Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides

Similar documents
AVINO SILVER & GOLD MINES LTD.

Spanish Mountain Gold Announces Results of New PEA for the First Zone

BMO 2012 Global Metals & Mining Conference February 2012

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

First Quarter 2009 Conference Call & Webcast May 5, 2009

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

NOVEMBER NYSE American: PZG

RNC MINERALS. Q Results Conference Call TSX:RNX. November 15, 2017

N E W S R E L E A S E

Skouries Update March 2018

NEWS RELEASE NR: October 11, 2017

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update

NEWS RELEASE K92 MINING INC. K92 Mining Discovers High Grade Extension of Kora Deposit in First Completed Exploration Hole

Eldorado Gold Reports Results of Technical Studies

RBC Capital Markets Underground Mining Technical Session Ernest Mast President & COO October 22, 2015

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

Kişladağ Update March 2018

MAG Silver Reports Juanicipio Updated PEA Study Prepared by AMC

N E W S R E L E A S E

Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

Detour Gold Achieves Production and Cost Guidance for 2017 and Provides 2018 Guidance

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

Q4 and Year End 2012 Conference Call. ArgonautGold.com

December Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

Allied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV

TSX:AR CORPORATE PRESENTATION

Boto Gold Project Feasibility Study Conference Call

Filo del Sol Copper/Gold/Silver. TSX-V, Nasdaq First North: FIL Corporate Presentation March 2018

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV

RNC MINERALS. Q Results Conference Call TSX:RNX. August 15, 2018

HBM. Creating Sustainable Value through High Quality Long Life Deposits

Karmin Exploration Inc.

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

COLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604)

MCEWEN MINING ANNOUNCES UPDATED RESERVE & RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

Detour Gold Announces 2016 Operating Results and 2017 Guidance

AGM Presentation June 14, 2018

PRESS RELEASE SEPTEMBER 17, 2018

Corporate Presentation

PRUDENTAND DISCIPLINED

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

N E W S R E L E A S E

El Compas is scheduled to achieve commercial production by the end of July 2018

COPPER SHINES BRIGHTLY FOR MCEWEN MINING - ENHANCED ECONOMICS OF LOS AZULES

PURE GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE MADSEN GOLD PROJECT

GROWTH THROUGH CASH FLOW. Q Results 3 August 2017

NEWS RELEASE GREAT PANTHER SILVER REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR THE CORICANCHA MINE

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

NEWS RELEASE New York - AG Toronto FR November 16, 2015 Frankfurt FMV Mexico - AG. First Majestic Reports Third Quarter Financial Results

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

RNC MINERALS Results Conference Call TSX:RNX. April 3, 2018

LUNDIN GOLD RECONFIRMS PROJECT SCHEDULE AND LOWERS ALL-IN SUSTAINING COST ESTIMATE TO US$583 PER OUNCE FOR ITS FRUTA DEL NORTE GOLD PROJECT

Highlights Achievements to Date

Kinross Gold Corporation. Merrill Lynch Global Metals & Mining Conference 2007 May 9, 2007

June 19, 2014 News Release Updated Feasibility Study for Brucejack Project Confirms Positive Economics

PRESS RELEASE FOR IMMEDIATE RELEASE May 13, 2016

CANADA S NEWEST COPPER AND GOLD PRODUCER

For further information: Investor Relations (416)

Corporate Presentation June 2015 EMERGING DEVELOPER MONETIZING A GREAT DISCOVERY

Northgate Minerals Reports Second Quarter Results

Orezone Announces Positive Preliminary Economic Assessment

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

AVINO SILVER & GOLD MINES LTD.

September 15, 2016 News Release SILVER STANDARD PROVIDES MARIGOLD FIVE-YEAR OUTLOOK

Pretivm Reports Third Quarter 2018 Results

MCEWEN MINING ANNOUNCES RECORD RESOURCE ESTIMATE AT THE SAN JOSÉ MINE IN ARGENTINA

2014 First Quarter Results

AbraPlata Files Diablillos Silver-Gold Project PEA Report IRR of 30.2% and After-Tax NPV 7.5% of US$212 Million

SANDSTORM GOLD ROYALTIES RELEASES HOD MADEN PFS AND INCREASES PRODUCTION GUIDANCE

SECOND QUARTER 2018 RESULTS. August 10, 2018

Gold Hawk Resources Inc.

