Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update

Similar documents
WEST HASTINGS ST. VANCOUVER, B.C. V6E 3T5 CANADA T F TSX.V: MLN

Q3 and First Nine Months 2017 Highlights

Marlin and Sailfish Execute Agreement to Acquire Significant Gold Royalty Spin- Out of Sailfish to Marlin Shareholders Expected in Q4

Mako Mining Provides Corporate Update

News Release. B2Gold Corp. Announces Positive Results from the Preliminary Economic Assessment for the Gramalote Project in Colombia

NEWS RELEASE NR: October 11, 2017

MIDWAY ANNOUNCES SIGNIFICANT UPGRADE IN RESOURCE AND 2014 BUDGET INCREASE AT SPRING VALLEY PROJECT, NEVADA

NEWS RELEASE K92 MINING INC. K92 Mining Discovers High Grade Extension of Kora Deposit in First Completed Exploration Hole

GOLDEN REIGN AND MARLIN GOLD ENTER INTO ARRANGEMENT AGREEMENT TO COMBINE BUSINESSES AND AMEND STREAM AGREEMENT WITH SAILFISH ROYALTY

NEWS RELEASE 03/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742

New Drilling Results and Mineral Resource Update for Certej Deposit Gold Resources Increase by 1,570,000 ounces

Avnel Gold Reports that Indicated Resources Increased 55% to 2 Million Ounces at the Kalana Main Project

Spanish Mountain Gold Announces Results of New PEA for the First Zone

Velocity Hole RDD-009 Intersects New Zone at Rozino Gold Project, Southeast Bulgaria

Velocity Files NI Technical Report on SEDAR for the Maiden Inferred Mineral Resource Estimate at Rozino Gold Project, Southeast Bulgaria

LEAGOLD FILES UPDATED TECHNICAL REPORT FOR LOS FILOS GOLD MINE, INCREASING RESERVES BY 59% TO 2.7 MILLION OUNCES GOLD

Exeter Secures Second Water Source Outlines Pathway for First Stage Development of Caspiche Oxides

ATLANTIC ANNOUNCES STRATEGIC INVESTMENT IN VELOCITY MINERALS LTD.

MAG Silver Corp. August 14, 2013

SHAHUINDO GOLD PROJECT DELIVERS POSITIVE ECONOMICS

GGX Gold Drill Intercepts Meter of 4.59 g/t Gold and g/t Silver. The COD Vein Greenwood BC

TSX.V:ORG Page 1 of 7. Orca Gold Inc West Georgia St. Vancouver, B.C., V6C 3E8, Canada Tel: Fax: HIGHLIGHTS

Stock Symbol: AEM (NYSE and TSX) For further information: Investor Relations (416)

COLONIAL COAL INTERNATIONAL CORP. Suite Howe Street, Vancouver, British Columbia, Canada, V6C 2T5 Telephone: (604)

Coeur Announces Initial Reserve Estimate and Reserve-Based Mine Plan for Silvertip Mine

Velocity Continues to Expand East Zone Discovery at Rozino Gold Project, Southeast Bulgaria

Velocity Announces C$9M Strategic Investment by Atlantic Gold

Argonaut Gold Announces Updates on the Magino and San Agustin Projects. Magino Metallurgical Column Test Work Shows Results of up to 70% Recovery

Nordic Gold Completes 1,234 Ounce First Pour

Cumberland Completes Cannu Gold Resource Estimate, Plans for New Reserves and Continued Exploration in 2007 at Meadowbank Gold Project

Minera Alamos Enters Option Agreement to Acquire Guadalupe de Los Reyes Advanced Stage Gold-Silver Project in Mexico from Vista Gold

Corvus Gold Announces Maiden Resource for Mother Lode Deposit, Nevada

CANAMEX RESOURCES CORP. Suite 303, 595 Howe Street Vancouver, B.C. V5C 2T5 Phone: (604) Fax: (604)

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

NEWS RELEASE New York AG February 25, 2019 Toronto FR Frankfurt FMV

NEWS RELEASE Orca Gold Intersects 13m at 10.19g/t Au and 93.7m at 1.72g/t Au at its Block 14 Gold Project in Sudan

Prophecy Reports 2.08 Million Tonnes of Indicated Resource Grading: 455 g/t Silver, 3.19% Zinc, 2.18% Lead (594 g/t Ag Eq.) for Pulacayo Project

