Professional Exam Seminar facilitation. Goitsemodimo Manowe

Similar documents
CLIENT-PROFESSIONAL PROJECT AGREEMENT FOR ARCHITECTURAL SERVICES BETWEEN CLIENT AND

Guide to the Canadian Standard Form of Contract for Architectural Services

FORM OF TENDER. Lead Consultancy for Labasa Office (Vatunibale) Restoration Project. June 4, 2018

REQUEST FOR PROPOSAL

A Guide to Standard Form of Agreement Between Client and Licensed Interior Designer

A Guide to Canadian Standard Form of Agreement Between Client and Architect Abbreviated Version Document Seven

Seattle Public Schools The Office of Internal Audit. Capital Internal Audit Report Historic Horace Mann School Construction

Administrative, Financial and Operational Aspects of Project Management

Government Gazette Staatskoerant

REQUEST FOR PROPOSALS FOR PROFESSIONAL EXTERNAL AUDITING SERVICES RFP No

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR

TITLE 70: DEPARTMENT OF FINANCE SUBCHAPTER COST AND PRICE ANALYSIS REGULATIONS

AIA Document B141 TM 1997 Part

Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, 2000, (Act No.

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES FOR

RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-XX-P-15-XXX CASCADE, SNELL, KERR RENOVATION DESIGN

This Webcast Will Begin Shortly

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

Standard Form of Agreement Between. Owner and Design-Builder Cost Plus Fee with an Option for a Guaranteed Maximum Price

Of... Annex C to the Living Green in Israel Competition documents Design of a demonstration structure for green construction

NOW, THEREFORE, THE BOARD OF TRUSTEES OF THE TWIN RIVERS UNIFIED SCHOOL DISTRICT DOES HEREBY RESOLVE, DETERMINE, AND ORDER AS FOLLOWS:

REQUEST FOR PROPOSAL. Compensation and Classification Study

Proposal Form Professional Indemnity Insurance (Architect & Engineers)


Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project


STANDARD FORM OF AGREEMENT BETWEEN DESIGN CONSULTANT AND DESIGN SUB-CONSULTANT

2009 TARIFF OF PROFESSIONAL FEES SCHEDULE

Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual

"RS Official Gazette" Nos 60/2011, /correction 61/2011

This procedure applies to the Facilities & Safety Business Office (FSBO) and Facilities Planning & Construction (FP&C).

SAMPLE REQUEST FOR PROPOSALS UNDER JAPANESE ODA LOANS

SCHEDULE 8 PAYMENTS TABLE OF CONTENTS 1. CALCULATION OF SERVICE PAYMENTS... 1

ANNEX VIII a STANDARD FORMATS AND TEMPLATES

REQUEST FOR PROPOSAL FOR EXTERNAL AUDIT SERVICES THE CHILDREN S AID SOCIETY OF OTTAWA (CASO)

SPECIAL CONDITIONS OF CONTRACT

Request for Proposal #2036. Orange Coast College Exterior Lighting Energy Efficiency Project Implementation

Standard Request for Proposals Selection of Consultants

REQUEST FOR PROPOSAL FOR. Full Cost Allocation Plan and Citywide User Fee and Rate Study. Finance Department CITY OF HUNTINGTON BEACH

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017)

Form of Agreement Between the Client And the Quantity Surveyor

FIRM FIXED PRICE TERMS AND CONDITIONS AES-1 Applicable to Architect-Engineering Services Contracts INDEX CLAUSE NUMBER TITLE PAGE

Tri-Cities Academic Building Washington State University Richland, WA Project Manual

Vendor Contract TERMS AND CONDITIONS OF PURCHASE. 2. Payment Terms. Payment to Seller is subject to compliance with the following requirements:

CONTRACTOR PERFORMANCE SYSTEM PROCEDURAL DOCUMENT. Revision date: June 8, 2016

UNIVERSAL SERVICE AND ACCESS FINAL REPORT

Procurement Approval Form (Refer to OpsPedia for forms appropriate to requested action)

DRAFT STANDARD PROCEDURES DOCUMENT FOR PREPARING FRAMEWORK AGREEMENTS PUBLIC PROCUREMENT REGULATORY AUTHORITY (PPRA) OCTOBER 2018

S.M.E. settled in the Netherlands CULGI B.V.'s counterparty. The contract for the rendering of (software) services.

October 21, Re: «Plan_Name» Dear «Primary_Contact Prefix» «Primary_Contact Last_Name»:

RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-xxx-P-15-xx CAMPUS ROOF REPLACEMENT DESIGN 2016

SAN DIEGO CONVENTION CENTER CORPORATION

FRIENDSHIP PUBLIC CHARTER SCHOOL REQUEST FOR PROPOSALS FOR RFP TEMPORARY STAFFING

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS

REQUEST FOR PROPOSAL FOR AUDIT SERVICES City of Yreka, California Dated February 08, 2018

The Development Agreement. Long-Term Care Home Renewal Branch October 2016

Affordable Housing Program 2018 Implementation Plan

Contract HSE Management/Part I

LEGAL ADVERTISEMENT CITY OF WINTER GARDEN REQUEST FOR QUALIFICATIONS (RFQ) RFQ #EN DESIGN CRITERIA PROFESSIONAL SERVICES

Multi-beneficiary Model Grant Agreement for Members

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK

Between the Danish Transport and Construction Agency and XX concerning the delivery of an examination system for the aviation area

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND SPAWGLASS CONSTRUCTION CORP., CONSTRUCTION MANAGER-AT-RISK

COMMENTARY TO OWNER S RIDER TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT FOR PROJECTS OF LIMITED SCOPE (AIA DOCUMENT B )

TABLE OF CONTENTS. (i) Page

AGC s Preliminary Commentary to the 2007 Edition of the AIA A201 General Terms and Conditions Document

FORENSIC INVESTIGATION (FI) 3 64

RECITALS. NOW, THEREFORE, in consideration of the mutual promises set forth herein, it is agreed by and between the parties as follows: TERMS

Construction Phase Services: Pitfalls, Perils and Payment. RLI Design Professionals Design Professionals Learning Event DPLE 147 May 18, 2016

OWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS

REQUEST FOR PROPOSALS

RS Official Gazette, No 51/2015

NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL

Solvency II Detailed guidance notes for dry run process. March 2010

REQUEST FOR INFORMATION ALBERTA LAWYERS INSURANCE ASSOCIATION CASE RESOLUTION AND LITIGATION COUNSEL SUPPORT SERVICES This is not a solicitation.

FRIENDSHIP PUBLIC CHARTER SCHOOL REQUEST FOR PROPOSALS FOR RFP COMPENSATION DESIGN CONSULTANT SERVICES

Standard Form of Agreement Between Owner and Architect without a Predefined

RFP ADDENDUM #1. Date of Addendum December 23, 2016

TERREBONNE PARISH CONSOLIDATED GOVERNMENT INSURANCE REQUIREMENTS CONTRACTORS

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

REQUEST FOR PROPOSAL West Virginia Northern Community College RFP #

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

1 Authority, Responsibility, and Policy

Project Title: INFRASTRUCTURE AND INTEGRATED TOOLS FOR PERSONALIZED LEARNING OF READING SKILL

ANNEX A Standard Special Conditions For The Salvation Army

PAPER 1: THE ARCHITECTURAL PROFESSIONAL AS PRACTITIONER, AND ARCHITECTURAL SERVICE TO THE CLIENT

PROVINCE OF MANITOBA DEPARTMENT OF FAMILIES FINANCIAL REPORTING REQUIREMENTS (FRR)

Request for Qualifications #9709RFQ. Architectural Services for Dawson County Fire Station #9

This Financial Conflict of Interest Policy is designed to maintain the trust of the public, research volunteers and the University research community.

MEMORANDUM Municipal Way, Lansing (Delta Township), Michigan Enclosed for your consideration is MERS Request For Proposal (RFP).

MINISTRY OF EDUCATION REVISED CONDITIONS OF ENGAGEMENT OF CONSULTANTS

1.1 Name and address of main Proposer : Contract Awarded?

to the DIRECTOR OF BUILDING CONTROL DEPARTMENT OF JUSTICE TASMANIA on the

Administrative Rule MARLBORO COUNTY SCHOOL DISTRICT PROCUREMENT CODE POLICY. Adopted 7/3/98; Revised 8/9/07 TABLE OF CONTENTS

GUIDELINES FOR COMPLETION OF APPLICATION FOR ANNUAL PRACTICE INSURANCE (RENEWAL)

Document C132 TM. Standard Form of Agreement Between Owner and Construction Manager as Adviser

OREGON STATE UNIVERSITY

STANDARD FORM OF CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES INCLUDING CONSTRUCTION FOR A GUARANTEED MAXIMUM PRICE BETWEEN

2. Do you have any final geotechnical report for the proposed property? Yes, See attached. More to come.

Transcription:

FRAMEWORK FOR THE USE OF THE TARIFF AND DELIVERY OF ARCHITECTURAL SERVICES Professional Exam Seminar facilitation by Goitsemodimo Manowe 20 t h May 2017

SESSION OBJECTIVES Appreciation of the key components of the framework and its most essential provisions Correct applications of the framework Expectation in terms of the Act: Upon registration, a person is expected to be fit to serve the public as a professional Current Status (Framework): Awaiting approval by the Minister Section 51 Current Status (Tariff): Approved by the Minister Mandatory use (ARC Notice)

Two (2) parts: Tariff Delivery of Service Tariff Project Cost Based Fee (Direct Appointments) Time Based Fee (Fee bids) Service Delivery ARC Concerns: Compliance by professional Contractual Obligations of the Client ARC Concerns: Quality of Delivery Contractual Obligations of Professional

Arrangement of Framework: Preamble Clause : Purpose of Framework Basis and use of the tariff Conditions regarding payments Obligations of the parties The services and the context of rendering such services Framework sets out ethical and contractual Obligations Not Recommendations Clause 1.2-page 3 and 4- The Principles: Defines what shall be included in the Client/Architectural Professional Agreement Standards forms of contract sanctioned by the Council shall be used Standard or Partial Services are as defined in the framework as Architectural Professional Principal Consultant or Principal Agent The parties select and incorporate into Client/Architectural Professional Agreement The selection may include additional as services The Client/Architectural Professional Agreement takes precedence in case of discrepancy.

PROJECT COST-BASED FEE Net Total Construction Cost excludes VAT, Contingencies and Budget Provisions COST BRACKET NET TOTAL CONSTRUCTION COST OF THE WORKS (BWP) PRIMARY FEE PLUS SECONDARY FEE (BWP) FROM TO ADD% ON BALANCE OVER A B C D E 1 1 180,000 13,303 11.50% 1 2 180,001 660,000 34,404 11.00% 180,001 3 660,001 1,980,000 80,275 10.00% 660,001 4 1,980,001 3,960,000 201,835 8.50% 1,980,001 5 3,960,001 6,360,000 357,798 8.00% 3,960,001 6 6,360,001 12,720,000 550,459 7.50% 6,360,001 7 12,720,001 38,400,000 1,009,174 7.00% 12,720,001 8 38,400,001 126,000,000 2,844,037 6.50% 38,400,001 9 126,000,001 252,000,000 8,623,853 6.25% 126,000,001 10 252,000,001 504,000,000 16,646,789 6.00% 252,000,001 11 504,000,001 1,008,000,000 32,293,578 5.75% 504,000,001 12 1,008,000,001 62,564,220 5.50% 1,008,000,001

FORMULA: Professional Fee = Primary Fee (C) for applicable Cost Bracket of Value of Works + Secondary Fee for applicable Cost Bracket of Value of Works calculated as (Applicable Value of Works MINUS Column E) X % in terms of Column D EXAMPLE: Fee = C + [(Vw - E)xD] where C is Primary fee [(Vw - E)xD] is Secondary Fee and Vw is Value of Works For value of Works (Vw) of 3,000,000 Primary Fee (C) is 201,835 Secondary Fee is (3,000,000-1,980,001) x 8.50% 1,019,999 x 8.50% 86,699.92 Professional fee = Primary Fee + Secondary Fee 201835 + 86699.92 288,534.78 The Project Cost Based Fee is based on the full scope of standard services being provided as articulated in the Framework for the Use of the Tariff of Fees.

Fee Basis and Remuneration: Project Cost Based Fee CONDITIONS/CONTEXT: Project is not subjected to fee bidding Scope is well defined Total construction Cost exceeds Cost Bracket 1 ( lowest cost bracket) Primary and % Fee components as per tariff table Template for fee calculation provided as part of the framework 10% reduction (stages 1-4b) if not Principal Consultant 10% reduction ( stages 5 and 6) if not Principal Agent Negotiated increase to fee for additional services at Clause 5 and include in Client/Architectural Professional Agreement Cost estimate used but updated at every work-stage Estimate provided by Professional QS shall be used where cost exceeds cost bracket 1 and price by builder is not available.

Adjustment of Fee Fee Component Criteria for Adjustment Fees for Pre-contract (work-stages 1 through to 4b, both inclusive) Fees for Pre-contract (work-stages 1 through to 4b, both inclusive Post-contract (work-stages 5and 6) Subject only to upward adjustment based on Total Construction Cost as at workstage 4b for Work-Stages already accomplished.. but not adjustment due to post- contract escalations on the value of Total Construction Cost after work stage 4b. Subject to downward adjustment on account of reduction in the scope of work and taking into account only work-stages not yet authorized to commence, by the Client. Subject to upward or downward adjustment due to changes in the scope of Works, i.e. based on project final account of Total Construction Cost.

Mandatory Apportionment of Cost Based Fee by Work-stage- Subject to Clause 6.1 (2) Work-Stages 1 to 6 Proportion of Fee Cumulative Total 1: Inception 5% 5% 2: Design Concept 15% 20% 3: Design Development 20% 40% 4a: Technical Documentation 20% 60% 4b: Construction Documentation 10% 70% 5: Construction 27% 97% 6: Close Out 3% 100% Estimate used, for interim fee claims, and updated at every stage

Fee Basis and Remuneration: CONDITIONS/CONTEXT: Time based Fee Project is not subjected to direct apppointment Scope is not well defined Total construction Cost is within Cost Bracket 1 ( lowest cost bracket) Hourly rates as sunctioned by the ARC apply No reduction to fee build-up save for 2.1 (7) OR 2.3 (1), (2) and (3) No negotiated increase or decrease to fee (fee includes everything) Apportionment by work-stage is by prior agreement or as per fee bid allocation of manhours

Work-stages: As per slide 10 above Important observations: Stage 1 (Inception) Quality Policy- see Definitions Confirmation of Client s budget, constraints and availability of funds Strategy for project delivery Organizational framework for project delivery Risk assessment (should apply to all stages) Submission of Report and for own record

Work-stages: As per slide 10 above Important observations: Stage 2 (Design Concept) Obtain approval and instruction to proceed Framework for Building Capacity Mangagement during operational phase Strategy for project delivery (refined) Review of risks Alignment to budget submission of report and for own record Stage 3 (Design development) Obtain approval and instruction to proceed Alignment to budget Review of planned Building Capacity Management Risk Review Submit report

Work-stages: As per slide 10 above Important observations: Stage 4 a (Technical Documentation) Obtain approval and instruction to proceed Framework for Building Capacity Mangagement during operational phase Strategy for project delivery Review of risks Alignment to budget submit report and keep own record Stage 3 (Design development) Obtain approval and instruction to proceed Alignment to budget Review of planned Building Capacity Management Risk Review Submit report and keep own record

Work-stages: As per slide 10 above Important observations: Stage 4 a (Technical Documentation) Obtain approval and instruction to proceed Framework for Building Capacity Mangagement during operational phase Strategy for project delivery Review of risks Alignment to budget submit report and keep own record Stage 3 (Design development) Obtain approval and instruction to proceed Alignment to budget Review of planned Building Capacity Management Risk Review Submit report and keep own record

Work-stages: As per slide 10 above Important observations: Stage 4 b (Construction Documentation) Obtain authority to prepare documents Obtain all statutory approvals (prerequisite) but no guarantee of timeous approval Stage 5 ( Construction) Perform duties of Principal Agent as per building contract Issue End-of-Activity Report Assist in obtaining an Occupation Permit

Additional Services As read Clauses 5.1 to 5.5 Negotiated fee not to exceed 10% of Standard Fee - Clause 2.1 (6) Services may be based on a Time Based Fee Clause 6.3 (1) Fees for Prototypes-Clause 6.6 Stages 1-4b: 100% for origination of 1 st Building + 32% for repeats Modifications for repeats ( stages 1-4b) shall be on a Time Based Fee No reduction for post contract services Fees for Buildings Repeated Under Separate Building Contracts- Clause 6.7 Separate fee calculation for each building contract- 32% of Std Fee Modification of designs, technical documentation on Time Based Fee No reduction for post-contract

Fees for use of designs, technical and construction documentation originated by others- Clause 6.8 Royalty of 7.5% of Std Fee (1-4b) Royalty does not apply to original geographical site Fee is 37% of Std Fee ( 1-4b) No reduction to Post contract Fee Fee portion for standard drawings forming a part of the works to be calculated separately and consolidated into total fee before apportionment by work-stage Work deemed to include; -review of std drawings to assess functionality, fitness-for-purpose, health and safety of the occupants - audit of the existing structure to which the Std drawing relates Modifications to std drawings are on a Time based Fee

Fee Apportionment for Work Based only on STD Drawings Stage Apportionment Cumulative Work-Stage 1 (Inception) 5 % 5% Work-Stage 2 (Design Concept) 0% 5% Work-Stage 3 (Design Development) 5% 10% Work-Stage 4a (Technical Documentation) 17% 27% Work-Stage 4b (Documentation) 10% 37% Reduced Fees

Fees for Taking Over Incomplete Work by Another Professional- Clause 6.9 Work to be preceded by an assessment of existing design/documentation and approval of recommendation by client Project Cost Based Fee unless otherwise agreed Increase of 15% for Stage at which work commences Fee apportionment as per 6.2 (1) Work deemed to include; -review of std drawings to assess functionality, fitness-for-purpose, health and safety of the occupants - audit of the existing drawings and the taking over of liability - necessary modifications to drawings

Site Inspection and Contract Administration - Clause 6.10 Obligation to inspect the works once a month (Liability unchanged) - Extra site visits and meetings are Special Management Services see 5.2 (1) Frequency of extra site visits to be agreed and stated in the Client/Architectural Professional Agreement No extra fee for site visits Re: RFIs due to deficiencies or omissions

Fees for Review ( Work produced by Arc Tech or Arc Draft)- Clause 6.11 Review is for purposes of advancing work-stages 4b, 5 and 6 and submission for statutory approval in accordance with Section 48A Time Based Fee only for a principal of the firm (architect) Fee is a deductable not extra (Minimal for quality documentation) Fees for stages 1 to 4a are for the Arc Tech or Arc Draft Conditions include; -Itemization of work (review) for fitness-for-purpose, health and safety -Duration and cost agreed in advance Act of signing-off implies professional liability

Fees for Review only of Work (Quality Assurance) - Clause 6.12 Obligations in terms of the Code of Conduct and Ethics of the profession Time based Fee only Fee agreed in advance Fees for Extended Period of Initial Building Contract -6.14 Calculation of monthly rate or part thereof; 27% of Standard Fee X Pex where Pex is prolongation and Pi is initial contract period Pi

Interim Claims - Clause 6.18 90% for work-stage deliverables met pending approval Deadline for client to approve Release of retention after 15 calendar days Withholding of Payment - Clause 6.20 Conditions to be in the Agreement re: set-off for errors, omissions, negligence, etc Right to report negligence to the ARC seek compensation NB: Process of inquiry shall kick-in Action (Obligations) in case of dispute- Clause 7 Architectural professional shall refer matter to the ARC for assessment, advice or recommendations ARC s recommendations not a ruling or waiver of rights in terms of the Client/ Architectural Professional Agreement ARC advice limited to use of tariff and interpretation of Framework

Definitions and Interpretation- Clause 8 1. Budget 2. Building Capacity Management 3. Budget Provisions 4. Construction Documentation 5. Quality Policy 6. Words and specific act Clause 8.2

Thank you