Ann Mason and the Revival of the Yerington District Nevada, USA. Robert Cann Robert Cinits Tom Watkins December 2014

Trevali Reports Record Preliminary Q and 2017 Annual Production, and Provides 2018 Production and Cost Guidance

NEWS RELEASE JANUARY 29, 2015

Delivering Disciplined Growth. Bank of America Merrill Lynch Canada Mining Conference September 10 th, 2009

PRESS RELEASE New Gold Reports Consolidated Reserve & Resource Statements

RNC MINERALS Results Conference Call TSX:RNX. April 3, 2017

(PEA) for its project in. anticipated. which are. to produce. Highlights. ounces is now. The 3,500 tpd. After-tax NAV. Guatemala this year,

Cash Preservation Cost Reduction Disciplined Capital Allocation

PRELIMINARY ECONOMIC ASSESSMENT FOR THE COMBINED LOS HELADOS AND JOSEMARIA COPPER/GOLD DEPOSITS NEARING COMPLETION

MCEWEN MINING PROVIDES FIRST QUARTER 2012 OPERATIONAL AND DEVELOPMENT UPDATE

October 01, 2018 News Release Release #

VALUE THROUGH GOLD DENVER GOLD FORUM 2016

KINROSS GOLD CORPORATION Q Results Conference Call & Webcast

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

Empowering People, Extraordinary Performance

Corporate Update. June 2013

On the Path to Production

McEWEN MINING REPORTS 2015 FIRST QUARTER OPERATING & FINANCIAL RESULTS

John A. McCluskey President and Chief Executive Officer

Forward Looking Statement

Coeur Announces Initial Reserve Estimate and Reserve-Based Mine Plan for Silvertip Mine

Alio Gold Reports Second Quarter 2018 Results

URSA Major Minerals Incorporated Press Release UMJ TSX March 2, 2012 URSA Major Minerals and Prophecy Platinum sign business combination agreement

Argonaut Gold Announces Q2 Production of 29,237 Gold Equivalent Ounces. Cash Balance Increases to $54.1 Million. 2 nd Quarter.

ELGIN MINING PROVIDES STRONG FOURTH QUARTER CASH COSTS AND POSITIVE 2014 OUTLOOK

Transcription:

For Immediate Release: NR 17-01 Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides Vancouver, B.C., January 17, 2017: Exeter Resource Corporation (NYSE-MKT:XRA, TSX:XRC, Frankfurt: EXB Exeter or the Company ) is pleased to announce that it has secured a second water source, which will provide a timely development pathway for its 100% owned Caspiche gold oxide/ gold-copper project in Chile. The Company will now proceed with technical studies intended to advance the first stage 1.7 million ounce gold oxide project through to a production decision. Caspiche is one of the largest gold discoveries made in Chile in recent years. Unique characteristics of the deposit include its sizeable oxide gold zone and underlying higher grade gold-copper core. This combination offers mining opportunities that range from modest scale oxide heap leach gold production, to larger scale open pit/underground mining of the gold-copper zone. Development options were assessed in the Preliminary Economic Assessment ( 2014 PEA ) A released in 2014. This report reviewed three potential development alternatives, all of which require significantly less capital than earlier studies. Over the course of the last 18 months, the Company has been optimizing Caspiche oxide development requirements, including detailed metallurgical studies, and importantly, infrastructure alternatives, as well as now securing a second water source. The Second Water Source To ensure an immediate development pathway for Caspiche oxides, Exeter has signed an option agreement (the Option ) with Cleanairtech Sudamerica SA ( CAT ) to supply 50 litres per second (L/s) of desalinated water. It is the Company s intention to use this water in construction, commissioning and operation of the first stage heap leach gold facility at Caspiche, subject to the outcome of a feasibility study. The plant and pipeline that CAT operates to Tierra Amarilla, already has the capacity available to deliver this water. Exeter will now initiate design, engineering and permitting of the required pipeline from Tierra Amarilla to Caspiche. Wendell Zerb, Exeter s President and CEO, stated Securing the water option now allows the Company to advance planning and studies for the development of the oxide heap leach gold project. Any question regarding potential development of the oxides due to the uncertain timeline for approval of water rights at Exeter s large Peñas Blancas water discovery, by the Chilean Government, is eliminated by the water option. In the medium to long term, the development of the Maricunga region s huge mineral potential will depend on sustainable and low-cost supplies of water and energy. The area has both, in terms of large volumes of unused subterranean water, including Exeter s Peñas Blancas water discovery, and world class solar and wind power resources.

Caspiche Strategically Located Source: Exeter Resource Corporation Next Steps Background engineering studies for Caspiche have been ongoing and are now sufficiently advanced that new studies leading to a production decision, can be fast tracked. Exeter initially plans to conduct a 6,000 metre infill and expansion drill program starting in early Q1/17. The program is designed to improve the definition of the oxide gold zone and other potentially leachable gold zones currently not included in the oxide gold heap leach mine plan. While the gold oxide zone is well defined by previous drilling, potentially leachable material defined as occurring within a transition zone below the oxides, has not been well defined. Additional drilling and expanded metallurgical studies on this material opens the potential for future leachable gold mineralization at Caspiche. Upon completion of the drilling program, Exeter expects to initiate new advanced studies on the oxide gold project using updated capital and operating cost estimates, as well as alternative infrastructure requirements associated with the desalination water source. In the 2014 PEA A, the heap leach oxide gold project produced a projected average of 122,000 oz AuEq* annually over a planned 10 year mine life, including 148,000 oz AuEq* annually in the first five years. A very low strip ratio (0.27:1) and favorable gold recoveries, produced excellent economics at US$1,300/oz gold, including after-tax (27% tax rate) NPV5% of US$252M, IRR 28.5% and projected average total cash operating costs US$589/oz AuEq* and AISC of US$676/oz AuEq*. Our 2014 PEA included US$65 million in capital costs (direct and indirect) to reticulate water from Peñas Blancas, and we estimate only moderately higher capital costs to reticulate water from the CAT site. Exeter expects a desalination alternative used in a new gold heap leach model will however, result in an increase in operating costs when compared to using the high altitude Peñas Blancas water source. That being said, Exeter anticipates that cost reductions, including lower power, fuel, consumables, and currency exchange ratios, together with the higher initial gold recoveries, as reported earlier by the Company, will mitigate the impact of an increase in water costs.

The Water Option Agreement The Option, which has an initial term of three years, can be extended for an additional year. To maintain the Option over the four year period, Exeter will make escalating annual option payments totaling US$1,250,000. Exeter can exercise the Option at any time and negotiate a water sales and purchase contract (the Supply Contract ) with CAT, following which Option payments cease. The Supply Contract will be in line with existing sales and purchase contracts that CAT has with other customers, where water costs are based on a transparent model of fixed and variable costs. Once the Supply Contract has been signed, CAT must supply the agreed quantity of water to Exeter at Tierra Amarilla within 12 months. CAT currently operates a 400 L/s desalination plant at Punta Totoralillo and a pipeline to Tierra Amarilla, located 120 km from the Caspiche project. It will supply the optioned water at Tierra Amarilla from existing capacity. CAT also has permits and infrastructure in place to expand supply to 600 L/s. CAT is a company jointly owned by CAP S.A. and Mitsubishi Corporation. CAP, listed on the Santiago Stock Exchange, is the Chilean holding company for the largest Chilean iron ore miner and steel producer, as well as the third largest port operator in the country. CAP has invested substantially in infrastructure for its operations, such as ports, energy & water and markets access to its infrastructure to third parties. 2014 PEA The 2014 PEA showed three potential development options: 1. A 30,000 tpd heap leach oxide gold project producing a projected average of 122,000 oz AuEq* annually over a planned 10 year mine life, including 148,000 oz AuEq* annually in the first five years. A very low strip ratio (0.27:1) and favorable gold recoveries, drive excellent economics. Projected average total cash operating costs US$589/oz AuEq*. AISC US$676/oz AuEq*. Pre-tax NPV5% of US$355M at US$1,300/oz Au; IRR of 34.7%. After-tax (27% tax rate) NPV5% of US$252M; IRR 28.5%. Payback period of 3.4 years from initial construction. Estimated initial capex US$210M plus US$41M in contingencies. Required water, 44 L/s. 2. A larger, scalable 60,000 tpd open pit, heap leach oxide gold operation followed by expanded open pit mining (27,000 tpd) of the gold copper sulphide zone. Planned mine life is 18 years with projected average annual production of approximately 289,000 oz AuEq* per year. 3. A scalable 60,000 tpd open pit, heap leach oxide gold operation transitioning to underground sub level open stope mining (27,000 tpd) of the higher grade gold copper sulphide zone. Projected annual average production is 250,000 oz of Au in years 1-3 and 425,000 oz AuEq* in years 4-13. Over a planned 42 year mine life projected average production is 344,000 oz AuEq* per year. Mineral Resources Tonnes Au Cu Ag AuEq 1 AuEq 2 Material Class Mt g/t % g/t g/t M oz Oxide Measured 65.9 0.46-1.55 0.46 1.0 Oxide Indicated 55.6 0.39-1.63 0.40 0.7 Total Oxide M & I 121.5 0.43-1.58 0.43 1.7 Sulphide Measured 554.2 0.58 0.23 1.16 1.02 18.3 Sulphide Indicated 727.9 0.48 0.18 1.17 0.84 19.6 Total Sulphide M & I 1,282.1 0.52 0.20 1.17 0.92 37.9 Total M & I 1,403.6 0.51 0.19 1.20 0.88 39.6 -oxide and sulphide materials above cut-offs of 0.18 g/t AuEq 1 and 0.30 g/t AuEq 1 Higher Grade Gold Copper Zone at 1.50, 1.00 and 0.75 g/t AuEq 3 cutoff Tonnes Au Cu Ag AuEq 3 AuEq 2 Material Class Mt g/t % g/t g/t M oz Total Sulphide M & I 177.1 1.05 0.41 1.71 1.83 10.4 Total Sulphide M & I 510.0 0.80 0.33 1.45 1.43 23.5 Total Sulphide M & I 810.2 0.67 0.29 1.35 1.22 31.8 -underground operation

About Exeter Exeter is a Canadian mineral exploration company focused on the exploration and development of the Caspiche project in Chile. The project is situated in the Maricunga gold district, between the Maricunga mine (Kinross Gold Corp.) and the Cerro Casale gold deposit (Barrick Gold Corp. and Kinross Gold Corp.). The discovery represents one of the largest known mineral discoveries made in Chile in recent years. On December 19, 2014, Exeter announced the filing of an Amended NI 43-101 Technical Report on the Caspiche Project ( 2014 PEA ). Refer to the Exeter web site or Sedar for details regarding the 2014 PEA. The Company currently has cash reserves of C$16 million and no debt. If you have any questions regarding Exeter, or would like a complete corporate presentation forwarded to you, please contact Mr. Rob Grey, VP Corporate Communications at: Toll-free 1.888.688.9592 or by email at rgrey@exeterresource.com Formatted: English (United States) Formatted: English (United States) A. Disclaimer: The economic analysis contained in the 2014 PEA is considered preliminary in nature. There is no certainty that the economic forecast outlined in the 2014 PEA will be realized. No inferred mineral resources were used in the PEA. See Exeter s website or Sedar for the news release dated December 19, 2014: Amended NI 43-101 Technical Report on the Caspiche Project; Effective date: April 30, 2014. Wendell Zerb, Exeter s President & CEO and a qualified person ( QP ) within the definition of that term in National Instrument 43-101, Standards of Disclosure for Mineral Projects, has reviewed and approved the technical information in this corporate update. The 2014 PEA used prices of: Au US$1,300 US$/oz., Ag US$20/oz. and Cu US$3/lb. * Gold equivalent oz (AuEq) value is based on Au, Ag and Cu revenues (prices and recoveries involved). AuEq oz [troy oz] = [Au g/t * Rec Au * tonnes]/31.1 + [Ag g/t * Rec Ag * tonnes]/31.1* silver price troy oz/ gold price troy oz + [[Cu% * Rec Cu * tonnes]*2204] * copper price lbs/gold price troy oz. Recoveries are adjusted based on metallurgical characteristic of the resource. P 1 $ / % Cu $ / lb R % PAg oz R Cu Ag AuEq g / t Au g / t Cu % 0.06857 g lb / oz 10,000 Ag g / t P Au $ / oz RAu % PAu $ / oz RAu % PAu and PCu are the Au and Cu prices (US$1,150/oz and US$2.50/lb, respectively), and RAu and RCu are the Au and Cu projected metallurgical recoveries, 65% and 85%, respectively for sulphide material and 78% for Au oxide material. 2 AuEq (M oz) = resource tonnes * AuEq 1 3 P $ / % Cu $ / lb R % PAg oz R Cu Ag AuEq g / t Au g / t Cu % 0.06857 g lb / oz 10,000 Ag g / t P Au $ / oz RAu % PAu $ / oz RAu % PAu, PAg and PCu are the gold, silver and copper prices (1,250 US$/oz, 15US$/oz. and 2.75 US$/lb, respectively). RAu and RCu are the Au and Cu projected metallurgical recoveries based on a number of S % thresholds. EXETER RESOURCE CORPORATION Wendell Zerb, P. Geol President and CEO For further information, please contact: Wendell Zerb, CEO or Rob Grey, VP Corporate Communications Tel: 604.688.9592 Fax: 604.688.9532 Toll-free: 1.888.688.9592 Suite 1660, 999 West Hastings St. Vancouver, BC Canada V6C 2W2 exeter@exeterresource.com Safe Harbour Statement This news release contains forward-looking information and forward-looking statements (together, the forward-looking statements ) within the meaning of applicable securities laws and the United States Private Securities Litigation Reform Act of 1995, including in relation to the Company s belief as to the potential significance of water discovered and the potential to utilize the desalinated water secured under option, the timing and completion of a new preliminary economic assessment or other studies for the advancement of Caspiche, including a production decision on the oxide project, the potential to establish new opportunities for the advancement of Caspiche, results from the 2014 PEA including estimated annual production rates, capital and production costs or expected changes to such costs, water and power requirements and metallurgical recoveries, expected taxation rates, potential for securing water rights and adequate water and potential approval of water extraction, potential for reduced power costs, potential to acquire new projects and expected cash reserves. These forward-looking statements are made as of the date of this news release. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the future circumstances, outcomes or results anticipated in or implied by such forward-looking statements will occur or that plans, intentions or expectations upon which the forward-looking statements are based will occur. While the Company has based these forward-looking statements on its expectations about future events as at the date that such statements were prepared, the statements are not a guarantee that

