C APITA L IMPRO VEMENTS S CHEDULE (FIGURE CI-14)

Similar documents
C APITA L IMPRO VEMENTS S CHEDULE (FIGURE CI-14)

Capital Improvements

TABLE OF CONTENTS LIST OF TABLES

CAPITAL IMPROVEMENTS ELEMENT

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal

8. CAPITAL IMPROVEMENT ELEMENT Goals, Objectives, and Policies

CAPITAL IMPROVEMENTS ELEMENT

CAPITAL IMPROVEMENTS. City of St. Augustine Comprehensive Plan EAR-Based Amendments

CAPITAL IMPROVEMENTS ELEMENT

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)

Georgia Funders Forum June 20, Impact Fees. Georgia s Most Ignored State Law? Bill Ross ROSS+associates

Chapter Ten, Capital Improvements Element City of St. Petersburg Comprehensive Plan

ORDINANCE NO

FISCAL YEAR 2019 July 9 th. FY2018 Budget Review Committee Adjustments. FY2019 Highlighted Other Funds Budget Summary

CAPITAL IMPROVEMENTS ELEMENT:

CAPITAL IMPROVEMENT ELEMENT Inventory Analysis

ARTICLE 8.6 PROPORTIONATE FAIR-SHARE PROGRAM [Enacted by Ord /5/06]

TABLE OF CONTENTS INTRODUCTION... 1 CAPITAL IMPROVEMENTS INVENTORY AND ANALYSIS... 1 DEFINITIONS... 2 DATA INVENTORY... 23

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES, AND POLICIES

CAPITAL IMPROVEMENTS ELEMENT

June 24, Lely Resort (PUD) Insubstantial Change (PDI) PL Dear Ms. Beasley:

2025 Comprehensive Plan for the City of Temple Terrace Florida. Capital Improvements. Adopted by City Council June 30, 2009

Capital Improvements Data and Analysis Report

AGENDA REPORT. DATE: November 27, City Commission. Kim D. Leinbach, Interim City Manager

City Services Appendix

City of Redding, California Development Impact Mitigation Fee Nexus Study

DRAFT. Amelia Walk Community Development District

Working with Proportionate Fair-Share

Sec Transportation management special use permits Purpose and intent.

VILLAGE COMMUNITY DEVELOPMENT DISTRICT NO. 9. Basic Financial Statements. September 30, (With Independent Auditors Report Thereon)

The $1.620 million Commercial Container Acquisition CIP project is planned through Solid Waste funds.

Working with Proportionate Fair-Share

PALM BEACH COUNTY CAPITAL IMPROVEMENT PROGRAM

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. 9.B. 1) MEMO May 16, 2017 Staff Contact: Tyra Hays, AICP (707)

Goals, Objectives, and Policies Capital Improvements Element

How did we get here?

CAPITAL BUDGET AND MULTI-YEAR CAPITAL PLAN SECTION 1 INTRODUCTION INTRODUCTION. Purpose of the Capital Improvement Plan

Introduced by the Council President at the request of the Joint. Planning Committee & substituted by the Land Use and Zoning Committee:

Hillsborough County City-County Planning Commission

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A

City of Ocoee Quarterly Report First Quarter Fiscal Year

ACTION STRATEGIES. Aurora Places is the guidebook

Public Works and Development Services

Presented By: L. Carson Bise II, AICP President

2025 COMPREHENSIVE PLAN PASCO COUNTY, FLORIDA CHAPTER 11 TABLE OF CONTENTS

System Development Charge Methodology

Fully Utilized Transportation Funding Sources

Case No.: N/A Staff Phone #: (805) Environmental Document: N/A 1.0 REQUEST

FINANCIAL STATEMENTS AND INDEPENDENT AUDITORS' REPORTS CITY OF ST. AUGUSTINE BEACH ST. AUGUSTINE BEACH, FLORIDA SEPTEMBER 30, 2016

Proposed Budget (as of September 15, 2016)

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

Georgetown Planning Department Plan Annual Update: Background

Georgetown Planning Department Plan Annual Update: Background

ARLINGTON COUNTY, VIRGINIA

CITY OF LANCASTER FISCAL BUDGET REVENUE SOURCES

Technical Report #2: Financial Resources Final Adopted Plan January 2016

CAPITAL IMPROVEMENT PROGRAM K-1

Capital Improvements Element

ARLINGTON COUNTY, VIRGINIA

CHAPTER Committee Substitute for House Bill No. 1049

Planning Commission Application Summary

FY Annual Budget: Mobility Solutions, Infrastructure, & Sustainability

CAPITAL IMPROVEMENT PROGRAM K-1

Millcreek City. Parks, Recreation, Trails and Open Space Impact Fee Facilities Plan DRAFT

Chapter 5. REMAINING REVIEW FACTORS

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012

MARION COUNTY GROWTH SERVICES

The Board of Supervisors of the County of Riverside ordains as follows:

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)

TOWN OF CARY CAPITAL IMPROVEMENTS BUDGET OVERVIEW FOR FISCAL YEAR 2015

Chapter 5: Cost and Revenues Assumptions

Minimum Elements of a Local Comprehensive Plan

TAUSSIG DEVELOPMENT IMPACT FEE JUSTIFICATION STUDY CITY OF ESCALON. Public Finance Public Private Partnerships Urban Economics Clean Energy Bonds

ENGINEER S REPORT COUNTY SERVICE AREA NO. 10 BENEFIT ZONE NO. 3 COUNTY OF SACRAMENTO THIRD ADMINISTRATIVE DRAFT NOVEMBER 21, 2005.

INTRODUCTION CAPITAL IMPROVEMENTS ELEMENT

City of Antioch Development Impact Fee Study

One-Cent for Transportation Presentation

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06

Mobility Plans and Fees: The Future of Transportation Funding

Capital Improvement Program Fund

Special Revenue Funds

2017 TRANSIT DEVELOPMENT PLAN PROGRESS REPORT

This page intentionally left blank

City of San Juan Capistrano Agenda Report. 1. Adopt the resolution amending the Operating and Capital Improvement Budgets for Fiscal Year ;

SPECIAL REVENUE FUNDS

Millcreek City. DRAFT Parks, Recreation, Trails and Open Space Impact Fee Analysis

DRAFT 2040 COMPREHENSIVE PLAN UPDATE

FUND STATUS FY 2017/18. As of December 31 st

Capital Improvements Element. Goals, Objectives and Policies

Chapter CONCURRENCY

Budgeted Fund Structure

ARTICLE 12 TRAFFIC PERFORMANCE STANDARDS

COMPREHENSIVE ANNUAL FINANCIAL REPORT

INTRODUCTION. Introduction Page 1 of 5. G:\Comp\Adopted Comprehensive Plans\15. Cylce 16-2 and 16-3\Elements not changed\_d. Introduction.

Where are your taxes going?

Pasco County, Florida. Multi-Modal Mobility Fee 2018 Update Study

AMELIA WALK COMMUNITY DEVELOPMENT DISTRICT NASSAU COUNTY, FLORIDA FINANCIAL REPORT FOR THE FISCAL YEAR ENDED SEPTEMBER 30, 2011

Transcription:

August 15, 2017 Staff Report to the Municipal Planning Board G M P 2 0 1 7-0 0 0 1 7 I TEM 3 S U M M A RY Applicant City of Orlando Requested Actions 1. Amend Figure CI-14 and Policy 2.2.30 of the Capital Improvements Element to reflect FY2017-2018 to FY2021-2022 Capital Improvements Program. 2. Recommend that the City Council include the CIE projects in the 2017/18-2021/22 CIP. C APITA L IMPRO VEMENTS S CHEDULE (FIGURE CI-14) S U MMARY Project Description Each year, the City amends GMP Capital Improvements Element (CIE) Figure CI-14, the Capital Improvement Funds Schedule to include projects needed to maintain the City s adopted level of service standards for various public facilities. This amendment must be consistent with the City s proposed Capital Improvement Program (CIP), the Florida Department of Transportation s Five Year Work Program, Metroplan Orlando s Five Year Transportation Improvement Program (TIP), and Orlando Utility Commission s Capital Improvement Program. The City is also required to amend Capital Improvements Element Policy 2.2.30 to reflect Orange County Public Schools Ten Year Capital Outlay Plan. Capital Improvements Element The CIE includes an adopted five-year schedule for the expenditure of funds to acquire or construct capital improvements needed to meet or maintain adopted level of service (LOS) standards. This schedule is adopted as part of the Growth Management Plan and labeled as Figure CI-14. The schedule includes City-funded projects as well as projects funded from other sources (FDOT, OUC, etc) if needed to meet LOS standards. Capital Improvement Program The CIP is the vehicle that links capital expenditures with adopted public policy. The CIP includes all City-funded projects listed in the CIE as well as other capital projects to be funded by the City. The CIP is adopted by City Council with the adoption of the annual operating and capital budget. The adoption of the CIP does not commit the City to expenditures or appropriations beyond the first year, except for those capital improvements programmed in the CIE. Staff s Recommendation Approval of the requested actions. Project Planner Michelle Beamon Robinson, AICP Updated: August 7, 2017 Role of the Municipal Planning Board Consistent with Land Development Code Section 65.141, one of the duties of the Municipal Planning Board is to annually submit to City Council a recommended list of capital improvements projects that are needed to implement the Growth Management Plan. This staff report fulfills this requirement. F I N DINGS 1. The proposed 2017/18-2021/22 Capital Improvement Program is consistent with the Capital Improvements Element of the Growth Management Plan. 2. The proposed 2017/18-2021/22 Capital Improvement Program will not lower adopted LOS standards. 3. The proposed 2017/18-2021/22 Capital Improvement Program is consistent with Chapter 163.3177, Florida Statutes.

Page 2 GMP A N A LY S IS Section 163.3177 (3)(b), Florida Statutes, provides that the CIE must be reviewed by the local government on an annual basis. Section 163.3177 also provides that amendments to the Capital Improvements Schedule may be adopted by ordinance and are not deemed to be amendments to the GMP. The purpose of the Capital Improvements Schedule, adopted as Figure CI-14 in the City s GMP, is to identify projects needed to maintain adopted level of service standards for various public facilities. The City has adopted level of service standards for the following facilities: Roadways Mass Transit Potable Water Wastewater Solid Waste Parks Stormwater Schools (addressed in Capital Improvements Element Policy 2.2.30 in lieu of Figure CI-14) In addition, although not part of the adopted LOS standards, the City includes bicycle and pedestrian projects to demonstrate the City s commitment to funding projects that promote mobility within the Transportation Concurrency Exception Area (TCEA). Each year, the City measures the actual level of service and provides the results in the Capacity Availability Report. The City also projects level of service for the next five years. If existing or projected levels of service do not meet adopted level of service standards, the City uses this information as a tool to prioritize capital improvements projects. Not all LOS deficiencies require a dedicated capital improvement project because they may be too small to justify a full-scale new project, or they may be better addressed by demand management rather than expanding supply. This staff report identifies each LOS deficiency, as well as a capital improvements project or other strategy to address the deficiency. Those capital improvements projects are included in proposed Figure CI- 14, along with additional projects that expand or maintain capacity to prevent future LOS deficiencies. Proposed Figure CI-14 is provided in Attachment 1. Attachment 2 shows a strikethrough/underline comparison of the existing and proposed Figure CI-14 projects and identifies changes to project funding and timing. Attachment 3 shows projected revenues from the City s funding sources for a five year period. CIE projects are a subset of the City s total Capital Improvements Program, therefore total revenues from each funding source are greater than the total CIE project cost because the remainder is spent on other projects. Attachment 4 summarizes CIE projects by project type and by funding source. Attachment 5 includes a table that organizes the City-funded projects shown in proposed Figure CI-14 into categories by funding source, and then identifies the projected revenues associated with each funding source. As shown in Attachment 5, the projected cost is equal to or less than the projected revenue for each funding source. Roadways As shown in the Capacity Availability Report, roadway segments throughout the City identified in last year s report as experiencing volume/capacity ratios over 85% have seen traffic demand volume increases of 1-5% since 2015. Several segments indicated year to year increases of more than 10%, but all of these are close to active construction zones, such as near Interstate 4, and are more affected by diverted construction traffic than by overall traffic growth. No segments were identified in this study that have substantially poorer performance due only to growth or that pose greater concern than in previous Capacity Availability Reports. There are certainly major roadways that can clearly be categorized as congested during peak travel periods of typical days, but the network is not exhibiting signs that reasonable levels of traffic growth cannot continue to be served. The strikethrough/underline comparison of the existing and proposed Figure CI-14 identifies changes to project funding and timing. Data regarding the 2017-2022 proposed capital improvements projects was obtained from the following sources: The City of Orlando draft 2017/18-2021/22 Capital Improvements Program.

Page 3 GMP A N A LY S IS, CONT. The Florida Department of Transportation s Five Year Work program, as shown on its website on July 28, 2017. Central Florida Expressway Authority (fka Orlando-Orange County Expressway Authority) Five-Year Work Plan FY 2018 FY 2022, dated May 12, 2017. Mass Transit Citywide, there are 156.5 miles of designated Transit Corridors and 106.3 miles or 68% of those corridors currently have LYNX service available for some portion of a typical day. As shown in the Capacity Availability Report, the LOS for transit is being met for 60% of the designated transit corridors (9 out of 15) are operating at 30-minute or less weighted average headways. Last year, the LYMMO service expanded operation by extending the footprint of its Orange Line to include the emerging North Quarter of the central business district. A new Lime Line is opening in August 2017. Potable Water The Orlando Utilities Commission (OUC) provides the City s potable water. The Potable Water LOS standards are currently maintained, and are projected to be maintained over the next five years. No deficiencies are projected over the next five years, the physical capacity of OUC s plants allows for withdrawals of up to 121.18 MGD, which exceeds projected demand. Therefore, capital improvements projects for water that are included in Figure CI-14 are provided to maintain adopted LOS standards. The projects are consistent with OUC s Consumptive Use Permit (CUP) and are included in OUC s five year capital improvements program. Wastewater As shown in the Capacity Availability Report, the City is projected to maintain a surplus of wastewater capacity through the five year reporting period, and level of service standards will continue to be met. Therefore, no projects are needed to expand capacity. Wastewater projects are ongoing, and included in the City s Capital Improvements Program. Solid Waste As shown in the Capacity Availability Report, the City is projected to maintain a surplus of solid waste capacity through the five year reporting period, provided trucks are purchased according to the schedule in Figure CI-14. Level of service standards will continue to be met. Parks Recreation Element Policy 1.1.1 identifies the actions that must be taken if an acreage deficiency is identified in a Community Park Sector or a Neighborhood Park Service Area (NPSA). The policy states the following:...the following thresholds shall be used to schedule the funding and construction of new community and neighborhood parks: A park project shall be added to the Capital Improvement Program and Capital Improvement Element when the level of service deficiency reaches 50% of the prototypical size for that specific park type (i.e., a 7.5 acre deficiency in a community park sector or a 2.5 acre deficiency in a neighborhood park service area). A park project shall be scheduled for funding in the first year of the Capital Improvement Program when the level of service deficiency reaches 75% of the prototypical size for that specific park type (i.e., an 11.25 acre deficiency in a community park sector or a 3.75 acre deficiency in a neighborhood park service area). A park project shall be constructed when the level of service deficiency for a specific park type reaches 90% of the prototypical park size (i.e., a 13.5 acre deficiency in a community park sector or a 4.5 acre deficiency in a neighborhood park service area).... The CAR identifies the following existing or projected LOS deficiencies: 1. Community Park Sector 6 has an existing deficiency of 4.98 acres, which is expected to grow to 5.07 acres in 2020, 11.36 acres in 2030, and 19.43 acres by 2045. Given the criteria in Recreation Policy 1.1.1 described above, a funded park project would need to be added to the CIP and CIE to address this current and projected deficiency sometime between 2021 and 2025. Residents in Community Park Sector 6 will ultimately need an additional 2 little league ballfields, 4 softball fields, and 2 soccer/ multi-purpose fields. 1. NPSA 18 (South Semoran East Area): This area includes a small number of single family homes, as well as a number of multifamily developments which have private recreational amenities. However, there are no City neighborhood park facilities in

Page 4 GMP A N A LY S IS, CONT. this area. Unfortunately, this service area is experiencing a fairly significant neighborhood park LOS deficiency of 4.55 acres. In the past, the City was able to utilize the recreational amenities associated with McCoy Elementary School through a Joint Use Agreement (JUA). However, because of the rebuilding of the school and the subsequent reconfiguration of the recreational amenities including lack of physical accessibility, FPR has found that operating recreational programs at this location is problematic. Because the previous JUA is no longer in place, the City can no longer count the school s recreational amenities in our neighborhood park LOS calculations. NPSA #18 has 9,830 residents generation a neighborhood park need for 7.37 acres. While the 2.82 acres of privately owned park land associated with the Carter Glen and Grandville at Jubilee Park projects can be counted in the analysis, a deficiency of 4.55 acres remains. That deficiency is expected to grow to 5.41 acres by 2020 and 6.37 acres by 2030. This level of deficiency exceeds all of the thresholds described in Recreation Policy 1.1.1. Therefore, the City will need to address this deficiency in one or a combination of the following ways: A. Renew the City/OCPS Joint Use Agreement at McCoy Elementary. This option could include a redesign of the existing substandard little league ballfield into a multi-purpose field that would better serve the needs of the school and the City. B. Add a neighborhood park project to the City s Capital Improvement Program budget and build a new 5 to 6 acre neighborhood park (or two smaller parks). C. Utilize Recreation Policy 1.1.3, which states that If no developable land is available for parks in a neighborhood park service area exhibiting measurable unmet demand, suitable alternate sites in adjacent service areas shall be identified and developed as appropriate. Such sites may be used to satisfy the minimum acreage requirements for that service area for the purpose of concurrency. D. Initiate an amendment to GMP Recreation Policy 1.1.15 to state that, because of the unique physical characteristics of the service area and presence of private recreational amenities associated with multifamily projects, the recreation needs within NPSA 18 shall be met by utilization of the City-wide combined level of service standard for community and neighborhood parks. Option 3 was utilized during the previous three years to ensure concurrency is technically met. 3. NPSA s 19-24 and 26 (Vista East, Southeast Orlando Sector Plan, and Storey Park Areas): To date, the developers of the residential projects in NPSA s 19-24 have provided neighborhood-level park land consistent with the City s Growth Management Plan. The developers of properties within the Southeast Orlando Sector Plan area (NPSA s 21-24) are required to provide neighborhood parks to serve their projected population according to the LOS standards specified in the Growth Management Plan. Similar requirements were incorporated into the Vista Park PD in NPSA 20, as well as the Storey Park and Starwood PD s in NPSA 26. In fact, these are currently the only areas of the City where some form of mandatory park land dedication is required. As residential Specific Parcel Master Plans are brought forward, staff will work with the developers to appropriately locate those neighborhood park facilities. As an example, construction of Lake Nona s Laureate Park residential project is in full swing. As part of this residential project, Lake Nona will be developing over 20 acres of publicly accessible neighborhoodlevel park land, which will be maintained by the applicable homeowner s association. Because of this and other similar privately funded park development activity, no additional action in terms of providing neighborhood-level park land is required by the City for these areas at this time. Stormwater The City maintains the adopted LOS standards for stormwater by requiring all new development to be consistent with the Engineering Standards Manual at time of building permit issuance. This has been required since 1984, therefore no projects are needed to meet LOS. However, some stormwater projects are included in Figure CI-14 because they correct flooding or drainage problems in areas that were developed prior to 1984. These existing deficiencies are being addressed as time and resources allow. Public Schools In 2008, the City adopted a Public School Facilities Element that requires school concurrency. Orange County Public Schools (OCPS) reviews all site plans and building permits to ensure adequate capacity exists. Because capacity availability is influenced by students generated in other jurisdictions, OCPS maintains capacity availability data rather than the City. OCPS is responsible for submitting this information to the State Planning Agency. The City is required to annually update its Capital Improvements Element to adopt by reference the OCPS ten-year capital improvements program. Accordingly, the following amendments are proposed to Capital Improvements Element Policy 2.2.30:

Page 5 GMP A N A LY S IS, CONT. Policy 2.2.30 The City hereby incorporates by reference the OCPS 10-year Capital Outlay Plan for 2016-2017 2017-2018, adopted by Orange County School Board on September 13, 2016 September 12, 2017, which includes school capacity sufficient to meet anticipated student demands projected by OCPS. S U MMARY Based on this review, staff has determined that the projects and timing of proposed projects in the 2017-2022 CIP will maintain adopted LOS standards. Therefore, the proposed CIP is consistent with the adopted GMP.

Page 6 A T TACHMENT 1

Page 7

Page 8 Note: OUC projects to be updated once we receive the work plan from OUC

Page 9 Page 9 A T TACHMENT 2

Page 10 Page 10

P aaggee 111 1 Note: OUC projects to be updated once we receive the work plan from OUC

Page 12 Page 12 A T TACHMENT 3: P R O J E C T E D REVENUES: FY2017/18 TO 2021/22

Page 13 Page 13 A T TACHMENT 4: S U M M A RY OF CIE PROJECTS BY T YPE AND FUNDING S O U R C E

Page 14 Page 14 A T TACHMENT 5: C O M PA R I S O N OF PROJECTED REVENUES AND PROJECT C O S T S