COMMISSION OF THE EUROPEAN COMMUNITIES. CORRIGENDUM : Ce document annule et remplace le COM(2008)334 final du Concerne la version EN.

Similar documents
COMMISSION OF THE EUROPEAN COMMUNITIES

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on the European Year for Active Ageing (2012) (text with EEA relevance)

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL DECISION

Evaluation of the European Neighbourhood Instrument Draft Report Executive summary January 2017

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

PROPOSAL FOR AMENDMENTS

EVALUATION AND FITNESS CHECK (FC) ROADMAP

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

Annex to the EX-ANTE EVALUATION

(Information) INFORMATION FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION

Annex 1: Conceptual Framework of the Swiss-Slovenian Cooperation Programme

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

EN 1 EN. Rural Development HANDBOOK ON COMMON MONITORING AND EVALUATION FRAMEWORK. Guidance document. September 2006

COMMISSION IMPLEMENTING DECISION. of

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a COUNCIL DECISION

Guidance for Member States on Performance framework, review and reserve

CORRIGENDUM: Annule et remplace le document COM(2011) 615 du Concerne: toutes les versions linguistiques. Proposal for a

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION IMPLEMENTING DECISION. of

L 201/58 Official Journal of the European Union

Proposal for a COUNCIL DECISION

EU financial instruments under the multiannual financial framework (MFF) 2021 to 2027:

Council conclusions on the review of the European Union Strategy for the Baltic Sea Region

Guide to Financial Issues relating to Indirect Actions of the Sixth Framework Programmes

REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT. on the feasibility of a network of smaller credit rating agencies

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Official Journal of the European Union L 144/3

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

CORRIGENDUM: Annule et remplace le document COM(2011) 627 final du 12 octobre 2011 Concerne les versions FR/EN/DE (table des matières) Proposal for a

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Towards robust quality management for European Statistics

Ex-post Evaluation of ENPI CBC Programmes

11813/17 RGP/kg 1 DG G 2A

Horizon Observations and Call for Amendments by Fraunhofer Gesellschaft

COMMISSION IMPLEMENTING DECISION. of

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

EN Official Journal of the European Union L 77/77

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. Establishing the European Voluntary Humanitarian Aid Corps

COMMUNITY GUIDELINES ON STATE AID TO PROMOTE RISK CAPITAL INVESTMENTS IN SMALL AND MEDIUM-SIZED ENTERPRISES

REPORT FROM THE COMMISSION TO THE EUROPEAN COURT OF AUDITORS, THE COUNCIL AND THE EUROPEAN PARLIAMENT

COMMISSION OF THE EUROPEAN COMMUNITIES. Implementing the Community Lisbon programme. Proposal for a

Proposal for a COUNCIL REGULATION

ERIC. Practical guidelines. Legal framework for a European Research Infrastructure Consortium. Research and Innovation

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION

Proposal for a COUNCIL REGULATION. establishing an Instrument for Nuclear Safety Cooperation. {SEC(2011) 1472 final} {SEC(2011) 1473 final}

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL DIRECTIVE

EUROPEAN UNION. Strasbourg, 16 April 2014 (OR. en) 2013/0238 (COD) LEX 1514 PE-CONS 43/2/14 REV 2 DEVGEN 37 ACP 27 RELEX 145 CODEC 474

L 347/174 Official Journal of the European Union

PE-CONS 3619/3/01 REV 3

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION

Evaluation of the European Union s Co-operation with Kenya Country level evaluation

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

(Acts whose publication is obligatory) REGULATION (EC) No 1927/2006 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 20 December 2006

EUROPEAN UNION. Brussels, 22 November 2013 (OR. en) 2011/0384 (COD) PE-CONS 68/13

REPORT 2015/009 INTERNAL AUDIT DIVISION. Audit of a donor-funded project implemented by the International Trade Centre in Côte d Ivoire

(Legislative acts) REGULATIONS

15536/17 FP/aga 1 DGC 2B

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL DIRECTIVE

6315/18 ML/ab 1 DG G 2A

COUNCIL OF THE EUROPEAN UNION. Brussels, 7 November /05 Interinstitutional File: 2004/0154 (COD)

REPUBLIC OF CROATIA MINISTRY OF REGIONAL DEVELOPMENT AND EU FUNDS EVALUATION STRATEGY FOR EUROPEAN STRUCTURAL INSTRUMENTS

COMMISSION DECISION. C(2007)6121 of 12/12/2007

2006 discharge: European Foundation for the Improvement of Living and Working Conditions

The approved ESPON 2020 Cooperation Programme. ESPON ECP Meeting 9-10 December 2015 in Luxembourg

Non-Paper from the services of DG Competition for discussion at a first Multilateral Meeting with experts from the Member States

COMMISSION EUROPÉENNE

ACP-EU JOINT PARLIAMENTARY ASSEMBLY RESOLUTION 1

EUROPEAN COMMISSION. The Commission has based its decision on the following considerations:

COMMISSION OF THE EUROPEAN COMMUNITIES

Cohesion Policy Territorial Co-operation

Recommendation for a COUNCIL DECISION. authorising the opening of negotiations for a Free Trade Agreement with New Zealand

Proposal for a COUNCIL DIRECTIVE

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION

COMMISSION OF THE EUROPEAN COMMUNITIES. Recommendation for a COUNCIL OPINION

SERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

COMMISSION OF THE EUROPEAN COMMUNITIES. Recommendation for a COUNCIL OPINION

COUNCIL OF THE EUROPEAN UNION. Brussels, 23 November /01 LIMITE SOC 469 ECOFIN 334

European Economic and Social Committee OPINION. of the European Economic and Social Committee on. (exploratory opinion)

Discharge 2012: Innovative Medicines Initiative Joint Undertaking

Report on the annual accounts of the Bio-based Industries Joint Undertaking for the financial year Together with the Joint Undertaking s reply

5876/17 ADD 1 RGP/kg 1 DG G 2A

ALDE POSITION PAPER ON EU BUDGET POST 2013

COMMISSION OF THE EUROPEAN COMMUNITIES

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION THE STRUCTURAL FUNDS AND THEIR COORDINATION WITH THE COHESION FUND

MEMO. Why a European promotion policy for agricultural products?

COMMISSION OF THE EUROPEAN COMMUNITIES

Official Journal of the European Union L 306/33

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

Proposal for a COUNCIL REGULATION. laying down the multiannual financial framework for the years

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a COUNCIL DECISION

INTERREG IIIC West Zone. Programme Complement

This action is funded by the European Union

Transcription:

EN EN EN

COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 22.01.2009 COM(2008)334 final/2 CORRIGENDUM : Ce document annule et remplace le COM(2008)334 final du 3.6.2008. Concerne la version EN. COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS Final evaluation of the eten Programme (presented by the Commission) EN EN

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS Final evaluation of the eten Programme (Text with EEA relevance) 1. INTRODUCTION This Communication provides a final evaluation of the eten Programme covering the period from re-orientation in 2002 until programme end in December 2006 in response to the requirement expressed in Article 19 of the Financial Regulation covering the programme. 2. BACKGROUND eten evolved from the TENs initiative 1 whose objectives were to provide Trans- European networks in the areas of transport, telecommunications and energy. Developing European transport, telecommunications and energy infrastructures are ambitious objectives 2 and are referred to in the Treaty and the Guidelines for growth and jobs 3. The objective of eten was to contribute to the development of the Information Society in terms of growth, employment, social cohesion and participation for all in the knowledge-based economy. The main themes covered were egovernment and eadministration, ehealth, einclusion and elearning. A sixth theme paying particular attention to SMEs was added at a later stage. Until 2005, all TENs shared a common financial legal base 4 (hereinafter referred to as "The Financial Regulation"). under which a maximum grant of 10% of the Total Investment Cost 5 could be made. Within this limit eten funded projects to a level of 50% for Feasibility and Evaluation Studies 6, and to a level of 10% for projects involving the deployment of services. The financial legal base for eten was revised 1 2 3 4 5 6 The Trans-European Network (TEN) initiative is based on articles 154, 155 and 156 of the Treaty establishing the European Community, which set the objective of establishing Trans-European networks in the areas of transport, telecommunications and energy. COM (2007) 0135 Communication from the Commission Trans-European networks: Towards an integrated approach {SEC(2007) 374}. Guidelines for growth and jobs (2005-2008) No 9, 10, 11 and 16. Regulation (EC) No1655/1999 of the European Parliament and of the Council of 19 July 1999, amending Regulation (EC) No 2236/95 laying down general rules for the granting of Community financial aid in the field of trans-european networks (OJ L 282, 24.11.1995, p. 16). Article 5 of Regulation No 1655/1999. Article 4 para 1(a) of Regulation No 1655/1999. EN 2 EN

in 2005 7 to allow increased grants of up to 30% of the Total Investment Cost for deployment projects. In conformance with requirements of the Treaty, a set of Guidelines was produced covering the objectives, priorities and broad lines of measures envisaged and identifying projects of common interest 8 (hereinafter referred to as "The Guidelines"). The Guidelines were modified in 2002 to bring the programme more in line with Community policies and especially with i2010. At the same time the name of the programme was changed from TEN Telecom to eten. Article 19 of the TEN's Financial Regulation requires the Commission to submit to the European Parliament and the Council a comprehensive report on the experience gained with the mechanisms under the Financial Regulation for granting Community aid, in particular the mechanisms and provisions laid down in Article 4. This document responds to this request. eten was implemented through cost-shared projects selected on the basis of public calls for proposals. A total of 149 cost shared projects were established following public calls for proposals with a total funding of just over 160 million. Projects from the 2003 and 2004 programmes have been completed but those from 2005 and 2006 are still ongoing. All projects are expected to complete by the end of 2009. A midterm evaluation was completed in 2005 9 and this covered the results of projects from programmes up to and including 2002 as well as initial results from the eten programme which started in 2002. 3. CONDUCT OF THE EVALUATION The evaluation assessed the following issues: relevance of the programme's objectives, priorities and means of implementation, the effectiveness and impact of the programme, its efficiency and cost effectiveness, its utility and sustainability, and causal links from resources used through to activities and presumed impacts (the intervention logic). This evaluation was carried out in 2007 by a team of professional evaluators from a company 10, which was contracted for that purpose. They provided a clear assessment through a thorough analysis of the available evidence consisting of monitoring and evaluation material, and programme documentation and outputs. The evaluators further enhanced the quality of the evidence base by undertaking interviews with key stakeholder representatives. The Commission hereby communicates the results of the evaluation in accordance with the Regulation concerning the programme. 7 8 9 10 Regulation (EC) No 1159/2005 of the European Parliament and of the Council of 6 July 2005 Decision No 1376/2002/EC of the European Parliament and of the Council of 12 July 2002 amending Decision No 1336/97/EC on a series of Guidelines for trans-european telecommunications networks.(oj 2002/ L200/1 of 30.07.2002) COM (2005)354 final, 1 Aug 2005. RAND Europe, contracted on the basis of a restricted call for tenders issued by DG Information Society in the autumn of 2006. EN 3 EN

4. EVALUATION RESULTS Annex 1 of this Communication contains the complete set of Findings provided in the evaluator's report. The Commission welcomes the evaluation report and its findings confirming both the effectiveness of the programme management and the utility of the programme. The Commission believes, contrary to the findings of the evaluation report, that certain synergies between the eten programme and the European Cohesion Fund have already been created. Entities from New Member States have been very successful in eten based on the financial contribution from New Member States of about 5% and their return in terms of project funding which has been about 11%. Actual experience with project results is a sound basis for further deployment of services and it is known that some entities have already approached the European Cohesion Fund to support the further deployment of services. When the majority of projects have been completed further synergies can be expected. The Commission will report on this matter in the midterm report of the ICT Policy Support Programme of the CIP in 2009. It also recognises some weaknesses identified by the professional evaluators, notably on the time from closure of call to contract award and long project time-scales. It notes that these weaknesses have however had a minor effect on the overall programme implementation: The Commission has already initiated new services which will reduce such delays in the future. It welcome the positive assessment of the programme design; the efficiency of the programme management; and the programme's potential to deliver sustainable results, generate positive impacts and add real value by mobilising all of the functions necessary to successful ICT deployment and catalysing structural changes. The results provide also evidence that the Policy Support Programme of the Competitiveness and Innovation Programme (CIP) can be expected to build on the results of eten. It considers that implementing such a unique set of funding mechanisms has been a particular challenge for all actors involved, and welcomes that the evaluators have recognised the efforts which resulted in major improvements in the late stages of the programme. 5. CONCLUSIONS OF THE COMMISSION The Commission considers that this is a very positive report confirming both the effectiveness of the programme management and the utility of the programme. Some weaknesses have been identified but these have had a minor effect on the overall programme implementation. Immediate impacts are the involvement of stakeholders from New Member States, SMEs and public bodies favouring the further deployment and uptake of project outputs at a pan-european level and the competitive health of markets for these and related services. Based on the results so far the programme may thus reasonably be expected to produce strong overall impacts by stimulating new areas of activity and EN 4 EN

demonstrating the ways in which ICTs may contribute to effective policy relating to innovation and the Lisbon Agenda and i2010 objectives. The results provide evidence that the follow on programme, the Policy Support Programme of the CIP, can be expected to build effectively on the results of eten. Work will continue into 2009 by both the evaluators and the Commission to determine the impact of projects from later years of the eten Programme. The Commission will report on this work in the midterm evaluation of the Policy Support Programme of the CIP. EN 5 EN

Annex 1: Key Findings from the Evaluator's Report RAND Europe has undertaken a final evaluation of the eten programme. This programme nominally finished at the end of 2006 although some project activities contracted late in its life continue. Key findings of the evaluation are as follows:- Overall success of the Programme eten was ultimately a well run and, in its later stages, successful programme, which contributed to the attainment of its over-arching objectives. This finding is, however, qualified in two ways. Success was not achieved without difficulties, particularly in the early years of the programme. Additionally the extent of its success is not quantifiable in part because its impacts are not yet fully visible and in part because its overarching objectives were expressed in qualitative terms without specific measurable success criteria. Programme Implementation Mechanisms Funding mechanisms other than grant aid were not utilised: this is unsurprising given the modest size of the projects, and we do not consider that this significantly affected the programme s performance. Linkage to the European Regional Development Funds and the European Social Fund was weak, despite the apparent scope for benefits. The Market Validation (MV) project mechanism was initially over-utilised (in part because of its more favourable financial arrangements for participants); this was remedied in the later stages of the programme. Many MV projects commissioned before the reorientation did not result in any visible subsequent deployment; this situation also improved in the later stages of the programme. The Initial Deployment (ID) project mechanism came on stream late, but worked well, particularly following the much-delayed implementation of the 30% cap on overall support as a proportion of total cost. Some promising deployments are now in progress and prospect, including some originating from earlier MV projects. The funding contracts allowed for insufficient flexibility. Project reviews were consequently limited in their ability to either direct or sanction necessary major changes of direction during project implementation. In interviews, some project managers reported an impression that they had no realistic means of modifying this situation even when the problem had been recognised. Efficiency of Programme Management From 2003 no major management issues arose and the standards of management processes; fairness, openness and transparency, and efficiency of day-to-day management were excellent. The operational procedures for preparing Work Programmes and Calls, their accompanying documentation and the receipt and evaluation of proposals improved continuously throughout the programme. Significant initial problems (particularly with proposal evaluation) were overcome and these mechanisms were subsequently satisfactory and, by the end of the programme, became excellent. EN 6 EN

Objective formulation and its reflection in work programme creation were sound and appropriate: we found no reason to criticise the evolution of objectives and indeed consider this responsiveness to change in the programme s external market (and policy) environment a very positive feature. The process leading to contracting projects (a sequence consisting of selection, credential checking, and negotiation of the technical annexes to contracts) took too long. This had been noted as a problem by the Intermediate Evaluation, and continued thereafter. In addition, project time-scales were long relative to private-sector counterparts and the dynamics of fastmoving sectors. This, together with the delays in contracting projects, frequently resulted in a very long time to market, which is likely to have worked against successful deployments and reduced their potential impacts. Effectiveness, Achievements and Impacts The programme made considerable progress in involving stakeholders from New Member States, SMEs and public bodies. Their participation strongly favours the further deployment and uptake of project outputs at a pan-european level and the competitive health of markets for these and related services. Activities in the latter stage of the programme promise good impacts through the formation of sector-based value chain communities (especially in the public sector). The emphasis placed in the latter stages of activity on inclusion in projects of the full value chain including sustaining partners and sustaining revenue streams was fully validated and represents an important lesson for future programmes. Fulfilment of Programme Objectives The later stages of the programme we find to have added real value through actions seeding and/or exemplifying structural change and also through placing actual deployment at the centre of policy development. The programme may thus reasonably be expected to produce strong overall impacts by stimulating new areas of activity and demonstrating the ways in which ICTs may contribute to effective policy relating to innovation and the Lisbon Agenda and i2010 objectives. Sustainability of Activities Long-term sustainability of activities is difficult to assess at this stage. However, the involvement of the whole value chain (adopted in the later and more productive stages of the programme), and the specific example provided by some of the projects that have proceeded into wider deployment via these value chains, strongly suggests a positive prognosis. EN 7 EN