BASE CAPEX PROPOSAL - QUALITATIVE INFORMATION

Similar documents
Attachment C: How capital expenditure is proposed and approved under the capex IM

Capital Expenditure Input Methodology draft decisions

TRANSPOWER MINOR CAPEX AND OPEX ALLOWANCES, AND QUALITY STANDARDS FOR RCP1 FINAL DECISIONS August 2011

Branch Name Commerce Commission Wellington NEW ZEALAND 27 June 2011 ISBN:

Solvency II Detailed guidance notes for dry run process. March 2010

2016 INTEGRATED TRANSMISSION PLAN COMPLIANCE REPORT

Transpower capex input methodology review

(Transpower) Reasons paper December 2010

Attachment D: Capex IM incentive framework

Entry Capacity Substitution Methodology Statement

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

Rules relating to intermittent generators - Assessment under section 172F(1) 1

Yellow cells denote information required to be entered. Grey cells denote no information should be entered.

Default price-quality paths for gas pipeline services from 1 October Final. Submission to the Commerce Commission

Input methodologies review related party transactions

The Entry Capacity Substitution Methodology Statement

Valuation of the Regulatory Asset Base: Submission on the Commerce Commission s Decision Paper

Approach to Assessing Capital Expenditure for Price Reviews

Transpower Individual Price-Quality Path Determination 2015

UNIVERSITY OF CAMBRIDGE INFORMATION SERVICES COMMITTEE PROJECT AND PROGRAMME GOVERNANCE: DECISION MAKING PROCESS

NIRS 2: Contract extension. REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 355 Session : 14 November 2001

The Entry Capacity Substitution Methodology Statement

Transpower Individual Price-Quality Path Determination NZCC XX

Joint Office of Gas Transporters 0231: Changes to the Reasonable Endeavours Scheme to better incentivise the detection of Theft

George Eliot Hospital NHS Trust - Securing a sustainable future Project. Annex A

Section 1 OVERVIEW OF PROJECT DEVELOPMENT PROCESS

Prince2 Foundation.exam.160q

PRINCE2 Sample Papers

Multiple Frequency Keepers Project Plan

1.12 Date of budget revision submission: Enter the month and year the budget revision was submitted for approval Prepared by: Enter the name of

Selection Criteria European Regional Development Fund and European Social Fund

PRINCE2 Sample Papers

Implementing IFRS 15 Revenue from Contracts with Customers A practical guide to implementation issues for the aerospace and defence industry

Expenditure Forecast Methodology

B.29[17d] Medium-term planning in government departments: Four-year plans

Electricity Distribution Services Input Methodologies Determination 2012

Forecast Expenditure Summary Operating Costs

BBC Trust. Strategic Framework for the BBC s Commercial Services

Investment criteria indicators

Office of Audit and Evaluation. Audit of Major Capital Project Management

CNAM Risk Management for Utility Managers

The Society of Actuaries in Ireland. Actuarial Standard of Practice INS-1, Actuarial Function Report

VOLTA RIVER AUTHORITY

Pricing Cost Assurance and Analysis Service (CAAS) Estimates Constraints

DRAFT STCP 18-1 Issue 004 Connection and Modification Application

Regulation and Risk in the Gas and Railway Sectors. Michael Pollitt

Decision on Electricity Network Connection Policy

Question 1. IND AS 16 Property, Plant & Equipment. Para 25.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006

TRANSFER PRICING IN THE WATER INDUSTRY REGULATORY ACCOUNTING GUIDELINE 5.03

This policy applies to: - Capital expenditures. - Leasing contracts of buildings and equipment. The useful life of the asset is extended;

Applying IFRS. Joint Transition Resource Group discusses additional revenue implementation issues. July 2015

Model Change. Appendix to the guidance notes VALIDATION ACTIVITY FOR DIFFERING CHANGE TYPES. July 2016

