Initial Environmental Examination

Similar documents
Compensation Plan for Temporary Damages

Project Administration Manual. India: Green Energy Corridor and Grid Strengthening Project. Project Numbers: October 2015

Safeguards Monitoring Report

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2)

Draft Resettlement Plan

India: Power Grid Transmission (Sector) Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

LOAN AGREEMENT (Ordinary Operations) (National Power Grid Development Investment Program Tranche 2) between POWER GRID CORPORATION OF INDIA LIMITED

LOAN AGREEMENT (Ordinary Operations) (National Grid Improvement Project) between POWER GRID CORPORATION OF INDIA LIMITED. and ASIAN DEVELOPMENT BANK

FY2016 Results and FY2017 Forecasts 2017/5/26

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

Power Workers' Union (PWU) INTERROGATORY #1. Ref (a): Participant Information Package: Exhibit C1-2-1, Page 5 of 6, Table 2 (OM&A Expenditures)

IND: Bihar Power System Improvement Project

VIE: Power Transmission Investment Program Tranche 3

PAK: Power Distribution Enhancement Investment Program, Tranche 2

PROJECT PREPARATION TECHNICAL ASSISTANCE

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 4)

Land Acquisition & Resettlement Plan Corrective Action Plan. PAK: Second Power Transmission Enhancement Investment Program, Tranche 1

Loan Agreement. (Power System Development Project-III) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

Land Acquisition and Resettlement

Bihar Budget Analysis

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

ARM: Sustainable Urban Development Investment Program, Tranche 1

DECISION AND ORDER ON PHASE 1

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject

Published by: Working Group on IFIs

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. PH - Bicol Power Restoration Project

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

SEBI (Listing Obligation and Disclosure Requirements) Regulations,2015. (Listing Regulations)

ANNEXURE-A INVITATION FOR BID (IFB) (LOCAL COMPETETIVE BIDDING) Name of Line

BOARD S REPORT DIVIDEND

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province)

DI: Charts. 1. What is the average value of the contract secured during the years shown in the diagram?

ARM: Sustainable Urban Development Investment Program, Tranche 1

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

TRANSMISSION LICENCE NO. 2 OF 2009 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

PROJECT PREPARATORY TECHNICAL ASSISTANCE

India: Private Sector Housing Finance Project (Dewan Housing Finance Corporation Limited)

Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2)

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum)

Earnings Presentation Q1FY19

Environmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

FINANCIAL ANALYSIS A. Introduction

IND: Chhattisgarh State Road Sector Project

TRANSMISSION CHARGING STATEMENT

In this Order, the Commission directs Eversource to adopt a cost allocation policy for

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Resettlement Plan. India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road

PROPOSAL FOR COST ESTIMATION REVIEW PROCESS FOR SPP TRANSMISSION

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

CASA-1000 Project List of FAQs

CENTRAL ELECTRICITY AUTHORITY Power Communication Development Division

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

India: Karnataka Urban Development and Coastal Environmental Management Project

Bangladesh: Bangladesh India Electrical Grid Interconnection Project

Northeast Asia Power System Interconnection

Sub: Investor Presentation on financial results for the Quarter ended 30 June 2018

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)

Osprey House, Tuesday 30 September 2014

Case No. 66 of Smt. Chandra Iyengar, Chairperson Shri Vijay L. Sonavane, Member

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

S. No. Name of director Number of meetings entitled to attend

Document No Amendment No Approved By Approval Date Review Date

Report and Recommendation of the President to the Board of Directors

MUHAMMAD DAUD Ex GM Planning/Consultant Planning NTDC/ Member Pakistan Working Group for CASA For SAARC Workshop Lahore, 30th, September, 2015

Time allowed : 3 hours Maximum marks : 100. Total number of questions : 6 Total number of printed pages : 7 PART A

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

STATE OF COMPANY S AFFAIRS

WELLINGTON CITY COUNCIL POLICY ON UNDERGROUNDING OF OVERHEAD CABLES

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

Attention: Ms. Chantal Briand, Regulatory Drafting Specialist Ms. Rebecca Vanderspiegel, Regulatory Development Specialist

AMENDMENT ORDER DATED

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line

Wanganui - Stratford Investment Proposal. Attachment B Costing report

(c) Section 3.07 is deleted and the following is substituted therefor:

NEP: South Asia Sub Regional Economic Cooperation (SASEC) Power System Expansion Project (On Grid Component)

Learning Journey. Centre for Insurance and Risk Management (CIRM)

Himachal Pradesh Budget Analysis

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

1. He is HT Consumer having contract demand of 475 KVA. 2. They applied for additional load of 175 KVA on

DAM SAFETY AND DRIP ACTIVTIES IN TAMIL NADU

Order on. Petition No. 21/2014

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line

Cambodia: Second Power Transmission and Distribution Project

Customer Grievance Redressal Mechanism

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

Country Operations Business Plan. Fiji September 2017

BHU: Second Green Power Development Project

Annual Report on Corporate Social Responsibility (CSR) activities for the financial year

48081 v1. India: Andhra Pradesh Road Sector Project. Environmental and. Social Management Framework. For. Maintenance Road. (approx.

KENYA ELECTRICITY TRANSMISSION COMPANY LIMITED MOMBASA NAIROBI 400KV & 220KV TRANSMISSION LINE PROJECT. Contract: Ketraco/1/6/09 QUARTERLY REPORT

Transcription:

Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kv VSC-HVDC power transmission lines between Pugalur, Tamil Nadu and North Trichur, Kerala) Annexures 9 10 Prepared by Power Grid Corporation of India Limited for the Asian Development Bank.

This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section on ADB s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

ANNEXURE 9 ESTIMATED BUDGET

Budget Estimate Total line length (Overhead Portion) Total line length (Underground Portion) - 127.4 km - 26.5 km A. Compensation 1 Forest Involvement (5 km in UG portion with RoW @ 4 meter) - 2.0 ha. - Forest compensation - Rs. 20.00 lakhs 2. Crop & Trees - Line length in Private /Revenue land - 127.4 km. - Crop/tree compensation (@Rs.5 lakhs/km) - Rs. 637.00 lakhs 3. Land Compensation for Tower Base & RoW corridor - 153.9 km (Considering line corridor as ' mostly agricultural land in rural - Rs 4228.00 lakhs setting' with compensation @ 15 lakhs/acre) Sub Total A 1+2+3 - Rs. 4885.00 lakhs B. Implementation Monitoring & Audit i) Man-power involved for EMP implementation & Monitoring in entire route of Transmission lines (Rs.10,000/-x 153.9 km) ii) Independent Audit (LS) if needed - Rs. 15.39 lakhs - Rs. 10.00 lakhs Sub Total B- - Rs. 25.39 lakhs Grand Total (A+B) = Rs. 4910.39 lakhs

EXHIBIT 1 SCHEMATIC MAP SHOWING PROPOSED SUBPROJECTS

EXHIBIT -1

EXHIBIT 2 ORGANISATIONAL SUPPORT STRUCTURE FOR EMP & ESPP IMPLEMENTATION

ORGANISATIONAL SUPPORT STRUCTURE FOR ESPP IMPLEMENTATION & MONITORING (EXHIBIT -2) Chairman & Managing Director Company Secretary Vigilance Chief vigilance officer Director (Finance) Director (Operation) CORPORATE LEVEL Director (Projects) Director (Personnel) REGIONAL LEVEL Executive Director (Regional) Executive Director (ESMD, CSR & LA) AGM/DGM (PESM) AGM (Env & Soc.) AGM (Land Acquisition) DGM (Env. & Soc) Env. Officer (Regional) Sr. Soc. Officer Ch. Mgr (Soc.) Sr. Engg. Engg. Soc. Officer (Regional) SITE LEVEL Sr. Env. Officer Sr. Env. Officer Sr. Soc. Officer Chief Mgr./.Mgr T/L (Sites) Chief Mgr./.Mgr S/S (Sites) ENVIRONMENT AND SOCIAL SPECIALIST BEING PLACED ON CONTRACT IF NEEDED.

FIGURE 1 TYPICAL PLAN OF TRANS. LINE TOWER FOOTINGS SHOWING ACTUAL GROUND POSITION AND EXTENT OF IMPACT

Fig.-1 TYPICAL PLAN OF TRANSMISSION LINE TOWER FOOTINGS SHOWING ACTUAL GOUND POSITION AND EXTENT OF IMPACT X a a Y T R A N S M I S S I O N L I N E INDICATIVE MEASURES X & Y = 10-15 METERS a = 300-450 mm ACTUAL POSITION ON GROUND

FIGURE 1 a SCHEMATIC DIAGRAM INDICATING AREA OF INFLUENCE/IMPACT OF ±320 KV TRANSMISSION LINE

Fig.-1a TREE FELLING AREA FOR ±320 KV TRANS. LINE TOWER ERECTION AREA 35X35m 85m SWING LINE OF CONDUCTOR. ELECTRICAL CLEARANCE = 5.3 m 3 m 200m 8.6 m 8.0 m 7M 85m TOWER ERECTION AREA 35X35m 10M TREE FELLING AREA FOR CONST. 44 m LOPPING / PRUNNING / FELLING AREA FOR CHARGING OF LINE

MAP 1 FOREST COVER MAP OF KERALA

Map-1 : Forest Cover Map of Kerala Subprojects Area

MAP 2 FOREST COVER MAP OF TAMIL NADU

Map-2 : Forest Cover Map of Tamil Nadu Subproject Areas Subprojects Area

MAP 3 ALTERNATIVES ROUTE ALIGNMENT OF ±320 KV HVDC BIPOLE LINK BETWEEN NORTH THRISSUR AND PUGALUR

MAP 4 SECTION WISE DRAWING OF PROPOSED UNDERGROUND CABLE ROUTE

PLATE 1 PROPOSED TRANSITION STATION LOCATION

Transition Station at Vadakancheri Proposed Site

Annexure 10 Environmental Safeguard Monitoring Report Reporting Period Date {From Month, Year to Month, Year} {Month, Year} IND: Green Energy Corridor and Grid Strengthening Project Prepared by Power Grid Corporation of India Limited for the Asian Development Bank

This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section on ADB s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

TABLE OF CONTENTS Page 1.0 Introduction 1.1 Brief Project Description 1.2 Project Progress Status and Implementation Schedule 2.0 Compliance to Applicable Statuary Requirements /National Regulations 3.0 Compliance to Environmental Covenants from the ADB Loan Agreement 3.1 Schedule 5 Environment (prepare a matrix to show how compliance was achieved) 4.0 Compliance to Environmental Management Plan (Refer to the EMP of the Project) 5.0 Safeguards Monitoring Results and Unanticipated Impacts (Refer to the Environmental Monitoring Plan and document any exceedence to environmental standards (if any), or any unanticipated impact not included in the EMP and any correction action/measures taken) 6.0 Implementation of Grievance Redress Mechanism and Complaints Received from Stakeholders (Summary of any complaint/grievance and the status of action taken) 7.0 Conclusion 8.0 Recommendations (if applicable)