Province of British Columbia. BC-23 APPLICATION FOR GAS COST ALLOWANCE For Reporting Production Periods Prior to October 2018 LAND COSTS INCURRED $

Similar documents
Freehold Mineral Tax 2018 Unit Value Submission GuidePage 1

PST-14 Issued: December 1995 Revised: March 26, 2018 INFORMATION FOR OIL AND NATURAL GAS PRODUCERS

The Crown Minerals Act The Freehold Oil and Gas Production Tax Act, 2010

NATURAL GAS ROYALTY REGULATION, 2002

PUBLIC STORAGE CANADIAN PROPERTIES INFORMATION TO ASSIST UNITHOLDERS WITH THEIR 2009 CANADIAN INCOME TAX RETURNS

DELPHI ENERGY CORP. REPORTS SECOND QUARTER 2018 RESULTS

exploration success increase in reserves reduction in operating costs $10.57 per boe FD&A cost 2012 Annual Report

EA March 7, 2008

Mines Act. B.C. Reg. 54/2015. Deposited March 30, 2015 and effective April 1, 2015 Last amended May 1, 2018 by B.C. Reg. 73/2018

THE UNION OF MYANMAR THE STATE PEACE AND DEVELOPMENT COUNCIL THE DAWEI SPECIAL ECONOMIC ZONE LAW

Retrofit Program - Participant Agreement

EA December 29, 2004

Sales & Indirect Tax and Energy

EA January 31, 2016

EA May 31, 2018

M A N I T O B A ) Order No. 85/14 ) THE PUBLIC UTILITIES BOARD ACT ) July 24, 2014

Three and twelve months ended December 31, 2013

Tax Calculation Supplementary Corporations (2014 and later tax years)

MINISTRY OF FINANCE July 2014

Tata AIG General Insurance Company Limited

STIPULATED PRICE BID FORM

Contractor s Pollution Liability Application

CHEMICAL ENGINEERING DESIGN & SAFETY

Thames Water Wholesale Tariff Document Version 1.0 Copyright Thames Water Utilities Ltd

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

DECREE No. 108/2006/ND-CP OF SEPTEMBER 22, 2006, DETAILING AND GUIDING THE IMPLEMENTATION OF A NUMBER OF ARTICLES OF THE INVESTMENT LAW THE

Final regulations issued on publicly traded partnership minerals or natural resources qualified income

Q Second Quarter Report

Consolidated Revenue Fund Extracts (Unaudited)

COUNTY SANITATION. DISTRICTS OF LOS ANGELES COUNTY

Winter Reliability Assessment En Banc Hearing Docket No. M

The Crown Minerals Act The Freehold Oil and Gas Production Tax Act, 2010

Thames Water Wholesale Tariff Document Version 1.4 Copyright Thames Water Utilities Ltd

Drilled four (2.60 net) wells, two (1.30 net) of which were brought on production on the last few days of the quarter;

Modernized Royalty Framework (MRF)

Shell Canada Limited

Miscellaneous Water and Developer Services Charges

The Alberta Energy Regulator has approved this directive on February 24, Purpose of the Large Facility Liability Management Program...

BRITISH COLUMBIA ROYALTY CREDIT PROGRAM ROAD DEVELOPMENT ROYALTY DEDUCTION AGREEMENT XXXXXXX PROJECT

Translated from Arabic Original

CONDITIONS OF SERVICE AND TARIFF. April 1, 2018

Spectra Energy Western Canada Transmission and Processing A Western Canadian Growth Story

MINISTRY OF ENERGY AND MINES

Saskatchewan Natural Gas Crown Royalty and Freehold Production Tax Regime

ALLIANCE PIPELINE LIMITED PARTNERSHIP

Energy ACCOUNTABILITY STATEMENT MINISTRY OVERVIEW

DELPHI ENERGY RELEASES YEAR END 2015 RESERVES

ENERGY Petroleum Plaza North Tower Street Edmonton, Alberta Canada T5K 2G6

The CETA and British Columbia: Impacts and Opportunities

Environmental Impairment Liability

Generated funds from operations of $10.1 million and realized net earnings of $10.7 million in the third quarter of 2015;

