11TH BEST PRACTICE IN CITIZENS PARTICIPATION Award

Similar documents
Intellectual property rights intensive industries: contribution to economic performance and employment in Belgium

Parliament of the Republic of Macedonia. Law on Balanced Regional Development

My Number System. ~Basic Outlines and Future Plans~ My Number Promotion Office, Cabinet Secretariat. My Number PR character Maina chan

THE WHITE HOUSE Office of the Press Secretary EXECUTIVE ORDER

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Intellectual property rights intensive industries: contribution to economic performance and employment in Luxembourg

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Increasing efficiency and effectiveness of Cash Transfer Schemes for improving school attendance

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

THE DIGITAL CITY MANAGEMENT SYSTEM IN HANGZHOU AS A PRACTISE OF URBAN GOVERNANCE IN CHINA

LOCAL FINANCE BENCHMARKING TOOLKIT

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

2016 NASCIO Recognition Award Submission Budget Forecasting Function (BFF)

THE PARTICIPATORY BUDGETING EXPERIENCE IN COTACACHI MUNICIPALITY OF COTACACHI LOCAL GOVERNMENT COTACACHI - ECUADOR

1050 Meeting, 11 March Administration and Logistics

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

Mainstreaming the 2030 Agenda. Country Examples from the UNDG Mainstreaming Reference Guide and SDGs Are Coming to Life Publication

IPR-intensive industries: contribution to economic performance and employment in the European Union

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

4. Forest Revenues. GFI Guidance Manual 182

1.7 INNOVATIVE PUBLIC SERVICES ( ) IDENTIFICATION OF THE ACTION EXECUTIVE SUMMARY

MATRIX OF STRATEGIC VISION AND ACTIONS TO SUPPORT SUSTAINABLE CITIES

Preparatory support... 4 Q. In the context of multi-funded CLLD, can preparatory support be funded by one Fund only?. 4

Strengthening Multisectoral Governance for Nutrition Deborah Ash, Kavita Sethuraman, Hanifa Bachou

BANK INDONESIA REGULATION NUMBER: 5/ 8 /PBI/2003 CONCERNING APPLICATION OF RISK MANAGEMENT FOR COMMERCIAL BANKS THE GOVERNOR OF BANK INDONESIA,

GUIDELINES FOR FUNDING OF CENTRAL AND LOCAL GOVERNMENT COMMON AFFAIRS ON POVERTY ERADICATION BY THE GRACE OF THE ONE ALMIGHTY GOD

Development Impact Bond Working Group Summary Document: Consultation Draft

ENERGY MANAGEMENT PLAN ENERGY MANAGEMENT POLICY: ERG-1

Consultation response Ferd Social Entrepreneurs

Pidie Jaya, Indonesia

The Presidency Department of Performance Monitoring and Evaluation

EPWP INCENTIVE GRANT MANUAL

Thirty-Second Board Meeting Risk Management Policy

Islamic Republic of Afghanistan Ministry of Finance. Terms of Reference. Ministry of Finance, Directorate General Budget

Turning the Tide Tirer Parti de la Vague Grise Harnessing the Grey Wave. February 27, 2016 Justine Wadhawan, Liam Stormonth & Zoe Soper

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT

How to Develop High-Quality Full Application Writing a Winning Proposal

Multi level governance in Poland: program budgeting in the context of strategic planning. Grzegorz Orawiec Cracow 10 December 2013

AC workshop on the M&E of adaptation Nadi, Fiji, 9-11 September 2013

National Farmers Federation. Submission to the Draft Great Artesian Basin Strategic Management Plan 2018

ANNEX. to the COMMISSION DECISION

Plenary Session 4 : Regional Forum on Reinventing Government in Asia. Country presentation: Lao PDR. Sector

Administrative Classification of the Budget: Practical Experience of Reform in Tajikistan

Council conclusions on the review of the European Union Strategy for the Baltic Sea Region

