CONFORMED COPY LOAN NUMBER 1329-MA LOAN AGREEMENT MALAYSIA. and. Dated November 18, Public Disclosure Authorized. Public Disclosure Authorized

Similar documents
LOAN AGREEMENT. (Fourth Education Project) between. and

UNITED REPUBLIC OF CAMEROON

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized O lciad *i LOAN NUMBER 2102 IND

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 1961 TUN. Public Disclosure Authorized. (Fourth Education Project)

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1539 GR. Public Disclosure Authorized. (Fourth Education Project)

(Second Education Project) between. and

774- 'I. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1369 EGT. Public Disclosure Authorized LOAN AGREEMENT

CONFORMED COPY LOAN NUMBER 1267 IND LOAN AGREEMENT. (National Food Crops Extension Project) between REPUBLIC OF INDONESIA. and

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. (Rainfed Agricultural Development (Iloilo) Project)

Loan Agreement CONFORMED COPY LOAN NUMBER 1146 JM INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT THE WATER COMMISSION, KINGSTON, JAMAICA

Public Disclosure Authorized COPY CONFORMED NUMBER 1238 BO. Public Disclosure Authorized. (Fourth Power Project) Public Disclosure Authorized between

Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1236 IND. Public Disclosure Authorized LOAN AGREEMENT. (Fourth Highway Project)

Loan Agreement -77- I. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1435 IND. Public Disclosure Authorized. (Ninth Irrigation Project)

LOAN AGREEMENT. (Fourth Rural Credit Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and. Dated April 11, 1977

CREDIT AGREEMENT. between REPUBLIC OF ZAIRE. and

LOAN AGREEMENT. (Ialomita-Calmatui Irrigation Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

Loan Agreement CONFORMED COPY LOAN NUMBER 1033 MAS. (Education Project) BETWEEN MAURITIUS AND INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

ANDHRA PRADESH PROJECT AGREEMENT. between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

Maharashtra Project Agreement

Project Agreement. Public Disclosure Authorized CREDIT NUMBER /. 67IN LOAN NUMBER 4 IN. Public Disclosure Authorized

Development Credit Agreement

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 1978 JM. Public Disclosure Authorized

Loan Agreement. Io~CIAL. Dated. Public Disclosure Authorized. DoOCTJMENTSLOAN NUMBER 1911 YU Public Disclosure Authorized

LOAN NUMBER INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Development Credit Agreement

Project Agreement CONFORMED COPY CREDIT NUMBER 419 MAS INTERNATIONAL DEVELOPMENT ASSOCIATION DEVELOPMENT WORKS CORPORATION DATED JULY 9, 1973

Project Agreement LOAN NUMBER 2104 DO. picaal. and. Public Disclosure Authorized. Public Disclosure Authorized

Project Agreement. Public Disclosure Authorized OFFICIAL LOAN NUMBER 1878 PAN DOCUMENPS. Public Disclosure Authorized

Loan Agreement OCUMENTS. Public Disclosure Authorized LOAN NUMBER 1870 TH. Public Disclosure Authorized. (National Sites and Services Project)

Project Agreement. Public Disclosure Authorized CREDIT NUMBER 1482 UV. Public Disclosure Authorized

Development Credit Agreement

LOFFIC. Loan Agreement. Public Disclosure Authorized I0CUMENTS LOAN NUMBER 1840 IND. Public Disclosure Authorized

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. (Second Pre-investment Studies Project) Public Disclosure Authorized

Loan Agreement. Public Disclosure Authorized CONFORMED COPY. Public Disclosure Authorized. (Sixth Korea Development Finance Corporation Project)

Project Agreement. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 775 SE. Public Disclosure Authorized. Public Disclosure Authorized

Loan Agreement. (Capital Goods Importation Credit Program) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT BANCO CENTRAL DE COSTA RICA

Development Credit Agreement

Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1281 PE. Public Disclosure Authorized LOAN AGREEMENT. Public Disclosure Authorized

Loan Agreement. Public Disclosure Authorized LOAN NUMBER RO Public Disclosure Authorized. (Orchards Project) Public Disclosure Authorized

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1418 PA. Public Disclosure Authorized. (Second Rural Development Project)

Loan Agreement OFFICIAL DOCUMENTS. Public Disclosure Authorized LOAN NUMBER 2400 TU. Public Disclosure Authorized