Business Water Charges Scheme for

Q HIGHLIGHTS CORPORATE UPDATE

Accounting instructions for activities under exploration and production licences

2017 Annual Report. Financial and Operating Highlights

Second Quarter 2016 Highlights

ALBERTA DEPARTMENT of ENERGY. Resource Revenue Operations Edmonton Gas Royalty Calculation Unit November 4, 2009

Request for Proposals Waterworks Operations and Maintenance Contract

Extractive Sector Transparency Measures Act - Annual Report

Natural Gas Rates. effective November 1, For residential customers

Gross Products Tax TABLE OF CONTENTS

Manitoba Petroleum Fiscal Regime JANUARY 2014

2017/18 Liability Management Rating Summary

South Australian Water Corporation Fees and Charges Schedule Rates and Sales

NO EXPOSURE CERTIFICATION For Exclusion from NPDES Stormwater Permitting. Complete No Exposure Certification

Pollution Legal Liability Questionnaire

2007 Property Assessment and Tax Analysis of 2006 Data. Prepared for Real Property Association of Canada. November 23, 2007

TERMS AND CONDITIONS OF ELECTRICITY AND NATURAL GAS FOR A BUSINESS

TAX CALCULATION SUPPLEMENTARY CORPORATIONS (2007 and later tax years)

BC Hydro FIrST QUArTEr report FISCAL 2015

XXXXX. Crowsnest Pass Waste Heat Project. Interconnection Facilities Study and Project Plan

Vehicle and Equipment Crossing Kinder Morgan Canada s Pipeline

SaskEnergy Commodity Rate 2011 Review and Natural Gas Market Update

GAS ROYALTY OPERATIONS INFORMATION BULLETIN October 2010

Pipeline Safety for Elected Officials and Government Agencies

SC Amount of line 1 income taxable to nonresident partners (from SC1065 K-1s)...

For the Nine. Nine Months ended BONTERRA ENERGY REPORTS THREE AND NINE MONTHS OF 2015 OPERATING AND UNAUDITED FINANCIAL RESULTS. September 30, 2015

NORTHERN INDIANA PUBLIC SERVICE COMPANY First Revised Sheet No. 9. GENERAL RULES AND REGULATIONS Applicable to Gas Service.

T4032-BC, Payroll Deductions Tables CPP, EI, and income tax deductions British Columbia Effective January 1, 2018

CLICK HERE FOR LINK TO TABLE OF CONTENTS

United Utilities Wholesale Charges A consultation on United Utilities proposed NAV tariff

Lecture in Energy Economics: Life Cycle Cost Analysis for Bankable Projects in Sustainable Energy

Energy BUSINESS PLAN ACCOUNTABILITY STATEMENT THE MINISTRY

Fiscal Year 2016 Columbia Generating Station Annual Operating Budget

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

'!'? /~tji'wi; O}. /Y- ~I/

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness. General Provisions

SALT SPRING ISLAND FIRE PROTECTION DISTRICT

Pacific Gas and Electric Company. Statement of Estimated Cash Flows April 20, 2001

Investment promotion application form filling guidelines

Revenue Requirement Application 2004/05 and 2005/06. Volume 2

DELPHI ENERGY CORP. REPORTS 2017 YEAR END RESULTS AND RESERVES AND PROVIDES OPERATIONS UPDATE

National Energy Board. Reasons for Decision. Westcoast Energy Inc. RH-2-97 Part II. August 1997

SALT SPRING ISLAND FIRE PROTECTION DISTRICT

COSTING AND PROJECT EVALUATION USING NODOC

SECOND QUARTERLY REPORT NOVEMBER 2017

Transportation of Customer-Secured Natural Gas (T-1)

The Ministry of Energy consists of the Department of Energy, the Alberta Petroleum Marketing Commission, and the Alberta Energy and Utilities Board.

