55 117 36 126 246 400 400 400 400 6,000 5,000 4,000 3,000 2,000 1,000 0 Tunisia - Power Sector Balance 9 Capacity Peak demand 11th- 12th Plan 5% pa

STEG: Accelerated Investment Although the financial situation of STEG is formally acceptable (in terms, for instance, of debt/equity or debt/ebitda ratios), the company heavily relies on subsidies, as tariffs are far from covering costs (even in the Tunisian context, where internal gas prices are lower than international prices) Investment is however planned to accelerate in the years to come, at USD 500m (TND 700m) per year to 2016 according to STEG (including gas): Average 2004-2008: TND 350m About USD 450m (TND 600m) per year to the end of the 11 th Plan (2011) About USD 550m (TND 800m) per year during the 12 th Plan (2012-2016) The expected increase is mainly due to needs for new capacity. Transmission and distribution (T&D) investment could be limited if necessary, after a phase of significant spending in the past few years: Only TND 70m per year on generation over 2005-2008 TND 215m per year on T&D over the same period. This was partly financed by the EIB, through a 2002 EUR 150m loan. A new USD 66m loan was recently approved by the AfDB for further improvement of the Tunisian power grid The Ghannouch plant, a EUR 400m project, is being financed mostly by donors (EIB, AFESD). Amounts they lent are higher than initially expected, due, besides lower STEG/budgetary financing, to much higher EPC cost than anticipated The Sousse project will be in every aspect comparable to Ghannouch. It should be financed by donors (EIB, AFD, IsDB, etc.), probably with local banks, without international banks, and probably without ECAs. Selection of the contractor is expected by late 2009-early 2010 More generally, STEG can count on a variety of international sources of finance, and no shortage is expected: IFIs and bilateral donors, ECAs, Arab funds 400 350 300 250 200 150 100 50 0 STEG: Investment (TND m) 2002 2003 2004 2005 2006 2007 2008 Other Gas Distribution Transmission Generation 10

Private Sector: Two Major Projects Over a decade after Carthage Power, two new major IPP projects are being launched, Bizerte and Elmed Bizerte: Very similar to Carthage Power: 400 MW CCGT, 20 year PPA, commissioning expected in 2014-2015. The option for another 400 MW tranche is likely to be delayed due the crisis and the reduced demand growth 17 manifestations of interest after the prequalification process, including major developers from Europe, Asia and the Gulf countries, with letters of support from major international banks. 5 bidders have been shortlisted (Marubeni, Mitsui, IP, GDF Suez, Powertek-Siemens), for final selection in 2010. Financial closing is not expected before end 2010, when the impact of the crisis will hopefully be much reduced Prequalification was launched before the crisis. Most bidders have confirmed their interest, as well as most commercial banks. No problem is expected regarding financing, due to the relatively modest size of the project (USD 300-500m) and its good risk profile (Tunisia risk, proven technology, conventional PPA with a well known offtaker) The main issue might be the financial conditions of the banks, which are still constrained. This would have an impact on the PPA price, and therefore on STEG s finances and/or electricity tariffs Donors are being approached (EIB, AfDB, IFC, etc.), and ECAs could be involved, which would help mitigating the financial burden Elmed: The project includes two separate components (with potentially separate financings): Subsea interconnection between Tunisia (Cap Bon) and Sicily (400 kv HVDC, 1,000 MW, approximately 200 km) Generation in Tunisia: 400 MW for the domestic market (PPA with STEG), 800 MW for export to Italy (with reserved capacity on the interconnector) Total cost around USD 3bn, commissioning expected in 2015-2016 The sponsor will be responsible for the offtake arrangement in Italy and the choice of technologies (coal or gas for the main capacity, renewable component) At this stage, there is some skepticism among international players, if not about the project itself, at least about its timing, not so much because of the financial crisis, but because of the project s complexity and uncertainties. Banks do not expect the project to reach financial close before at least 2-3 years The selection process has been launched for the power plant(s). 16 bidders were prequalified (including Mubadala, Macquarie Capital, Siemens, SNC Lavalin, Edison, Enel, Marubeni, Sumitomo, IP, BG, etc.). The formal RFP is to be issued soon, for final selection of the sponsor by end 2010 11

