REGULATORY ACCOUNTS. The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts.

Similar documents
Balsam Lake Coalition Interrogatory # 8

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB VERIDIAN CONNECTIONS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB KENORA HYDRO ELECTRIC CORPORATION LTD.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ORANGEVILLE HYDRO LIMITED

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB NIAGARA PENINSULA ENERGY INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB HYDRO ONE NETWORKS INC.

EXHIBIT 9 DEFERRAL AND VARIANCE ACCOUNTS

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

An Application. Canadian Niagara Power Inc. To Adjust. Electricity Distribution Rates. Effective January 1, 2019 EB

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB TILLSONBURG HYDRO INC.

GUELPH HYDRO ELECTRIC SYSTEMS INC.

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective January 1, 2017 Board File No.: EB

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

CHAPLEAU PUBLIC UTILITIES CORPORATION ED IRM APPLICATION EB

2019 PRICE CAP INCENTIVE REGULATION ELECTRICITY DISTRIBUTION RATE APPLICATION

WHITBY HYDRO ELECTRIC CORPORATION

Oakville Hydro Electricity Distribution Inc Distribution Rate Adjustment Application (EB ) Effective January 1, 2018

DECISION AND RATE ORDER

Veridian Connections Inc., 2019 Electricity Distribution IRM Rate Application Board File No.: EB

Orangeville Hydro Limited 2019 IRM APPLICATION EB Submitted on: September 24, 2018

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

Collus PowerStream Corp. ED Incentive Regulation Mechanism Electricity Distribution Rate Application

DEFERRAL AND VARIANCE ACCOUNTS

North Bay Hydro Distribution Ltd. Application for 2018 Electricity Distribution Rates EB

REGULATORY ASSETS, VARIANCE AND DEFERRAL ACCOUNTS

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB COLLUS POWERSTREAM CORP.

DEFERRAL AND VARIANCE ACCOUNTS

AIRD BERLIS. October 16, 2017 VIA COURIER, AND RESS

Ontario Energy Board Commission de l énergie de l Ontario

Halton Hills -- HYDRO--

NEWMARKET - TAY POWER DISTRIBUTION LTD.

PowerStream Inc. (Licence Name PowerStream Inc. ED ) 2010 Electricity Distribution Rate Adjustment Application EB

PARTIAL DECISION AND RATE ORDER

RATE RIDERS. Filed: EB Exhibit G1 Tab 5 Schedule 1 Page 1 of REGULATORY ASSET RATE RIDER

Canadian Manufacturers & Exporters (CME) INTERROGATORY #1 List 1

Oakville Hydro Electricity Distribution Inc Distribution Rate Adjustment Application (EB ) Effective January 1, 2017

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB WEST COAST HURON ENERGY INC.

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Essex Powerlines Corporation 2730 Highway #3, Oldcastle, ON, N0R 1L0 Telephone: (519) Fax: (519)

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB GUELPH HYDRO ELECTRIC SYSTEMS INC.

October 22, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700, P.O. Box 2319 Toronto, ON M4P 1E4

REGULATORY ASSETS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Assets.

RESIDENTIAL SERVICE CLASSIFICATION

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

Ontario Energy Board Commission de l énergie de l Ontario RATE ORDER EB HYDRO ONE NETWORKS INC.

REGULATORY ACCOUNTS. The purpose of this evidence is to provide a description of Hydro One Transmission s Regulatory Accounts.

2.11 EXHIBIT 8: RATE DESIGN... 2 Overview... 2

REGULATORY ASSET RECOVERY ALLOCATION TO CUSTOMER GROUPS

ATTACHMENT 8 SUMMARY OF FIXED/VARIABLE SPLITS HORIZON UTILITIES RZ

Enersource Hydro Mississauga Inc. Application for Distribution Rates Effective May 1, 2012 Board File No. EB Evidence Update

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB ALGOMA POWER INC.

RP EB IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B

BY COURIER. August 16, Ms. Kirsten Walli Board Secretary Ontario Energy Board 2300 Yonge Street Suite 2700 P.O. Box 2319 Toronto, ON M4P 1E4

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

SUMMARY OF APPLICATION

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

The Filing includes the Application; the Manager s Summary; and live versions of the following models:

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

August 23, via RESS signed original to follow by courier

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

EXECUTIVE SUMMARY OF APPLICATION

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B) (the Act );

DISPOSITION OF SMART METER DEFERRAL ACCOUNT AND STRANDED METER BALANCES

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

EB Hydro One Networks Inc. s 2019 Transmission Revenue Requirement Application and Evidence Filing

OSHAWA PUC NETWORKS CUSTOM INCENTIVE REGULATION RATE PLAN MID-TERM UPDATE INTRODUCTION & OVERVIEW

List of Appendices Application Manager s Summary Proposed Adjustments... 12

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION

RATE DESIGN. The proposed distribution rates for each rate class over the Custom COS period are summarized in Table 1.

SECOND QUARTER REPORT JUNE 30, 2015

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

TORONTO HYDRO CORPORATION MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS FOR THE YEAR ENDED DECEMBER 31, 2005

PROJECT COSTS, ECONOMICS, AND OTHER PUBLIC INTEREST CONSIDERATIONS

IN THE MATTER OF subsections 78(2.1), (3.0.1), (3.0.2) and (3.0.3) of the Ontario Energy Board Act, 1998;

Energy Probe (EP) INTERROGATORY #50 List 1

Financial Statements of FESTIVAL HYDRO INC. Year ended December 31, 2014

TABLE OF CONTENTS. C. Business Planning and Budgeting Process and Economic Assumptions

CENTRALLY HELD COSTS

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B)

Table 1: Revenue / Cost Ratios from Cost Allocation Model (%)

Ontario Energy Board

EXHIBIT LIST. Administration. Summary of Board Directives and Undertakings from Previous Proceedings A 5 1 Corporate Organization Charts

SECOND QUARTER FINANCIAL REPORT JUNE 30, 2017

Horizon Holdings Inc.

SPECIFICATION. Format Specifications for Settlement Statement Files and. Data Files PUBLIC. Issue 47.0 IMP_SPEC_0005

HYDRO ONE NETWORKS INC. DISTRIBUTION Revenue Deficiency/(Sufficiency) Year Ending December 31, 2010 and 2011 ($ Millions)

PAYMENTS IN LIEU OF CORPORATE INCOME TAXES

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

Consolidated Financial Statements. Toronto Hydro Corporation DECEMBER 31, 2007

RATES FOR EXPORT TRANSMISSION SERVICE

Ontario Energy Board (Board Staff) INTERROGATORY #16 List 1

Ontario Energy Board

Consumer Deposit Security Policy

Transcription:

Updated: 000 Tab Page of REGULATORY ACCOUNTS. INTRODUCTION The purpose of this Exhibit is to provide a description of Hydro One Distribution s regulatory accounts. 0 All of the regulatory accounts reported by Hydro One Distribution have been established consistent with the Ontario Energy Board s ( the Board ) requirements as set out in the Accounting Procedures Handbook, subsequent Board direction, or as per specific requests initiated by Hydro One Distribution. Hydro One Distribution s outstanding regulatory account balances are summarized in Table. Hydro One Distribution has not made any adjustments to regulatory account balances that were previously approved by the Board on a final basis. Table : Summary of Regulatory Accounts s Outstanding ($ Millions) Description 0 0 0 as at 0 Forecast as at 0 Total Regulatory Accounts (.)*....0 *Differs from EB00 due to exclusion of Cat Lake Operational Deferral Account balance of $. million. 0 The forecast interest for 0 is calculated by applying simple interest on the actual audited December, 0, yearend balance using the Board s prescribed th quarter interest rate of.%, as per the Bankers Acceptances threemonth rate plus a spread of basis points. This is consistent with the Board s methodology on prescribing interest rates for the approved regulatory accounts under the Uniform System of Accounts for natural gas utilities and electricity distributors (EB000).

Filed: 00 Tab Page of Information on each regulatory account and its balance is further described in detail in Section.0 of this Exhibit; with a complete continuity schedule provided in Attachment and a schedule of account balances provided in Attachment of this Exhibit. Further details on the regulatory accounts are provided in subsequent Exhibits:, Tab, : Planned Disposition of Regulatory Accounts; and, Tab, : Regulatory Accounts Requested.. REGULATORY ACCOUNTS 0 A list of Hydro One Distribution s regulatory accounts and associated balances is provided in Table.

Description Table : Regulatory Accounts ($ Millions) US of A Account Ref. 0 0 Updated: 000 Tab Page of 0 0 Forecast Dec., 0 Regulatory Accounts Seeking Continuance and Disposition Retail Settlement Variance Accounts 0 to (.) (.). 0. 0. (excluding Global Adjustment) Retail Cost Variance Accounts /.0 0. 0.0 0. 0. Pension Cost Differential Account 0...0.. Tax Rate Changes Account (.) (.) (.) (.) (.) OEB Cost Differential Account 0 0.0 0.0 0.0 (.) (.) Smart Meter Entity Charge Variance Account 0. 0. 0. (0.) (0.) Regulatory Accounts Seeking Disposition Only Revenue Offset Difference Account Pole 0 0.0 0.0 0.0 (.) (.) Attachment Charge Bill Impact Mitigation Variance Account 0 0.0 0.0... Microfit Connection Charge Variance Account 0 (.) (.) (0.) (0.) (0.) Distribution Generation Other Costs HONI (.) (0.) 0. 0. 0. Variance Account Distribution Generation Express Feeders (0.) (0.) (0.0) (0.0) (0.0) HONI Variance Account Smart Grid Variance Account (.) (.) (.) (.) (.) Distribution System Code (DSC) Exemption 0..0... Deferral Account Total Regulatory Accounts for Disposition..0. 0. 0. Regulatory Accounts Not Seeking Disposition RRRP 0.. (.) 0.0 0.0 Distribution Generation Other Costs (.) (.0) (0.) (.) (.) Provincial Variance Account Distribution Generation Express Feeders (.) (.) (.) (.0) (.0) Provincial Variance Account Rider 0 to 0 Disposition and Recovery 0.0 0.0 0.. 0. of Regulatory s (OEB Approved) Revenue Difference Account Pole 0 0.0 0.0 0.0.0.0 Attachment Charge Long Term Load Transfer Rate Impact 0 0.0 0.0 0.0 0.0 0.0 Mitigation Deferral Account Smart Grid Fund (SGF) Pilot Deferral Account 0 0.0 0.0 0.0 0.0 0.0 Retail Settlement Variance Account Power (.).... SubAccount Global Adjustment Others (.). 0.0 0.0 0.0 Total Regulatory Accounts Not Seeking Disposition (.) (.)... Total Regulatory Accounts (.)*....0 *Differs from EB00 due to exclusion of Cat Lake Operational Deferral Account balance of $. million.

Updated: 000 Tab Page of A detailed description of each of these regulatory accounts is provided in the following sections. For each account discussed below, simple interest is applied to the monthly opening principal balance in this account according to the Boardprescribed interest rate. Each account is reported to the Board on an annual basis consistent with the Board's Reporting and Record Keeping Requirements. The balance of each account is an actual audited amount at December, 0, inclusive of interest accrued. Interest improvement has then been forecast on the principal balance to the end of December, 0. 0. REGULATORY ACCOUNTS SEEKING CONTINUANCE AND DISPOSITION.. RETAIL SETTLEMENT VARIANCE ACCOUNTS ( RSVAs ) The RSVAs have been established pursuant to Article 0, which requires all distributors establish such accounts to record the differences between the amounts owed to the IESO / host distributors and the amount billed to customers and retailers. 0 The RSVAs were previously reviewed and approved by the Board in RP00 0/0, RP00000/EB000, EB000, EB0000 and EB0 0. The Board approved the disposition of the 0 audited RSVA balance over a threeyear period in its EB00 Decision respecting 0 distribution rates. The balance of commodity accounts ( & ) has been filed with the Board on a quarterly basis, and the balance of the other RSVAs is filed with the Board annually per the Electricity Reporting and Record Keeping Requirements.

Updated: 000 Tab Page of The balance in Hydro One Distribution s Retail Settlement Variance Accounts is summarized in Table. 0 0 Table : Retail Settlement Variance Accounts (RSVAs) ($ Millions) Description USofA Account Ref 0 Dec, 0 0 as at 0 Forecast as at 0 Low Voltage Variance Account 0..... Wholesale Market Service Charge 0 (.) (.) (.) (.) (.0) Retail Transmission Network Charge..... Retail Transmission Connection Charge...0.. PowerSubAccountPower (0.).0... Subtotal RSVAs for Disposition (.) (.). 0. 0. PowerSubAccountGlobal Adjustment* (.).... Total RSVAs (.)...0. * Due to a clarification of embedded generation submissions used in the calculation for the global adjustment that is applicable to Hydro One Distribution from January 00 through to August 0, the IESO will refund $. million that will be applied to the monthly IESO settlement for Hydro One Distribution from April through November 0. The issue arose due to the wholesale meter injection channels readings not being netted with the energy withdrawn in the submission of embedded generation used in the calculation of the Global Adjustment for the period noted. As the refund exceeds the 0 audited balance of the account, Hydro One Distribution is no longer requesting to recover this balance from customers. The IESO is funding this credit through a monthly charge during the same period in which the refund is being applied. Only a portion is applicable to Hydro One Distribution. While an estimate can be made of Hydro One Distribution s allocation of the total charge, the exact net impact is unknown at this time. In April 0, as documented in the Board s letter entitled Accounting Guidance on Capacity Based Recovery, the IESO established a transitional initiative entitled Capacity Based Demand Response to recover the costs of the demand response market program through uplift charges under charge types 0 and. A breakdown of the balances related to wholesale market service charge is included in Table. Further details on the disposition of these balances are presented in Exhibit H, Tab,.

Updated: 000 Tab Page of 0 Table : RSVA Wholesale Market Service Charge ($ Millions) Description USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 Sub CBR Class A 0 N/A N/A 0. 0.0 0.0 Sub CBR Class B 0 N/A N/A.0.. Other 0 (.) (.) (.) (.) (0.) Wholesale Market Service Charge (.) (.) (.) (.) (.0) Hydro One Distribution does not make a profit or loss on the commodity. Hydro One Distribution matches the energy sales and the cost of power, with the difference between the two values going to the variance accounts. However for USofA reporting, the higher of energy sales or cost of power is reduced to match the other, with the difference going to the variance account. The two methods result in the same variance account balance, and the same energy sales net of cost of power. As per Section. of the OEB s Filing Requirements for Electricity Distribution Rate Applications; a reconciliation of energy sales and cost of power expense yearend balances for 0 are provided in Table. Table : 0 Energy Sales and Cost of Power Costs ($ Millions) Description Audited Financial Statements USofA Reporting Delta Cost of Power Revenue (Energy Sales) Commodity,.,. (0.) Global Adjustment (GA) 0... Billed Wholesale Market Service Charge (WMSC).. 0.0 Billed Networks.. (.) Billed Connection.0.. Billed Low Voltage. 0.0. Total,.,0.. Cost of Power Costs Commodity,.,. (0.) Global Adjustment (GA) 0... Billed WMSC.. 0.0 Billed Networks.. (.) Billed Connection.0.. Billed Low Voltage. 0.0. Total,.,0..

Updated: 000 Tab Page of Furthermore, as required by Section... of the OEB s Filing Requirements for Electricity Distribution Rate Applications, a distributor must also provide support of its Global Adjustment ("GA") claims with a description of its settlement process with the IESO. These requirements are addressed below. 0 Method of Global Adjustment Invoicing: Hydro One Distribution uses the customer specific predefined Peak Demand Factor applied to the IESO invoiced Class A GA amount to invoice all Class A customers. Hydro One Distribution uses the first estimate of the GA rate published by the IESO to invoice all applicable Class B customers who pay the Hourly Ontario Energy Price (also referred to as Spot or Market Price) or customers who have signed a retail contract. Hydro One Distribution uses the actual GA rate published by the IESO to invoice all applicable Class B embedded distributors paying the Spot price. 0 Method of Settlement with the IESO: The monthly IESO settlement is completed by the fourth business day after the month end. This entails settling two amounts associated with customers: () the difference between Regulated Price Plan ("RPP") pricing and Spot price for the actual invoices created during each fiscal month; and () the RPP Invoiced Consumption at actual GA rate. This is done for both tiered rate and timeofuse rate customers. All settlement amounts are calculated automatically by the billing system which pairs the RPP customer consumption with the Spot price for each invoice. Hydro One Distribution uses the second estimate of GA rate published by IESO to calculate RPP GA settlement amount associated with the RPP consumption during the current fiscal month. As the actual GA rate is not available until six business days after the IESO declaration, the trueup is then calculated by using the actual GA rate and declared to the IESO in the following month.

Updated: 000 Tab Page of The monthly IESO settlements also include the embedded generation declaration for the difference between the rate paid to regulated and contracted generators and Spot price. On a monthly basis, embedded distributors calculate their own RPP and generation settlement amounts and declare to the IESO through Hydro One Distribution. As a host distributor, Hydro One Distribution settles with the IESO on behalf of embedded distributors and treats it as pass through costs, in the monthly IESO settlement declaration. 0 0 Accounting Accrual Process: The determination of customer invoicing is based on a systemic reading of meters throughout the month for all customers. Hydro One Distribution has about. million customers and provides services across the province. As such, there are many meter reading schedules that do not coincide with the fiscal month end. At the end of each month, the customer consumption since the date of the last meter reading is estimated based on a standard SAP functionality. As a result, corresponding unbilled commodity revenue and GA revenue are recorded for accounting accrual purposes. Estimates are reversed in the following month and actual revenue is recorded based on the subsequent meter readings. The IESO settlement amounts discussed above are also estimated based on unbilled consumption for accounting accrual purposes. These accrual amounts are not included in the monthly IESO declaration. Only the settlement amounts based on the actual invoices are declared to the IESO. Accounting Treatment for Global Adjustment: Hydro One Distribution allocates the Class B GA charge on the IESO invoices into RPP and nonrpp portions and incorporates these portions into accounts and respectively, by using the GA charge reported on the RPP settlement with the IESO.

Updated: 000 Tab Page of.. RETAIL COST VARIANCE ACCOUNTS ( RCVAS ) Providing retail services to customers, as a result of the deregulated electricity market, results in the distributor having a need to recover certain retail service costs. The rates and charges used in determining these costs are set by the Board, which recognizes that the actual costs may be different in practice. In accordance with Chapter of the Distribution Rate Handbook, distributors are required to establish variance accounts, for future disposition, which record the differences in these costs and revenues. 0 Hydro One Distribution has established RCVAs to capture the differences between the revenues collected by the distributor, based on Boardapproved rates, and the actual incremental costs of providing the related services. The methodology underlying the operation of these variance accounts is given in the Accounting Procedures Handbook Article 0. The balance in Hydro One Distribution s RCVAs is summarized in Table. 0 Description Table : Retail Cost Variance Accounts (RCVAs) ($ Millions) USofA Account Ref Dec, 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 RCVA Accounts /.0 0. 0.0 0. 0... PENSION COST DIFFERENTIAL ACCOUNT The Pension Cost Differential Account tracks the difference between the noncapital portion of pension cost estimates, based on actuarial assessments and other forecasts, upon which Hydro One's distribution rate application is based, and the actual pension contributions charged to OM&A.

Updated: 000 Tab Page 0 of This account was previously reviewed and approved by the Board for use in EB00 00 and EB00. The balance in Hydro One Distribution s Pension Cost Differential Account is summarized in Table. Table : 0 Other Regulatory Assets Sub Account Pension Cost Differential Description Pension Cost Differential Account USofA Account Ref ($ Millions) 0.. TAX RATE CHANGES ACCOUNT Dec, 0 0 Dec., 0 Forecast Dec., 0 0...0.. 0 In the Board communiqué to distributors in December 00, and the Board s April, 00 Decision with Reasons (RP00000 / EB000) regarding Hydro One s 00 Distribution Rates, the Board authorized the creation of an account to capture the tax impact of the following differences between the tax assumptions included in revenue requirement and actual results. This tax changes account was subsequently reviewed and approved by the Board in EB0000, EB00, and EB00. This account captures the following: 0 Those differences that result from a legislative or regulatory change to the tax rates or rules; and Those differences that result from a change in, or disclosure of, a new assessing or administrative policy that is published in the public tax administration or interpretation bulletins by relevant federal or provincial tax authorities.

Filed: 00 Tab Page of This Tax Rate Changes Account was also used to capture the savings in Provincial Sales Tax ( PST ) cost included in revenue requirement due to the introduction of flow through Harmonized Sales Tax ( HST ) in July 00. 0 The 0 audited balance, which included amounts for both a change in the tax rate and for the savings in PST, was disposed of as part of the EB00 rate application. An impact of $. million including interest, related to the savings in PST, is being put forward for disposition in this Application. The amount was recorded in the account in the 0 rate year. Once this remaining PST savings amount has been disposed of, the only amounts recorded in this Tax Rate Change account on a goforward basis will be the tax impact of the differences between the tax assumptions included in revenue requirement and actual results, which are noted above. The balance in Hydro One Distribution s Tax Rate Changes Account is summarized in Table. Description Table : Tax Rate Changes Account ($ Millions) USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 Tax Rate Changes (.) (.) (0.0) (0.0) (0.0) PST Savings (.) (.) (.) (.) (.) Total (.) (.) (.) (.) (.)

Updated: 000 Tab Page of.. OEB COST DIFFERENTIAL ACCOUNT In a letter from the Board, dated February, 0, entitled Revisions to the Ontario Energy Board Cost Assessment Model ; the Board authorized the establishment of Account 0 Other Regulatory Assets, SubAccount OEB Cost Assessment Variance. 0 The Board authorized this account to record any material differences between the annual OEB cost assessment currently approved in rates and the actual OEB cost assessment amounts charged to Hydro One Distribution that will result from the application of the new cost assessment model effective April, 0. The balance in Hydro One Distribution s OEB Cost Differential Account is summarized in Table. Table : 0 Other Regulatory Assets Sub Account OEB Cost Differential Description Account ($ Millions) USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 OEB Cost Differential Account 0 0.0 0.0 0.0 (.) (.) 0.. SMART METER ENTITY ("SME") CHARGE VARIANCE ACCOUNT The SME Charge Variance Account was established consistent with Board direction included in the Decision issued March, 0 for EB0000/EB00. As a result of this Decision, effective May, 0, the SME charge to be levied and collected by the licensed electricity distributors identified in the Board s annual Yearbook of

Updated: 000 Tab Page of Electricity Distributors from Residential and General Service <0kW customers was $0. per month, effective May, 0 to October, 0. The account is used to track the difference between the monthly settlement invoice received from the IESO, including accruals, and the amount billed to the distributor s customers for the SME charge, including accruals. The balance in Hydro One Distribution s Smart Meter Entity Charge Variance Account is summarized in Table 0. 0 Table 0: Smart Meter Entity (SME) Charge Variance Account ($ Millions) Description Smart Meter Entity Charge Variance Account USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 0. 0. 0. (0.) (0.). REGULATORY ACCOUNTS SEEKING DISPOSITION ONLY.. REVENUE OFFSET DIFFERENCE ACCOUNT POLE ATTACHMENT CHARGE 0 The Revenue Offset Difference Account Pole Attachment Charge was established consistent with Board direction in its Decision dated August, 0, in EB00. The pole attachment charge relates to the charge Hydro One Distribution collects from cable and telecommunications companies for connecting their overhead wires to Hydro One poles. In its Accounting Order of September, 0, the Board directed Hydro One Distribution to establish a variance account effective January, 0 to record the

Updated: 000 Tab Page of differences in the revenue offsets related to forecast pole attachment revenues included in rates in EB00/EB000 and revenue offsets based on the pole attachment charge approved by the Board in EB00. The Board had approved distribution rate revenues based on a pole attachment charge of $.0 per pole per year. The final approved charge is $. per pole per year. This account is used to track this variance, including accrued interest charges based on the Board prescribed interest rates. The balance in Hydro One Revenue Offset Difference Account Pole Attachment Charge is summarized in Table. 0 Table : 0 Other Regulatory Assets Sub Account Revenue Offset Difference Account Pole Attachment Charge ($ Millions) Description Revenue Offset Difference Account Pole Attachment Charge USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 0 0.0 0.0 0.0 (.) (.).. BILL IMPACT MITIGATION VARIANCE ACCOUNT 0 As a result of the rate class review accepted by the Board in its Decision EB00, certain customers were expected to experience significant bill impacts in 0. As part of EB00, Hydro One Distribution requested to use the Bill Impact Mitigation Variance Account to mitigate the adverse total impacts for specific customers affected by the review. As part of its Decision for EB00, the Board determined that those rate classes which experienced a bill impact in excess of 0% would qualify for rate mitigation. The costs of mitigation and related implementation costs for these customers have been

Updated: 000 Tab Page of tracked in this account. Once this remaining amount has been disposed of, this Bill Impact Mitigation Variance Account will not be required to continue on a goforward basis. The balance in the Hydro One Distribution s Bill Impact Mitigation Variance Account is summarized in Table. 0 Table : 0 Bill Impact Mitigation Variance Account ($ Millions) Description Bill Impact Mitigation Variance Account USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 0 0.0 0.0..... MICROFIT CONNECTION CHARGE VARIANCE ACCOUNT The Board established the fixed charge for microgenerators account for Hydro One Distribution in the Board s Decision of April, 00 (EB0000) for 00 and 0 distribution rates. 0 This account was established provincewide, for all distributors, in EB000 and EB000. The rate was subsequently updated to require the recording of the collection of revenue from this monthly charge as per the Board s September 0, 0 letter to all distributors entitled Update to Fixed Monthly Charge for microfit Generator Service Classification Board File Numbers EB000 and EB00 0.. This account records revenue collected from the new fixed meter charge that is applied to microgenerator connections. The amounts are deferred for refunding to customers in a future period.

Updated: 000 Tab Page of The Board in its Decision on Hydro One s distribution rate application (EB00) approved Hydro One s request for the discontinuance of this account commencing in 0. As the disposition approved in that application was based on the 0 principal balance and accrued interest, the 0 balance of $0. million including interest is being put forward for disposition in this Application. The balance in Hydro One Distribution s Microfit Connection Charge Variance Account is summarized in Table. 0 Table : 0 Other Regulatory Assets Sub Account Microfit Connection Description Microfit Connection Charge Variance Account Charge Variance Account ($ Millions) USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 0 (.) (.) (0.) (0.) (0.).. DISTRIBUTION GENERATION HONI VARIANCE ACCOUNT The Board directed Hydro One Distribution to establish deferral accounts related to the Green Energy Plan in the Board s Decision of April, 00 (EB0000) for 00 and 0 distribution rates. 0 Hydro One established the Distribution Generation HONI Variance Account, consisting of separate subaccounts for Distribution Generation Express Feeders and Distribution Generation Other Costs to record the interim funding received in respect of the expenditures made for these programs.

Updated: 000 Tab Page of The Board in its Decision in Hydro One s distribution rate application (EB00) approved Hydro One s request for the discontinuance of this account, including both subaccounts, commencing in 0. However, there is a small balance that was accrued after 0 remaining for disposition, as noted in the table below. The balance in Hydro One s Distribution Generation HONI Variance Accounts is summarized in Table. 0 Table : Distribution Generation HONI Variance Accounts ($ Millions) Description Distribution Generation HONI Variance Accounts USofA Account Ref 0 Dec, 0.. SMART GRID VARIANCE ACCOUNT Dec., 0 Dec., 0 Forecast Dec., 0 (.) (0.) 0. 0. 0. The Board directed Hydro One Distribution to establish deferral accounts related to the Green Energy Plan in the Board s Decision of April, 00 (EB0000) for 00 and 0 distribution rates. Hydro One established the Smart Grid Variance Account to record the interim funding received in respect of the expenditures made for this program. 0 In the Board s Decision of December 0, 0 (EB00), the Smart Grid Variance Account was continued and a continuance of interim funding for Hydro One s Smart Grid OM&A expenditures in 0 was approved in 0 rates. Under the Board s Partial Decision (EB00) on September, 0, the Smart Grid Variance Account was again continued and interim funding was again approved in

Updated: 000 Tab Page of 0 rates. The Board accepted Hydro One s proposal relating to Smart Grid as filed in Hydro One Distribution s Settlement Proposal dated September, 0 that the expenditures recorded in Account will not be subject to a future prudency review. The Board in its Decision in Hydro One s distribution rate application (EB00) approved Hydro One s request for the discontinuance of this account commencing in 0. However, significant activity in this account for 0 has resulted in a balance for disposition, including interest, of $. million. 0 The balance in Hydro One Distribution s Smart Grid Variance Account is summarized in Table. Description Table : Smart Grid Variance Account ($ Millions) USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 Smart Grid Variance Account (.) (.) (.) (.) (.).. DISTRIBUTION SYSTEM CODE ( DSC ) EXEMPTION DEFERRAL ACCOUNT 0 The Board ordered Hydro One Distribution to establish the Distribution System Code Exemption Deferral Account in the Board s Decision of December 0, 00 (EB00 0). In the Decision, the Board recognized that costs to mitigate certain unforeseen technical issues should not be visited upon generators who have already executed Connection Costs Agreements, but should instead be eligible for recovery through Hydro One s distribution rate base, subject to the Board s final review in a future rate proceeding. Specifically, the Board ruled that expenditures for the three specific categories of expenditure included in that proceeding be recorded in subaccounts of

Updated: 000 Tab Page of 0, Other Regulatory Assets, subject to the Board s review at a future date. These three categories are: SubAccount Category Distance Limitation Capital and OM&A Expenses; SubAccount Category DeltaY Transformers Capital and OM&A Expenses; and SubAccount Category Dual Secondary Winding Transformers Capital and OM&A Expenses. 0 The Board in its Decision in Hydro One s distribution rate application (EB00) approved Hydro One s request for the discontinuance of this account commencing in 0. However, the principal accumulated in 0, including interest, is being put forward for disposition as part of this Application. The balance in Hydro One Distribution s Distribution System Code Exemption Deferral Account by subaccount is summarized in Table. Table : 0 Other Regulatory Assets Sub Account Distribution System Description Code Exemption Deferral Account ($ Millions) USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 Distance Limitation 0..... DeltaY Transformers 0 0. 0. 0. 0. 0. Total 0..0... 0. REGULATORY ACCOUNTS NOT SEEKING DISPOSITION Hydro One is not seeking disposition of the following accounts at this time.

