Copper & Diamonds. Arnaud Soirat Chief executive, Copper & Diamonds. October 2018

Similar documents
Copper & Diamonds. Investor roadshow, December Arnaud Soirat chief executive, Copper & Diamonds

Delivering superior returns

10 May BoAML Global Metals, Mining & Steel Conference Chris Lynch. Chief financial officer

Delivering superior returns

Fixed income investors update. March 2018

03 August 2016 Highlights Financial performance Outlook Appendix half year results

Preserving and creating shareholder value

Fixed income investors update. March 2017

The presentation will be webcast live at 7pm (Australian Eastern Standard Time) and can be accessed at

BMO Capital Markets 2017

Bank of America Merrill Lynch 2017 Global Metals, Mining & Steel Conference. 16 th May 2017 Alfredo Atucha CFO

2017 full year results

The presentation will be webcast live at 7.30pm (Australian Eastern Daylight Time) and can be accessed at

2018 half year results

Driving for growth. Tolga Egrilmezer Vice President, Sales & Marketing, Aluminum. 24 April 2018

Building value for shareholders

Oyu Tolgoi a world-class copper and gold mine

Investor Meetings NOVEMBER 6, Developing the third-largest copper mine

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

Oyu Tolgoi a world-class copper and gold mine

For personal use only

8 August 2013 Safety Strategy Performance Delivery interim results. Pursuing greater value for shareholders

Guy Elliott. Cautionary statement. Chief financial officer Analyst Handout

Asian Investor Meetings AUGUST 15-18, The future of Oyu Tolgoi is underground Developing the third-largest copper mine

RBC Global Mining and Materials Conference JUNE 14-15, The future of Oyu Tolgoi is underground Developing the third-largest copper mine

2010 full year results 10 February 2011

Iron Ore - delivering optimal value

Southern Copper Corporation November, 2016

Bank of America Merrill Lynch Global Metals, Mining & Steel Conference. Iván Arriagada CEO Antofagasta Minerals 12 May 2015

Copper market outlook: Transitioning to deficits

The future of Oyu Tolgoi is underground Developing the third-largest copper mine

Southern Copper Corporation

Oyu Tolgoi a world-class copper and gold mine

Second Quarter 2014 Results. July 24, 2014

For personal use only

An emerging new world-class copper and gold producer. Company presentation April 2013

2013 full year results

Oyu Tolgoi a world-class copper and gold mine

Generating significant business value

FREEPORT-McMoRan INC. (Exact name of registrant as specified in its charter)

BMO Capital Markets 2008 Global Metals and Mining Conference

2016 Half Year Financial Results. Presentation

Maximising the potential of our unique orebodies

Southern Copper Corporation Highlights

Goldman Sachs Basic Materials Conference 2008

CLSA Copper Access Day 4 JUNE MICHAEL NOSSAL Executive General Manager Business Development HKEx: 1208

Q Results Presentation

Interim report January March 2013

Richard C. Adkerson. President & Chief Executive Officer

TD Securities Mining Conference JANUARY 18-19, Oyu Tolgoi:Creating long-term value at world s best developing copper project

Syrah Resources and Graphite Market JP Morgan Clean Energy Conference 17 May Shaun Verner, Managing Director & CEO

Investor Presentation FEBRUARY Oyu Tolgoi: Creating long-term value at world s best developing copper project

Global Metals & Mining/Steel Conference. November 20, 2014

FREEPORT-McMoRan INC. (Exact name of registrant as specified in its charter)

FCX Conference Call to Discuss Revised Operating Plans

Energy and Mines World Congress: Scotiabank Metals Outlook

BMO Global Metals & Mining Conference FEBRUARY 26 MARCH 1, Oyu Tolgoi: Advancing Value, Creating Options

Goldman Sachs Basic Materials Conference

For personal use only

Denver Gold Forum 2008

5 August 2010 Shiploader, Cape Lambert

Oyu Tolgoi a world-class copper and gold mine

Corporate Update. Right Time, Right Business, Right Model

Southern Copper Corporation

Investor Day 2014: Strategic progress Mining exploiting our potential

Saudi Arabian Mining Company (Ma aden)

Turquoise Hill files 2016 Oyu Tolgoi Technical Report

Mongolia Selected Macroeconomic Indicators January 24, 2014

Mongolia Selected Macroeconomic Indicators December 18, 2013

The New Leader in Global Copper. June, 2013

Metals Outlook: The Good, The Middling & The Unlucky

newest iron ore LABRADOR IRON MINES Canada s producer Q3 Conference Call (for the quarter ended December 31, 2012)

Company Announcements Office. Date: 25 February 2019

3 rd Quarter 2012 Earnings Conference Call

2016 Annual general meeting

Richard C. Adkerson. President & CEO

Driving Long-Term Value from Solid Foundations. Denver Gold Forum. Octavio Alvídrez. 19 September 2016

Nickel Market Outlook

The New Leader in Global Copper

Overview & Strategy. Don Lindsay President & CEO

TASEKO ANNOUNCES 43 MILLION POUNDS OF COPPER PRODUCTION AND FINANCIAL RESULTS FOR THE THIRD QUARTER

2018 full year results

2017 FY Results Presentation

INVESTOR RELATIONS PRESENTATION

Nickel West Reimagining the future. Eduard Haegel, 20 October 2016

TASEKO REPORTS SECOND QUARTER 2018 FINANCIAL AND OPERATIONAL RESULTS

FCX reported 3Q earnings from operations of $0.34 per share, beating consensus by 3 cents.