Renewable Energy: Tunisian Solar Plan, MENA CSP Scale-Up Tunisian Solar Plan (PST): Ambitious plan to develop energy efficiency and renewable energy, recently announced 40 projects identified in solar, wind, biomass and energy efficiency EUR 2.0bn to be invested, including EUR 1.4bn by the private sector Includes Bizerte wind farms (120 MW), together with over 500 MW of additional capacity (cf. table) MENA CSP Scale-Up World Bank/AfDB sponsored program to develop 1,000 MW of concentrated solar power (CSP) in the MENA region, with concessional finance from Clean Technology Fund (CTF, up to USD 750m) 3 projects identified in Tunisia, including the Elmed interconnector and a 100 MW CSP component within the Elmed generation complex, as well as the 100 MW CSP plant already in the Tunisian Solar Plan Tunisian Solar Plan MW Sponsor Financing (TND m) Implemen- Remarks Solar Private Public Total tation Hybrid Concentrated thermal-gas 150 STEG 0 355 355 2010-14 25 MW solar, 125 MW gas Concentrated thermal 100 Private 600 0 600 2010-16 Mainly for export, also in MENA Scale-Up (IPP-CSP) Hybrid Concentrated thermal-gas 40 Private 98 0 98 2012-14 El Borma gas field, 10 MW solar, 30 MW gas Photovoltaic 18 Various 118 62 180 2010-14 Off-grid plants Photovoltaic 10 STEG 0 64 64 2010-16 One large on-grid plant Photovoltaic 10 Private 64 0 64 2010-16 Small on-grid plants Other Wind 120 STEG 0 360 360 2009-11 Bizerte wind farms Wind 100 Private 280 0 280 2012-16 One large wind farm Wind 60 Private 180 0 180 2010-14 Smaller wind farms (self production) Biomass 26 Private 76 0 76 2010-14 Poultry droppings, landfill gas, etc. Total 634 1,416 841 2,257 MENA Scale-Up IPP-CSP Elmed Elmed Tunisian Projects (100 MW) CSP Trans- (USD m) (100 MW) mission CTF 73 73 40 Other concessional 128 128 0 Equity 100 100 100 Commercial/ECA dabt 150 150 1,000 Total 450 450 1,140 12

Local Banks: 13 Cash Rich, Lack of Long Term Finance The Tunisian financial sector has not been directly affected by the crisis The authorities have continued their long-term strategy of reinforcing the banking sector. For instance, non-performing loans have decreased from 17.6% of total loans in 2007 to 15.5% in 2008. The central bank keeps a 15% target for 2009 Local banks are cash rich, with a stable level of excess liquidity during the first quarter of 2009 (latest available data). They were able, for instance, to replace international banks and donors in the Hasdrubal financing (an offshore gas field and a USD 400m financing): a project finance scheme was initially contemplated, but the proposed conditions were considered too expensive (over 250-300bp for a 7 year financing, instead of the expected 120-130bp and 10-12 year maturity); local banks provided 5 year corporate finance at around 150bp Although liquid, the local banking market is not well equipped to provide long term finance (beyond 7 years). In addition, the size of Tunisian banks is relatively limited, and it would be difficult for the local banking system alone to finance projects amounts of several hundred million USD Foreign currency availability is also limited (and decreasing, due to decreasing export revenues)

14 Conclusion and Recommendations

Projects Are Unchanged, With Delays 15 Since the beginning of the crisis, power demand growth has slowed down However, medium to long term prospects have not significantly changed, as the fundamentals of the Tunisian economy remain solid, and the government response to the crisis has been prompt and well targeted The electricity supply-demand situation is relatively balanced: new capacity will be needed in the next few years, but there is some flexibility that would allow reasonable delay in project development Readjustments in the implementation schedule of the mega-projects might have a significant impact on the power sector investment plan. However, as of now, no project has been cancelled. Some have experienced minor delays, which are only partly due to the crisis, and are relatively normal delays in project development