NEWS RELEASE February 13, 2018

Q4 and Year End 2012 Conference Call. ArgonautGold.com

Velocity Extends East Zone Discovery at Rozino Gold Project, Southeast Bulgaria

Nordic Gold Secures Funding to Complete the Path to Production

NEWS RELEASE February 15, 2017

Coeur Files Technical Report for Kensington Mine

MARLIN GOLD MINING LTD. MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE AND SIX MONTHS ENDED JUNE 30, 2018

NEWS RELEASE. Equinox Gold to Acquire the Mesquite Gold Mine in California for $158 Million Announces Concurrent $75 Million Equity Financing

TSX:AR CORPORATE PRESENTATION

CORPORATE PRESENTATION

ALAMOS GOLD INC. 130 Adelaide Street West, Suite 2200 Toronto, Ontario M5H 3P5 Telephone: (416) or 1 (866)

SilverCrest Announces Babi Sur Vein High-Grade Discovery at Las Chispas 2.2 Metres Grading 556 gpt AgEq. 1.5 Metres Grading 606 gpt AgEq

Capstone Mining 2017 Production Results and 2018 Operating and Capital Guidance

(PEA) for its project in. anticipated. which are. to produce. Highlights. ounces is now. The 3,500 tpd. After-tax NAV. Guatemala this year,

AGNICO EAGLE TO ACQUIRE CAYDEN RESOURCES

Allied Nevada Announces Improved Mine Plan and Economics for Hycroft Mill Expansion With 77% IRR and $2.7 Billion NPV

Allied Nevada Reports Gold Equivalent Measured & Indicated Resources of 10.3 Million Ounces and Further Inferred Resources of 7.

Trevali Provides Murray Brook Project Update

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: November 12, 2009

# West Georgia Street, Vancouver, B.C., Canada, V6C 3E8 p: f:

Marigold Life of Mine Plan

TSX.V: TEN US: TCEGF

TSX.V: TEN US: TCEGF

Orezone Announces Positive Preliminary Economic Assessment

METALLA ANNOUNCES FRIENDLY ACQUISITION OF VALGOLD AND ROYALTY ON THE GARRISON PROJECT

MANAGEMENT S DISCUSSION & ANALYSIS QUARTERLY HIGHLIGHTS SEPTEMBER 30, 2017

Corporate Presentation

MINERA ALAMOS AND COREX GOLD COMBINE TO CREATE A LEADING MEXICAN GOLD COMPANY

MCEWEN MINING ANNOUNCES UPDATED PRELIMINARY ECONOMIC ASSESSMENT FOR THE LOS AZULES COPPER PROJECT (All Dollar Amounts in US Dollars)

BMO 2012 Global Metals & Mining Conference February 2012

Highlights Achievements to Date

Coeur Provides Updated Palmarejo Mine Plan

CORPORATE PRESENTATION TSX-V: MLN OTCQX: MLNGF FEBRUARY 2017

SECOND QUARTER 2018 RESULTS. August 10, 2018

METALLA ADDS PRODUCING ROYALTY ON PAN AMERICAN SILVER PROPERTY AND ANNOUNCES BROKERED PRIVATE PLACEMENT

ESPERANZA UPDATES CERRO JUMIL PROJECT

MANAGEMENT S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS FOR THE THREE AND SIX MONTHS ENDED MAY 31, 2018 AND 2017

APRIL Balkan Gold Project

PRESS RELEASE New Gold Reports Consolidated Reserve & Resource Statements

PRESS RELEASE. Banro Files NI Technical Report on Namoya Project, Democratic Republic of the Congo

MANAGEMENT DISCUSSION AND ANALYSIS QUARTERLY HIGHLIGHTS

Argonaut Gold Announces First Quarter 2015 Production of 43,255 Gold Equivalent Ounces

Antioquia Gold Announces Preliminary Economic Assessment and Mineral Resource Update for Cisneros Gold Project

Jinshan Gold Mines Inc. April 24, 2006

Trevali expands high-grade zinc-lead-silver mineralization at Santander Zinc Mine and discovers new Central-Oyon zone

Alio Gold Reports Second Quarter 2018 Results

NEWS RELEASE. Centerra Gold Announces Positive Feasibility Study on the Öksüt Project

Corporate Update. June 2013

Bellhaven Receives Favourable Preliminary Economic Assessment for its 100%- Controlled La Mina Gold-(Copper, Silver) Project, Colombia

AGNICO-EAGLE MINES LIMITED. Corporate Update. May 2012

Corvus Gold Outlines Mother Lode Project Exploration and Resource Definition/Mine Development Plan

Caledonia Mining Corporation (TSX: CAL, OTCQX: CALVF, AIM: CMCL) Revised Investment Plan and Production Projections (2015 to 2021)

Coeur Reports Year-End 2016 Mineral Reserves and Resources

AVINO SILVER & GOLD MINES LTD.

October 01, 2018 News Release Release #

Northgate Minerals Reports Second Quarter Results

For Immediate Release Date: July 4, 2017 # ORVANA PROVIDES UPDATE ON DON MARIO OPERATION; ANNOUNCES US$11.3 MILLION DEBT FINANCING

The greatest shareholder gains are frequently made at the time of discovery

For further information: Investor Relations (416)

NEWS RELEASE March 8, 2017

NEWS RELEASE Orca Gold Intercepts 39m at 2.52 g/t Au in The Republic of The Sudan and 27.7 m at 1.74 g/t Au in Côte d Ivoire

RNC MINERALS. Q Results Conference Call TSX:RNX. November 15, 2017

SCHAFT CREEK PROJECT. Moving A Giant Porphyry Deposit Towards Production TSX.V:CUU OCTOBER February 2012

Transcription:

250 1199 WEST HASTINGS ST. VANCOUVER, B.C. V6E 3T5 CANADA T. 604 646 1580 F. 604 642 2411 WWW.MARLINGOLD.COM TSX.V: MLN Marlin Gold Closes Acquisition of Commonwealth Silver and Gold and Provides Corporate Update NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR RELEASE OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES May 21, 2015 Vancouver, British Columbia Marlin Gold Mining Ltd. (TSX V: MLN) ("Marlin" or the Company ) is pleased to announce that it has completed the acquisition of Commonwealth Silver and Gold Mining Inc. ( Commonwealth ). The acquisition of Commonwealth provides Marlin a path towards internally financed production growth. With the operating La Trinidad mine approaching its highest grade and most profitable ounces prior to the construction of the Commonwealth Project in Cochise County, Arizona (the Project ), Marlin expects to have the ability to internally fund the Project through operating cash flow and through a potential Sailfish Royalty financing once a construction decision is made. Highlights of the Commonwealth Acquisition The key investment highlights of the acquisition of Commonwealth include: Attractive Investment Opportunity The Commonwealth Project is an advanced stage open pit heap leach project with approximately 985,000 gold equivalent ounces (1) in the Measured and Indicated categories with an additional 200,000 gold equivalent ounces (1) in the Inferred category according to Commonwealth s existing Preliminary Economic Assessment for the Project, entitled National Instrument 43 101 Technical Report Preliminary Economic Assessment, Commonwealth Silver and Gold Project, Cochise County, Arizona, USA, and dated April 30, 2014, with an effective date of November 30, 2013 (the PEA ). When in production, the Commonwealth Project is expected to produce an average of 1.3 million oz of silver and 35,800 oz of gold per year for 8.5 years. 1 Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources estimated will be converted into Mineral Reserves. Measured and Indicated Mineral Resources captured within the pit shell meet the test of reasonable prospect for economic extraction and can be declared a Mineral Resource. Inferred Mineral Resources are that part of the Mineral Resource for which the quantity and grade or quality are estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity, due to insufficient exploration to date. All resources in the PEA (as defined below) are stated above a 0.2 g/t gold equivalent ( AuEq ) cut off. Pit optimization is based on assumed gold and silver prices of US$1,350/oz. and US$22.50/oz., respectively and mining, processing and G&A costs of US$7.25 per tonne. Metallurgical recoveries for gold and silver were assigned by lithologic unit. Mineral resource tonnage and contained metal have been rounded to reflect the accuracy of the estimate, and numbers may not add due to rounding. Gold Equivalent stated using a ratio of 60:1 and ounces calculated using the following conversion rate: 1 troy ounce =31.1035 grams. Metallurgical recoveries are not accounted for in the gold equivalent calculation.

2 Robust Economics The Commonwealth Project has a base case after tax NPV 5% of US$101.3 million and after tax IRR of 58.2% (1) according to the PEA at a gold price of US$1,350/oz, a silver price of US$22.50/oz and a 0.24 g/t AuEq cut off grade. (2) Favorable Jurisdiction The Commonwealth Project is located in Cochise County, Arizona, a wellestablished and mining friendly jurisdiction. It is in proximity to established infrastructure with access to a skilled labour force from local communities and throughout the greater regional area. Accretive to Marlin Shareholders At a total acquisition cost of $11.25 million, including approximately $3.85 million in assumption and payment of Commonwealth liabilities, the acquisition is accretive to Marlin shareholders on a NAV per share and cash flow per share basis. Significant Increase to Marlin s Estimated Mineral Resources & Expected Production On a proforma basis, Marlin s total Measured and Indicated gold equivalent resources are expected to increase by 396% and estimated life of mine production will increase by 282%. (2) Fits Marlin s Operational Team s Expertise Marlin s technical team has a proven track record of building open pit heap leach mines and hopes to fast track development of the Commonwealth Project. Diversifies & Strengthens Marlin Allows Marlin to diversify its asset base with silver resources and provides Marlin with a second near term development project. The acquisition also provides Marlin with an asset for a potential third royalty streaming opportunity for its royalty subsidiary company, Sailfish Royalty Corp. Marlin adapts to a volatile gold price environment by evaluating satellite targets and further accelerates HS Zone development Based on positive exploration and trenching results, Marlin has started to advance the San Carlos satellite target approximately 3km north from our primary Taunus pit within the La Trinidad project in Sinaloa, Mexico. The San Carlos area is included in the existing 699 hectare exploitation permit within our 118,518 hectare land package encompassing La Trinidad. If exploration results are supportive of a production decision, we can be in a position to begin mining this area within four months. The mineralization outcrops on surface, and management has begun to develop a block model which will be the basis for an optimized pit design. An access road to the target was completed earlier this month, and a drill rig is on its way to site to help define tonnage and grade of the target. 2 Gold equivalent resources and life of mine production are derived from the Commonwealth PEA and the 2 nd Amended NI 43 101 Technical Report Preliminary Economic Assessment for the Trinidad/Taunus Project, Sinaloa, Mexico, dated February 1, 2013, with an effective date of June 1, 2012 (the Trinidad/Taunus PEA ). Life of mine production assumes production in 2015 and beyond. Calculated at a gold price of US$1,350/oz and silver price of US$22.50/oz. The Trinidad/Taunus PEA is preliminary in nature, and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the Trinidad/Taunus PEA will be realized.

3 San Carlos Geology and Mineralization The mineralization at San Carlos is related to a structurally controlled, highly fractured zone containing disseminated pyrite, which contains patches of silicification and near surface oxidation. Oxidized material may be amenable to heap leaching using our current infrastructure at La Trinidad. The mineralized units are in dacite and fine black magnetic andesite, with the latter containing more than 95% of the known mineralization. After several encouraging trench and surface rock analysis results, Eldorado Gold drill tested this zone in the mid 1990 s. The best drill hole intersections reported by Eldorado were: Drill Hole From To Interval (m) Au g/t SCC 01 0 6 6 0.65 78 84 6 0.34 SCC 02 0 30 30 0.35 70 72 2 0.36 SCC 03 0 44 44 0.51 60 102 42 1.66 134 152 18 1.46 SCC 04 8 20 12 0.32 28 30 2 0.72 38 42 4 0.35 50 52 2 0.27 64 66 2 0.54 72 90 18 0.28 SCC 05 12 14 2 0.70 74 76 2 1.34 102 128 26 0.34 150 156 6 0.36 170 178 8 0.63 SCC 06 10 12 2 0.38 42 56 14 1.37 66 68 2 0.33 SCC 07 40 42 2 2.31 90 94 4 0.47 SCD 08 21 59 38 0.40 71 107 36 1.21 115 119 4 0.92 Marlin Gold, with the help of Resource Geosciences de Mexico, completed a trenching program to cut in a perpendicular way the mineralized trend identified by the combination of the historical drilling results and surface rock sampling. A total of 175 trench samples within six trenches were collected and sent to Inspectorate Laboratories for analysis. Four trenches showed favorable results, while it was not possible to reach the mineralized unit in the remaining two trenches (SCC 01 and SCC 02) because of the

