Meeting & Outreach efforts

Similar documents
MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017

Title 6 WATER AND SEWER FEES AND CHARGES

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for

Marina Coast Water District Marina, California

Table 2-2 Projected Water Production and Costs

Water Rate Study Final Report

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016

Sanitation Rate Study Final Report

City of Benicia. Rate Study Update: Water & Wastewater Rates

Water and Wastewater Utility Rates

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

The City of Sierra Madre

City of San Carlos Sewer Financial Plan & Rate Update

WATER AND SEWER RATE STUDY

Notice of a public hearing

Marina Coast Water District Marina, California

MEMORANDUM OF UNDERSTANDING REGARDING FORT ORD WATER AUGMENTATION AND A THREE PARTY EFFORT TO STUDY ALTERNATIVES

June 9, \RESOLUT : i W.inii!Jid~()(>-10.\\lW:I"b.dgct&wol"(lpl>ndoc

STORM WATER USER RATE STUDY

WATER AND SEWER UTILITIES RATE STUDY

Goleta Water District

Temescal Valley Water District

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges

Water Rates Rate Restructure and Rate Adjustments

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

General Manager s Recommended Budget for Fiscal Years 2018 & Maureen A. Stapleton, General Manager

Water Rate Study FINAL January 31, 2018

FY 2013/14 Proposed Operating Budget

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

Santa Clarita Water Division

FORT COLLINS- LOVELAND WATER DISTRICT

Study Workshops are designed to be both educational and to seek broad direction from the Board

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

La Cañada Irrigation District

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

YORBA LINDA WATER DISTRICT

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

UTILITY RATE STUDY. Public Hearing

CITY OF THOUSAND OAKS

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

Administrative Draft COST ALLOCATION PLAN. Marina Coast Water District

YORK COUNTY, SOUTH CAROLINA

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS

Rates Effective 1/1/2018 Water Residential and Commercial Charges CPI not applicable to base and consumption rates for Rates Effective 1/1/2017

WATER AND WASTEWATER RATE STUDY

ANNUAL BUDGET WORKSHOP. Operating and Capital Budget Fiscal Year Ending June 30, 2019

Richard Pearson, Community Development Director Tim Tucker, City Engineer

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020

WATER, WASTEWATER, AND RECLAIMED WATER RATE STUDY Public Meeting to Review Study Results. January 5, 2016

Final Report Water and Sewer Rate Model Town of Denton, MD

Sewer Rate Study July 2016

Page 2 of 11. Operating Fund Current Plan Last Plan Target 25. Rev vs. Exp 50 CIP. Long-Term Borrowing Current Plan Last Plan

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

Sonoma County Service Area #41(CSA #41) Water Rate Study

Utility Rates. October 13, 2015

Progressive Planning for Financially Robust Water Systems

MARINA COAST WATER DISTRICT

FINANCIAL PLAN REVIEW AND FORECAST

City of Norco WATER AND SEWER RATES Frequently Asked Questions

LCA Lease Concession Financial Study Summary of Results

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and

Capital Improvement Program

SUMMERLAND SANITARY DISTRICT

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016

The Village has had Village. age of. repair. were were 10,000 9,000. 8,000 Gallons 7,000 6,000 5,000 4, Even with the.

Valencia Water Company. Cost of Service Study

CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN

NALDRAFT SEPTEMBER2015 WASTEWATE

CITY OF RAPID CITY. Financial and Rate Setting Policies for the Water and Water Reclamation Utilities

City of Riverbank. Water Rate Study FINAL 6/18/2015

Focused Water Rate Study

PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS

Water Rate Study for City of Lemoore

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

Budget Assumptions for FY 2013/14 and the 10 Year Forecast

Outline. 40 Second Introductions. Introduction - Public Water and Wastewater Characteristics

Capital Region Water Proposed 2019 Budget and Rates. November 20, 2018

Glacial Lakes Sanitary Sewer & Water District Utility Rate Study. Shelly Eldridge Ehlers Jeanne Vogt - Ehlers

SPRINGVILLE CITY CULINARY WATER IMPACT FEE ANALYSIS (IFA) MAY 2014

Estimated Cost By Fiscal Year 1,008,456 35, , , , ,464,656

Long-Term Financial Stability Workshop #4. Capital Investment & Financing. Board of Directors September 23, 2014

CITY OF TACOMA. Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016

CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY. FINAL July 2017

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE

WATER AND SEWERAGE CORPORATION BENCHMARKING STUDY (USING WORLD BANK MODEL) DATA REFERENCE GUIDE. Mr. Armbrister Research Department Central Bank

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

City of Buffalo Water and Sewer Rate Study. Nick Anhut Jessica Cook

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3

City of Fridley Water and Sewer Rate Study. Jessica Cook 9/25/17

Presented By: L. Carson Bise II, AICP President

Sewer Rate Study CRESCENT CITY CALIFORNIA

Water Rates Adjustments Phase 2

Water and Sewer Utility Rate Studies

Transcription:

May 30, 2014

Meeting & Outreach efforts February 27th Proposed Compensation Plan Distributed to Joint Admin/WWOC March 5th Joint Admin/WWOC Meeting First discussion on proposed Compensation Plan April 2nd Joint Admin/WWOC Meeting Reviewed proposed Compensation Plan Provided responses to questions received April 30th WWOC Meeting Submitted and reviewed revision to Compensation Plan May 7th - Joint Admin/WWOC Meeting Presentation on 2013 Rate and Fee Study Presentation of FY 2014/15 Ord Community Compensation Plan May 21st Joint Admin/WWOC Meeting Presentation of FY 2014/15 Ord Community Compensation Plan No action was taken 2

Proposed FY2014/15 Compensation Plan: Funds required on-going O&M Funds existing debt and coverage requirements Provides minimal PAYGO funding Remaining CIP to be Capital Reserve funded Requires $1M loan from Marina Water to cover O&M Expenditures supported by proposed 10% water revenue and 4% sewer revenue increase Typical monthly water increase of $12.37 based on 13 hcf Monthly sewer increase of $1.23 3

MCWD Ord System: Background & Statistics 3,092 accounts 208 miles of water / 112 miles of sewer 5 wells and 15 lift stations Total Ord asset value - $141M Average life of asset 47 years Annual depreciation - $3M ($141M 47 yrs) Standard to benchmark capital reinvestment $970 Annual cost per account 4

Regional Project deferred funding of capital reinvestment Capital Reinvestment Regional Project 5

On Going Unfunded Needs are not unique to MCWD Taking care of Streets costs less than deferring & rebuilding City of Marina 2014 Financial Compass This [funding maintenance] can save communities millions of dollars City of Marina 2014 Financial Compass 6

There is a significant impact of deferred maintenance and capital replacement Deferred maintenance is causing streets to deteriorate rapidly & cost much more City of Marina 2014 Financial Compass Less preventive maintenance on your systems shortens asset life cycle by as much as one-third Would increase annual depreciation to $4.5M Roughly $1,450/yr per account (an increase of $500) Less preventive maintenance results in more emergency repairs, which are more costly than planned repairs 7

Standard practice, in most industries, is to annually adjust rates to maintain cost recovery and curtail large one-time increases 8

Proposed rate increases consistent with historical CPI-WSM* escalation $70.00 $60.00 $50.00 $40.00 $30.00 $20.00 $10.00 Typical Water Monthly Bill (13 hcf) $63.72 $- FY 2011/12 FY 2012/13 FY 2013/14 FY 2014/15 Previously recommended If escalated by CPI - WSM Existing Rate Proposed * Consumer Price Index - Water and Sewerage Maintenance (5yr rolling average) 9

In-lieu of rate increase, reserves were utilized in order to maintain the necessary level of service Millions $10 $9 $8 $7 $6 $5 $4 $3 $2 $1 $0 Combined Ord Operating Reserves 2009/2010 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 Total Operating Reserves Operating Reserves Target FY14/15 Budget, Ord Water must borrow $1M from Marina Water 10

Dependence on reserves, without increases, causes rate spikes and removes flexibility Illustrative Potential Rate Impact 5% Escalation Without reserves, large one-time increase (28% ) needed Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Revenues Use of Reserves Expenditures Ending Fund Balance 11

May 30, 2014

Rate & Financial Study Objectives focused on: 5-10 year outlook to smooth proposed increases as well as to provide greater operational and financial stability Identify revenue requirements to develop water and sewer rates for providing sufficient and predictable revenues to fund expenditures and reserves Prepare a cost of service analysis to evaluate the appropriate rates and charges that are consistent with legal requirements Design rates that promotes conservation to meet the State s 20 x 2020 requirements (SB 7x-7) 13

Cost of Service process includes three main analysis components Revenue Requirement Analysis Compares the revenues to operating and capital costs to determine adequacy of the existing rates to recover costs Cost of Service Analysis Allocates revenue requirements to various customer classes in a reasonable and equitable manner Rate-Design Analysis Considers the structure of the rate design to collect the revenue requirements from each class of service 14

Rate setting process is complex due to diverse and competing objectives Rate Design Cost of Service Prop. 218 Conservation Objectives Affordability Financial Stability Revenue Sufficiency Predictable & Stable Revenue Use of/ Ideal Reserve Levels Capital Funding Short-term Needs Long-term Needs Proactive vs. Reactive 15

Forecasted five-year capital needs are significant driver of proposed revenue program Millions $25 $20 Five-Year Proposed Capital Improvement Program (Total) $15 $10 $5 $0 Ord Water - Capital Need (CIP) Ord Sewer - Capital Need (CIP) 16

Debt funding potential is sufficient to fund identified Capital Program Ord Water - 5yr Capital Outlook Millions ($) 30 25 20 Capital Need 15 10 5 0 Cash Funding Potential Debt Funding Potential 17

Debt funding only partially funds identified Capital Program Ord Sewer - 5yr Capital Outlook Millions ($) 18 16 14 Capital Need 12 10 8 6 4 2 0 Cash Funding Potential Debt Funding Potential 18

Approval of rate increases are necessary to comply with existing bond covenants 1.50 Ord Water Coverage Factor 1.00 0.50 0.00-0.50-1.00-1.50 FY 2013/14 FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Senior Debt Coverage Factor Senior Minimum Coverage Junior Debt Coverage Factor Junior Minimum Coverage -2.00 * Based on 2013 Rate Study cash flow projections for Ord Water Cost Center assuming no revenue increases. Targets exceed legal DCSR of 1.25x and 1.10x for the 2006 Bond and 2010 Bond, respectively, to allow for continued debt funding. 19

Financial outcome without recommended increases is not an option Millions $12 $10 $8 $6 $4 $2 $- $(2) $(4) $(6) Forecasted Cash Flows Without Increases FY 2013/14 FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total Expenditures Proposed Rate Revenue Total Reserves 20

Facilities Agreement 7.1.2 - MCWD Will Recover Costs. MCWD will recover all of its direct and indirect, short term and long term costs of furnishing the facilities to the service area. MCWD shall not be required to take any action in connection with furnishing the facilities to the service area unless and until a source of funds is secured from the service area to pay in full in a reasonable manner consistent with normal accounting practices all of MCWD s direct and indirect, short term and long term costs of the action to be taken by MCWD, including costs of administration, operation, maintenance and capital improvements to provide adequate system capacity to meet existing and anticipated service demands. 21

Gradual increases provide financial stability, ability to issue new debt, and fund adequate capital reinvestment Millions $12 $10 $8 Ord Water Forecasted Cash Flows With Increases $6 $4 $2 $- FY 2013/14 FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Total Expenditures Proposed Rate Revenue Total Reserves 22

Gradual increases enable rebuilding of reserves over the forecasted period Millions $7 $6 $5 Ord Water Forecasted Fund Balances $4 $3 $2 $1 $0 FY 2013/14 FY 2014/15 FY 2015/16 FY 2016/17 FY 2017/18 FY 2018/19 Capital Operating Operating Target 23

Resulting Proposed Ord Water and Sewer Rates Description Existing FY 2013/ 2014 FY 2014/ 2015 FY 2015/ 2016 Consumption Rates (per hcf) FY 2016/ 2017 FY 2017/ 2018 0 to 8 hcf $2.33 $2.22 $2.60 $2.97 $3.40 $3.68 9 to 16 hcf 3.27 3.40 3.98 4.56 5.22 5.65 16+ hcf 4.22 4.59 5.37 6.14 7.03 7.62 Monthly Service Charges 5/8" - 3/4" $17.11 $ 28.96 $ 31.48 $ 34.37 $ 37.55 $ 38.79 1" 42.76 45.18 49.11 53.62 58.57 60.51 1 1/2" 85.49 72.21 78.49 85.71 93.62 96.71 2" 136.78 104.64 113.74 124.20 135.66 140.14 3" 256.47 180.37 196.05 214.09 233.85 241.57 4" 427.45 288.45 313.52 342.36 373.96 386.31 6" 854.89 558.75 607.31 663.18 724.39 748.31 8" 1709.79 1,099.66 1,195.24 1,305.19 1,425.66 1,472.72 Flat Rate $84.34 $ 98.36 $112.65 $127.29 $143.94 $153.99 Sewer (EDU) $ 25.26 $ 26.49 $ 27.55 $ 28.65 $ 29.80 $ 32.18 24

Typical Customer Impact Based on 13 Units (hcf) of Water Ord Water: $12.37 increase Ord Sewer: $1.23 increase $100 $93.78 $90 $80 $80.18 $70 $60 $50 $40 $30 $20 $10 $- Existing Proposed Service Charge Consumption Charge Sewer (Fixed) Total Charge 25

Water Rate Comparison (Based on 13 hcf = hundred cubic feet) $160 $140 $120 $145.06 $125.47 $143.81 $100 $80 $60 $54.06 $53.78 $55.46 $63.72 $72.18 $40 $20 $0 Cal-AM Cal-Water MCWD (Marina) 2014 MCWD (Marina) 2015 City of Seaside Cal-AM (DRO) MCWD MCWD (Ord) 2014 (Ord) 2015 26

Wastewater Rate Comparison $30 $25 $24.74 $26.49 $27.55 $20 $15 $10 $10.25 $12.40 $12.40 $10.10 $11.11 $5 $4.85 $0 Pacific Grove Monterey Salinas Seaside Del Rey Oaks MCWD (Marina) 2014 MCWD (Marina) 2015 MCWD (Ord) 2014 MCWD (Ord) 2015 27

Capacity Fees 28

Capacity Charge Structure Capacity Charge = RCNLD* for Existing System** + PV of Future CIP Existing + Future Customers * Replacement Cost New Less Depreciation (RCNLD) ** Value does not include any Conveyed Assets 29

Capacity Charge Cost Basis Current Asset Value Escalated Asset Replacement Values Does not include conveyed assets Plus: Applicable Reserves & Other Assets Less: Depreciation Less: Debt Principal Future CIP Present Value of CIP Includes Total Capital Improvements Meter Equivalent Projections Population Growth (Based on UWMP Projections) Total Meter Equivalents (in 2030) 30

System Capacity Charges Description Existing ($25 month surcharge) System Capacity Charges (per EDU) Proposed (No surcharge) Ord Water $5,750 $8,010 Ord Sewer $2,150 $3,322 * Charges reflect updated asset valuation and financial records 31

Closing Remarks / Questions 32

FORA s approval of the Compensation Plan Complies with Facilities Agreement Enables future debt (minimizes upfront capital costs) Funds Updated Water & Sewer System Master Plans Funds development of Asset Management program Funds / Incentivizes conservation programs Funds less expensive, preventive maintenance program Failure to endorse will continue to jeopardize day-to-day operations and will restrict ability to plan and construct new water sources 33

Extra Slides 34

Conservation does not impact overall sizing of system needs Normal 10% Conservation Fire Flow (FF) Max Day Flow (MD) 1,500 GPM Residential 1,152 GPM 1,037 GPM FF + MD 2,652 GPM 2,537 GPM Pipe Size 8-inch 12-inch 8-inch 12-inch Velocity 16.9 fps 7.5 fps 16.2 fps 7.2 fps Recommended Max Day Plus Fire Flow velocity is 15 fps Max Day Flow adjusted from City of Seaside 2015 water demand (768x1.5), Table 4.4, MCWD 2006 Ord Water Master Plan Flow expressed in gallons per minute (GPM) Velocity express in feet per second (fps) 35

Historical Engineering News Record (ENR) and Consumer Price Index (CPI) escalators exceed previously adopted rates 8.0% 7.0% 6.0% 5.0% 4.0% 3.0% 2.0% 1.0% 0.0% 1/1/2009 1/1/2010 1/1/2011 1/1/2012 1/1/2013 CPI - WWM ENR-CCI 36

ENR vs CPI The Consumer Price Indexes (CPI) tracks monthly data on changes in the prices paid by urban consumers for a representative basket of goods and services The basket includes a combination of food, beverages, housing, apparel, transportation, medical care, etc. CPI has little to do with the cost of building and maintaining water or sewer infrastructure ENR (Engineering News-Record) and tracks the change in price for a specific combination of construction labor, steel, concrete, cement and lumber 37

ENR vs CPI 38

System Capacity Charges Description Existing ($25 Monthly Surcharge) Original Proposed System Capacity Charges (per EDU) Revised Proposed* Ord Water $5,750 $15,669 $8,010 Ord Sewer $2,150 $7,636 $3,322 * Charges reflect updated asset valuation and financial records 39