such future events will occur and are subject to risks, uncertainties, assumptions and other factors which could cause events or outcomes to differ materially from those expressed or implied by such forward-looking statements. Such factors and assumptions include, among others, the effects of general economic conditions, the price of gold, silver and copper, changing foreign exchange rates and actions by government authorities, uncertainties associated with negotiations and misjudgments in the course of preparing forward-looking information. In addition, there are known and unknown risk factors which could cause the Company s actual results, performance or achievements to differ materially from any future results, performance or achievements expressed or implied by the forward-looking statements. Known risk factors include risks associated with project development; including risks associated with the failure to satisfy the requirements of the Company s agreement with Anglo American on its Caspiche project which could result in loss of title; the need for additional financing; operational risks associated with mining and mineral processing; risks associated with metallurgical recoveries, risks associated with operating in areas subject to drought conditions and scarcity of available water sources, power availability and changes in legislation affecting the use of those resources; fluctuations in metal prices; title matters; uncertainty and risks associated with the legal challenge to the easement secured from the Chilean government; uncertainties and risks related to carrying on business in foreign countries; environmental liability claims and insurance; reliance on key personnel; the potential for conflicts of interest among certain officers, directors or promoters of the Company with certain other projects; the absence of dividends; currency fluctuations; competition; dilution; the volatility of the Company s common share price and volume; tax consequences to U.S. investors; and other risks and uncertainties, including those described herein and in the Company s Annual Information Form for the financial year ended December 31, 2015 dated March 22, 2016 filed with the Canadian Securities Administrators and available at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company is under no obligation to update or alter any forward-looking statements except as required under applicable securities laws. Cautionary Note to United States Investors - The information contained herein and incorporated by reference herein has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of United States securities laws. In particular, the term resource does not equate to the term reserve. The Securities Exchange Commission s (the SEC ) disclosure standards normally do not permit the inclusion of information concerning measured mineral resources, indicated mineral resources or inferred mineral resources or other descriptions of the amount of mineralization in mineral deposits that do not constitute reserves by U.S. standards, unless such information is required to be disclosed by the law of the Company s jurisdiction of incorporation or of a jurisdiction in which its securities are traded. U.S. investors should also understand that inferred mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Disclosure of contained ounces is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute reserves by SEC standards as in place tonnage and grade without reference to unit measures. NEITHER THE TSX NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE