Forward Looking Statements

Similar documents
Forward Looking Statements

FORWARD LOOKING STATEMENTS

GOLD RESOURCE CORPORATION REPORTS 2017 NET INCOME OF $4.2 MILLION, OR $0.07 PER SHARE; PROVIDES 2018 PRODUCTION OUTLOOK

GOLD RESOURCE CORPORATION REPORTS RECORD ANNUAL PRODUCTION RESULTS FOR 2012 AND OUTOOK FOR 2013

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE

GOLD RESOURCE CORPORATION REPORTS FIRST QUARTER NET INCOME OF $0.10 PER SHARE, MAINTAINS 2018 PRODUCTION OUTLOOK

GOLD RESOURCE CORPORATION REPORTS THIRD QUARTER RESULTS; MAINTAINS 2013 PRODUCTION OUTLOOK

GOLD RESOURCE CORPORATION. Markets: OTC BB: GORO FSE: GIH

Agnico-Eagle Mines Limited Annual General Meeting May 12, 2006

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE GOLD RESOURCE CORPORATION REPORTS SECOND QUARTER NET INCOME OF $0.07 PER SHARE, MAINTAINS 2018 PRODUCTION OUTLOOK

The Mexican Junior Gold and Silver Producer Report

NYSE Amex: GORO NEWS. Tuesday DENVER. cost gold. Overview. ce. The mine. ($0.46/share) cash items. heavy rains. in the third grade run 31, 2010.

GORO: One My Top Picks for Here s Why.

AGNICO EAGLE TO ACQUIRE CAYDEN RESOURCES

Agnico-Eagle Mines Limited Corporate Update May 2010

Forward Looking Statements

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

European Gold Forum. April 17 19, 2018

First Quarter 2012 Results

Corporate Presentation December 5, 2017

Agnico-Eagle Mines Limited Corporate Update September 2010

Corporate Update. June 2013

BMO Global Metals & Mining Conference. February 25 March 1, 2018

NOW IN COMMERCIAL PRODUCTION

Corporate Presentation. February 28, 2019

SILVER PRODUCER STRENGTH UPSIDE PRIMARY SILVER PRODUCER. Primary Silver Producer 57% Ag, 33% Au, 10% Pb-Zn

SILVER PRODUCER STRENGTH UPSIDE PRIMARY SILVER PRODUCER. Primary Silver Producer 55% Ag, 36% Au, 9% Pb-Zn

How Life of Mine and Budgets are Developed Toronto February 14, 2014 agnicoeagle.com

Corporate Summary. November 2017

2014 First Quarter Results

14MAR Management s Discussion and Analysis (Prepared in accordance with United States GAAP) for the year ended December 31, 2013

CORPORATE SUMMARY. May 2018

Corporate Update New York August 2013

SILVERCORP REPORTS SIGNIFICANT GAIN IN MEASURED AND INDICATED MINERAL RESOURCES AT THE YING SILVER-LEAD-ZINC MINING DISTRICT, HENAN PROVINCE, CHINA

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

Hecla Mining Company BMO Capital Markets Global Metals and Mining Conference

Gold Reserve Inc. JANUARY 2005

SILVER PRODUCER STRENGTH DISCIPLINED UPSIDE PRIMARY SILVER PRODUCER. Primary Silver Producer 60% Ag, 34% Au, 6% Pb-Zn

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

CORPORATE UPDATE. November 2014

RBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015

P R I M E R E G I O N S. P R I M E P R O J E C T S. I N T E L L I G E N T E X P LO R AT I O N.

BANK OF AMERICA MERRILL LYNCH GLOBAL METALS, MINING & STEEL CONFERENCE May 2017

Corporate Strategy Review. January 2007

For personal use only

AGNICO EAGLE MINES LTD

Gold Hawk Resources Inc.

JEFFERIES 10 TH ANNUAL GLOBAL INDUSTRIALS CONFERENCE

SILVER PRODUCER PROFITABLE GROWTH PROFITABLE PRIMARY SILVER PRODUCER. Primary Silver Producer 63% Ag, 27% Au, 10% Pb-Zn

BMO CAPITAL MARKETS 27 TH GLOBAL METALS AND MINING CONFERENCE

Coeur Files Technical Report for Kensington Mine

November 7, 2017 NYSE:HL. Third Quarter Earnings Conference Call

POSITIONING FOR SUSTAINABLE GROWTH

RICHMONT MINES INC. Investor Presentation October TSX - NYSE MKT: RIC. Copyright 2012 by Richmont Mines

Alien Metals Ltd Corporate Presentation October 2018

BMO CAPITAL MARKETS 27 TH GLOBAL METALS & MINING CONFERENCE

Telson Mining Corporation

SILVER PRODUCER PROFITABLE GROWTH PROFITABLE PRIMARY SILVER PRODUCER. Primary Silver Producer 66% Ag, 28% Au, 6% Pb-Zn

Second Quarter 2013 Earnings Conference Call

DENVER GOLD FORUM. September 2014

China Gold International Annual General Meeting 2013 Financial Growth, Expansion Progress, M&A

True Value Proposition Second Quarter Results. July 31, 2015 TSX: YRI NYSE: AUY

Corporate Presentation November 2018 TSX-V: RRI OTCQB: RVSDF Frankfurt: R99

Corporate Presentation

Lupaka Announces Positive PEA for Invicta with Average Annual Pre-Tax Cash Flow of US$10.2 Million

MCEWEN MINING PROVIDES FIRST QUARTER 2012 OPERATIONAL AND DEVELOPMENT UPDATE

2018 FIRST QUARTER RESULTS. May 3, 2018

AGNICO EAGLE MINES LTD

MAG Silver Reports Juanicipio Updated PEA Study Prepared by AMC

ANNUAL GENERAL MEETING APRIL 28, 2017

(Please note that all dollar amounts in this news release are expressed in U.S. dollars unless otherwise indicated.)

AGNICO EAGLE MINES, LTD MEXICO. Chihuahua, Chih. Sept 13 rd, 2012.

Corporate Presentation March 1, 2017

Coeur Announces Initial Reserve Estimate and Reserve-Based Mine Plan for Silvertip Mine

RAYMOND JAMES 39 TH ANNUAL INSTITUTIONAL INVESTORS CONFERENCE

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

Corporate Presentation

European Gold Forum Zurich, Switzerland

KENA AND DAYLIGHT GOLD PROJECT

N E W S R E L E A S E

NYSE American USAS TSX USA. Corporate Presentation

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

HECLA REPORTS SECOND QUARTER RESULTS; INCREASES SILVER PRODUCTION 60% For the Period Ended June 30, 2008 For Release: August 4, 2008

15, 2007 YAMANA GOLD INC. MERIDIAN GOLD INC.

True Value Proposition. Corporate Summary. May 2015 TSX: YRI NYSE: AUY

Third Quarter 2014 Earnings Conference Call

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE

DEFIANCE SILVER CORP. MANAGEMENT S DISCUSSION & ANALYSIS For the six months ended December 31, 2017

Hudbay Announces Updated Technical Report for Constancia and Provides Annual Reserve and Resource Update

SILVER PRODUCER PROFITABLE GROWTH PROFITABLE PRIMARY SILVER PRODUCER. Primary Silver Producer 63% Ag, 31% Au, 6% Pb-Zn

Q Results Webcast & Conference Call

WESDOME ANNOUNCES FOURTH QUARTER AND FULL YEAR 2016 FINANCIAL RESULTS AND RESERVE AND RESOURCE UPDATE

Mt. Milligan Gold Stream Transaction: Acquisition and Project Finance Investment. July 2010

CORPORATE PRESENTATION

Forward Looking Statements

Q4 and Full Year 2017 Results & 2018 Outlook. February 16, 2018

SilverCrest Announces Babi Sur Vein High-Grade Discovery at Las Chispas 2.2 Metres Grading 556 gpt AgEq. 1.5 Metres Grading 606 gpt AgEq

Transcription:

4 4 12

Forward Looking Statements This presentation is to be read in conjunction with the most current 10K available at the Securities & Exchange Commission website www.sec.gov. or www.goldresourcecorp.com This brochure contains statements that plan for or anticipate the future. Forward looking statements include statements about the Company's ability to develop and produce gold or other precious metals, statements about our future business plans and strategies, statements about future revenue and the receipt of working capital, and most other statements that are not historical in nature. Forward looking statements are often identified by words such as "anticipate," "plan," "believe," "expect," "estimate," and the like. Because forward looking statements involve future risks and uncertainties, there are factors that could cause actual results to differ materially from those expressed or implied, including those described in our filings with the SEC. Prospective investors are urged not to put undue reliance on these forward looking statements.

Engineered To Maximize Shareholder Value Gold Producer Focused on Growth Low Cost Production High-Grade Asset Base with Significant Exploration Potential Strong, Experienced Management Team Focused on Cash and Dividends

Strategy Decisions based on financial performance Payback initial Project CAPEX less than 1 year Production at earliest possible date Build company with cash generated Limit shareholder dilution (Disciplined Cap Structure) Distribute meaningful dividend (Approx.1/3 GMP (1) ) (1) Gross Mine Profit(GMP): Sales Cost of Sales

Overview Exploration and production of gold and silver projects that target low operating costs and high return on capital Oaxaca Mining Unit: 6 potential high-grade gold and silver properties (+200 sq miles) Dominant land position: 48 kilometer mineralized structural corridor Oaxaca Mining Unit Property Interest Production Development Exploration El Aguila 100% El Rey 100% Alta Gracia 100% Las Margaritas 100% El Chamizo 100% Solaga 100%

Arista Production Targets Aggressive Growth Curve Calendar Year-end Precious Metal (AuEq) Production Targets Precious Metal Gold Equivalent oz s (AuEq) 53:1 Ag/Au 225,000 200,000 175,000 150,000 125,000 100,000 75,000 50,000 25,000 10,493 66,159 T/D 900 140,000 T/D 1200 200,000 2012 target range: 120,000 140,000 AuEq 0 T/D=tonnes per day. Production targets assume 53:1 silver gold ratio, dependent on actual tonnage and grade. Mill capacity as built = ~200,000 oz. Internal Estimate, Not SEC Proven & Probable Reserves; see Risk Factors in Company s 10K

Production Cash Cost Targets 300 Cash Cost / Ounce Targets *Precious Metal $ Cash Cost / oz 200 100 0 $217 $136 2011 AVG $136 $150-$50 $50-$0 *Precious metals cash cost / oz production targeted using industry standard base metal by product credits of: Cu, Pb, Zn Total cost per tonne 2011 $81.00 Ore mined & milled Cash Cost (Internal Estimate, Not SEC Proven & Probable Reserves; see Risk Factors in Company s 10K) Total Cash Cost Industry Average GRC GRC Cash cost/oz $620* $136 $222** *ABN AMRO Gold Mine Total Cash Cost Report Q1 2011 **Includes 5% royalty

Flexible Mill Design Two mill circuits Flotation 2011 Record Mine Gross Profit: $87 million Agitated leach

Arista Underground Vein Deposit Arista Vein Deposit Mineralized Material (1) : Company Estimate 2,962,000 tonnes in-situ Insert new photo Precious metal grades Au 6.5 grams / tonne Ag 506 grams / tonne 15 grams/t (1/2oz) AuEq Base metal grades Cu 0.60% Pb 2.24% Zn 6.75% ~$0 cost target potential w/ these byproduct grades Mine Life Estimate (1) : 7 years Arista deposit open on strike and depth (1)Internal Estimate, Not SEC Proven & Probable Reserves; see Risk Factors in Company s 10K

Arista Underground Mine La Arista Deposit Multiple en echelon veins ~500 meters of strike ~500 meters of depth Deposit remains open Drill Station Drill Station Arista Vein Open Baja Vein Development 1-1-12

Arista Underground Vein Deposit Deposit Expansion Potential December 2009: Mineralized Material Polygonal Envelopes Estimated mine life: 7 Years 100 m to surface 200 m 100 m Potential: Double current mine life estimate Baja vein 12/09 Arista vein 12/09 Current mining location Veins remain open on strike and depth Geologic model potential of 1000+ meter deep mineralized system Internal Estimate, Not SEC Proven & Probable Reserves; see Risk Factors in Company s 10K

Arista Underground Vein Deposit Deposit Expansion Potential Open Continued vein and grade continuity Open Open

Arista Mine Development Development ore Schematic of Mine Development Descending Benches Sub-level long hole stoping L 4 Ore Pass L5 L6

Arista Mine Development Drills assisting development work Hole # 1 st Stope; mine development drill results between L5-L6 include Meters Au g/t 5110004 33.81 18.49 1853 1.59 1.76 5.21 Safety ramp Ag g/t (weighted avg. not true width) Cu % Pb % Zn % L4 1 st Stope Hole 5110004 L5 L 6

Arista Mine Development Additional Veins Arista Vein Decline Level 7 Arista Vein channel samples Meters Au g/t Ag g/t Cu % Pb % Zn % 5.3 11.9 3499 1.47 2.04 3.78 3.4 16.1 1419 1.32 2.64 4.46 3.3 9.9 1092 0.92 2.33 3.71 2.5 12.5 2615 1.94 4.50 6.76 2.3 7.9 1419 1.75 1.76 3.97 Baja Vein

Arista Mine PORTION OF 6 METER WIDE EPITHERMAL VEIN 3 METERS OF 6 METER WIDE VEIN

Arista Mine Relative Average Metal Grade Comparisons Company Agnico Eagle Mine Name Gold (Au) g/t Silver (Ag) g/t Copper (Cu) % Lead (Pb) % Zinc (Zn) % Gold Equivalent (AuEq*) g/t LaRonde 2.80 68 0.35 3.65 5.82 (1) Pinos Altos 3.01 86 4.25 (1) Yamana Chapada 0.24 0.34 0.69 (1) El Penon 6.64 280 10.56 (1) Gualcamayo 1.69 1.69 (1) Minera Florida 4.51 37 5.04 (1) GoldCorp Penasquito 0.44 29 0.33 0.72 1.31 (1) Gold Resource Corp. La Arista Estimated Avg 6.50 506 0.60 2.24 6.75 23.20 (1) Source: Based on publicly available information, except Gold Resource, which has been based on internal estimates, not SEC proven & probable reserves (see Risk Factors in Company s 10-K). (1) Based on the Company s calculations. All metal value AuEq* @ $950/oz Au, $17/oz Ag, $2.70/lb Cu, $1.00/lb Pb, $1.00/lb Zn.

Large consolidated Land Position 6 properties (+200 square miles) 5 properties consolidate important mineralized structural corridor N70W High-grade gold and silver Epithermal deposits Intermediate polymetallic deposits Skarn potential

Large consolidated Land Position 48+ kilometer N70W structural corridor Mineralization at each end and along trend El Aguila Project deposits: La Arista Underground Metals: Au, Ag, Cu, Pb, Zn El Aguila Open Pit Metals: Au, Ag El Aire Underground Metals: Au, Ag, Cu, Pb, Zn Significant exploration potential 99% of concessions to be drilled Consultant geologists include: Dr. Jeff Hedenquist, Dr. Larry Meinert, Dr. Jeff Jaacks, Dr. Bob Ellis, Dr. Eric Nelson Dr. Peter Lipman, David Jones

El Aguila Project-Exploration Potential World class grade World class geologic setting Expansion potential 3 existing El Aguila Project deposits: El Aguila open pit La Arista underground vein system El Aire underground vein system Numerous exploration targets include: Cerro Colorado, La Escondita, Salina Blanca, Paredonas, El Chacal, Fossil Bend, Fossil Hill, The Switchback, La Curva Map represents ~4km of 48km mineralized trend Existing sites with expansion potential Exploration targets Geologist; David Jones Geological Setting: N70W regional structural trend Nested calderas Resurgent domes Piston-like plug

El Aguila Project & Regional Exploration Potential Ground Magnetic Anomalies Coincident with mineralization (Zonge Geophysical) Additional epithermal vein potential (Dr. Jeff Hedenquist) Aguila Deposit La Arista Deposit Geochemical Surveys Element suite indicate skarn potential near Arista deposit (Dr. (Dr. Jeff Jaacks) Aguila Deposit La Arista Deposit Titan 24 Geophysics Numerous deep targets. Skarn potential below epithermal veins (Dr. Larry Meinert) ~40km Regional Survey Airborne geophysical planned (Dr. Bob Ellis) Aguila Deposit La Arista Deposit

Exploration/Development Property El Rey Property High-grade gold vein system Exploration / development underground Mineralization within 100 meters of the surface Vein drill intercepts include (5 holes): 1 m of 132.5 g/t Au 1.4 m of 55.3 g/t Au 9 m of 19.4 g/t Au including 1 m of 66.4 g/t Au 1 m of 31.8 g/t Au 1 m of 30.3 g/t Au 1 m of 29.1 g/t Au 1 m of 23.7 g/t Au Refurbishing & extending existing shaft Drive 2 development drifts along veins Bulk sampling, test mine Underground drill station El Rey

Exploration Property Alta Gracia Property Alta Gracia Property Discovered many high-grade targets Similarities to Arista deposit May be above boiling point Old workings utilized for new exploration Surface samples (rock chip) include: # Meter Ag g/t Au g/t 101814 0.3 2590 4.75 101815 1.2 604 1.32 101817 0.3 431 1.08 101820 0.3 801 1.69 101828 0.5 356 0.39 101837 1.0 287 2.08 101841 0.3 560 0.36 101793 0.3 926 2.10 Alta Gracia

Exploration Property Las Margaritas High-grade gold / silver district Mined Pre-Mexican Revolution (1910) The Mines of Mexico Mex. Gov. Publication 1905 "...the place in which has been found some of the richest ores in Mexico, some of the ores having reached the value of 18,000 ounces to the ton, and ores are frequently found which assay 4,000 and 5,000 ounces to the ton." Rock chip samples include: Gold Silver 6.29 g/t 4150 g/t 5.25 g/t 2000 g/t 7.76 g/t 1850 g/t 3.46 g/t 1330 g/t 2.23 g/t 716 g/t 1.65 g/t 710 g/t 1.22 g/t 942 g/t Historic workings Ghost town Las Margaritas Developing 2012 drill program

Employee Safety & Health Safety Commission Weekly Waste Collection and Recyclables First Aid Training Protections Labor Environment Studies Fire Brigade

Corporate Citizenship Plant Nursery/Reforestation Town Infrastructure Commitment to Hire Locally Health Clinic Dental Clinic Sustainable Development Student Scholarships

Mine Camp Green construction saved over 2 million plastic bottles from the landfill as recycled plastic block walls.

GORO; Unique Gold Investment COMPANY FOCUS Mine Gross Profit (1) Dividends LONG TERM GOAL ~1/3 MGP for taxes ~1/3 MGP for growth ~1/3 MGP for dividends 2011 30.5% MGP for dividends ($26.5M of $87.5M MGP) DIVIDENDS Month Year Dividend Total Dividends to Date Jul. Dec. 2010 $0.18 Jan. Dec. 2011 $0.50 Jan.- Mar. 2012 $0.15 $0.83 Dividends may vary in amount and consistency or be discontinued at management s discretion depending on variables including but not limited to operational cash flows, Company development requirements and strategies, spot gold and silver prices, taxation, general market conditions and other factors described in the Company s public filings. INSTITUTED DIVIDEND $0.05 / month (1) Mine Gross Profit (MGP): Sales Cost of Sales (GRC targets, performance not guaranteed, see Risk Factors in Company s 10K)

GORO; Unique Gold Investment Consecutive Monthly Dividend Distribution Since commercial production declaration July 2010 Returned + $43,000,000.00 to Shareholders Dividend Options; Gold, Silver or Cash (GRC targets, performance not guaranteed, see Risk Factors in Company s 10K)

Dividend & Yields Company Annual Dividend Estimate Yield % Share Price Close 4/4/2012 Agnico Eagle U.S.$0.81 2.4% U.S.$32.63 Barrick U.S.$0.60 1.4% U.S.$41.31 Goldcorp U.S.$0.54 1.2% U.S.$41.17 Kinross U.S.$0.16 1.7% U.S.$9.24 Newmont U.S.$1.40 2.8% U.S.$47.94 Yamana U.S.$0.22 1.4% U.S.$14.76 Royal Gold U.S.$0.60 0.9% U.S.$61.67 PEER AVERAGE 1.7% Gold Resource U.S.$0.60 2.4% U.S.$23.76 Source: Based on each company s annual public filing and Bloomberg.

The Go To Gold Company Cash Aggressive Growth Curve Dividends Gold & Silver Dividends Adding Ounces Physical Treasury Capitalize on Opportunities Low Cost Producer (GRC targets, performance not guaranteed, see Risk Factors in Company s 10K)

Tight Capital Structure Exchange NYSE Amex: GORO Present Capitalization 12 months Shares Outstanding 52,902,620 Treasury Shares 104,251 Options Outstanding 5,182,000 Warrants Outstanding 0 IPO (9/2006) Substantial Shareholders Management ~19% Hochschild Mining plc ~28% Tocqueville Asset Management ~8% NFJ Investment Group ~6% Blackrock ~5% Oppenheimer ~2% Shares Fully Diluted 58,188,871 Debt Nil Cash @ 12-30-11 $52 Million Bullion: Gold=868oz Silver=41,728oz $2.5Million Market Cap @ $24.00/share $1.3Billion Liquidity Average Daily Volume (3m as of 2-27-12) ~140,000 52 wk Range Low/Hi $15.06-$31.38 Vanguard ~2%

2011 Highlights Record production of 66,159 ounces precious metal gold equivalent (AuEq) Annual Cash cost of $136 per ounce AuEq (ex. royalty) Annual Total cash cost of $222 per ounce AuEq Record annual revenue of $105 million Record annual mine gross profit of $87 million Record annual net income of $58 million or $1.10 per share Record annual dividend distributions of $26.5 million, or $0.50 per share for year Physical gold and silver in treasury of $2.5 million Stock repurchase of 104,251 shares at an average price of $18.69 per share Increased cash in bank to $52 million Overview of Q4 2011 Results from El Aguila Project Fourth quarter production from the El Aguila Project totaled 19,934 ounces AuEq at a cash cost of $120 per ounce AuEq (ex. royalty) and realized average sales prices of $1,691 per ounce gold and $30 per ounce silver. The mine generated gross profit of $30.0 million. The Company paid $7.9 million to shareholders in dividends, and repurchased 53,251 shares at an average share price of $18.39, after which the Company Email: gregpatterson@goldresourcecorp.com increased its bank account by $7.0 million over the previous quarter. Gold Resource Corporation 2886 Carriage Manor Point Colorado Springs, CO. 80906 USA Office: (303) 320-7708 Fax: (303) 320-7835 Website: www.goldresourcecorp.com (For more information see Company s entire 2011 10K filing)

Potential Catalysts Increasing production Adding ounces New discoveries NI 43-101 (1) resource report (Mar.-Apr. 2012) TSX secondary listing Increasing dividends Dividends in-kind Potential targets and projections. Not guaranteed; see Risk Factors in Company s 10K (1) NI 43 101 is a Canadian construct and not permitted in filings with the SEC

Conclusion Low-Cost Precious Metals Producer High-Grade Asset Base with Significant Exploration Potential Positioned for Aggressive Growth

Corporate Headquarters Gold Resource Corporation 2886 Carriage Manor Point Colorado Springs, CO. 80906 USA Office: (303) 320-7708 Fax: (303) 320-7835 Email: gregpatterson@goldresourcecorp.com Website: www.goldresourcecorp.com