4 thickness of the cover unit. A summary of the continuously mineralized intervals obtained from the four trenches with favorable results were 3 : Trench Total (m) Au (g/t) SCC 03 6 0.65 2 4.38 2 0.19 6 7.20 2 0.32 1.5 1.97 SCC 04 12 0.48 2 2.63 10 2.64 14 0.41 38 0.66 SCC 05 2 0.59 2 0.21 SCC 06 2 0.16 2 0.25 9.2 1.00 3 Resource Geosciences implemented industry standard QA/QC protocols for the San Carlos trench sampling program including insertion of duplicate and reference standard samples. Original assay certificates are not available for the Eldorado drillholes. The San Carlos exploration drillhole results are reported in exploration reports prepared by Eldorado during the time they developed and mined the La Trinidad mine. Dr. Matthew D. Gray. C.P.G. and a Qualified Person under the definitions of CSA NI 43 101 verified the reliability of the trench sampling results. San Carlos to be Advanced in Parallel with Taunus Marlin s original strategy was to develop the San Carlos target towards the end of the delineated mine life of Taunus. Because of the relatively low grade and high strip nature of our mine between the upper (Eldorado) and lower (HS) zones of our Taunus deposit, Management now believes that further advancing San Carlos based on these successful exploration results could lead to a positive production decision which may improve the economics of the project during this transitional period. To make sure that the development of the high grade and low strip HS Zone at the primary Taunus pit is uninterrupted, we ve optimized our mine further, with expectations of reaching the HS Zone earlier in Q2 of 2016. In order to accelerate the San Carlos project and to complete the optimization work at Taunus, we ve engaged Sonoran Resources, LLC, led by Jesse Munoz, for a period of four months to complete these two critical projects. Mr. Munoz has direct historical experience at La Trinidad with both the Taunus pit development and the San Carlos exploration program, having worked at Eldorado as Manager of New Project Development when La Trinidad was originally mined.

5 La Trinidad Operations Continue to Advance and Marlin s Balance Sheet to Strengthen Since commercial production began on November 1, 2014, Marlin has shipped 11,251 ounces of gold and has recovered approximately 17,500 ounces since pre commercial mining activities began in March 2014. After discussions with some of our shareholders, Marlin plans to reduce its existing debt, including $10 million owed to the Sprott Resource Lending Partnership ( Sprott Resource Lending ). Marlin has agreed to repay $5 million of this debt due to Sprott Resource Lending no later than June 1, 2015, and will aim to repay additional debt depending on the success of the subscription receipt financing led by Dundee Securities as announced on March 30, 2015, or an alternative common equity structure. Further to the Company s press release dated May 20, 2015, Marlin confirms that it has issued 100,000 common shares to Sprott Resource Lending Partnership ( Sprott ) in consideration of Sprott s granting a waiver to Marlin to certain terms of the credit agreement between Marlin and Sprott. About Marlin Gold Marlin is a TSX V publicly listed company with properties located in Sinaloa and Zacatecas, Mexico. Marlin's priority is to advance its properties toward commercial production and enhance shareholder value through financial optimization, namely through the growth of its wholly owned subsidiary, Sailfish Royalty Corp. The La Trinidad property, which hosts the Taunus gold deposit, declared commercial production on November 1, 2014. An NI 43 101 mineral resource estimate and preliminary economic assessment for the Taunus gold deposit can be found at www.sedar.com or at www.marlingold.com. For further information contact: Akiba Leisman, Executive Chairman Marlin Gold Mining Ltd. Telephone: 203 862 7059 E mail: aleisman@marlingold.com Neither the TSX Venture Exchange nor its Regulation Services Provider (as the term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary statement regarding forward looking information This news release contains 'forward looking statements' within the meaning of applicable securities laws. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by words such as the following: expects, plans, anticipates, believes, intends, estimates, projects, assumes, potential and similar expressions. Forward looking statements also include reference to events or conditions that will, would, may, could or should occur, including in relation to statements regarding the use of proceeds from any debt or equity financing, the expected results and

6 timing for the development and exploitation of any mineral resources, the timing of reprocess of material and production from La Trinidad. These forward looking statements are necessarily based upon a number of estimates and assumptions that, while based on management's expectations and considered reasonable at the time they are made, are inherently subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward looking statements, including, without limitation: uncertainties related to raising sufficient financing to fund planned work in a timely manner and on acceptable terms; changes in planned work resulting from logistical, technical or other factors; the possibility that results of work will not fulfill projections/expectations and realize the perceived potential of the Company's projects; uncertainties involved in the interpretation of drilling results and other tests and the estimation of gold resources; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of environmental issues at the Company's projects; the possibility of cost overruns or unanticipated expenses in work programs; the need to obtain permits and comply with environmental laws and regulations and other government requirements; fluctuations in the price of gold and other risks and uncertainties, including those described in the Company's current Annual Information Form filed on SEDAR at www.sedar.com. As a result, readers are cautioned not to place undue reliance on these forward looking statements. The forward looking statements contained in this news release are made as of the date of this release. Unless required by law, Marlin has no intention to and assumes no obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise.