Supporting document for the Danish TSO, Energinet, of the Nordic Capacity Calculation Region proposal for splitting long-term cross-zonal capacity

Similar documents
All Baltic CCR TSOs Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation

Capacity Calculation Region Nordics regional design of long-term transmission rights in accordance with Article 31 of the Commission Regulation (EU)

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES

Proposal of the Transmission System Operators of the Baltic. Capacity Calculation Region for the regional design of longterm

(7) This proposal is submitted for the approval of all National Regulatory Authorities (hereafter referred to as the NRAs ) of the CCR GRIT.

7 April ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON

Long Term Transmissions Rights

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission

THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION

APPROVAL BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

Harmonised Allocation Rules for Forward Capacity Allocation Summary of the assessment of the comments from the public consultation

18 April 2016 Draft for consultation


CID Methodology Explanatory note

Mr Alberto Pototschnig, Director ACER. CC: Dr Klaus-Dieter Borchardt, Director Internal Energy Market DG ENER European Commission

System Operating Policies on Compensation between Elia and Nemo Link

Methodology for assessment of the Nordic forward market

February February 2017 Page 1 of 12

EFET reaction 25 April 2017

ACER. Congestion income distribution methodology. in accordance with Article 73 of the Commission Regulation

EAI Response to ACER Consultation on Forward Risk-Hedging Products and Harmonisation of Long-Term Capacity Allocation Rules

7 April ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority.

Status quo: Network Codes and Guidelines from NRAs perspective. Dace Bite Public Utilities Commission of Latvia Deputy Director of Energy Department

ALL TRANSMISSION SYSTEM OPERATORS OF THE CAPACITY CALCUCULATION REGION CORE, TAKING INTO ACCOUNT THE FOLLOWING: Whereas

TSOs perspective of the CACM requirements. Athanasios Troupakis Market Advisor ENTSO-E

Specific Annex for the Bidding Zone borders serviced by SEE CAO to the Harmonised Allocation Rules for long-term transmission rights

IU TSOs proposal for fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a

Business Process. BP_SO_13.1 Interim Long-Term Coordinated Capacity Calculation

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018

Network Code on Forward Capacity Allocation

Quick Guide to the Integrated Single Electricity Market. Version 1

Measures to support the functioning of the Nordic financial electricity market

We appreciate your feedback

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2)

DK1-DE COUNTERTRADE MODELS IMPACT ASSESSMENT

FORTUMS RESPONSE TO ACER CONSULTATION ON FORWARD RISK-HEDGING PRODUCTS AND HARMONISATION OF LONG-TERM CAPACITY ALLOCATION RULES

ACER ON THE CONGESTION INCOME DISTRIBUTION METHODOLOGY. of 14 December 2017 THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS,

Response to ENTSOE public consultation. Network Code on Capacity Allocation and Congestion Management for. Electricity

1/12/2018. Allegato A

Allegato A. Summary WHEREAS... 3 GENERAL PROVISIONS Article 1 Subject matter and scope Article 2 Definitions... 4

Regulatory framework for crossborder redispatching and countertrading

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES

Viviane Illegems European Market Integration

CROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES

Allocation Rules for Forward Capacity Allocation

13 th February th February 2017 Page 1 of 7

We appreciate your feedback

Chapter 2: Market Governance, Administration and Operation. Industry Guide to the I-SEM

Minutes of Workgroup European Market Design 29/09/2015

16 July 2018 DRAFT VERSION for public consultation

SUMMARY OF THE ASSESSMENT OF THE COMMENTS FROM THE PUBLIC CONSULTATION OF REGARDING PRICE OF THE SERVICES OF ACCESS TO INTERCONNECTION LINES

Power Trading in the Coupled European Markets

Comments on CEPA s draft conclusions in relation to European transmission tariffs

BritNed Participants Forum. 12 October 2017 London

1.4. In accordance with paragraph 4 of Article 17, the decision is made on a case by case basis by the NRAs of the concerned Member States.

Trading across borders - The key to manage portfolios at a regional scale

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

NordREG s status update to EMG July June Approved by NordREG Board

Intraday cross-zonal gate opening and gate. in accordance with Article 59 of Commission Regulation (EU) 2015/1222 of 24

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

CHAPTER 1. General Provisions

CHARGING METHODOLOGY STATEMENT FOR THE ELECLINK INTERCONNECTOR

Energinet.dk s comments to the report on measures to support the functioning of the Nordic financial electricity market

The Model of Implicit Capacity Allocation in the Baltic States

BritNed border specific annex to the Allocation Rules. GB NL border

Methods for evaluation of the Nordic forward market for electricity

Commission de Régulation de l Electricité et du Gaz. the CWE region. ELCom Forum Alain Marien Technical Operation of the Markets

FTR Trading Information Pack February 2018

***I DRAFT REPORT. EN United in diversity EN. European Parliament 2016/0379(COD)

Present: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners.