Financial Report Instruction Manual

Kenya School of Government Centre for Devolution Studies Working Paper Series WORKING PAPER 2

8 Legislative Changes and Potential Impact of Provincial Reforms across Social Services

APEC Checklist of Enablers for Alternative Health Financing

Indonesia s Experience

Cabinet Committee on State Sector Reform and Expenditure Control STAGE 2 OF TRANSFORMING NEW ZEALAND S REVENUE SYSTEM

Lebanon s Experience in Producing its First Citizen Budget

Deliverable D7.2 Tool for influencing budget allocation

Local Government Institutional Review in Waste Management in Indonesia.

Financial Inclusion: Using Financial Education to Reach Out to Undeserved Groups and the Informal Sector

ANTI MONEY LAUNDERING (AML) POLICY

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

Oracle Banking Digital Experience

COPY REGULATION OF THE CHAIRMAN OF INVESTMENT COORDINATING BOARD REPUBLIC OF INDONESIA NUMBER 17 OF 2015


Running Your Business for Growth

Better Experiences, Better Outcomes

Bone Bolango, Indonesia

STRATEGY OF THE TAX ADMINISTRATION FOR THE PERIOD

Financial Management of Government (State) Universities in Indonesia

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

Question 1: Are you sufficiently informed about upcoming calls for proposals in a timely manner? What improvements would you suggest?

AUGUST 2016 LEGAL ALERT. agrarian, land and spatial layout. banking

SEPTEMBER 2017 LEGAL ALERT. general. agrarian affairs and spatial planning

Oracle Banking Digital Experience

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Towards robust quality management for European Statistics

THE REGIONAL MUNICIPALITY OF PEEL BY-LAW NUMBER

REPORT MARKET DISCIPLINE REPORT FINANCIAL YEAR Made in accordance with the Cyprus. Securities and Exchange Commission. Directive DI

The role of regional, national and EU budgets in the Economic and Monetary Union

1. Introduction. Juan Zapardiel / Carlos Palomino. Ministry of Economy and Finance SPAIN. The Spanish Public Administration Framework

The Pensions Authority. Public Consultation Guidelines

What does the Eurostat-OECD PPP Programme do? Why is GDP compared from the expenditure side? What are PPPs? Overview

SOCIAL AUDIT. 1) Name of the State. 2) Name of the district. 3) Name of Block. 4) Name of Gram Panchayat. 5) Name of the Village

STRATEGY OF PUBLIC INTERNAL FINANCIAL CONTROL DEVELOPMENT IN THE REPUBLIC OF SERBIA FOR THE PERIOD OF

This document can be shared by CB participants with Centers for input in advance of Board deliberations. Document Category Standard Document

Decentralization of corporate operations: Innovative management to increase operational efficiency A case of the National Health Insurance Fund

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices.

BANKS IN MICROFINANCE Guidelines for Successful Partnerships

Investing in the future

Annual report in brief

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

ANNEX to the Commission Decision C(2018)1514 of

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Section 3.07 is deleted and the following is substituted therefor:

COMMISSION ON REVENUE ALLOCATION GUIDELINES ON FORMATION OF THE COUNTY BUDGET AND ECONOMIC FORUM

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

Ladies and gentlemen, It is my pleasure to attend this 19th XBRL International Conference, especially focusing on the reduction of reporting burden

Audit of PCH Responsibilities related to the Roadmap for Canada s Official Languages : Education, Immigration, Communities

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

INTRODUCTION TO CAPITAL IMPROVEMENTS PROGRAMMING

Transcription:

A. BASIC INFORMATION: Title of the experience : OPTIMIZING E-MUSRENBANG TO SUPPORT PARTICIPATORY-BASED DEVELOPMENT PLANNING Name of city/region : SURABAYA Promoting entity: Country: INDONESIA Starting date: Finishing date : Population size: 2.883.800 Surface area: 326,36 km 2 Population Density: 8.836,25/km 2 GDP per capita: Rp. 156.860.000,- Sector of the economy: Trade sector Type of experience: Urban planning Referendum/Public consultation Open-government/ e-government Regional scope Entire Region Thematic area Urban management Local Development B. PROCESS DESCRIPTION OF THE CONTEXT IN WHICH THE EXPERIENCE OCCURRED Based on Regulation by Minister of Home Affair No. 54 of 2010 about the Implementation of Government Regulations No. 8 of 2008 about Stages, Preparation Procedures, Control, and Evaluation of the Implementation of Regional Development Plans and supported by Law No. 25 of 2004 about National Development Planning System. Development Planning Forum or unanonimously known as Musrenbang in Indonesia is one of the stages in development planning which involve society and people at large or also known as participative planning and development. The involvement of the people iduring this process is done through the submission of development proposal which started in the entry level forum namely Neighborhood Unit (RT) and Community Unit (RW) to the city level. In 2009 the initiative to create e-musrenbang application system has emerged, where the proposed development of society is no longer done manually but facilitated by the application system. There are changes in the submission of musrenbang proposal from 1

manual to online which results in a transformation in the administration system, change of organizational and administrative culture, and reformation towards a more worthy, easier and more transparent government service procedures. Transparency has become people's demand to be able to monitor the proposal that has been presented in musrenbang and was answered through the application system. OBJECTIVES The purpose of this online application development is to facilitate the supervision or monitoring. With open access to the widest appropriate authority, surveillance can be done not only by the competent authority, but also by all employees and the community who are willing to take time to assist the monitoring process. In addition to this application, opened channels to lodge complaints and suggestions were also provided which will be responded by Bappeko and may result in a healthy dialectic process. Utilization of progress and evaluation using e-musrenbang system is done through a coordination mechanism between Bappeko with each village / district and technical SKPD (Government Units and Agencies). DESCRIBE THE EXPERIENCE Filing people aspirations of the development planning from the local level up to the districts until 2008 were presented in the form of hard copy / print. If there were changes in the proposed development, reprinting it would be required, so it creates inefficiencies in both costs and time, and if citizens are asking the status of the proposal then the answer would be difficult to be given quickly and directly because they must track the proposal files and the results of the verification that has been done by SKPD. The documents submission pattern in a form of hard copy caused several problems including: 1. Proposal priority stipulation. It is necessary to prioritize the proposals because not every proposal submitted by society could be accommodated or realized due to 2

limited budget. 2. Conformity between proposals and program plans. Manual musrenbang recapitulation and implementation allowed unconformity between development planning proposals and program and activity plans that had been set forth by the government. This occured because the proposal had not yet been listed with set prices agreed by the government and thus led to inaccuracy in budget target; 3. Controlling or monitoring. Both the government and the society had difficulty in controlling or monitoring the proposal process because proposal recapitulation result was not outlined in a document or an application that can be viewed real time. The creativities made by Surabaya City Government in the website www.musrenbang.surabaya.go.id include : 1. It becomes possible to determine maximum priority budget in urban village level based on the number of neighborhoods, number of community units, total area as well as the number of poor families. This maximum priority budget will automatically limit the number of proposal intake since they couldn t exceed the ceiling budget. Therefore, the development in Surabaya could be evenly distributed in all areas and has been through society discussions and considerations. 2. It becomes possible to prioritize the proposals as per their urgency, availability and magnitude impact on the society. 3

3. It becomes possible to facilitate the reserved proposals as replacements if they have some weight in them. 4. The application could show the detail of development proposals accompanied with some photos of the accurate location based on survey conducted. 5. It could display the point of the proposed development location in spatial-based map by making the use of Geographic Information System (GIS). 6. It becomes possible to verify the development proposals in parallel between technical working units realizing the proposals and Development Planning Board as the development planner. 7. It could facilitate alternative proposals as a replacement if there is a proposal that otherwise does not pass the verification. 8. It could print the meeting minutes with a specific format that has been adapted to the prevailing regulations. The meeting minutes are also signed by representatives of the community and City Government authorities so that the proposals accountability in the application can be maintained. 9. Society can give a rating for the proposals in accordance with the area in which they live by providing like or unlike on the proposal through login by using identity card numbers. The rating could support the society point of view toward public affairs, that are Surabaya development in general as well as musrenbang proposal realization. 4

LEADERSHIP AND SHARED RESPONSABILITES. 1. Development Planning Board as implementing regional working unit which have roles in holding city musrenbang and providing the system as well as other data. 2. Sub-districts and urban villages, which have role in validating the proposals as well as the closest officials to the community. 3. Regional working units, as the verifiers of development activity implementation of the City Government and also as executors of the proposals from the community; 4. The community as the proposers that are represented by neighborhood and community units. 5. Surabaya City Council as the observer of musrenbang implementation. COLLABORATION WITH OTHER ENTITIES OR WITH OTHER DEPARTMENTS OF THE SAME MUNICIPAL GOVERNMENT Development Planning Board in implementing E-Musrenbang process, was collaborating with the following parties: 5

1. Regional Units such as urban village and sub-district; 2. Regional working units, as the verifiers of development activity implementation of the City Government and also as executors of the proposals from the community; 3. The community as the proposers that are represented by neighborhood and community units; 4. Surabaya City Council as the observer of musrenbang implementation. C. METHODOLOGY DESCRIBE THE METHODOLOGY AND THE PARTICIPATION MECANISMS IMPLEMENTED IN THE DIFFERENT STAGES OF THE PROCESS. 1. Develop e-musrenbang application continuously. This process is done by taking into account of musrenbang implementation mechanism as per the prevailing regulations. 2. Create the dictionary about the proposed activities which has been adjusted with standard unit price thus the community proposals and the development programs by Surabaya City Government could be synchronized. Therefore, it could improve government responsiveness toward citizen s demand and needs. 3. Make an online guideline for musrenbang procedure. 6

4. Install internet connection in all community units throughout Surabaya as much as 1.721 points to facilitate community to access musrenbang website; 5. Optimize the function of Broadband Learning Centers (BLC) which spread in strategic locations in Surabaya as a learning center of IT-based participatory planning process. 6. Coordinate with other regional working units, sub-districts and urban villages about musrenbang implementation. 7. Socialize and provide technical assistance on musrenbang to regional working units as well as the community; 8. Held meeting forum among regional working units and the community. This forum aims to obtain mutual agreement regarding type, location, and the volume of the proposals thus it demonstrates transparency through public consultation mechanism. 7

D. FUNDING STRATEGY AND BUDGET BUDGET Total amount and percentage amount over the total costs of the project/institution/department. The overall financing for the implementation came from Regional Budget of the City of Surabaya. FUNDING STRATEGY The source of fund came mainly from the local budget of the City of Surabaya and there area several supports in a form of Corporate Social Responsibility (CSR) from telecommunication provider to develop several BLCs which can be used to give learning access to the society related to information technology and other facilities for the community so that they can actively participate in the development process by submitting proposals and advices as well as critics to e-musrenbang. 8

E. INFORMATION SPREADING AND FEED-BACK TO THE PARTICIPANTS DESCRIPTION OF THE INFORMATION DISSEMINATED DURING THE PROCESS. The information conveyed to the public are: - Musrenbang is an open forum to identify and prioritize community development policies in order to achieve mutual agreement regarding development priorities and their budgets. - Musrenbang can be an effective means to engage citizens in local development planning. - Musrenbang serves to synchronize planning of 'bottom-up' and 'top down' in regional development. In E musrenbang there are 2 steps of login, the first one is the apparatus of the governments login, among others, RW team, Village, District, Region, and Bappeko. The second login is Surabaya residents by indicating the name and identification number, and identify themselves as citizens of Surabaya validated by e-ktp. In E musrenbang, there are guide manuals / filling procedures and the number of proposals that are categorized as RW proposals and the community proposals. Until now there are 1743 of RW proposals and 827 community proposals, other proposals were processed by (SKPD) with a total number of 2167 proposals. List of proposals can be seen in detail by district names in which there are many RW proposals and community proposals. The list of proposals based on existing community districts allow the districts to monitor the proposals. FEED-BACK TO THE PARTICIPANTS The target groups facilitated by e-musrenbang application system are as follows: - The society submitting their proposals. - Surabaya City Government officials. 9

- Surabaya citizens in general. The benefits obtained by Bappeko as the institution that accommodate the proposals and the society as the participants are: - More data accuracy on the proposals (the data namely location, type, volume, budget and the proposer are more accurate) - It could simplify work type grouping on the proposals. - Faster data processing and efficient time management due to the change in administrative process from manual to system. Hence, the new system has cut some unnecessary costs compared to the previous one. - People could easily validate whether their proposals have been verified by musrenbang team or not, completed with the photos of their proposals. - Development Planning Board or Surabaya City Government is able to estimate the budgetary needs of the proposed activity in the proposals quickly through the application. - All Surabaya citizens could participate by giving their opinions and comments on each proposal. 10

F. RESULTS TOTAL NUMBER OF PARTICIPANTS. PERCENTATGE OF PARTICIPANTS OVER THE TARGET POPULATION GROUP. PROFILE OF THE PARTICIPANTS. 1. RW proposal stage, followed by representatives from RW to make entry proposal to be sent to the village. The number of participants of representatives RW who take part, ± 5 people. 2. Village proposal stage, made by the village (village chief or his related staff) and some representatives are within RW authority. The number of participants of representatives who take part, ± 25 people. 3. Verification Phase, followed by representatives from RW, Village, Bappeko and some representatives of SKPD related directly to development work in the community. The number of participants is around 50-75 people. HAVE THE RESULTS BEEN DOCUMENTED? WHAT KIND OF DOCUMENTATION IS IT? HAVE OUTCOMES BEEN RETURNED TO THE CITIZENS? Yes, they have. In a form of photographs during musrenbang discussion, minutes of meeting, and e-musrenbang itself which is still used every year. In e-musrenbang, there are examples of proposals which dated back to 2009. IMPACTS ON PUBLIC POLICY. PLEASE DESCRIBE IF, ONCE THE EXPERIENCE HAS BEEN IMPLEMENTED, HAVE THERE BEEN CHANGES IN THE LEGISLATION, ACTIONS OF THE ADMINISTRATION (NEW PLANS, NEW PROJECTS), BUDGET AND/OR MUNICIPAL MANAGEMENT. Basically, this system is similar with the usual musrenbang, the only difference is that it was modified into an electronic system/computerized that has transparency and enables us to control cost and time so that the process can be more effective and efficient. Both Development Planning Board as the agency accommodating the proposals and the society as the participant have benefited from e-musrenbang application that 11

can be accessed via the website www.musrenbang.surabaya.go.id since 2009, as follows: 1. More data accuracy on the proposals (location, type, volume, budget and the proposer are more accurate) 2. It could simplify work type grouping on the proposals. 3. Faster data processing and efficient time management due to the change in administrative process from manual to system. Hence, the new system has cut some unnecessary costs compared to the previous one. 4. People could easily validate whether their proposals have been verified by musrenbang team or not, completed with the photos of their proposals. 5. Development Planning Board or Surabaya City Government is able to estimate the budgetary needs of the proposed activity in the proposals quickly through the application. 6. All Surabaya citizens could participate by giving their opinions and comments on each proposal. IMPACTS ON THE ACTORS. CULTURAL EFECTS AMONG PARTICIPANTS AND CULTURAL EFECTS AT THE ADMINISTRATION (TECHNICAL STAFF, POLITICAL STAFF) CAN BE DESCRIBED? People are already able to set priorities for development planning which are considered very important to them allowing them to take part in the determination of development priorities set by the government of Surabaya. EXTERNAL IMPACTS. IS THE EXPERIENCE TRANSFERABLE? CAN IT BE REPLICATED IN ANOTHER CITY OR BY ANOTHER ORGANISATION? This system can be implemented in other cities and regions since the mechanism is actually the same with other musrenbang implemented in other cities. This system was also developed in an open source manner and it does not use technology that has patents or copyrights that can be learned or adopted by the other parties without having to perform a procedure or mechanism related to Intellectual Property Rights (IPR). 12

G. EVALUATION AND MONITORING. DESCRIBE SHORTLY WHAT KIND OF EVALUATION (INTERNAL/EXTERNAL) HAS BEEN FORESEEN FOR THE PROCESS, WHO WILL CONDUCT IT AND WHICH PARAMETERS WILL BE MEASURED. HRD team in Technical SKPD and Development Planning Board as the proposals verificators and supervisors of musrenbang in each village and sub-district will also be verificators in internal level. While from external level the society represented by RT and RW as the program initiators will be the evaluators as the mechanism progress, since the application can be supervised real time and all citizens can participate by dropping their comments and opinions on each proposal. WILL CITIZENS BE INVOLVED IN THE EVALUATION? WILL THEY BE PROVIDED WITH THE EVALUATION S RESULTS? The people represented by the Neighborhood Unit (RT) and Community Unit (RW) or even the concerned individuals themselves can evaluate the musrenbang results online. Progress utilization and evaluation using e-musrenbang system is done through a coordination mechanism between Bappeko with village / district and technical SKPD. ONCE THE EVALUATION PROCESS IS FINALIZED, IS THERE A CITIZENS MONITORIZATION/ FOLLOW UP PROCESS FORESEEN? When the proposed development plan submitted by the community online, controlling can be easily done either by city officials and by society itself due to the fact that recapitulation of the proposals has already been displayed in the application that can be monitored real time and can be accessed easily. In this case, the process is aided by the facility called Broadband Learning Center (BLC) spread in strategic points in the city of Surabaya as to include suggestions and complaints to the application of e-musrenbang. 13

H. ABSTRACT AND CONCLUSIONS. HIGHLIGHTS OF THE EXPERIENCE. The main highlights of e-musrenbang implementation are among others: 1. The implementation of participatory development planning so that people can contribute directly to the development planning process; 2. The development implemented by the Surabaya City Government has been right on target so that the budget allocated by the government of Surabaya is not wasted and can be useful for the development of society, both the physical and non-physical; 3. The development activities undertaken by the government of Surabaya can be controlled by the people because they themselves know exactly the location and volume of development activity. FUTURE CHALLENGES TO ACHIEVE. One of the potential challenges thay may emerge in e musrenbang implementation is the socialization process. It is also necessary to make the application more user friendly so that the society can evaluate the proposals easily. Socializations towards 31 sub districts and 160 urban villages initiated opportunity for horizontal agitation. In that state, either intensive approach by conducting coordination meeting or administrative approach by issuing formal letter on Musrenbang procedures can be taken. 14

WHY CAN THE EXPERIENCE BE CONSIDERATED INNOVATIVE? One of the goals of this e-musrenbang development is to facilitate supervision or monitoring. Utilization of Information Technology in this process is expected to help improve the efficiency of the budget and the administrative process as well as time so that the quality, accountability and transparency of the planning generated also increases. The innovation made by the Surabaya City Development Planning Board is a new innovation and need to be developed further, because in 2016 it can be implemented as pilot project in other areas either inter-city or regional districts of the province and among the provinces in Indonesia. 15