Funds Are Available, But Expensive 16 Following completion of CPC, the first IPP in the country, about a decade ago, Tunisia has relied on the public sector (STEG) for power generation investment. Several private sector projects are now being considered for future capacity extension Public sector projects are typically financed through International Financial Institutions (IFIs), bilateral donors, Export Credit Agencies (ECAs) and local banks. No major financing problem is expected for such projects in Tunisia. In spite of the crisis, IFIs, donors and ECAs are still willing to finance. Local banks remain liquid and consider the power sector a good risk: they are also willing to participate in financing power projects. However, their capacity is limited in terms of maturity and foreign currency lending Private projects, which rely more on international banks, can face a more difficult financing situation. However, Tunisia is considered an attractive, investment grade risk among emerging countries. In spite of a still paralyzed syndication market, sector players are generally confident that the good projects will be financed, thanks, if need be, to alternative sources: local tranches, international public or quasi-public players (ECAs, IFIs, donors) While most projects remain bankable in spite of the crisis, the key issue is the overall cost of finance, regardless of sources, and of the public/private nature of the projects. The high cost of finance includes higher margins, but also shorter tenors, higher fees, stricter covenants, etc. This is mostly true for international commercial lenders, although it also applies, to some extent, to public sector entities (IFIs, ECAs). This would lead to higher electricity tariffs, or to more burden on public finances (tariff subsidies, financial support to public utilities)

Recommendations 17 The main issues for the power sector are delays in structuring projects, as attracting banks has become more difficult, and more difficult terms of conditions for loans In this context, financial support from the World Bank and other multilateral institutions could be required as follows: In order to prevent tariffs from too much increasing, they can blend their long term, reasonably priced, foreign currency resources with less competitive funds (higher margins and/or shorter tenors and/or local currency only) This is especially true for the new IPP projects, for which project finance funds, although available, are likely to be expensive: significant co-financing would contribute to keep PPA price conditions reasonable Financing of renewable energy projects may also be needed: the government expressed strong political support for renewables (as shown for instance by the PST), but financing projects could prove difficult in the current financial context, as capital costs are generally higher than for conventional technologies. The MENA solar scale-up program would be one component of this effort, but other initiatives may be necessary Another way of helping projects to reach prompt financial closing at reasonable conditions, and attract enough commercial banks, would be to provide adequate security offerings, such as the IBRD Partial Risk Guarantee The government may also need technical assistance in several fields: Assistance in the Elmed project preparation, from bidding to structuring: the complexity of this project might be cause for delay (as shown by concerns expressed by several private sector developers and financiers) Assistance in preparing the CSP projects proposed in the CTF investment plan Sector regulation, as several IPPs are likely to be commissioned in the next few years. Regulatory issues regarding cross border transmission will also need to be addressed, in relation with Elmed and regional grid integration Tariff policy, in order to reduce the gap between costs and pre-subsidy revenues Sector long tem strategy, including future energy mix options (gas vs. coal, renewables )

18 Appendix: STEG s Financial Statements

STEG P&L (TND m) 2004 2005 2006 2007 2008 Sales 1,027.9 1,157.1 1,316.6 1,433.0 1,877.6 growth 13% 14% 9% 31% Subsidy 589.7 672.7 1,232.4 Cost of sales -1,621.0-1,774.6-2,754.1 growth 9% 55% EBITDA 238.6 275.9 285.3 331.0 355.9 %sales 23% 24% 22% 23% 19% EBIT 95.6 100.0 84.5 107.8 110.9 %sales 9% 9% 6% 8% 6% PBT 25.5 14.3 25.2 30.0-14.8 Income tax -0.7-6.2-12.2-18.4-3.2 Net profit 24.9 8.1 13.0 11.6-18.0 19 Cash flow statement (TND m) 2004 2005 2006 2007 2008 Cash flow from operations 112.9 100.4 228.0 182.3 274.2 Investment -366.5-276.5-432.8-320.1-460.0 Free cash flow -253.6-176.1-204.8-137.8-185.8 Asset disposals 3.6 4.4 4.0 8.7 5.6 New net debt 269.1 170.0 233.4 223.7 180.7 Change in net cash 19.1-1.7 32.6 94.6 0.5 Balance sheet (TND m) 2004 2005 2006 2007 2008 Net fixed assets 2,583.0 2,687.4 2,921.7 3,065.1 3,405.2 Net current assets -113.4-62.4-129.1-162.1-334.4 Net worth 1,387.9 1,421.5 1,415.4 1,449.9 1,470.1 Long term liabilities 110.4 121.7 169.6 183.9 234.9 Long term debt 774.6 876.6 996.6 1,142.3 1,241.9 Short term debt 196.6 205.3 210.9 126.8 123.9 Net financial debt (NFD) 971.2 1,081.8 1,207.5 1,269.1 1,365.8 NFD/Net worth 70% 76% 85% 88% 93% NFD/EBITDA 4.1 3.9 4.2 3.8 3.8