Congestion Management Guidelines. Compliance report

1. Foreword Main developments in the gas and electricity market The electricity market Wholesale...

(a) maximises market participants opportunities for adjusting their balances by

Supporting document of the necessary arrangements to support the functioning of wholesale electricity markets in accordance to Article 30(6) of

EU Capacity Regulations Capacity Allocation Mechanisms with Congestion Management Procedures

Integrated Single Electricity Market (I-SEM)

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

Grid Investments from a Nordic Perspective

Baltic Harmonised Imbalance Settlement Model Document

2 April Investigation of forward markets for hedging in the Danish electricity market

ACER. Annex II Evaluation of responses to the consultation on the Congestion income distribution methodology with all regulatory authorities and T$Os

European Market Desing and focus on Flow-Based Market Coupling

DECISION ON MODIFICATIONS TO THE ELECTRICITY INTERCONNECTOR OPERATOR LICENCE

Chapter 5: Trading. Industry Guide to the I-SEM

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received

Content Abbreviations Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Article 8 Article 9 Article 10 Article 11 Article 12

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance

Vision Paper LT UIOLI

Flow-Based Concept and Methodology

Scope and policy options for Framework Guidelines on Harmonised transmission tariff structures. -Public Hearing -

CRR Prices and Pay Outs: Are CRR Auctions Valuing CRRs as Hedges or as Risky Financial instruments?

The Road to the I-SEM

MARI Project. BSG meeting 7/12. Manually Activated Reserves Initiative - Creating a European platform for the exchange of mfrr balancing energy

ADAPTING THE TARGET MODEL TO VALUE FLEXIBILITY

The Concept of Baltic CoBA

Wholesale Electricity Market Monitoring Report for the Energy Community Contracting Parties and Georgia

Wholesale Energy Markets Overview. Jeff Klarer Market Strategist

Transcription:

Supporting document for the Danish TSO, Energinet, of the Nordic Capacity Calculation Region proposal for splitting long-term cross-zonal capacity methodology in accordance with Article 16(1) of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation.

Table of Content 1. Introduction and executive summary... 3 1.1 Proposal for the Splitting rule... 3 2. Motivation for the articles in the Splitting Rule proposal... 3 2.1 Article 3 Applying of capacity calculated for the long-term time frame... 3 2.2 Article 4 Methodology for taking underselling into account... 3 2.3 Article 5 Methodology for splitting long-term cross-zonal capacity... 4 2.4 Article 6 Rules for avoiding undue discrimination of access to purchase of long term transmission rights... 6 3. Impact assessment... 6 4. Timeline... 7

1. Introduction and executive summary This document is the supporting document for the Nordic methodology for splitting long-term cross-zonal capacity (hereafter MSR ). The document describes the MSR for the long term time frame for the Nordic Capacity Calculation Region (CCR). The intention of this document is to provide an explanation, background and motivation for the proposed legal text of the MSR. In the time of writing Energinet is the only TSO within CCR Nordic that is issuing transmission rights, which is why the MSR will only be submitted to the Danish National Regulatory Authority (NRA). The other TSOs within CCR Nordic have exemptions from the MSR in accordance with Article 30 (7) of the Commission Regulation (EU) 2016/1719 establishing a guideline on forward capacity allocation (FCA Regulation). Even though only Energinet in CCR Nordic will submit a proposal for approval with their NRA, the proposal has been presented to the other Nordic. Energinet has not received any objection to the proposal. 1.1 Proposal for the Splitting rule With regard to the FCA Regulation Article 16, Energinet is proposing to introduce the MSR for capacity allocated to the long term timeframe. In accordance with Article 16 (2) the MSR shall meet the hedging needs of the market, be coherent with the capacity calculation methodology, and it shall not lead to restrictions in competition, in particular for access to the long-term transmission rights. Energinet proposes a two-element approach for calculating the amount of long term transmission rights (LTTRs) for the times frames offered. The first element is about managing the risk of in-efficiency from the underselling of LTTRs The second element divides the economically efficient volumes between the timeframes given by the Regional Design of LTTR, developed under FCA Article 31. 2. Motivation for the articles in the Splitting Rule proposal This chapter presents explanations for the proposed MSR articles. The aim of the chapter is to provide an explanation and motivation for the content of each article. 2.1 Article 3 Applying of capacity calculated for the long-term time frame This article ensures that the MSR proposal lives up to one of the requirements stated in Article 16 (2). Article 16 (2) states that the MSR proposal shall be coherent with the capacity calculation methodology. In article 3 this coherence is ensured, by taking the point of departure in the capacities calculated for the long term timeframe, applying the FCA CCM. Moreover, this article ensures coherence with the methodology developed under Article 31(2) of the FCA stating that the time frames shall at least be monthly and yearly. 2.2 Article 4 Methodology for taking underselling into account This article deals with the concept of underselling. Underselling is defined as a situation where the marginal price of the LTTR determined in the auction of LTTRs, for a given timeframe, is lower than the average day ahead price spread between two bidding zones used as the reference price for settlement of the LTTRs. Underselling in short means a situation where the buyer of the LTTR systematically obtains a higher cash flow from the variable settlement than what was paid by the buyer of the transmission right. In case of well-functioning competition one should (to some degree) expect the auction price should be statistically distributed around the price spread. If underselling was present in a product, then with perfect competition it would

be expected that new market participants enter the auctions and drive up the price until equality is reached where no underselling is present. However the Danish power market and market for LTTRs cannot be perceived as a market with perfect competition. The market is characterized by illiquidity, as too few market participants have a natural hedging interest in the Danish LTTRs to create perfect competition. The market has also not attracted enough speculators to ensure the liquidity that would give perfect competition. The impact of underselling materializes in an increase of grid tariffs. The design of the grid tariffs shares many similarities with a tax for public finance as the objective is to generate revenue for financing the cost of system operation and grid maintenance. Increasing the tariff will increase the social dead weight loss as the current tariff is way above the short run marginal cost of exchanging in the transmission grid. On the other hand, allocating LTTRs is expected to improve the efficiency of the retail electricity market, thus the goal is to balance the potential marginal dead weight loss from increased tariffs with the gain from allocating LTTRs. The basic approach to manage the risk of underselling is done by calculating the amount of LTTRs that can be allocated, securing that the expected price spread is equal to the expected auction price. This means, that if the auction price is below the price spread, the amount of lttrs will reduced. On the other hand, if the auction price is above the price spread, the amount will be increased. The exact approach is explained in the next section. 2.3 Article 5 Methodology for splitting long-term cross-zonal capacity This article describes precisely how underselling specifically will be taken into account and how the capacity shall be divided between the different long-term timeframes. In order to take underselling into account Energinet will take the public data from the auctions on the Single Allocation Platform (SAP) as input to the calculation of volumes for the LTTRs. Joint Allocation Office (JAO) is appointed as SAP according to the methodology developed under Article 48 of the FCA. On JAOs website data for the historical auctions is available. The data includes all submitted bids and related prices, such that it can be investigated which volume would have resulted in no underselling for any given auction. The picture below is a graphical example of the data available on JAOs website for the September 2018 monthly auction.

It can be seen that the auction cleared at a price of 3,81 EUR/MWh. The realized price spread for September 2018 was 1,9 EUR/MWh. In this month there was no underselling, this means that the volume according to the methodology should have been higher than 150 MW. If this month is taken as a sample then the methodology would state that the volume should have been roughly 428 MW as the clearing price of 428 MW was 2,11 EUR/MWh and the clearing price of 429 MW was 1,75 EUR/MWh. The methodology proposed for the MSR does however consider more than one historical data point to make the assessment of the volume of LTTR considering underselling. This is in order to make the volumes more stable, and less volatile to a single months price spikes, that may be caused by sudden changes in outage planning or weather patterns. Article 5 also states how the capacity shall be divided between all time frames defined by the Regional design, FCA article 31. This ensures robustness in the MSR. For each of the time frames an individual amount will be calculated as the amount where the historical auction price is equal to the historical price spread. The result will be the amount offered to the market if this was the only time frame offered to the market. However, as two (or more) times frames are offered the amount calculated will be reduced to 50% in case of two time frames, 331/3% in case of three time frames etc.. An example could be that there is only allocated capacity to the yearly and monthly timeframe. In the individual calculation it is found that on the yearly data the equilibrium volume is 350 MW while it is 300 MW for the monthly timeframe. Then the allocation to the yearly auction would be 50%*350=175 MW and the allocation to the monthly timeframe would be 50%*300=150 MW. The methodology does not need an amendment if a new product or timeframe should be introduced in the Regional Design. Energinet also believes that the proposal is transparent to the market, as they can use the JAO data to estimate the volumes, and then the simple rule that an equal share is allocated between the products. Energinet has ensured that the MSR reflects the hedging needs of the market in accordance with Article 16 (2). By applying a questionnaire Energinet has asked a representative selection of market participants what kind of distribution between time frames they would find beneficial for hedging. The answers from the market participants have indicated that the equal distribution between products is preferred. When designing the splitting rule Energinet took market behavior into account. Hedging of consumer risk tends to be progressive towards delivery. This means that the hedging percentage of a consumer increases the closer to delivery they get. This hedging behavior was also confirmed by market participants in the questionnaire. Thus the fact that Energinet also allocates capacities progressively towards delivery complies with the hedging needs of the market. Energinet asked for other factors that influence the hedging needs of the market. In this question the market mainly pointed to the risk of curtailment. When LTTRs are curtailed the market receives the market spread up to a monthly cap (for DC interconnectors) which is set at the actual monthly congestion income for the border in question. This means if an unplanned outage happens that lasts a whole calendar month, then the market participant would only get the marginal price from the auction of the product as compensation, thus leaving them without a hedge. The risk of unplanned outages is reduced with the products with shorter time to delivery as outage planning is more firm month or quarter ahead compared to year ahead. On the other hand the market needs the progressive hedging volumes in order to mimic retailer hedging behavior. With these considerations Energinet thinks that the proposed MSR takes into consideration that curtailment of LTTRs should be limited as much as possible. It is also not in the interest of Energinet to curtail LTTRs as compensation up to the cap still has to be

paid to the owner of the LTTR, thus Energinet is committed to curtail as little as possible when an LTTR has been sold on an auction. It should be noted that any curtailment that happens will always follow the Harmonized Allocation Rules as given by Article 51 of the FCA. Furthermore Energinet has chosen to include an assessment every third years of the market needs in the MSR. This is added to ensure that Energinet is aware if changing market needs or environment in the future would warrant an amendment of this methodology in order to ensure that the MSR lives up to the hedging needs of the marked as required by Article 16 (2). This assessment will take place for the first time three years after the regulation has entered into force. The reason for this is that an assessment of market needs has been made in order to develop this methodology, which is why Energinet believes that the methodology takes market needs into consideration from the outset, and thus Energinet needs to assess if market needs change, which will be done after three years. All in all Energinet believes that Article 5 ensures economic efficiency in the allocation of LTTRs to the market along with stability in volumes that ensures less uncertainty for the hedgers. 2.4 Article 6 Rules for avoiding undue discrimination of access to purchase of long term transmission rights The approach is firstly to establish an understand of what kind of service or good that is under consideration when talking about undue discrimination. Within the CACM CCM the service is access to physical grid capacity, hence it is about calculation of capacity up for allocation, where no undue discrimination between internal and external flows shall be avoided. On the other hand, within the splitting rule methodology, the service under consideration are LTTRs, hence the focus is on rules for avoiding undue discrimination of access to purchase of LTTRs. Article 6 has been included in the legal text to explicitly ensure that no undue restriction in access to purchase takes place when Energinet sells the LTTRs. In accordance with the FCA Article 51 and 52 Harmonized Allocation Rules (HAR) is established for LTTRs. These rules describe that all market participants need to follow in order to be able to buy LTTRs, how to submit bids for LTTRs, how the allocation of LTTRs is done and how LTTRs are settled. These rules have been approved by All NRAs subject to the FCA. One of the requirements to the HAR is that the HAR should be non-discriminatory and be applicable for both physical and financial transmission rights. Since the HAR has been approved by all NRAs and Energinet in article 6 of the MSR refers to HAR the access to LTTRs is non-discriminatory and thus MSR lives up to the requirements in accordance with Article 16 (2). 3. Impact assessment The impact of the MSR is difficult to quantitatively assess, as a quantitative assessment requires data regarding consumers hedging activity that Energinet does not have access to. Due to this the impact assessment will be purely qualitative. Energinet is of the opinion that the MSR does not fundamentally change the practices already in place today for allocation of LTTR. The methodology primarily ensures a transparent way to split capacity between long term timeframes. This ensures that the market is able to better forecast the volumes allocated in the different auctions, and thus better prepare their hedging and bidding strategy. The methodology also ensures that underselling is taken into account in a transparent way when calculating the volumes allocated to LTTRs. This ensures that Energinet incorporates an equilibrium view in the calculation of the volumes towards LTTRs and thus adjusts volumes

according to market needs over a period of time, without introducing to much volatility in the volumes and thereby providing the market with instability. 4. Timeline In Article 11 of the Splitting Rule methodology the time line is mentioned. It is the view of Energinet that the implementation of the MSR should follow the implementation of the longterm capacity calculation methodology. This is due to the fact that the point of departure for the MSR is the long-term capacity calculation methodology, and as such the MSR does not make sense to implement before the long-term capacity calculation methodology has been implemented.