Delay Expert practical tips for making delay claims

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT

PRINCE2 Sample Papers

ASSET RISK MANAGEMENT Asset Health Framework

SOCIAL SECURITY COMMISSION DEVELOPMENT FUND (SSC-DF) PROPOSAL WRITING GUIDE FOR EMPLOYMENT & TRAINING SCHEMES

UN-Habitat Policy For Implementing Partners. UN-Habitat. Policy For. Partners

UNIVERSITY OF ABERDEEN RISK MANAGEMENT FRAMEWORK

M_o_R (2011) Foundation EN exam prep questions

4. This letter sets out our key regulatory priorities for 2017 for insurance companies and covers the following areas:

ADMINISTRATIVE MANUAL FOR PROJECT IMPLEMENTATION

A new global standard on revenue

Compliance with Control Mechanisms. October 2014

Overview of the Northern Ireland Ireland - Scotland VA Programme. Electric Vehicles Call Workshop

Approved Dispute Resolution Schemes: Minimum Compensation Cap for Insurance Disputes Discussion Document March 2015

Project Document Format for non-cpap Countries or Projects outside a CPAP

Ontario Energy Board

Date of Issue: 6 th June 2013

Delegated Authority Policy

IASB Discussion Paper DP/2014/1 Accounting for Dynamic Risk Management: a Portfolio Revaluation Approach to Macro Hedging

Revised proposal for revenue from contracts with customers

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

Submission on proposed IPP and compliance reporting

Revenue for the engineering and construction industry

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change

Supervisory Statement SS12/16 Solvency II: Changes to internal models used by UK insurance firms

The Global Fund. Financial Management Handbook for Grant Implementers. December 2017 Geneva, Switzerland

Auditor Guidance Note 3 (AGN 03) Auditors Work on Value for Money (VFM) Arrangements Version issued on: 10 November 2017

Guidance for Member States on Performance framework, review and reserve

IFRIC Interpretation DI/2015/1 Uncertainty over Income Tax Treatments

Revenue from Contracts with Customers A guide to IFRS 15

1. Indirect Clearing. 2. Straight Through Processing (RTS 26)

Risk Management Procedure. Version Number: 6.0 Controlled Document Sponsor: Controlled Document Lead:

Tax Strategy. March 2018

Section 6 IMPLEMENTATION, MONITORING AND EVALUATION

Control activities that are part of the process are detailed in the riskcontrol

Regulatory Incentives and the Cost of Capital

European common enforcement priorities for 2017 IFRS financial statements

Assurance Approach Delivery assurance activities for Retail Market Release April 2019

Labour Cost Escalation Report Tasmanian Networks Pty Ltd

Final decision. Aurizon Network's revenue adjustment amounts for

Subsection Policies (policy #)

PRINCE2-PRINCE2-Foundation.150q

Joint Office of Gas Transporters 0231V: Changes to the Reasonable Endeavours Scheme to better incentivise the detection of theft

Project Appraisal Guidelines for National Roads Unit Business Case

D.17 STATEMENT OF CORPORATE INTENT CONNECTING NEW ZEALAND SCI

Accounting for revenue - the new normal: Ind AS 115. April 2018

Transcription:

SCHEDULE F BASE CAPEX PROPOSAL - QUALITATIVE INFORMATION cl. 7.3.1, 9.1.1 F1 Qualitative information required in a base capex proposal For the purpose of clause 7.3.1 (1) a base capex proposal must, in addition to the other things specified in that clause, include all the information listed or described in this schedule. F2 Identified programmes (1) Identified programmes means base capex projects or base capex programmes forecast to be undertaken during the next regulatory period defined by reference to one or more of the following categories or criteria- base capex categories; a classification by way of a maximum cost or expenditure threshold or another related financial measure; a ranking system, such as the five highest cost programmes or projects; any other distinguishing characteristic or measure applicable to types of programmes or projects undertaken by Transpower, and identified programme means one of those programmes or projects. Commented [A1]: Lifts the level of approval, and clause is clear that classification is for Transpower to describe F3 Overview (1) detailed commentary as to how the proposed projects and programmes relating to base capex are consistent with the- most recent integrated transmission plan, and if there is any material divergence from and if not, why not; and opex proposal, for the next regulatory period; (2) overall description of Transpower s aims and objectives with respect to base capex during the next regulatory period; (3) summary of the key evidence supporting those aims and objectives; Schedule F - Transpower Capital Expenditure Input Methodology Determination 1 Commented [A2]: Level of commentary consistent with overview intent

(4) explanation as to the overall deliverability of the proposed projects and programmes relating to base capex; and (5) identification and explanation of the factors likely to affect the deliverability of the proposed projects and programmes relating to base capex, by base capex category; F4 Governance Policies, processes and consultant reports (1) schedule listing governance all policies or processes applicable to base capex concerning- base capex projects costing over $20 million; base capex programmes; asset management; business planning; or capital works; (2) description of all material changes to policies and processes described in subclause (1) made since the Commission s last determination of a base capex allowance; and (3) schedule listing all consultant reports commissioned for the purpose of preparing the proposal; Commented [A3]: Superseded by listed projects mechanism Commented [A4]: Time consuming and unsure how requirement assists Part 4 objectives or Commission s evaluation We could describe the governance process (e.g. the controlled document process). F5 Cost and efficiency (1) evidence demonstrating if, and how, Transpower has, in relation to base capex, during the current regulatory period- pursued, and is pursuing process improvements, ensured and is seeking to ensure appropriate least-whole-of-life cost and efficient interventions pursued and is pursuing cost reduction strategies for its projects and programmes ensured and is seeking to ensure that both internal and external suppliers of goods and services have incentives to perform well and identify cost savings; (2) description of all efficiency assumptions relied upon in the proposed base capex allowances; and Schedule F - Transpower Capital Expenditure Input Methodology Determination 2 Commented [A5]: This section implies ex-post evaluation of efficiency actions and that the Commission needs to form a view of how we carry out our work plan. The Commission has to apply judgement to determine our level of efficiency. In our view the incentive regime reveals our level of efficiency. The incentive regime will reward and penalise us for our level of efficiency revealed over the course of the control period. We could provide information about how we have incorporated our current level of efficiency within the baselines (e.g. via section F6(2)).

(3) description of- any contingency included in proposed costs; and the methodology for calculating such contingencies; Commented [A6]: We consider the incentive regime for base capex on P50 mitigates against specifying contingency F6 Information on programmes and identified programmes (1) description, in respect of each base capex programme, of the milestones that have been passed in accordance with Transpower s internal approval processes; (2) in respect of each identified programme: (f) (g) description of the programme, including its aims and objectives in relation to grid development, maintenance or operation; cost-benefit economic analyses that support it; explanation as to its deliverability, with reference to factors likely to specifically affect that programme; description of the methodology used to generate the forecast of its base capex, including, but not limited to- (iv) the relevant key assumptions and how they were applied; any relevant cost benchmarking undertaken by or for Transpower; and internal historical cost trends for specific cost components relied upon e.g. unit costs; any material changes any models used accompanied by explanations for them and how they were relied on. any material change from historical costs in any cost component included in the programme and its effect on the forecast capex; list of all relevant documents taken into account in forecasting its base capex, including documents relating to its deliverability, relevant policies and consultant reports; explanation of the extent to which its forecast base capex implements the key assumptions, any consultant reports, and policies relating to the planning of the grid and the forecasting of capital expenditure and operating expenditure for that purpose, including in relation to- long term grid development; Schedule F - Transpower Capital Expenditure Input Methodology Determination 3 Commented [A7]: At a higher level, could describe our internal governance process as suggested for F4 Commented [A8]: Accommodates a wider range of justification tests e.g. cost-effectiveness Commented [A9]: Repeat requirement. Already under F3 Commented [A10]: We consider models are potential input to base capex forecasts Commented [A11]: Repeats requirement, already in F4 Commented [A12]: Having to try to evaluate then explain the extent to which each relevant policy supports each base capex programme (having identified the relevant polices under (f)) is a level of mapping that adds nothing to understanding the why (the need) for the work. F (6) (2) covers key assumptions and objective for base capex

(h) (j) (k) (l) grid maintenance; and grid operation; explanation of all material departures from any- relevant policies; planning standards; or conclusions and recommendations contained in the consultant reports identified pursuant to paragraph (f); overview of any significant tradeoffs between operating expenditure, base capex and quality that Transpower considered in its development; assessment of its impact upon either or both of the- quality performance; and serviceability, of the assets to which it relates; description of relevant legally enforceable duties owed by Transpower, whether arising under legislation, at common law or in contract, that have a material impact on an identified programme; description of any material step change compared to historic costs for the same or a similar type of programme; (m) explanation of the effect of a step change identified pursuant to paragraph (l) on its forecast base capex; and (n) where not required by the regulatory templates agreed pursuant to clause 2.2.1(1) or specified pursuant to clause 2.2.1 (2) schedule of any models used accompanied by explanations of them and how they were relied upon; (3) in respect of each identified programme forecast to be first commissioned during the next regulatory period- description of the system growth project prioritisation approach; summary of the options considered (where relevant), analyses undertaken and the reasons for rejecting those that are not proposed to be implemented; a schedule- Commented [A13]: How to assess significant consider could be a description of our approach to consideration of opex / capex trade-offs and quality change (if any) from consideration. Commented [A14]: Any quality change could be covered at a higher level, by suggestion for amendment for Commented [A15]: Covered in F3 (5) Commented [A16]: policy moved to cause F(6) (2). Commented [A17]: Unsure what rule means or what it is for Commented [A18]: Only require if there are genuine options Schedule F - Transpower Capital Expenditure Input Methodology Determination 4

F7 F8 (iv) listing all programmes or projects whose forecast base capex includes a contingency amount additional to the forecast cost of that programme; describing the rationale for inclusion of each such contingency amount; describing the uncertainties each contingency amount accounts for; and specifying the methodology for calculating the quantum of each contingency amount; and (4) in respect of each identified programme with a fixed end date forecast to be first commissioned in the regulatory period after the next regulatory period, information of the type specified in subclause (1) must be provided in respect of the period ending on the forecast commissioning date; Procurement (1) In relation to procurement, identify any identified programme that uses outsourced services which have a material effect on the desired outcome of that identified programme. (2) In relation to each identified programme identified pursuant to subclause (1),- identify the outsourced services that have a material effect; explain whether those outsourced services are to be provided- under a discrete contract; or as part of a broader operational arrangement or contract (or similar); provide an overview of the procurement process, including an explanation of the extent to which the process was competitive, and if not, why not; identify any significant components of any outsourced services that will be or have been sub-contracted to another supplier; and identify relevant procurement documents in a schedule, including but not limited to requests for tender and submissions in response. Resourcing and delivery Commented [A19]: Unclear on what is purpose for this requirement Commented [A20]: Lift up level of detail (1) description of plans for resourcing and delivering the proposed base capex projects; (2) identification of the key risks associated with resourcing and delivering the proposed base capex projects including explanation of each risk s potential to affect- Schedule F - Transpower Capital Expenditure Input Methodology Determination 5 Commented [A21]: Already required at F 3 (4)

F9 F10 the forecast base capex; and forecast grid output measures; and (3) description of the approach processes that will be implemented to manage or mitigate the resourincg and delivery risks to which subclause (2) relates. Other capex In respect of any base capex included in the regulatory templates agreed pursuant to clause Error! Reference source not found. or specified pursuant to clause Error! Re ference source not found. to which clause F6 does not apply, description of the rationale for any forecast base capex exceeding $1 million $5 million in any one disclosure year. Escalation factors and foreign exchange assumptions (1) in respect of each escalation factor relied on to account for changes in input prices in completing the regulatory templates agreed pursuant to clause 2.2.1 (1) or specified pursuant to clause 2.2.1 (2) description of each such escalation factor and rationale for its use; methodology underlying the calculation of its quantum, by reference to data sources, data conversions and assumptions relied upon, including lags; the weighting given to it and description of how that weighting was determined, including any assumptions relied upon; explanation of whether the same escalation factor has been used in the base capex proposal and opex proposal, and if not, explanation and supporting evidence as to why different escalator factors were applied; an explanation of whether, in applying escalation factors that relate to labour or material inputs, additional contingency factors were applied and, if so, description of the uncertainties they account for and how they were calculated; (2) a list of the foreign exchange rates used to prepare the proposed base capex allowance; (3) an estimate of the exposure to foreign currency for each foreign currency for each year of the next regulatory period and description of how these estimates were produced. Commented [A22]: For in RCP2 submission we provided a risk register including the risk, some value assigned to the risk, and the mitigating actions. The mitigating actions tend to reflect our policies and procedures. Commented [A23]: For clarity, plus $1 million is very small in scheme of base capex propose higher level e.g. $5 million. Commented [A24]: Allowance conveys a limit of expenditure; we have suggested the concept of a funding baseline for the incentives to operate Schedule F - Transpower Capital Expenditure Input Methodology Determination 6

F11 F12 Information on proposed grid output measures (1) lists of all proposed grid output measures to measure the benefit delivered by proposed expenditure performance-based measures; asset capability grid output measures; asset health grid output measures; and grid output measures designed to measure the benefit delivered by proposed expenditure not captured by paragraphs to above, that clearly identify those proposed to be revenue-linked grid output measures; (2) description of each grid output measure listed under subclause (1) including- (f) (g) detailed definitions; details as to what the measure includes and excludes; any relevant calculations; the reasons for selecting each measure; relationship between it and risks associated with the grid; relationship between it and forecast performance of the grid; relationship between it and the key purposes of the investment; (3) in respect of each measure listed under subclause (1)- the effect that the proposed base capex allowances would have on it both during the next regulatory period and beyond it; and its alignment with the underlying business processes used to plan and operate the grid. Revenue-linked grid output measures Commented [A25]: We query the need to have to specify (define) different types to such level Commented [A26]: Unclear on what is needed and why. Commented [A27]: Unclear on what is needed and why Commented [A28]: Unclear on what is needed and why Commented [A29]: Unclear on value of information given the reasons already given by 2 (1) in respect of each proposed revenue-linked grid output measure- a description of how it will be linked to revenue through the grid output mechanism; in respect of each disclosure year of the regulatory period, a proposed- grid output target; Schedule F - Transpower Capital Expenditure Input Methodology Determination 7

F13 (iv) grid output incentive rate; cap; and collar; description of and justification for the proposed grid output targets, caps, collars, and grid output incentive rates including- how each was determined by reference to the relevant definitions; whether, and if so, for each grid output target, Transpower has had regard to any consultation responses and relates to relevant policies and key assumptions; to the extent possible, historical performance data for the seven most recently completed disclosure years; (2) commentary comparing and evaluating the performance of each proposed revenue-linked grid output measure with respect to actual capital expenditure and operating expenditure over the 7 most recently completed disclosure years; (3) commentary as to how the proposed grid output targets relate to the proposed base capex allowances and proposed operating expenditure allowance as contained in the opex proposal; (4) identification of any key assumptions relied upon and modifications or changes made to historical performance data for the purpose of determining the proposed grid output targets; and (5) description of models and all data used to determine the grid output targets, caps and collars; Grid output measures not linked to revenue in respect of each grid output measure not subject to the grid output mechanism- the forecast quantum of the grid output measure at the start of the regulatory period; explanation as to how that forecast quantum was determined; forecast incremental change to its quantum by the end of the regulatory period were no base capex undertaken during the regulatory period; Commented [A30]: Clause F11 describes all grid output measures and rationale for development Schedule F - Transpower Capital Expenditure Input Methodology Determination 8

forecast incremental change to its quantum by the end of the regulatory period were expenditure made in accordance with the proposed base capex allowances; and models and data used to forecast- its quantum at the start of the regulatory period; and incremental changes to its quantum during and by the end of the regulatory period; Schedule F - Transpower Capital Expenditure Input Methodology Determination 9