Closet(s), Kitchen Cabinet Re-facing (s) & Garage(s) Renovation Contract

Security Policy Guidance for Contaminated Sites Decision Matrix Ministry of Water, Land and Air Protection 28 May 2003

Transcription:

Province of British Columbia BC-23 APPLICATION FOR GAS COST ALLOWANCE For Reporting Production Periods Prior to October 2018 Months Operating in Calendar Year A1 Actual Claim For Calendar Year A2 Estimated Claim For Calendar Year A3 FACILITY Facility Code B1 LAND COSTS INCURRED $ C1 Land Cost DEPRECIABLE CAPITAL ADDITIONS (DISPOSALS) COSTS INCURRED $ D1 1. D2 2. 3. 4. Net Depreciable Capital Additions (Disposals) DEPRECIATION CAPITAL DEPRECIATION $ E1 Opening Balance of Undepreciated Capital as at January 1 E2 Total Undepreciated Capital (before depreciation) [ D2 + E1] E3 Prorated Depreciation [ 5% OF E2 A1 / 12 ] SAMPLE E4 Closing Balance of Undepreciated Capital as at December 31 DIRECT OPERATING COSTS DIRECT COSTS INCURRED $ DIRECT COSTS INCURRED $ F1 Labour F1 Direct Insurance Materials Chemicals Property Taxes Camp Costs Transportation Contract Services Utilities Other Other Other Total Direct Operating Costs Maintenance F2 [ F1 Total ] Overhead Allowance Purchased Fuel Gas F3 [ 10% of F2 ] Telecommunications F4 Total Direct Operating Costs [ F2 + F3 ] WORKING CAPITAL ALLOWANCE G1 Working Capital Allowance [ F4 1/6 ]

BC-23 APPLICATION FOR GAS COST ALLOWANCE RATE BASE H1 Rate Base [ (E1 + E4) / 2 + C1 + G1] H2 Return on Rate Base [ 15% of H1 A1 / 12] ACTUAL GAS COST ALLOWANCE RATE AND CARRY-FORWARD J1 Total Actual Cost Allowance [ F4 + E3 + H2] J2 J3 Gas Cost Allowance Carry-Forward (Prior Year) Actual Plant Throughput (1000 cubic metres raw gas) J4 Actual Gas Cost Allowance Rate (Current Year) [ (J1 + J2) / J3 ] J5 Approved Estimated Rate J6 Total Gas Cost Allowance Applied [ J5 J3 } J7 Gas Cost Allowance Carry-Forward (Current Year) [ J1 + J2 - J6 ] ESTIMATED GAS COST ALLOWANCE RATE K1 Estimated Total Cost Allowance [ J1 or L12 ] K2 Gas Cost Allowance Carry-Forward (Current Year) [ J7 ] K3 Estimated Plant Throughput (1000 cubic metres raw gas) K4 Estimated Gas Cost Allowance Rate ($ / 1000 cubic metres) [ (K1 + K2) / K3 } ESTIMATED TOTAL COST ALLOWANCE L1 Opening Balance of Undepreciated Capital [ E4 } L2 Depreciable Capital Additions (Disposals) L3 Total Undepreciated Capital [ L1 + L2 } SAMPLE L4 1. Prorated Depreciation [ 5% of L3 expected operating months / 12 ] L5 Closing Balance of Undepreciated Capital [ L3 - L4 ] L6 2. Direct Operating Costs (DOC) L7 3. Overhead Allowance (10% of DOC) [ 10% of L6 } L8 Estimated Total Operating Costs [ L6 + L7 ] L9 Working Capital Allowance [ L8 1/6 ] L10 Rate Base [ ( L1 + L5 ) / 2 + C1 + L9 ] L11 4. Return on Rate Base [ 15% of L10 expected operating months / 12 ] L12 Estimated Total Cost Allowance [ L4 + L8 + L11 ] FACILITY OPERATOR I hereby certify that the information provided on this form and in supporting documentation is correct. Signature M1 Telephone ( ) M3 Name M2 Fax ( ) M4 03-01

DESCRIPTION BC-23 APPLICATION FOR GAS COST ALLOWANCE A Gas Cost Allowance (GCA) is a site-specific deduction from gross natural gas royalties and taxes. This deduction is intended to compensate for: (i) the costs of construction and operation applicable to the Crown s share of natural gas processed through producer-owned gas processing plants; (ii) and/or, the costs of construction and operation applicable to the Crown s share of natural gas transported through producer-owned residue gas pipelines. PURPOSE The BC-23 is used by the operator of a gas plant to report costs incurred in each calendar year and to apply for a GCA rate for the next calendar year. CUSTOM PROCESSING A producer-owned plant or sales line may be for the producer s own use, or for the use of other producers who pay custom processing fees to use the facilities. Producers who pay custom processing fees to process and/or transport their gas at producer-owned facilities may only claim the approved GCA rate for that calendar period. FILING The BC-23 should be submitted to the for actual operations for each year not later than March 15 of the following year. Each BC-23 must include an estimate of costs and volumes for the following year. For a new facility, the details of estimated capital costs should be provided approximately two months prior to start-up. This will help ensure that the estimated GCA rate is as accurate as possible. Completed Excel files can be sent to us by clicking the Submit button within the Excel file. AMENDMENTS The BC-23 can be used to report amendments to previously reported information for production periods prior to October 2018. Amendments must be reported within 72 months of the producing month. Amendments must be made by re-submitting the complete form. The BC-23 cannot be amended by re-submitting the amended line only. METHODOLOGY An outline of the GCA methodology is as follows: Calendar Year One In the first calendar year that a facility is eligible for a GCA a BC-23 is submitted for approval of an estimated GCA rate for the year. The estimated GCA rate is based upon estimated facility costs and estimated plant throughput volumes. See Section K of BC-23 Application. The approved estimated GCA rate is used to calculate GCA for gas royalties in year one. November 2018 Page 1

METHODOLOGY cont d Calendar Year Two (1) Before March 15 of the second calendar year a BC-23 is submitted to apply for a GCA rate for the second calendar year. In this BC-23 the actual costs and actual raw gas throughput are used to determine the actual GCA rate for year one. (2) The total GCA applied during the first calendar year is determined by multiplying the approved estimated GCA rate for the facility by the actual plant throughput in year one. (3) The difference between the actual GCA for year one and the estimated GCA applied during year one results in an adjustment called a Gas Cost Allowance Carry-Forward (Current Year). (4) The GCA rate for year two is estimated by dividing the estimated Total Cost Allowance and the Gas Cost Allowance Carry-forward by the estimated plant throughput. Two options may be used for estimating the Total Cost Allowance: Option A The estimated Total Cost Allowance for year two is the actual Total Cost Allowance for year one. Option B The estimated Total Cost Allowance for year two may be determined by estimating the capital and operating costs and doing new calculations of depreciation, overhead allowance and return on rate base. Subsequent Years (1) At the end of each calendar year, the actual facility costs and actual plant throughput are used to develop an actual facility GCA rate. (2) The total GCA applied during the calendar year is determined by multiplying the approved estimated GCA rate for the facility by the actual plant throughput. (3) The Gas Cost Allowance Carry-forward for the year is determined as the Actual Total Cost Allowance for the year plus the previous year s Gas Cost Allowance Carry-forward, minus the total GCA applied. NOTE: (1) Once an estimated GCA Rate is approved by the Ministry, it must be used until a revised rate is approved by the Ministry. (2) If the difference between the estimated GCA claimed and the actual GCA for a year is significant, the Province may retroactively adjust royalty charges for the year. (3) Where a producer-owned plant and/or sales line is purchased by another producer, who continues to operate the facilities as a producer-owned plant and/or sales line, the capital cost in any GCA applications shall be equal to the original construction costs plus any allowable capital additions less any depreciation deducted prior to the purchase date. November 2018 Page 2

GENERAL INFORMATION A1 A2 A3 Months Operating in Calendar Year Enter the number of production months this facility operated, or will operate, in the calendar year. Actual Claim for Calendar Year If an actual GCA rate is being calculated, indicate the calendar year to which the actual GCA rate applies. Estimated Claim for Calendar Year If an estimated GCA rate is being calculated, indicate the calendar year to which the estimated GCA rate applies. FACILITY B1 Facility Code Insert the 4-digit code assigned to the facility. If the facility has not yet been assigned an identifying code, contact the Ministry. LAND C1 Land Cost Enter the original cost of the site upon which the facility is located. In the GCA calculation, land is treated as an asset that does not depreciate in value. DEPRECIABLE CAPITAL ADDITIONS (DISPOSALS) D1 D2 DEPRECIATION E1 E2 E3 List all allowable depreciable capital additions and disposals claimed for the year as defined in the attached Schedules I and II. Enter the actual costs incurred in the column provided. If there are more than four entries, attach a separate sheet listing the additional items. Disposals, excluding land, are to be recorded at net book value using the per annum depreciation allowance specified in E3 (i.e., 5 percent). Net Depreciable Capital Additions (Disposals) Enter the sum of the costs incurred in the year for depreciable assets less the net book value of depreciable assets disposed of in the year. Opening Balance of Undepreciated Capital as at January 1 Enter the dollar value of undepreciated capital carried forward from the end of the previous year. (Note: Land is not to be depreciated). In the first year of operations, enter the total cost of depreciable assets as at the commencement date of operations. Total Undepreciated Capital (before depreciation) Enter the sum of Net Depreciable Capital Additions/(Disposals) (D2) and Opening Balance of Undepreciated Capital as at January 1 (E1). Prorated Depreciation Depreciation is the Total Undepreciated Capital (E2) multiplied by 0.05. Prorate the result by multiplying by the number of operating months divided by 12. i.e., E3 = (E2 0.05) (A1 12) November 2018 Page 3

DEPRECIATION cont d. E4 Closing Balance of Undepreciated Capital as at December 31 Subtract Prorated Depreciation from Total Undepreciated Capital. i.e., E4 = E2 E3 NOTE: Where material capital additions to the plant are made part way through a reporting year, the calculation of depreciation will be prorated based on the actual number of months that the asset is in operation. DIRECT OPERATING COSTS (DOC) F1 Direct Operating Costs ($) List the actual allowable costs claimed for the year as defined in the attached Schedules III and IV. If there are more than two entries under Other Expenditures, attach a separate sheet listing additional entries. F2 Direct Operating Costs Enter the sum of the Sub-Totals for columns 1 and 2. F3 Overhead Allowance (10% of Total DOC) Enter an amount for overhead that is 10 percent of Total DOC. F4 i.e. F3 = F2.10 Total Direct Operating Costs (Total DOC + Overhead) Enter the sum of Total DOC and Overhead. i.e. F4 = F2 + F3 WORKING CAPITAL ALLOWANCE G1 Working Capital Allowance Enter one-sixth of Total Operating Costs. i.e. G1 = F4 6 RATE BASE H1 H2 Rate Base Enter the sum of Average Net Depreciable Capital plus Land Value plus Working Capital Allowance. i.e. H1 = (E1 + E4) 2 + C1 + G1 Return on Rate Base Enter 15.0 percent of the Rate Base prorated over the operating months in the claim year. i.e. H2 =.15 H1 x A2 12 NOTE: Where material capital additions to the plant are made part way through a reporting year, the calculation of Return on Rate Base will be prorated based on the actual number of months that the capital asset is in operation. November 2018 Page 4

ACTUAL GAS COST ALLOWANCE RATE AND CARRY-FORWARD J1 J2 J3 J4 J5 J6 J7 Total Actual Cost Allowance Enter the sum of Total Operating Costs plus Prorated Depreciation plus Return on Rate Base. i.e. J1 = F4 + E3 + H2 Gas Cost Allowance Carry-Forward (Prior Year) Enter the carry-forward amount from J7 of the previous year s BC-23 Application. Actual Plant Throughput (1 000 cubic metres raw gas) Enter the total plant throughput for the year in 10 3 m 3 of raw gas. Actual Gas Cost Allowance Rate (Current Year) Calculate the Actual Gas Cost Allowance Rate in $/10 3 m 3 by dividing the sum of Total Actual Cost Allowance and Gas Cost Allowance Carry-Forward (Prior Year) by Actual Plant Throughput. i.e., J4 = (J1 + J2) J3 Approved Estimated Rate Enter the Approved Estimated Rate from K4 of the previous years BC-23 Application. Total Gas Cost Allowance Applied Calculate the total GCA claimed for the current year by multiplying the Approved Estimated Rate by the Actual Plant Throughput. i.e., J6 = J5 J3 Gas Cost Allowance Carry-Forward (Current Year) Subtract the Total Gas Cost Allowance Applied from the sum of the Total Actual Cost Allowance and the Gas Cost Allowance Carry-Forward (Prior Year). i.e., J7 = J1 + J2 - J6 ESTIMATED GAS COST ALLOWANCE RATE K1 K2 K3 Estimated Total Cost Allowance Enter the Estimated Total Cost Allowance determined using either Option A or B. In calculating the Estimated Gas Cost Allowance Rate, the Estimated Total Cost Allowance may be calculated using one of two options: Option A Use the Actual Total Cost Allowance for the previous year (J1). Option B Calculate the Estimated Total Cost Allowance based on estimated costs. Section L may be used to perform this calculation (L12). Gas Cost Allowance Carry-Forward (Current Year) Enter the Gas Cost Allowance Carry-Forward calculated in J7. Estimated Plant Throughput (1000 cubic metres raw gas) Enter a plant throughput estimate based on the previous year s actual plant throughput or an estimated plant throughput for the current year. November 2018 Page 5

ESTIMATED GAS COST ALLOWANCE RATE cont d K4 Estimated Gas Cost Allowance Rate ($ / 1000 cubic metres) Calculate the Estimated Gas Cost Allowance Rate in $/10 3 m 3 by dividing the sum of the Estimated Total Cost Allowance and Gas Cost Allowance Carry-Forward (Current Year) by the Estimated Plant Throughput. i.e., K4 = (K1 + K2) K3 ESTIMATED TOTAL COST ALLOWANCE (Option B) L1 L2 L3 Opening Balance of Undepreciated Capital Enter the dollar value of undepreciated capital carried forward (E4) from the end of the previous year. In the first year of operations, enter the total undepreciated capital as at the commencement date of operations on line L1. Land is not to be depreciated. Depreciable Capital Additions (Disposals) Enter the sum of the depreciable costs for the estimated capital additions less the net book value of depreciable assets that will be disposed of in the year. Provide a list of all estimated depreciable capital additions and disposals for the upcoming year as defined in the attached Schedules I and II, as well as the estimated completion or commissioning date of the addition or disposal. Total Undepreciated Capital Enter the sum of Depreciable Capital Additions (Disposals) (L2) and Opening Balance of Undepreciated Capital as at January 1 or the start up date (L1). L4 Prorated Depreciation Enter the Total Undepreciated Capital (L3) multiplied by 0.05 multiplied by the number of operating months divided by 12. L5 L6 i.e. L4 = (L3 x 0.05) (Operating Months 12) Closing Balance of Undepreciated Capital Subtract Prorated Depreciation from Total Undepreciated Capital. i.e. L5 = L3 - L4 Direct Operating Costs Enter the estimated total of allowable direct operating costs. L7 Overhead Allowance (10% of Total DOC) Enter an amount for overhead that is 10 percent of the estimated Direct Operating Costs. L8 L9 i.e. L7 = L6 x.10 Estimated Total Operating Costs (Total DOC + Overhead) Enter the sum of Total DOC and Overhead. i.e. L8 = L6 + L7 Working Capital Allowance Enter as the Working Capital Allowance one-sixth of the estimated Direct Operating Costs and Overhead Allowance. i.e. L9 = L8 6 November 2018 Page 6

ESTIMATED TOTAL COST ALLOWANCE (Option B) cont d L10 L11 L12 FACILITY OPERATOR M1 M2 M3 M4 Rate Base Enter the sum of average net depreciable capital plus Land Value plus Working Capital Allowance. i.e. L10 = (L1 + L5) 2 + C1 + L9 Return on Rate Base Enter 15.0 percent (effective June 1, 1998) of the Rate Base prorated over the operating months in the claim year. i.e. L11 =.15 x L10 x A2 12 Estimated Total Gas Cost Allowance Enter the sum of Prorated Depreciation, Direct Operating Costs, Overhead Allowance and Return on Rate Base. i.e. L12 = L4 + L8 + L11 Signature An authorized representative of the operator must certify that the preceding information is correct. Name Print clearly the name of the signatory in M1 above. Telephone Enter the signatory s telephone number. Fax Enter the signatory's fax number. November 2018 Page 7

SCHEDULE I ALLOWABLE CAPITAL EXPENDITURES This schedule lists allowable capital expenditures associated with producer-owned gas plants and sales lines. Direct Depreciable Expenditures Air strips; Commissioning and start-up; Communication controls not associated with the production functions; Corrosion protection; Plant site surveys, easements or rights-of-way; Effluent basins and facilities for process water; Emergency flare stacks and relief facilities; Engineering and inspection services; Fire fighting and safety equipment; Loading facilities, railway spur lines, storage or other facilities on the plant site; Meter runs and measurement equipment; Process and sales compression; Pollution monitoring and seepage detection equipment; Processing facilities (includes sulphur recovery facilities) and associated piping; Processing studies that relate directly to the plant process used; All weather main access roads located in British Columbia to producer-owned gas plants located in British Columbia; Interior plant gate roads, bridges, walkways and fences; Sales gas pipeline (producer-owned); Warehouses, laboratories, plant offices and buildings for processing facilities only; Water treatment facilities if water is used for processing. NOTE: (1) Construction overhead equal to one percent (1%) of the total capital additions in the claim year may also be included as a depreciable capital addition. (2) Where a Depreciable Expenditure relates to both processing and production activities, an allocation of the expenditure should be made between the plant and field operations. (3) Where a producer-owned plant and/or sales line is purchased by another producer, who continues to operate the facilities as a producer-owned plant and/or sales line, the capital cost of any Gas Cost Allowance Applications shall be equal to the original construction costs plus any allowable capital additions less any depreciation deducted prior to the purchase date. (4) Where a gas plant is not in operation for each month in the calendar year, the calculation of depreciation and return on rate base is to be prorated based on the number of operating months divided by twelve. (5) Where an all weather main access road has been constructed prior to January 1, 2000, the undepreciated capital costs of the producer-owned road are to be added as an allowable capital expenditure into the rate base of the producer-owned gas plant. November 2018 Page 8

SCHEDULE I cont d (6) When an all weather main access road originates in Alberta, only capital costs associated with the portion of the road located in British Columbia qualify as an eligible gas cost allowance expenditure. Non-Depreciable Expenditures Purchased cost of land. November 2018 Page 9

SCHEDULE II CAPITAL EXPENDITURES NOT ALLOWED This schedule lists capital expenditures not allowed for GCA purposes in the construction of producerowned gas plants and sales lines. Communication Controls associated with the production function; (i.e., production SCADA systems) Downhole, wellhead, protection, controlling, servicing, testing, salt water and other production facilities or equipment relating to the production function; Field compression (Note: Capital costs associated with field compression located on the plant site are not allowed.); Field Dehydration within the plant gate; Gathering systems including line heaters, dehydration, sweetening and pigging facilities; Housing, other than those costs directly attributable to the processing function as they relate to natural gas; Interest costs; Lines, compressors, wells and other significant facilities or equipment relating to the injection function; Roads, bridges, walkways and fences for producer-owned roads other than all weather main access roads to producer-owned gas plants located in British Columbia; Storage, separators, dehydrators, scrubbers, boots and any other facilities or equipment relating to gas conservation and oil; Vehicles, aircraft and mobile equipment. NOTE: Gathering system, field dehydration and field compression costs are covered by the Province s Producer Cost of Service allowance. November 2018 Page 10

SCHEDULE III ALLOWABLE DIRECT OPERATING COSTS This schedule lists allowable direct operating costs associated with producer-owned gas plants and sales lines. Labour; Direct Supervision; Materials used during the claim period; Fuel Tax; Chemicals used in the plant process; Transportation of materials and chemicals for use in the plant; Contract services; Utilities; Maintenance; Direct Insurance other than Loss of Revenue; Property taxes (plant site only); Surface rentals; Purchased fuel gas; Maintenance for all weather main access roads located in British Columbia to producer-owned gas plants located in British Columbia; Overhead allowance. Licenses, Dues, Fees, Surveys and Inspections relating to the processing function; Telecommunications; Camp Costs. NOTE: (1) Where an operating expenditure relates to both processing and production activities, an allocation of the expenditure should be made between the plant and field operations. (2) Where road maintenance costs are recovered from users of the main access road, the recoveries should be included in the GCA claim as a reduction of total road maintenance costs. (3) When an all weather main access road originates in Alberta, only operating costs associated with the portion of the road located in British Columbia qualify as an eligible gas cost allowance expenditure. November 2018 Page 11

SCHEDULE IV OPERATING COSTS NOT ALLOWED This schedule lists operating costs not allowed for GCA purposes in the operation of producer-owned gas plants and sales lines. Operating costs relating to production, gathering systems, field compression, field dehydration, gas conservation, injection or oil functions; Production monitoring, controlling and communication costs; Operating costs associated with all non-allowed capital costs; Loss on disposal of capital; Indirect insurance costs and Loss of Revenue insurance; Tax levies as applied by the Government of British Columbia; Road maintenance for producer-owned roads other than all weather main access roads to gas plants located in British Columbia; Production, gathering system and field compression lease rentals; Petroleum and natural gas royalties; Overhead, administrative and indirect charges. November 2018 Page 12