Boto Gold Project Feasibility Study Conference Call

Similar documents
Saramacca Reserve Declaration

Côté Gold Project Feasibility Study Conference Call

Côté Gold Analyst Site Visit

All amounts are in US dollars, unless otherwise indicated.

A Story of Transformation

Empowering People, Extraordinary Performance

Empowering People, Extraordinary Performance

Cash Preservation Cost Reduction Disciplined Capital Allocation

Empowering People, Extraordinary Performance

CIBC 19 th Annual Whistler Institutional Investor Conference January 20-23, Gord Stothart EVP & Chief Operating Officer

Deutsche Bank s 25 th Annual Leveraged Finance Conference. Empowering People, Extraordinary Performance. October 2-4, 2017

Deutsche Bank 26 th Annual Leveraged Finance Conference

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Third Quarter 2018 Results

Cash Preservation Cost Reduction Disciplined Capital Allocation

Empowering People, Extraordinary Performance

Cash Preservation Cost Reduction Disciplined Capital Allocation

A Story of Transformation. Empowering People, Extraordinary Performance. BMO Capital Markets Global Metals and Mining Conference. February 25-28, 2018

Cash Preservation Cost Reduction Disciplined Capital Allocation

Empowering People, Extraordinary Performance

Acquisition of Trelawney Mining and Exploration Enhancing our Future Growth Profile

2014 Annual Meeting May 11, 2015

RBC Capital Markets Global Mining and Materials Conference

Empowering People, Extraordinary Performance

TSX: IMG NYSE: IAG IAMGOLD REPORTS 2013 RESERVES OF 10.1 MILLION OUNCES AND MEASURED AND INDICATED RESOURCES OF 23

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Second Quarter 2018 Results

2014 FINANCIAL REVIEW

Kişladağ Update March 2018

2019 TD Securities Mining Conference

Cash Preservation Cost Reduction Disciplined Capital Allocation

Morgan Stanley Leveraged Finance Conference June

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

Forward Looking Statement

WESTWOOD: Commercial Production

IAMGOLD REPORTS SOLID THIRD QUARTER AND CONTINUES TO EXECUTE ON ITS TRANSFORMATIONAL STRATEGY

Orezone Announces Positive Preliminary Economic Assessment

Corporate Update. June 2013

KINROSS GOLD CORPORATION

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

Skouries Update March 2018

Marigold Life of Mine Plan

2018 SECOND QUARTER RESULTS WEBCAST. July 26, 2018

HBM. Creating Sustainable Value through High Quality Long Life Deposits

Exploration Projects September 30, 2014

ANNUAL GENERAL MEETING. April 25, 2018

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast

Capstone Extends Pinto Valley Mine Life to 2026 (all amounts in US dollars)

A Story of Transformation. Empowering People, Extraordinary Performance. European Gold Forum 2018 April 17, 2018

A Story of Transformation. Empowering People, Extraordinary Performance. European Gold Forum 2018 April 17, 2018

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

Bank of America Merrill Lynch 2014 Global Metals, Mining & Steel Conference

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD.

Empowering People, Extraordinary Performance

LEAGOLD ANNOUNCES 2018 EARNINGS, INCLUDING AISC OF $974/oz AND AISC MARGIN OF $83.2 MILLION

Q4 and Year End 2012 Conference Call. ArgonautGold.com

Detour Gold Updates Life of Mine Plan for Detour Lake

EDV EVR NEWS RELEASE. ENDEAVOUR MINING UPDATES HOUNDÉ PROJECT ECONOMICS FOLLOWING INCREASE IN MINERAL RESERVES TO 2.1Mozs

ANNUAL GENERAL MEETING APRIL 28, 2017

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

First Quarter 2012 Results

A $100 per ounce decline in the gold price would reduce the reserves by approximately 3.3% or 310,000 ounces.

New Gold Announces 2017 Financial Results with 11% Increase in Cash Flow Per Share (All dollar figures are in US dollars unless otherwise indicated)

Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides

Kişladağ Expansion Project

Forward Looking Statement

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT

CANADA S INTERMEDIATE GOLD PRODUCER

YEAR END 2015 CONFERENCE CALL

New Gold Delivers on 2017 Production and Cost Guidance and Provides 2018 Outlook (All dollar figures are in US dollars unless otherwise indicated)

January 18, 2016 Capstone Extends Pinto Valley Mine Life to 2039 (all amounts in US dollars)

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)

PRESS RELEASE New Gold Reports Consolidated Reserve & Resource Statements

RNC MINERALS Results Conference Call TSX:RNX. April 3, 2018

MCEWEN MINING ANNOUNCES UPDATED RESERVE & RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

Alio Gold Reports Second Quarter 2018 Results

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

RNC MINERALS. Q Results Conference Call TSX:RNX. August 15, 2018

Corporate Update August 2016 TSX: LUN OMX: LUMI

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

New Gold Reports Strong Fourth Quarter Rainy River Achieves Revised Annual Guidance New Afton Exceeds Annual Guidance

CANADA S INTERMEDIATE GOLD PRODUCER LOM Presentation / Workshop 25 January 2016

Empowering People, Extraordinary Performance

NEWS RELEASE JANUARY 29, 2015

NEWS RELEASE. Fort Knox Gilmore project feasibility study highlights 1

Maximizing Returns for Investors CIBC 2012 Whistler Institutional Investor Conference

TSX:AR CORPORATE PRESENTATION

Q Earnings Review

Argonaut Gold Announces Positive Feasibility Study for its Magino Project

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

PRUDENTAND DISCIPLINED

RBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

Morila our company maker in a post mining legacy. Chiaka Berthe

BEATING THE ODDS. Empowering People, Extraordinary Performance. Sustaining Growth through Exploration

Goldcorp and Teck Combine El Morro and Relincho Projects in Chile

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

FNV. Forward-Looking Statements

Argonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery

Transcription:

Boto Gold Project Feasibility Study Conference Call October 23, 2018 l TSX: IMG l NYSE: IAG l

Cautionary Statement All information included in this presentation whether in narrative or chart form, including any information as to the Company s future financial or operating performance, and other statements that express management s expectations or estimates of future performance, other than statements of historical fact, constitute forward looking information or forward-looking statements and are based on expectations, estimates and projections as of the date of this presentation. Forward-looking statements contained in this presentation include, without limitation, statements with respect to: the Company s guidance for production, cash costs, all-in sustaining costs, depreciation expense, effective tax rate, and operating margin, capital expenditures, operations outlook, cost management initiatives, development and expansion projects, exploration, the future price of gold, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, the timing and amount of estimated future production, costs of production, permitting timelines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. Forward-looking statements are provided for the purpose of providing information about management s current expectations and plans relating to the future. Forward-looking statements are generally identifiable by, but are not limited to the, use of the words may, will, should, continue, expect, anticipate, estimate, believe, opportunities, intend, plan, possible, suggest, guidance, outlook, potential, prospects, seek, targets, strategy or project or the negative of these words or other variations on these words or comparable terminology. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The Company cautions the reader that reliance on such forwardlooking statements involve risks, uncertainties and other factors that may cause the actual financial results, performance or achievements of IAMGOLD to be materially different from the Company s estimated future results, performance or achievements expressed or implied by those forward-looking statements, and the forward-looking statements are not guarantees of future performance. These risks, uncertainties and other factors include, but are not limited to, changes in the global prices for gold, copper, silver or certain other commodities (such as diesel and electricity); changes in U.S. dollar and other currency exchange rates, interest rates or gold lease rates; risks arising from holding derivative instruments; the level of liquidity and capital resources; access to capital markets, and financing; mining tax regimes; ability to successfully integrate acquired assets; legislative, political or economic developments in the jurisdictions in which the Company carries on business; operating or technical difficulties in connection with mining or development activities; laws and regulations governing the protection of the environment; employee relations; availability and increasing costs associated with mining inputs and labour; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; adverse changes in the Company s credit rating; contests over title to properties, particularly title to undeveloped properties; and the risks involved in the exploration, development and mining business. With respect to development projects, IAMGOLD s ability to sustain or increase its present levels of gold production is dependent in part on the success of its projects. Risks and unknowns inherent in all projects include the inaccuracy of estimated reserves and resources, metallurgical recoveries, capital and operating costs of such projects, and the future prices for the relevant minerals. Development projects have no operating history upon which to base estimates of future cash flows. The capital expenditures and time required to develop new mines or other projects are considerable, and changes in costs or construction schedules can affect project economics. Actual costs and economic returns may differ materially from IAMGOLD s estimates or IAMGOLD could fail to obtain the governmental approvals necessary for the operation of a project; in either case, the project may not proceed, either on its original timing or atall. Exploration Target Potential: The potential quantity and grade of the exploration targets referred to are conceptual in nature and insufficient exploration work has been completed to define a mineral resource. The property will require significant future exploration to advance to a resource stage and there can be no certainty that the exploration target will result in a mineral resource being delineated. The exploration targets are consistent with similar deposits in the area, deposit models orderived from initial drilling results. For a more comprehensive discussion of the risks faced by the Company, and which may cause the actual financial results, performance or achievements of IAMGOLD to be materially different from the company s estimated future results, performance or achievements expressed or implied by forward-looking information or forward-looking statements, please refer to the Company s latest Annual Information Form, filed with Canadian securities regulatory authorities at www.sedar.com, and filed under Form 40-F with the United States Securities Exchange Commission at www.sec.gov/edgar.shtml. The risks described in the Annual Information Form (filed and viewable on www.sedar.com and www.sec.gov/edgar.shtml, and available upon request from the Company) are hereby incorporated by reference into this presentation. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as required by applicable law. All amounts in this presentation are expressed in U.S. dollars except as otherwise noted. 2

Technical Information and Qualified Persons The FS was prepared by IAMGOLD and Lycopodium and incorporates the work of IAMGOLD, Lycopodium and Specialist Consultants Qualified Persons (QPs) (as defined under National Instrument 43-101). QPs are independent of IAMGOLD and have reviewed and approved this news release. IAMGOLD QPs are not independent of IAMGOLD and have reviewed and approved this news release. The areas of responsibility for each QP involved in preparing the FS, upon which the technical report will be based, are: Lycopodium QPs N. Lincoln, P. Eng., Summary, introduction, project infrastructure, reliance on other experts, metallurgical testing and mineral processing, recovery methods, overall capital and plant operating costs R. McIsaac P. Eng. (Knights Piésold), Tailings and water management Specialist Consultants QPs P. Daigle, P.Eng. (AGP Mining Consultants) Summary, accessibility, geological setting, deposit type, exploration, drilling, sample preparation and analysis and security, data verification, mineral resource estimate G. Zurowski, P. Eng. (AGP Mining Consultants), Summary, mine design, mine capital and operating costs, reserve estimate R. Thomas, MAusIMM CP Geotech (Absolute Geotechnics Consultant), Open pit geotechnical IAMGOLD QPs M. Lanctot, Ing., Summary, property description, historical setting, permitting, financial analysis and adjacent properties Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources This presentation uses the term "indicated resources". We advise investors that while that term is recognized and required by Canadian regulations, the United States Securities and Exchange Commission (the SEC ) does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. Cautionary Note to Investors Concerning Estimates of Inferred Resources This presentation also uses the term "inferred resources". We advise investors that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. 3

Boto Gold Project, Senegal Essakane Boto Gold Sadiola Diakha- Siribaya 4

Boto Adds to Impressive Growth Profile Rosebel Creating a new gold district through consolidation Essakane Unlocking potential through Heap Leaching, CIL optimization and satellite prospects Westwood Ramping up production Côté Gold Advancing towards development Boto Gold Investment decision to be made Future Growth Options Further brownfield expansion and exploration projects in the pipeline 5

Boto Reserves Increased by 36% Pre- Feasibility Study Feasibility Study 100% Basis Tonnes (Mt) Grade (g/t) Au (koz) Malikoundi 31.1 1.68 1,676 Malikoundi North 2.0 1.88 118 Boto 5 2.0 2.03 132 Total Probable Reserves 35.1 1.71 1,926 Malikoundi 25.3 1.61 1,310 Boto 5 1.6 2.06 105 Total Probable Reserves 26.8 1.64 1,415 Increase 8.3 0.07 511 6

Reserves & Resources Classification Mineral Resource Statement May 8, 2018 Tonnes (000) Grade Contained Ounces (g/t Au) (000) Attributable Contained Ounces (000) Indicated 48,045 1.61 2,487 2,238 Inferred 2,483 1.8 144 130 Classification Mineral Reserve Statement Aug 30, 2018 Tonnes (000) Grade Contained Ounces (g/t Au) (000) Attributable Contained Ounces (000) Probable 35,060 1.71 1,926 1,733 Proven & Probable 35,060 1.71 1,926 1,733 Notes: 1 CIM Definition Standards were followed for classification of Mineral Reserves and Mineral Resources. 2 Mineral Resources are inclusive of Mineral Reserves. 3 Reserves estimated assuming open pit mining methods. 4 Reserves are based on a gold price of $1,200/oz. 5 Cut-off grades varied between 0.46 g/t Au and 0.63 g/t Au depending on alteration profile and pit area. 6 Average process recovery of 89.5%. 7 Mining costs ($/t processed): $13.01/t. Processing costs: $15.04/t. G&A (Include refining cost): $4.22/t. 9 Cut-off grades used to report mineral resources vary from 0.37 g/t Au and 0.51 g/t Au depending on alteration profile. 10 Mineralized Resources are reported within optimized constraining shells. 11 Mineral Resources are estimated using a long-term gold price of $1,500 per ounce. 12 Attributable is a representation of dividends calculated as 90% for IAMGOLD, with 10% to the government of Senegal. 7

Robust Project Economics PFS - 2017 FS - 2018 Change Mining Capacity 18.0 Mtpa 18.2 Mtpa + 0.2 Mtpa Annual Milling Throughput 2.0 Mtpa 2.75 Mtpa + 0.75 Mtpa LOM Average Annual Production 95 Koz 140 Koz + 45 Koz Recovered Gold 1.3 Moz 1.7 Moz +0.4 Moz Average Grade 1.64 g/t 1.71 g/t + 0.07 g/t LOM Average Strip Ratio 6.4 5.8-0.6 Project Mine life 13.5 years 12.8 years - 0.7 years Initial CAPEX $249 million $254 million + $5.0 million Sustaining CAPEX $106 million $66 million - $40 million LOM Average Total Cash Cost $745 / oz $714 / oz - $31 / oz LOM Average AISC $829 / oz $753 / oz - $76 /oz After-Tax NPV @ 6% $104 million $261 million + $157 Million IRR (After-tax) 13.3% 23.0% 970 basis points Payback Period 6 years 3.4 years - 2.6 years Gold Price $1,275 /oz $1,250 /oz - $25 oz 1 PFS: 1.15 US/Euro and $70/barrel 2 FS: 1.20 US/Euro and $75/barrel 8

Next Steps Submitted mining permit application October 22, 2018 and expect approval in H1 2019. Dalafin Environmental Permit was received October 18, 2018. Continue to optimize certain aspects of the project design, and complete an infrastructure condemnation drilling program. Boto West Additional high potential targets identified adjacent to the resource pits. Boto Exploration team has consolidated additional exploration concessions within economic distance of the Boto Gold Project. High Grade Soil Anomaly 9

Ken Chernin VP, Investor Relations T: 416-360-4743 Laura Young Director, Investor Relations T: 416-933-4952 Martin Dumont Senior Analyst, Investor Relations T: 416-933-5783 l TSX: IMG l NYSE: IAG l