CONFORMED COPY LOAN NUMBER 4043 IND LOAN NUMBER 4043 IND

Loan Agreement _IV. (Fourth KDB Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and KOREA DEVELOPMENT BANK

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1583 CO. Public Disclosure Authorized. Interconnection Project)

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3771 BUL. Public Disclosure Authorized. (Agricultural Development Project)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Project Agreement OFFICIAL. Public Disclosure Authorized. onr'unients LOAN NUMBER 2300 IND. Public Disclosure Authorized. (Thirteenth Power Project)

Loan Agreement. Public Disclosure Authorized CONFORNED COPY LOAN NUMBER 2214 IND. Public Disclosure Authorized. (Twelfth Power Project)

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized 1803 AL C LOAN NUMBER. Public Disclosure Authorized

CONFORMED COPY LOAN NUMBER 3770 LE

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized COMFORMED COPY

Project Agreement CONFORMED COPY CREDIT NUMBER 385 JO INTERNATIONAL DEVELOPMENT ASSOCIATION AMMAN MUNICIPAL AREA WATER AND SEWERAGE AUTHORITY

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized BANCA DE INVESTITII

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1419 PA. Public Disclosure Authorized. (Industrial Credit Project)

Project Agreement OFFIIL DOCUMENTS REDIT NUMBER 1374 PAK. Public Disclosure Authorized. Public Disclosure Authorized. (Karachi Water Supply Project)

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1438 KE. Public Disclosure Authorized

Loan Agreement. Dated July 26, Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1611 YU. Public Disclosure Authorized

Development Credit Agreement

Project Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1674 PA. Public Disclosure Authorized

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1516 JM. Public Disclosure Authorized. (Second Power Project)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Development Credit Agreement

and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER Public Disclosure Authorized LOAN AGREEMENT (Tanjung Priok Port Project) between

Development Credit Agreement

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1518 SE. Public Disclosure Authorized. (Third Railway Project)

Loan Agreement. (Industrial Finance Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and

Loan Agreement LOAN NUMBER 180 PAK. (Second Railway Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT ISLAMIC REPUBLIC OF PAKISTAN

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1524 ME. Public Disclosure Authorized. (Tourism Development Project)

Development Credit Agreement

Loan Agreement. (Central Provinces Electrification Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement NUMBER 1878 PAN 1)0CUMP. 'OFFI uloan. Public Disclosure Authorized. Public Disclosure Authorized. (Colon Urban Development Project)

Project Agreement. OCUMEN Pf. (Grain Distribution and Storage Project) OFFICE DES CEREALES. Public Disclosure Authorized OFFICIAL LOAN NUMBER 2052 TUN

LOAN AGREEMENT. between. and

Loan Agreement. Public Disclosure Authorized LOAN NUMBER 1836 KO. Public Disclosure Authorized. (Seventh Railway Project) Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Development Credit Agreement

IDBI Loan Agreement. Public Disclosure Authorized LOAN NUMBER 3779 IN. Public Disclosure Authorized. (Industrial Pollution Prevention Project)

Loan Agreement. (Third Industrial Credit Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Development Credit Agreement

Development Credit Agreement

Loan Agreement. (Cameron Highlands Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Development Credit Agreement

Loan Agreement. (Railway Project) INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT LOAN NO. 60 PAK AND DATED MARCH 27, 1952

Public Disclosure Authorized COPY CONFORMED LOAN NUMBER 1257 BR. Public Disclosure Authorized LOAN AGREEMENT. (COPEL Power Distribution Project)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1558 CO. Public Disclosure Authorized. (Urban Development Project)

Loan Agreement. Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1593 CO. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized CONFORMED COPY

76-74 LOAN NUMBER 1283 PE. (Urban Sites and Services Development Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT.

Project Agreement DOCUMNTS.CREDIT NUMBER 860 TA. Dated -, Public Disclosure Authorized. Public Disclosure Authorized

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Project Agreement. (Agricultural and Rural Market Development Project) between INTERNATIONAL DEVELOPMENT ASSOCIATION. and BANQUE NATIONALE DU RWANDA

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

Development Credit Agreement

Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1317 BR. Public Disclosure Authorized LOAN AGREEMENT. (Second Agro-Industries Credit Project)

CONFORMED COPY CREDIT NUMBER 566 CE REPUBLIC OF SRI LANKA INTERNATIONAL DEVELOPMENT ASSOCIATION DATED JUNE 27, Public Disclosure Authorized

Transcription:

LOAN NUMBER 1329-MA Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized LOAN AGREEMENT Public Disclosure Authorized (Fourth Education Project) between MALAYSIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Dated November 18, 1976

LOAN AGREEMENT AGREEMENT, dated November 18, 1976, between MALAYSIA (hereinafter called the Borrower) and INTERNATIONAL BANK FOR RECON- STRUCTION AND DEVELOPMENT (hereinafter called the Bank).

-2- ARTICLE I General. Conditions; Definitions Section 1.01. The parties to this Agreement accept all the provisions of the General Conditions Applicable to Loan and Guarantee Agreements of the Bank, dated March 15, 1974, with the same force and effect as if they were fully set forth herein (said General Conditions Applicable to Loan and Guarantee Agreements of the Bank being hereinafter called the General Conditions). Section 1.02. Wherever used in this Agreement, unless the context otherwise requires, the several terms defined in the General Conditions have the respective meanings therein set forth and the following additional terms have the following meanings: (a) "Project Units" means the two project units in the Borrower's MOE and MOLM, respectively, referred to in Section 3.03 of this Agreement; (b) "MOE" means the Borrower's Ministry of Education; (c) "MOLM" means the Borrower's Ministry of Labor and Manpower; and (d) "MOA" means the Borrower's Ministry of Agriculture;

-3- (e) "Project States" means the seven States of the Borrower included in the Project, namely, Kedah, Kelantan, Pahang, Perak, Sabah, Saravak and Trengganu, and "Project State" means any one of the Project States.

-4- ARTICLE II The Loan Section 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions in the Loan Agreement set forth or referred to, an amount in various currencies equivalent to thirty five million dollars ($35,000,000). Section 2.02. The amount of the Loan may be withdrawn from the Loan Account in accordance with the provisions of Schedule 1 to this Agreement, as such Schedule may be amended from time to time by agreement between the Borrower and the Bank, for expenditures made (or, if the Bank shall so agree, to be made) in respect of the reasonable cost of goods and services required for the Project described in Schedule 2 to this Agreement and to be financed out of the proceeds of the Loan. Section 2.03. Except as the Bank shall otherwise agree, contracts for the purchase of goods or for civil works to be financed out of the proceeds of the Loan, shall be procured in accordance with the provisions of Schedule 4 to this Agreement. Section 2.04. The Closing Date shall be June 30, 1982 or such later date as the Bank shall establish. The Bank shall promptly notify the Borrower of such later date. Section 2.05. The Borrower shall pay to the Bank a commitment charge at the rate of three-fourths of one per cent (3/4 of 1%)

-5- per annum on the principal amount of the Loan not withdrawn from time to time. Section 2.06. The Borrower shall pay interest at the rate of eight and ninety hundredths per cent (8.90%) per annum on the principal amount of the Loan withdrawn and outstanding from time to time. Section 2.07. Interest and other charges shall be payable semi-annually on February 1 and August 1 in each year. Section 2.08. The Borrower shall repay the principal amount of the Loan in accordance with the amortization schedule set forth in Schedule 3 to this Agreement.

ARTICLE III Execution of the Project Section 3.01. The Borrower shall carry out the Project through MOA and the Project Units with due diligence and efficiency and in conformity with appropriate administrative, engineering, financial and educational practices, and shall provide, promptly as needed, the funds, facilities, services and other -Vesources required for the purpose. Section 3.02. Except as the Bank shall otherwise agree, the Borrower shall employ or engage qualified and experienced architectural and engineering consultants in order to assist the Borrover in designing, preparing contract documents for and supervising construction of the teacher training college, education resource centers and one industrial training institute included in the Project and to assist in the engineering aspects of the remaining industrial training institutes and large primary schools in Sabah included in the Project. Section 3.03. The Borrower shall maintain the Project Units established in MDE and MOLM with such staff functions and responsibilities as described in Schedule 5 to this Agreement. Section 3.04. (a) The Borrower undertakes to insure, or make adequate provision for the insurance of, the imported goods to be financed out of the proceeds of the Loan against hazards incident to the acquisition, transportation and delivery thereof to the place of use or installation, and for such insurance any indemnity

-7- shall be payable in a currency freely usable by the Borrower to replace or repair such goods. (b) Except as the Bank shall otherwise agree, the Borrower shall cause all goods and services financed out of the proceeds of the Loan to be used exclusively for the Project. Section 3.05. (a) The Borrower shall furnish to the Bank promptly upon their preparation: (i) for its information, the proposed annual primary school construction programs indicating distribution of facilities by and within each Project State with supporting reasons, and (ii) for its review, specifications, reports, contract documents and work and procurement schedules for the Project, and any material modifications thereof or additions thereto, in such detail as the Bank shall reasonably request. (b) The Borrower: (i) shall maintain records adequate to record the progress of the Project (including the cost thereof) and to identify the goods and services financed out of the proceeds of the Loan, and to disclose the use thereof in the Project; (ii) shall enable the Bank's accredited representatives to visit the facilities and construction sites included in the Project and to examine the goods financed out of the proceeds of the Loan and any relevant records and documents; and (iii) shall furnish to the Bank all such information as the Bank shall reasonably request concerning the Project, the expenditure of the proceeds of the Loan and the goods and services financed out of such proceeds. Section 3.06. The Borrower shall take or cause to be taken all such action as shall be necessary to acquire not later than

-8- six months prior to the scheduled date for the commencement of construction of each institution included in the Project all such land and rights in respect of land as shall be required for the construction and operation of said institutions and shall inform the Bank, if and when requested by the Bank, that such land and rights in respect of land are available for purposes related to the Project. Section 3.07. The Borrower shall appoint qualified, experienced and competent staff to such positions as are described in paragraph 5 of Schedule 5 to this Agreement, and to additional positions required to implement the Project in accordance with a timetable acceptable to the Bank.

9- ARTICLE IV Other Covenants Section 4.01. (a) It is the policy of the Bank, in making loans to, or with the guarantee of, its members not to seek, in normal circumstances, special security from the member concerned but to ensure that no other external debt shall have priority over its loans in the allocation, realization or distribution of foreign exchange held under the control or for the benefit of such member. To that end, if any lien shall be created on any public assets (as hereinafter defined), as security for any external debt, which will or might result in a priority for the benefit of the creditor of such external debt in the allocation, realization or distribution of foreign exchange, such lien shall, unless the Bank shall otherwise agree, ipso facto and at no cost to the Bank, equally and ratably secure the principal of, and interest and other charges on, the Loan, and the Borrower, in creating or permitting the creation of such lien, shall make express provision to that effect; provided, however, that, if for any constitutional or other legal reason such provision cannot be made with respect to any lien created on assets of any of its political or administrative subdivisions, the Borrower shall promptly and at no cost to the Bank secure the principal of, and interest and other charges on, the Loan by an equivalent lien on other public assets satisfactory to the Bank. (b) The foregoing undertaking shall not apply to: (i) any lien created on property, at the time of purchase thereof, solely

- 10 - as security for payment of the purchase price of such property; and (ii) any lien arising in the ordinary course of banking transactions and securing a debt maturing not more than one year after its date. (c) As used in this Section, the term "public assets" means assets of the Borrower, of any political or administrative subdivision thereof and of any entity owned or controlled by, or operating for the account or benefit of, the Borrower or any such subdivision. Section 4.02. The Borrower shall maintain or cause to be maintained records to reflect in accordance with consistently maintained sound accounting practices the operations, resources and expenditures, in respect of the Project, of the departments or agencies of the Borrower responsible for carrying out the Project or any part thereof. Section 4.03. The Borrower shall continue to develop and collect information on a set of educational indicators for each of the Project States and establish school mapping and planning procedures to assist MOE in allocating educational resources within t among the Project States. Section hl..-4 (a) The Borrower shall operate, or cause to be operated, the educational institutions and facilities included in the Project in accordance with sound administrative practice and with due regard to efficiency.

- 11 - (b) The Borrower shall at all times employ, or cause to be employed, qualified administrators and teachers in adequate numbers to staff the educational institutions included in the Project. Section 4.05. The Borrower shall: (i) adequately maintain or cause to be maintained the buildings, furniture and equipment of the educational institutions included in the Project and make or cause to be made all necessary repairs and renewals thereof in accordance with sound technical and administrative practices; and (ii) provide or cause to be provided, as and when needed, the funds, facilities, services and other resources required for the foregoing.

- 12 - ARTICLE V Termination Section 5.01. The date February 23, 1977, is hereby specified for the purposes of Section 12.04 of the General Conditions.

- 13 - ARTICLE VI Representative of the Borrover; Addresses Section 6.01. The Minister of Finance or Deputy Minister of Finance of the Borrower or such other person or persons as the Minister of Finance shall appoint in writing is designated as representative of the Borrower for the purposes of Section 11.03 of the General Conditions. Section 6.02. The following addresses are specified for the purposes of Section 11.01 of the General Conditions: For the Borrower: The Treasury Kuala Lumpur 01-01 Malaysia Cable address: For the Bank: TREASURY Kuala Lumpur International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 United Vtates of America Cable address: INTBAFRAD Washington, D.C.

IN WITNESS WHEREOF, the parties hereto, acting through their representatives thereunto duly authorized, have caused this Agreement to be signed in their respective names in the District of Columbia, United States of America, as of the day and year first above written. MALAYSIA By /s/ Zain Azraai Authorized Representative INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By /s/ Bernard R. Bell Regional Vice President East Asia and Pacific

- 15 - SCHEDULE 1 Withdrawal of the Proceeds of the Loan 1. The table below sets forth the Categories of items to be financed out of the proceeds of the Loan, the allocation of the amounts of the Loan to each Category and the percentage of expenditures for items so to be financed in each Category: Amount of the Loan Allocated % of (Expressed in Expenditures Category Dollar Equivalent) to be Financed I. MOE (1) Civil works, furniture and 18,300,000 25% professional services (2) Instructional 2,200,000 equipment (a) Directly imported (b) Manufactured locally 100% of foreign expenditures 100% of local expenditures (ex-factory) (c) Imported 70% and procured locally (3) Technical training and 400,000 100% specialist services

- 16 - II. MOLM Amount of the Loan Allocated % of (Expressed in Expenditures Category Dollar Equivalent) to be Financed (4) Civil works, 1,440,000 25% furniture and professional services (5) Instructional 3,520,000 equipment (a) Directly imported 100% of foreign expenditures III. MOA (b) Manufac- 100% of local tured lo- expenditures cally (ex-factory) (c) Imported 70% and procured locally (6) Technical 1,400,000 100% training and specialist services (7) Civil works, 30,000 25% furniture and professional services (8) Instructional 4o,ooo equipment (a) Directly imported 100% of foreigr expenditures

- 17 - Amount of the Loan Allocated % of (Expressed in Expenditures Category Dollar Equivalent) to be Financed (b) Manufactured locally 100% of local expenditures (ex-factory) (c) Imported 70% and procured locally (9) Technical 270,000 100% training and specialist services IV. Unallocated 7,400,000 TOTAL 35,000,000

- 18-2. For the purposes of this Schedule: (a) the term "foreign expenditures" means expenditures in the currency of any country other than the Borrower and for goods or services supplied from the territory of any country other than the Borrower; and (b) the term "local expenditures" means expenditures in the currency of the Borrower and for gods or services supplied from the territory of the Borrover. 3. The disbursement percentages have been calculated in compliance with the policy of the Bank that no proceeds of the Loan shall be disbursed on account of payments for taxes levied by. or in the territory of, the Borrower on goods or services, or on the importation, manufacture, procurement or supply thereof; to that end, if the amount of any such taxes levied on or in respect of any iter to be financed out of the proceeds of the Loan decreases or increases, the Bank may, by notice to the Borrower, increase or decrease the disbursement percentage then applicable to such item as required to be consistent with the aforementioned policy of the Bank. 4. Notwithstanding I the provision of paragraph 1 above, no withdrawals shall be made: Agreement; (a) in respect of expenditures prior to the date of this

- 19 - (b) for any purpose under Category I unless the Bank shall have received evidence satisfactory to it that one full-time project architect has been designated to the MOE Project Unit; (c) in respect of expenditures in any Project State related to the primary school component under Category I unless the Bank shall have received evidence satisfactory to it that such State has created a position of the State Assistant Development Officer for Education; (d) in respect of expenditures in the State of Sabah related to the primary school component under Category I unless the Bank shall have received evidence satisfactory to it that: (i) a position of an Assistant for Development to the Resident Education Officer in each of the five Residencies in Sabah has been created; and (ii) a Residency Project Coordinator in each of the five Residencies in Sabah has been designated; (e) in respect of expenditures in the State of Saravak related to the primary school component under Category I unless the Bank shall have received evidence satisfactory to it that: (i) a position of an Assistant for Development to the Division Education Officer in each of the seven Divisions in Sarawak has been created; and

- 20 - (ii) a Division Project Coordinator in each of the seven Divisions in Sarawak has been designated; and (f) for any purpose under Category II unless the Bank shall have received evidence satisfactory to it that the positions of an Architect or Engineer and a Procurement Officer have been created. 5. Notwithstanding the allocation of an amount of the Loan or the disbursement percentages set forth in the table in paragraph 1 above, if the Bank has reasonably estimated that the amount of the Loan then allocated to any Category will be insufficient to finance the agreed percentage of all expenditures in that Category, the Bank may, by notice to the Borrower: (i) reallocate to such Category, to the extent required to meet the estimated shortfall, proceeds of the Loan which are then allocated to another Category and which in the opinion of the Bank are not needed to meet other expenditures; and (ii) if such reallocation cannot fully meet the estimated shortfall, reduce the disbursement percentage then applicable to such expenditures in order that further withdrawals under such Category may continue until all expenditures thereunder shall have been made. 6. If the Bank shall have reasonably determined that the procurement of any item in any Category is inconsistent with the procedures set forth or referred to in this Agreement, no expenditures for such item shall be financed out of the proceeds of

- 21 - the Loan and the Bank may, without in any way restricting or limiting any other right, power or remedy of the Bank under the Loan Agreement, by notice to the Borrower, cancel such amount of the Loan as, in the Bank's reasonable opinion, represents the amount of such expenditures which would otherwise have been eligible for financing out of the proceeds of the Loan.

- 22 - SCHEDULE 2 Description of the Project The Project will mainly support the Borrower's five-year primary school construction program in the Project States. The program is designed to improve the quality of primary schooling and to redress existing imbalances in the provision of primary school education. The Project will also assist in the further expansion and upgrading of industrial skill training. The Project consists of providing construction, furniture and equipment for the following institutions and related technical training and specialist services as described in the Annex to this Schedule, as such Annex may be amended by agreement between the Borrower and the Bank: A: MOE 1. Primary schools by State Staff Approx. Gross No. of Boarding Housing Area of Institutions Places Units Construction sq. ft. Kedah 68-56 888,6oo Kelantan 76 - - 815,800 Pahang 61 - - 951,4oo Perak 61 - - 849,700 Sabah 283-340 1,386,300 Sarawak 261 1,200 275 1,294,ooo Trengganu 38-32 461,700

- 23 - Staff Approx. Gross No. of Boarding Housing Area of Institutions Places Units Construction sq. ft. 2. Teacher Training College 1 480 25 140,000 3. Education Resource Centers 4 160 4 82,000 B: NOLM 1. Industrial Training Institutions 5 1,145 39 325,300 C: MOA 1. Community Service Centers 3 - - 9,000 This Schedule may be amended with the agreement of the Bank. * P e The Project is expected to be completed by June 30, 1981.

-24- ANNEX TO SCHEDULE 2 Technical Training and Specialist Services A. Technical Training Area of Study Man-months Educational Planning/School Mapping for Institutions in Part A 144 Pre-service Teacher Training for Institutions in Part A 192 In-service Teacher Train_g for Institutions in Pur' A 144 Technical/Vocational Training for Institutions in Part B 360 Total 84o B. Specialist Services Area of Specialization Man-months Educational Planning/School Mapping for Institutions in Part A 12 Industrial Training for Institutions in Part B 228 Non-formal Education for Institutions in Part C 30 Total 270 C. Study of non-formal community education to be undertaken by an agency such as the Malaysian Centre for Development Studies.

- 25 - SCHEDULE 3 Amortization Schedule Date Payment Due Payment of Principal (expressed in dollars) February 1, 1980 1,295,000 August 1, 1980 1,295,000 February 1, 1981 1,295,000 August 1, 1981 1,295,000 February 1, 1982 1,295,000 August 1, 1982 1,295,000 February 1, 1983 1,295,000 August 1, 1983 1,295,000 February 1, 1984 1,295,000 August 1, 1984 1,295,000 February 1, 1985 1,295,000 August 1, 1985 1,295,000 February 1, 1986 1,295,000 August 1, 1986 1,295,000 February 1, 1987 1,295,000 August 1, 1987 1,295,000 February 1, 1988 1,295,000 August 1, 1988 1,295,000 February 1, 1989 1,295,000 August 1, 1989 1,295,000 February 1, 1990 1,295,000 August 1, 1990 1,295,000 February 1, 1991 1,295,000 August 1, 1991 1,295,000 February 1, 1992 1,295,000 August 1, 1992 1,295,000 February 1, 1993 1,330,000 * To the extent that any portion of the Loan is repayable in a currency other than dollars (see General Conditions, Section 4.02), the figures in this column represent dollar equivalents determined as for purposes of withdrawal.

- 26 - Premiums on Prepayment The following percentages are specified as the premiums payable on repayment in advance of maturity of any portion of the principal amount of the Loan pursuant to Section 3.05 (b) of the General Conditions: Time of Prepayment PPremium Not more than three years before maturity 1.55% More than three years but not more than six years before maturity 3.15% More than six years but not more than eleven years before maturity 5.75% More than eleven years but not more than fifteen years before maturity 7.85% More than fifteen years before maturity 8.90%

-27- SCHEDULE 4 Procurement A. International Campetitive Bidding 1. Except as provided in Part B hereof, contracts for the purchase of all goods shall be procured in accordance with procedures consistent with those set forth in Part A of the "Guidelines for Procurement under World Bank Loans and IDA Credits" published by the Bank in August 1975 (hereinafter called the Guidelines), on the basis of international competitive bidding. B. Other Procurement Procedures 1. Contracts for equipment estimated to cost the equivalent of $100,000 or less and for civil works and furniture shall be procured, after national and local advertisement, in accordance with such normal procedures of the Borrower as are acceptable to the Bank. 2. Notwithstanding the provisions of paragraph 1 of this Section, small items of equipment estimated to cost the equivalent of $10,000 each or less and not exceeding in the aggregate the equivalent of $250,000, or such other amount as may be.agreed upon between the Borrower and the Bank, shall be purchased by direct negotiation after at least three quotations have been obtained from local suppliers.

- 28-3. Books shall be purchased in accordance with the normal procedures of the Borrower. C. Evaluation and Comparison of Bids for Goods; Preference for Domestic Manufacturers 1. For the purpose of evaluation and comparison of bids for the supply of goods except those to be procured in accordance with local procedures: (i) bidders shall be required to state in their bid the c.i.f. (port of entry) price for imported goods, or the exfactory price for domestically-manufactured goods; (ii) customs duties and other import taxes on imported goods, and sales and similar taxes on domestically-supplied goods, shall be excluded; and (iii) the cost to the Borrower of inland freight and other expenditures incidental to the delivery of goods to the place of their use or installation shall be included. 2. Goods manufactured in Malaysia may be granted a margin of preference in accordance with, and subject to, the following provisions: (a) All bidding documents for the procurement of goods shall ciearly indicate any preference which will be granted, the information required to establish the eligibility of a bid for such preference and the following methods and stages that will be followed in the evaluation and comparison of bids. (b) After evaluation, responsive bids will be classified in one of the following three groups:

- 29 - (1) Group A: bids offering goods manufactured in Malaysia if the bidder shall have established to the satisfaction of the Borrower and the Bank that the manufacturing cost of such goods includes a value added in Malaysia equal to at least 20% of the ex-factory bid price of such goods. (2) Group B: all other bids offering goods manufactured in Malaysia. (3) Group C: bids offering any other goods. (c) All among themselv,, ated bids in each group shall be first compared excluding any customs duties and other import taxes on goods to be imported and any sales or similar taxes on goods to be supplied domestically, to determine the lowest evaluated bid of each group. Such lowest evaluated bids shall then be compared with each other, and if, as a result of this comparison, a bid from group A or group B is the lowest, it shall be selected for the award. (d) If, as a result of the comparison under paragraph (c) above, the lowest bid is a bid from group C, all group C bids shall be further compared with the lowest evaluated bid from group A after adding to the c.i.f. bid price of the imported goods offered in each group C bid, for the purpose of this further comparison only, an amount equal to (i) the amount of customs duties and other import taxes which a non-exempt importer

- 30 - would have to pay for the importation of the goods offered in such group C bid; or (ii) 15% of the c.i.f. bid price of such goods if said customs duties and taxes exceed 15% of such price. If the group A bid in such further comparison is the lowest, it shall be selected for the award; if not, the bid from group C which as a result of the comparison under paragraph (c) is the lowest evaluated bid shall be selected. D. Review of Procurement Decisions by the Bank 1. Review of invitations to bid and of proposed awards and final contracts: With respect to all contracts for civil works except under Part A.1 of the Project and for equipment and furniture estimated to cost the equivalent of $100,000 or more: (a) Before bids are invited, the Borrower shall furnish to the Bank, for its comments, the text of the invitations to bid and the specifications and other bidding documents, together with a description of the advertising procedures to be followed for the bidding, and shall make such modifications in the said documents or procedures as the Bank shall reasonably request. Any further modification to the bidding documents shall require the Bank's concurrence before it is issued to the prospective bidders. (b) After bids have been received and evaluated, the Borrower shall, before a final decision on the award is made, inform the Bank of the name of the bidder to which it intends to award

- 31 - the contract and shall furnish to the Bank, in sufficient time for its review, a detailed report, by the consultants referred to in Section 3.02 of this Agreement, on the evaluation and comparison of the bids received, together with the recommendations for award of the said consultants and such other information as the Bank shall reasonably request. The Bank shall, if it determines that the intended award would be inconsistent with the Guidelines or this Schedule, promptly inform the Borrower and state the reasons for such determination. (c) The terms and conditions of the contract shall not, without the Bank's concurrence, materially differ from those on which bids were asked. (d) To conformed copies of the contract shall be furnished to the Bank promptly after its execution and prior to the submission to the Bank of the first application for withdrawal of funds from the Loan Account in respect of such contract. 2. With respect to each contract for civil works to be financed out of the proceeds of the Loan and not governed by the preceding paragraph, the Borrower shall furnish to the Bank, promptly after its execution, a consolidated statement of bid awards indicating the name of the related institution and of the person to whom the award was made. 3. With respect to each contract to be financed out of the proceeds of the Loan and not governed by the preceding paragraphs,

- 32 - the Borrower shall furnish to the Bank, promptly after its execution and prior to the submission to the Bank of the first application for withdrawal of funds from the Loan Account in respect of such contract, two conformed copies of such contract, together with the analysis of the respective bids, recommendations for award and such other information as the Bank shall reasonably request. The Bank shall, if it determines that the award of the contract was not consistent with the Guidelines or this Schedule, promptly inform the Borrower and state the reasons for such determination.

- 33 - SCHEDULE 5 Project Implementation 1. MOA and the Project Units in MOE and MOLM shall be responsible for the administrative control and proper execution of the Project, including, inter alia: (a) the briefing and coordination of architects and engineers required under the Project, including the establishment of their terms of reference and administration of their agreements; (b) the design of buildings in accordance with the working papers and the preparation of construction drawings and contract documents; (c) the preparation of master lists of furniture and instructional equipment; (d) all necessary steps for international and local competitive bidding for construction and for instructional equipment and for bidding for furniture, and the subsequent evaluation of bids; (e) the over-all supervision of construction and procurement and of installation procedures for furniture and instructional equipment; (f) administration of technical training and specialist services provided under the Project;

(g) submission to the Bank for its information proposed annual primary school construction programs indicating distribution of facilities by and within the Project States; (h) organization of training of school mapping personnel; (i) coordination with ministries and other governmental agencies concerned with the Project; (j) liaison with the Bank; (k) the maintenance of records and the furnishing of information under Section 3.05 (b) of this Agreement during the period of implementation of the Project; (1) the preparation of applications for withdrawals from the Loan Account; (m) the preparation of a comprehensive schedule as normally used by the Borrower for setting down the planned timetable of coordinated activities and responsibilities on which the carrying out of the Project will be based; and (n) the evaluation of progress made in implementing the Project and preparation of progress reports to the Bank. 2. In addition to above, the MOE Project Unit shall maintain a file for each project primary school available for inspection for Bank,progress review missions. Each file shall include: (a) the completed educational and architectural brief; (b) the lay-out

- 35 - plans; (c) bids received; (d) bid analysis and contract recommendation and award; and (e) details of expenditures. 3. The Borrower shall strengthen the existing MOE Project Unit with the addition of three officers and shall designate a fulltime project architect to such Project Unit, a project coordinator in each Project State and a chief for MDA community education sub-project. 4. The Project Unit in MOLM shall be staffed with (i) a Project Director; (ii) an assistant to Project Director on full-time basis; (iii) a full-time architect or engineer; and (iv) a procurement officer and supporting staff. 5. The Borrower shall appoint to its Public Works Department the following staff in accordance with Section 3.07 of this Agreement: Number of Staff Positions Peninsular Malaysia Sabah Sarawak (i) Architects 2 1 1 (ii) Senior Engineers 5 - - (iii) Engineers or Superintendents of Works 2 1 1 (iv) Technicians 2 - -