Updated: 000 Tab Page 0 of.. RRRP VARIANCE ACCOUNT 0 The treatment of the balance of the Rural or Remote Electricity Rate Protection ( RRRP ) Variance Account has not been within scope of Hydro One Distribution s past rate applications. As a result of changes made in 0 to the regulations relating to the RRRP account, Hydro One Distribution is no longer required to maintain this account. As of March, 0, the IESO is responsible for distributing RRRP in accordance with Ontario Regulation / (amending Ontario Regulation /0: Rural or Remote Electricity Rate Protection). As such, Hydro One Distribution is seeking discontinuance of this account. The balance in the RRRP Variance Account is summarized in Table. Description Table : 0 RRRP Variance Account ($ Millions) USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 RRRP Variance Account 0.. (.) 0.0 0.0.. DISTRIBUTION GENERATION PROVINCIAL VARIANCE ACCOUNT 0 Hydro One established the Distribution Generation Provincial Variance Account, consisting of separate Distribution Generation Express Feeders and Distribution Generation Other Costs accounts to record the interim funding received in respect of the expenditures made for these programs related to the provinciallyfunded portion of the investments.

Updated: 000 Tab Page of Hydro One received the Board s approval to discontinue the collection of revenue through the funding adder from the provincial rate payers on December, 0. In light of the continuation of renewable distributed generation connection investments, Hydro One Distribution is not seeking disposition of the balance in this account at this time and will continue to record the costs eligible for direct benefit treatment according to Ontario Regulation 0/0. The balance in Hydro One Distribution s Distribution Generation Provincial Variance Account is summarized in Table. 0 Table : Distribution Generation Provincial Variance Accounts Description Distribution Generation Provincial Variance Account USofA Account Ref ($ Millions) 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 (.) (.) (.) (.) (.).. REVENUE DIFFERENCE ACCOUNT POLE ATTACHMENT CHARGE VARIANCE ACCOUNT 0 The Revenue Difference Account Pole Attachment Charge Variance Account was established consistent with Board direction in its Decision dated August, 0, in EB 00. The pole attachment charge is the amount that Hydro One Distribution collects from cable and telecommunications companies for connecting their overhead wires to its power poles. This account was established to record the revenue difference between the interim pole attachment charge and the final pole attachment charge approved by the Board in its Decision. As per the decision, this account will be closed after the allocated balances have been invoiced to the pole attachment customers and therefore Hydro One Distribution is not seeking disposition of this account.

Updated: 000 Tab Page of The balance in Hydro One Distribution s Revenue Difference Account Pole Attachment Charge Variance Account is summarized in Table. Table : 0 Revenue Difference Account Pole Attachment Charge Variance Description Revenue Difference Account Pole Attachment Charge Variance Account USofA Account Ref Account ($ Millions) 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 0 0.0 0.0 0.0.0.0.. LONG TERM LOAD TRANSFER ( LTLT ) RATE IMPACT MITIGATION DEFERRAL ACCOUNT 0 The LTLT Rate Impact Mitigation Deferral Account was established consistent with Board direction in its Decision on the joint application by Hydro One Networks Inc. and Hydro Ottawa Limited, dated August, 0 in EB00. 0 In the Decision, the Board approved the elimination of the load transfer arrangements between the two distributors consistent with the Board s LTLT policy as documented in the amended Distribution System Code ( DSC ) of December, 0. The Board also recognized that the affected Residential and General Service rate class customers moving from Hydro Ottawa to Hydro One shall receive a monthly bill credit to offset the increase in delivery charges, as prescribed in Section.. of the DSC. Hydro One requested a deferral account to record lost revenue resulting from this rate impact mitigation plan. In its Accounting Order of November, 0, the Board directed Hydro One Distribution to establish the deferral account to record lost revenue resulting from the rate

Updated: 000 Tab Page of impact mitigation plan as well as any costs involved in the setup of such a plan effective August, 0. The balance in Hydro One Distribution s Long Term Load Transfer Rate Impact Mitigation Deferral Account is summarized in Table 0. 0 Table 0: 0 Other Regulatory Assets Sub Account Long Term Load Transfer (LTLT) Rate Impact Mitigation Deferral Account ($ Millions) Description LTLT Rate Impact Mitigation Deferral Account USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 0 0.0 0.0 0.0 0.0 0.0.. SMART GRID FUND ( SGF ) PILOT DEFERRAL ACCOUNT The SGF Pilot Deferral Account was established consistent with Board direction in the Decision issued September, 0 for EB000. In the Decision, the Board approved the establishment of a deferral account for costs associated with extending the existing SGF Pilot. The Board limited the costs to those incurred to extend the pilot from October, 0 to April 0, 0 and to no more than $ million. In its Accounting Order of November, 0, the Board directed Hydro One Distribution to establish the deferral account effective October, 0. 0 In a subsequent Decision dated April, 0, the Board approved Hydro One s request to extend the time period for the deferral account to July, 0 to facilitate continuation of the pilot.

Updated: 000 Tab Page of The balance in Hydro One Distribution s SGF Pilot Deferral Account is summarized in Table. Table : 0 Other Regulatory Assets Subaccount Smart Grid Fund (SGF) Description Pilot Deferral Account ($ Millions) USofA Account Ref 0 Dec, 0 0 Dec., 0 Forecast Dec., 0 SGF Pilot Deferral Account 0 0.0 0.0 0.0 0.0 0.0

Updated: 000 Attachment Page of HYDRO ONE NETWORKS INC. DISTRIBUTION Continuity Schedule Regulatory Accounts F00 0 Account Descriptions Calc For Disposition Account Number Principal Disposition of 0 Bal's (on Jan 0) instructed by Board Rider Interest Disposition of 0 Bal's (on Jan 0) instructed by Board Rider Opening Principal s after transfers of 0 approved balances (0) opening bal's Transactions Debit / (Credit) during 0 excluding interest and adjustments BoardApproved Disposition during 0 Adjustments during 0 other Closing Principal as of Dec Opening 0 Interest Principal s after transfers of 0 approved balances BoardApproved Interest Jan to Dec Disposition during 0 Adjustments during 0 other Closing Interest Amounts as of Dec Total Dec, 0 Type Accounts Requesting Disposition LV Variance Account Yes 0,, 0,,0,,,,,,0,,,, RSVA Wholesale Market Service Charge Yes 0 (,,) (,) (,,) (,,) (,,0) (,,) (,) (,0,) (,0,) RSVA Retail Transmission Network Charge Yes 0,, 0,,,,,0,,,,0,0,, RSVA Retail Transmission Connection Charge Yes,,,00,, (,),,0,,,0,,0 RSVA Power SubAccount Power Yes (,) (,) (,) Group SubTotal (0,,) (,),0, (,,) (,,) (,) (,) (,) (,,0) Type Regulatory Accounts Requesting Disposition RCVA Yes /, 0,,0, (,), (),0,0 Pension Cost Differential Account Yes 0,,,,0,,, 0,,0,,, Microfit Connection Charge Variance Account Yes 0 (,0) (,) (,,) (,) (,0) (,0) (,,) Tax Rate Changes Account Yes (,,0) (,00,000) (,,0) (,) (,) (0,0) (,,00) DG Other Costs HONI Variance Account Discontinued Yes (,,), (,,) (,00) (,) (,) (,,) DG Express Feeders HONI Variance Account Discontinued Yes (,0) (,0) (,) (,) (,) (,0) Smart Grid Variance Account Yes (,,),,0 (0,) (,) (,) (,) (,0,) OEB Cost Differential Account Yes 0 DSC Exemption Deferral Account Yes 0,0,0,,0,0,0,, 0,,0, Smart Meter Entity Charge Variance Account Yes,0,0,0,0,0 Revenue Offset Difference Account Pole Attachment Charge Yes 0 Bill Impact Mitigation Variance Account Yes 0 Subtotal Type Accounts Requesting Disposition,,,,0,0,, 0,0,0,,00 Total Regulatory Accounts Requesting Disposition A (0,,) (,),, (,,),, (0,) 0,0 0,,0,0 Type Accounts Not Requesting Disposition RSVA Power SubAccount Gobal adjustment No (,,) (,0) (0,0,) (,0,) (,,) (0,) (0,) (0,0) (,,) Rider Disposition and Recovery of Regulatory s Discontinued No,, (,0,) (,,),,0 (,,),0, (,),, (,,) Special Purpose Charge Variance Account (SPC) Discontinued No,,,,0,,0 Recovery of Regulatory Asset s Discontinued No 0 (,,0),, (,0),0 Rider Disposition and Recovery of Regulatory s Discontinued No, (,), (,) (0) Rider 00 Disposition and Recovery of Regulatory s No Type Accounts Not Requesting Disposition OEB Cost Differential Account Discontinued No 0,0,,,,,, 0,,,,0 Smart Meters Minimum Functionality Discontinued No / (,,),,0 (,,) (,) (,) (,0) (,0,) Smart Meters Exceeding Minimum Functionality Discontinued No /,0,,, 0,,0, 0,0,,0,0 Deferred Revenue Project Costs Account Discontinued No 0 (,,) (,,) (,) (,0) (,) (,,) Generator Joint Use Revenue Deferral Account Discontinued No 0 (,) (,0) (,) (,) (,) (,) (,) RRRP No 0 (,0,),0,,00,0, (,),0,, DG Other Costs Provincial Pool Variance Account No (,,0) (,0,) (,,) (,) (,0) (,,0) (,0,) DG Express Feeders Provincial Pool Variance Account No (,,) (,,) (,,) (,) (,) (,) (,0,) Revenue Difference Account Pole Attachment Charge No 0 Long Term Load Transfer (LTLT) Rate Impact Mitigation Deferral Account No 0 Smart Grid Pilot Deferral Account No 0 Subtotal Accounts Not Requesting Disposition B 0,,, (0,0,0),,0 (,,),, (0,),,0 (,,0) Total Regulatory Account s C=A+B (,,0),0, (,,),,0 (,0),, (,0,0) Comment (): 0 Total Differs from EB00 due to exclusion of Cat Lake Operational Deferral Account balance of $. million Comment Comment (): Account RSVAPowerSub AccountGlobal Adjustment has been excluded from the amount requested for disposition. For further details, please refer to, Tab,.

Updated: 000 Attachment Page of HYDRO ONE NETWORKS INC. DISTRIBUTION Continuity Schedule Regulatory Accounts F00 0 Account Descriptions Calc For Disposition Account Number Opening Principal Amounts as of Jan 0 Transactions Debit / (Credit) during 0 excluding interest and adjustments BoardApproved Disposition during 0 Adjustments during 0 other Transactions/ Adjustments During Year Closing Principal as of Dec 0 Opening Interest Amounts as of Jan 0 Interest Jan to Dec BoardApproved Disposition during 0 Adjustments during 0 other Transactions/ Adjustments During Year Closing Interest Amounts as of Dec 0 Total Dec, 0 Type Accounts Requesting Disposition LV Variance Account Yes 0 RSVA Wholesale Market Service Charge Yes 0 RSVA Retail Transmission Network Charge Yes RSVA Retail Transmission Connection Charge Yes RSVA Power SubAccount Power Yes Group SubTotal,,,0,,0,,,0,,0,0,,, (,,0) (,,) (,,) (,,) (,0,) (,0) (,0) (,0,) (,,),0,,0,,0,,,,0,0,,,0,,0,,,0,,,,,,,0,,,,, (,),0,,0,,,,,,,0, (,,) 0,, 0,, (,,) (,),, (0,) (,00,) Type Regulatory Accounts Requesting Disposition RCVA Yes / Pension Cost Differential Account Yes 0 Microfit Connection Charge Variance Account Yes 0 Tax Rate Changes Account Yes DG Other Costs HONI Variance Account Discontinued Yes DG Express Feeders HONI Variance Account Discontinued Yes Smart Grid Variance Account Yes OEB Cost Differential Account Yes 0 DSC Exemption Deferral Account Yes 0 Smart Meter Entity Charge Variance Account Yes Revenue Offset Difference Account Pole Attachment Charge Yes 0 Bill Impact Mitigation Variance Account Yes 0 Subtotal Type Accounts Requesting Disposition Total Regulatory Accounts Requesting Disposition Type Accounts Not Requesting Disposition RSVA Power SubAccount Gobal adjustment No Rider Disposition and Recovery of Regulatory s Discontinued No Special Purpose Charge Variance Account (SPC) Discontinued No Recovery of Regulatory Asset s Discontinued No 0 Rider Disposition and Recovery of Regulatory s Discontinued No Rider 00 Disposition and Recovery of Regulatory s No A,0, (,00) (,00), (),,,,,,,,,,,,0,0,,,,,,, (,,) (,0) (,0) (,00,0) (,0) (,) (,) (,) (,,) (,,0) (,,) (,,) (,,) (0,0) (,) (,) (,0) (,,) (,,),, (,0) (,) (,) (,) (,) (,) (,0) (,0) (,) (,0) (,0) (,) (,0) (0,) (,,) (,,) (,,0) (,) (,) (,) (0,0) (,,),0,0,,,,,,0 0,,0,0,00,0,,0 (,0) (,0),00,0,,,,0,0,,0,,0,,,,0,,,,,0,,,,,,,,, 0,,0,0,0,,00, (,,),,,, 0,, (0,0) (,) (,) (,,),0,0 (,,),,,,,, (,0,), (,,), (,) (,), (,) (,) Type Accounts Not Requesting Disposition OEB Cost Differential Account Discontinued No 0 Smart Meters Minimum Functionality Discontinued No / Smart Meters Exceeding Minimum Functionality Discontinued No / Deferred Revenue Project Costs Account Discontinued No 0 Generator Joint Use Revenue Deferral Account Discontinued No 0 RRRP No 0 DG Other Costs Provincial Pool Variance Account No DG Express Feeders Provincial Pool Variance Account No Revenue Difference Account Pole Attachment Charge No 0 Long Term Load Transfer (LTLT) Rate Impact Mitigation Deferral Account No 0 Smart Grid Pilot Deferral Account No 0 Subtotal Accounts Not Requesting Disposition B,,,,,,,,,,,,,0, (,,),,0,,0 (,,0) (,0) (,) (,) (,0) (,0,00) 0,,0,0,,0,,0,0,,,,,, (,,) (,,) (,) (,) (,) (0,) (,,0) (,) (,) (,) (,0) (,) (,) (,) (,0) (,),00,0 (,,) (,,),0,0,, 0,,,0 (,,) (,,) (,,) (,0,) (,,0) (00,) (00,) (,,) (,0,) (,,) (,,) (,,) (,0,0) (,) (,) (,) (,) (,,) (,,),,,, (,) 0,,0 (,0,00),,0 (,0,) (,0,), (,,) (,,) (,,) Total Regulatory Account s Comment (): 0 Total Differs from EB00 due to exclusion of Cat Lake Operational Deferral Account balance of $. million Comment (): Account RSVAPowerSub AccountGlobal Adjustment has been excluded from the amount requested for disposition. For further details, please refer to, Tab,. C=A+B (,,),,,, (,),,,0,,, (,) (,0,), (,,) (,0,00),,

Updated: 000 Attachment Page of HYDRO ONE NETWORKS INC. DISTRIBUTION Continuity Schedule Regulatory Accounts F00 0 Account Descriptions Calc For Disposition Account Number Opening Principal Amounts as of Jan 0 Transactions Debit / (Credit) during 0 excluding interest and adjustments BoardApproved Disposition during 0 Adjustments during 0 other Transactions/ Adjustments During Year Closing Principal as of Dec 0 Opening Interest Amounts as of Jan0 Interest Jan to Dec BoardApproved Disposition during 0 Adjustments during 0 other Transactions/ Adjustments During Year Closing Interest Amounts as of Dec 0 Total Dec, 0 Type Accounts Requesting Disposition LV Variance Account Yes 0 RSVA Wholesale Market Service Charge Yes 0 RSVA Retail Transmission Network Charge Yes RSVA Retail Transmission Connection Charge Yes RSVA Power SubAccount Power Yes Group SubTotal,,0 (,,0) (,,0),,0, (,) (,),,, (,,),0,,0, (0,,) (,0,),,0,,0 (,) (,,0),, (,,0) (,,0),0,,0, (,,) (,,) 0,00,,,,,,0,,0,0,, (,0) (,0),,0,00,,,,,,,,,,,,,, (,,),,,,,, (0,) 0, 0,,,, Type Regulatory Accounts Requesting Disposition RCVA Yes / Pension Cost Differential Account Yes 0 Microfit Connection Charge Variance Account Yes 0 Tax Rate Changes Account Yes DG Other Costs HONI Variance Account Discontinued Yes DG Express Feeders HONI Variance Account Discontinued Yes Smart Grid Variance Account Yes OEB Cost Differential Account Yes 0 DSC Exemption Deferral Account Yes 0 Smart Meter Entity Charge Variance Account Yes Revenue Offset Difference Account Pole Attachment Charge Yes 0 Bill Impact Mitigation Variance Account Yes 0 Subtotal Type Accounts Requesting Disposition Total Regulatory Accounts Requesting Disposition Type Accounts Not Requesting Disposition RSVA Power SubAccount Gobal adjustment No Rider Disposition and Recovery of Regulatory s Discontinued No Special Purpose Charge Variance Account (SPC) Discontinued No Recovery of Regulatory Asset s Discontinued No 0 Rider Disposition and Recovery of Regulatory s Discontinued No Rider 00 Disposition and Recovery of Regulatory s No A, (,0) (,0) 0,, (,) (,),,,,0 (,,) (,,),,,, (,,) (,,),,00, (,00,0),,,, (,) (,),, (,0) (0,) (,,),,0,,0 (,,) (,0) 0, 0, (,0) (,,0) (,0),,,,, (,),,,0, (,0),0,0 (,),0,0 (,0) (,0) (,,0) 0, 0, (,,) (0,0),0,0 (0,0) (,,),,0 (,0,0) (,0,0),,,00 (,) (,),,0,,00 (,0) (,0),, (,00) (,00),,0,,0,,,,,,,, (0,,0) (,0,),,,, (,0) (,0),,,0,, 0,,,,,,,0, (0,) (0,),,, 0,,,0,,0,,, (,,),0,0 (,),,,0, (,,),0,,0, (,0),, (,) 0,, Type Accounts Not Requesting Disposition OEB Cost Differential Account Discontinued No 0 Smart Meters Minimum Functionality Discontinued No / Smart Meters Exceeding Minimum Functionality Discontinued No / Deferred Revenue Project Costs Account Discontinued No 0 Generator Joint Use Revenue Deferral Account Discontinued No 0 RRRP No 0 DG Other Costs Provincial Pool Variance Account No DG Express Feeders Provincial Pool Variance Account No Revenue Difference Account Pole Attachment Charge No 0 Long Term Load Transfer (LTLT) Rate Impact Mitigation Deferral Account No 0 Smart Grid Pilot Deferral Account No 0 Subtotal Accounts Not Requesting Disposition B,, (,,) (,,), (,) (,) (,,0),,0,,0 (,0),0,0,0,0 (,0,0) (,0,0), (,) (,) (,,),,,, (0,) 0, 0, (,0),0,0 (,0),0,0,0 (,,) (,,) (,0,) 0, (0,) (0,),0 (,0,0) (,0,),,,, (,,) (,,) (,) (,) (,,) (0,,) (,0,0) (,0,0) (,) (,0) (,0) (,) (,00,) (,0,00),0,0 (,,),0,,, (,,),0,0 (,,00),, Total Regulatory Account s Comment (): 0 Total Differs from EB00 due to exclusion of Cat Lake Operational Deferral Account balance of $. million Comment (): Account RSVAPowerSub AccountGlobal Adjustment has been excluded from the amount requested for disposition. For further details, please refer to, Tab,. C=A+B,0,,0, (,,),,,,0 (,,00) (,0) (,0) (,0,0),,

Updated: 000 Attachment Page of HYDRO ONE NETWORKS INC. DISTRIBUTION Continuity Schedule Regulatory Accounts F00 0 Account Descriptions Calc For Disposition Account Number Opening Principal Amounts as of Jan 0 Transactions Debit / (Credit) during 0 excluding interest and adjustments Actual Board Approved Disposition during 0 Adjustments during 0 other Transactions/ Adjustments During Year Closing Principal as of Dec 0 Opening Interest Interest Jan to Dec Amounts as of Jan 0 BoardApproved Disposition during 0 Adjustments during 0 other Transactions/ Adjustments During Year Closing Interest Amounts as of Dec0 Total Dec, 0 Type Accounts Requesting Disposition LV Variance Account Yes 0 RSVA Wholesale Market Service Charge Yes 0 RSVA Retail Transmission Network Charge Yes RSVA Retail Transmission Connection Charge Yes RSVA Power SubAccount Power Yes Group SubTotal,,0,,,,,,0,,0,0,,0, (0,,) (,00,) (,00,) (,,) (,) (,) (,) (,,) (,00,),0, (,,) (,,),, 0,00,,,,0,,0,,,,,,,,,0,0,0,,,,, (,0) (,0),,,,,,,,,, (,,) (,,),,,,,, 0,0,0 Type Regulatory Accounts Requesting Disposition RCVA Yes / Pension Cost Differential Account Yes 0 Microfit Connection Charge Variance Account Yes 0 Tax Rate Changes Account Yes DG Other Costs HONI Variance Account Discontinued Yes DG Express Feeders HONI Variance Account Discontinued Yes Smart Grid Variance Account Yes OEB Cost Differential Account Yes 0 DSC Exemption Deferral Account Yes 0 Smart Meter Entity Charge Variance Account Yes Revenue Offset Difference Account Pole Attachment Charge Yes 0 Bill Impact Mitigation Variance Account Yes 0 Subtotal Type Accounts Requesting Disposition Total Regulatory Accounts Requesting Disposition Type Accounts Not Requesting Disposition RSVA Power SubAccount Gobal adjustment No Rider Disposition and Recovery of Regulatory s Discontinued No Special Purpose Charge Variance Account (SPC) Discontinued No Recovery of Regulatory Asset s Discontinued No 0 Rider Disposition and Recovery of Regulatory s Discontinued No Rider 00 Disposition and Recovery of Regulatory s No A 0, 0,0 0,0,,,,,,,, (,,0) (,,0),0,,,0,0,,, (,) (,) (,0) (,) (,) (,) (,) (,,) (,,) (,0) (,) (,) (,) (,,0),,,0,0,0,, (,0) (,0) (,0) (,,) (,,) (0,0) (,) (,) (,) (,00,) (,,0) (,,0) (,,0) (,) (,) (,) (,0,),,,,, 0, 0,,0,0,, (,) (,) (0,),,, (00,) (,0,) (,0,) (,0,) (,) (,) (,) (,,),0,,,,0,0,,0,0,,,,, (,0,) (,0,) (,),,,,,,, (,,) (,,),,, 0,0 0,0,, 0,,,,,,,,,,0 (,),00,,00,,,,,0, (,,) (,,),, (,),, (,),, Type Accounts Not Requesting Disposition OEB Cost Differential Account Discontinued No 0 Smart Meters Minimum Functionality Discontinued No / Smart Meters Exceeding Minimum Functionality Discontinued No / Deferred Revenue Project Costs Account Discontinued No 0 Generator Joint Use Revenue Deferral Account Discontinued No 0 RRRP No 0 DG Other Costs Provincial Pool Variance Account No DG Express Feeders Provincial Pool Variance Account No Revenue Difference Account Pole Attachment Charge No 0 Long Term Load Transfer (LTLT) Rate Impact Mitigation Deferral Account No 0 Smart Grid Pilot Deferral Account No 0 Subtotal Accounts Not Requesting Disposition B (,0,),0,,0,,0 (,0) (,0) (,,),,0,,0 (,,) (,,) (0,0) (0,0) (,,0) (,,) (,0,0) 0 (,0,0) (,) (,00) (,00) (,) (,,),00,,00,,00,,00,,0,0,0,,,,,0 (,,),0,0 0,, (,,00),, (,,0),, Total Regulatory Account s Comment (): 0 Total Differs from EB00 due to exclusion of Cat Lake Operational Deferral Account balance of $. million Comment (): Account RSVAPowerSub AccountGlobal Adjustment has been excluded from the amount requested for disposition. For further details, please refer to, Tab,. C=A+B,,0,0, (,,),,0,0,0 (,0,0),, (,,),,

Updated: 000 Attachment Page of HYDRO ONE NETWORKS INC. DISTRIBUTION Continuity Schedule Regulatory Accounts F00 0 Account Descriptions Calc For Disposition Account Number Opening Principal Amounts as of Jan 0 Transactions Debit / (Credit) during 0 excluding interest and adjustments Forecasted Board Approved Disposition during 0 Adjustments during 0 other Transactions/ Adjustments During Year Closing Principal as of Dec 0 Opening Interest Amounts as of Jan 0 Forecasted Interest Jan to Dec Forecasted Board Approved Disposition during 0 Adjustments during 0 other Transactions/ Adjustments During Year Closing Interest Amounts as of Dec0 Total Dec, 0 Type Accounts Requesting Disposition LV Variance Account Yes 0 RSVA Wholesale Market Service Charge Yes 0 RSVA Retail Transmission Network Charge Yes RSVA Retail Transmission Connection Charge Yes RSVA Power SubAccount Power Yes Group SubTotal,,0,,0,,, 0,,0, (,,) (,,) (,,) (,) (,) (,,) (,,),,,,, 0, 0,,,,00,,,,,0,,0,0,0,,,,,,,, 0, 0, 0,,,0,,,,,,,, 0,, Type Regulatory Accounts Requesting Disposition RCVA Yes / Pension Cost Differential Account Yes 0 Microfit Connection Charge Variance Account Yes 0 Tax Rate Changes Account Yes DG Other Costs HONI Variance Account Discontinued Yes DG Express Feeders HONI Variance Account Discontinued Yes Smart Grid Variance Account Yes OEB Cost Differential Account Yes 0 DSC Exemption Deferral Account Yes 0 Smart Meter Entity Charge Variance Account Yes Revenue Offset Difference Account Pole Attachment Charge Yes 0 Bill Impact Mitigation Variance Account Yes 0 Subtotal Type Accounts Requesting Disposition Total Regulatory Accounts Requesting Disposition Type Accounts Not Requesting Disposition RSVA Power SubAccount Gobal adjustment No Rider Disposition and Recovery of Regulatory s Discontinued No Special Purpose Charge Variance Account (SPC) Discontinued No Recovery of Regulatory Asset s Discontinued No 0 Rider Disposition and Recovery of Regulatory s Discontinued No Rider 00 Disposition and Recovery of Regulatory s No A,,,,0,0,,,0,,0,,,,,,, (,) (,) (,) (,) (,) (,) (0,0) (,,) (,,) (,) (,) (,) (0,0) (,,),,,,0,0,0, (,0) (,0) (,0) (,,) (,,) (,) (,) (,) (,) (,,) (,,0) (,,0) (,) (,) (,) (,00) (,,0),,,,,0 0, 0,,,,0 (0,) (0,), (,) (,),0 (0,0) (,0,) (,0,) (,) (,) (,) (0,) (,,),0,0,0,0,,0,0,,, (,) (,), (,0) (,0), 0,,,,,,,,,,, 0,, A,,0,,0,,,,,,,,0,000,, (,,) (,,) (,),,0, 0, 0, Type Accounts Not Requesting Disposition OEB Cost Differential Account Discontinued No 0 Smart Meters Minimum Functionality Discontinued No / Smart Meters Exceeding Minimum Functionality Discontinued No / Deferred Revenue Project Costs Account Discontinued No 0 Generator Joint Use Revenue Deferral Account Discontinued No 0 RRRP No 0 DG Other Costs Provincial Pool Variance Account No DG Express Feeders Provincial Pool Variance Account No Revenue Difference Account Pole Attachment Charge No 0 Long Term Load Transfer (LTLT) Rate Impact Mitigation Deferral Account No 0 Smart Grid Pilot Deferral Account No 0 Subtotal Accounts Not Requesting Disposition B (,,) (,,) (,,0) (,) (,) (,,) (,,) (,0,0) (,0,0) (,) (,00) (,00) (,) (,00,),00,,00,,,,,0,0,0,0, 0,, (,,) (,,),, (,,0),,0,, (,0,),0, B Total Regulatory Account s Comment (): 0 Total Differs from EB00 due to exclusion of Cat Lake Operational Deferral Account balance of $. million Comment (): Account RSVAPowerSub AccountGlobal Adjustment has been excluded from the amount requested for disposition. For further details, please refer to, Tab,. C=A+B,0,0 (,,) (,,),0,0 (,,),0,,0,, (,0),, (A+B=C) Comment