Bank of America Merrill Lynch Equities Conference

NEWCREST PROFITABLE GROWTH

Interim report Q2 2014

Mongolia Selected Macroeconomic Indicators September 19, 2013

SOUTH AUSTRALIA EXPLORATION AND MINING CONFERENCE STEVEN MCCLARE IIIII GENERAL MANAGER 28 NOVEMBER 2013

Delivering superior returns

Tuesday, 25 November Annual General Meeting

Investor seminar London / New York. Oyu Tolgoi, Mongolia

Richard C. Adkerson Vice Chairman of the Board, President & Chief Executive Officer February 25, 2019

Forging a Stronger Newcrest

Focus on China: Economic Outlook. April 4, 2018 Michael Han, Chief Economist

PALADIN RESOURCES LTD THE NEW ENERGY IN THE MARKET

AUDITED ANNUAL RESULTS FOR THE YEAR ENDED 31 DECEMBER 2018

Transcription:

Copper & Diamonds Arnaud Soirat Chief executive, Copper & Diamonds October 2018

Cautionary statements 2 This presentation has been prepared by Rio Tinto plc and Rio Tinto Limited ( Rio Tinto ). By accessing/attending this presentation you acknowledge that you have read and understood the following statement. Forward-looking statements This document, including but not limited to all forward looking figures, including those on slide 5, contains certain forward-looking statements with respect to the financial condition, results of operations and business of the Rio Tinto Group. These statements are forward-looking statements within the meaning of Section 27A of the US Securities Act of 1933, and Section 21E of the US Securities Exchange Act of 1934. The words intend, aim, project, anticipate, estimate, plan, believes, expects, may, should, will, target, set to or similar expressions, commonly identify such forward-looking statements. Examples of forward-looking statements include those regarding estimated ore reserves, anticipated production or construction dates, costs, outputs and productive lives of assets or similar factors. Forward-looking statements involve known and unknown risks, uncertainties, assumptions and other factors set forth in this presentation. For example, future ore reserves will be based in part on market prices that may vary significantly from current levels. These may materially affect the timing and feasibility of particular developments. Other factors include the ability to produce and transport products profitably, demand for our products, changes to the assumptions regarding the recoverable value of our tangible and intangible assets, the effect of foreign currency exchange rates on market prices and operating costs, and activities by governmental authorities, such as changes in taxation or regulation, and political uncertainty. In light of these risks, uncertainties and assumptions, actual results could be materially different from projected future results expressed or implied by these forward-looking statements which speak only as to the date of this presentation. Except as required by applicable regulations or by law, the Rio Tinto Group does not undertake any obligation to publicly update or revise any forward-looking statements, whether as a result of new information or future events. The Group cannot guarantee that its forward-looking statements will not differ materially from actual results. In this presentation all figures are US dollars unless stated otherwise. Disclaimer Neither this presentation, nor the question and answer session, nor any part thereof, may be recorded, transcribed, distributed, published or reproduced in any form, except as permitted by Rio Tinto. By accessing/ attending this presentation, you agree with the foregoing and, upon request, you will promptly return any records or transcripts at the presentation without retaining any copies. This presentation contains a number of non-ifrs financial measures. Rio Tinto management considers these to be key financial performance indicators of the business and they are defined and/or reconciled in Rio Tinto s annual results press release and/or Annual report. Reference to consensus figures are not based on Rio Tinto s own opinions, estimates or forecasts and are compiled and published without comment from, or endorsement or verification by, Rio Tinto. The consensus figures do not necessarily reflect guidance provided from time to time by Rio Tinto where given in relation to equivalent metrics, which to the extent available can be found on the Rio Tinto website. By referencing consensus figures, Rio Tinto does not imply that it endorses, confirms or expresses a view on the consensus figures. The consensus figures are provided for informational purposes only and are not intended to, nor do they, constitute investment advice or any solicitation to buy, hold or sell securities or other financial instruments. No warranty or representation, either express or implied, is made by Rio Tinto or its affiliates, or their respective directors, officers and employees, in relation to the accuracy, completeness or achievability of the consensus figures and, to the fullest extent permitted by law, no responsibility or liability is accepted by any of those persons in respect of those matters. Rio Tinto assumes no obligation to update, revise or supplement the consensus figures to reflect circumstances existing after the date hereof.

Safety and health come first 3 Continuing history of improvement in AIFR Rio Tinto ICMM (23 companies) 2.78 Fatality at Rio Tinto Fer et Titane in April 2018 Fatal assault on a security contractor at Richards Bay Minerals in July 2018 Fatality at Paraburdoo Iron Ore mine in August 2018 All injury frequency rate per 200,000 hours 0.97 0.81 1.56 1.17 1.24 1.01 0.69 0.67 0.67 0.65 0.90 0.90 0.94 0.59 0.44 0.44 0.42 0.40 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Jul 2018 YTD 0.85 0.79 Eliminating fatalities through the Critical Risk Management programme which continues to be embedded, including controls for critical health risks Preventing catastrophic events through our focus on process safety and the identification and management of controls for major hazards Reducing injuries through targeted hazard elimination campaigns Ongoing focus on mental health, wellbeing and fatigue management

Building a sector-leading copper portfolio 4 Portfolio Performance Growth Simplified and focussed portfolio High quality Reserve & Resource base Technical synergies with diamonds Mine to market approach is delivering Productivity gains at Kennecott and OT Continued focus on cost efficiency Integrated commercial hubs Core strengths Projects at OT and Kennecott on-track Production increase at Escondida Growth to market optimally timed Resolution progressing Integrated leadership model Long history of successful partnerships Some of the most productive operations at Rio Tinto with potential for further improvement Deep project study and execution expertise Block-caving know-how

5 A global presence with high-quality growth options Diavik, Canada (Diamonds) RT Share: 60% Partner: Dominion Diamond Mines ULC Kennecott, US RT Share: 100% Resolution, US RT Share: 55% Partner: BHP Escondida, Chile RT Share: 30% Partners: BHP, JECO 1. Oyu Tolgoi, Mongolia - RT Share: 33.5% indirect interest through a 50.8% interest in Turquoise Hill Resources Ltd. Rio Tinto s indirect ownership for the Hugo North Extension is 29.91%. 2. Through a joint venture with Freeport, Rio Tinto is entitled to a 40% share of production from Grasberg above an agreed threshold. However on 28 September Rio Tinto signed a binding agreement for the sale of Rio Tinto s entire interest in Grabserg to Inalum for $3.5 billion. The transaction is inter-conditional on a separate transaction between Inalum and Freeport McMoRan Inc. and both are subject to a number of conditions precedent being satisfied, including the receipt of regulatory approvals. Subject to these conditions being met, completion of both transactions is expected to occur in the first half of 2019. Oyu Tolgoi, Mongolia RT Share: 33.5%11 11 Partners: TRQ, GoM Grasberg, Indonesia RT Share: 40%2 Partner: Freeport Argyle, Australia (Diamonds) RT Share: 100% Operation Evaluation project Exploration programme Commercial hub

Rio Tinto well placed to benefit from copper s attractive long-term fundamentals 6 Copper supply/demand (million tonnes) Surplus Deficit Market remains finely balanced despite healthy mine performance since 2Q17, underscoring solid demand 25 Rio Tinto copper growth to be delivered into a period that requires development of higher-cost projects 20 3Mt 8Mt Current year demand above trend growth (2.8% YoY) on outperforming Chinese end-use and OECD prolonged industrial production cycle 15 Further demand growth expected in China and other emerging markets to drive consumption expansion. Consumer goods and new uses to provide upside: 10 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 electric vehicles and associated infrastructure renewable energy battery storage systems IT infrastructure (data centres) Base Supply Demand Source: Wood Mackenzie Q2 2018. Rio Tinto. Includes Wood Mackenzie estimates of production from Oyu Tolgoi underground.

The future for copper: grade decline / expensive projects 1.1% Avg copper mine ore grades by processing route, % Cu in ore 1.1% 7 1.0% 0.9% 0.8% 0.7% 0.6% Mill Feed Grade (wt. avg, ore milled) Heap Leach Feed Grade (wt. avg, ore leached) 0.5% Ore Grade 0.4% 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 1.0% 0.9% 0.8% 0.7% 0.6% 0.5% 0.4% The best deposits have been developed and mined: New projects usually lower grade than the old mines they replace. Orebody characteristics changing: declining grades observed as mature operations mine deeper. SxEw (solvent extraction / electro-refining) operations close: Exploitation of oxide deposits in 90s/00s boosted grades, but these deposits are exhausted, grades declining Source: CRU, Wood Mackenzie, company data 1. Based on current trend attributed to depletion of existing reserve base. Required growth 1 : 1.6Mt of annual production will be lost as mines close between now and 2023. Committed projects are expected to deliver an additional 1.5Mt of supply by 2023. Uncommitted projects will need to deliver a further 1.7Mt of copper by 2023 to fill the supply gap.

Performance: productivity roadmap 8 Mining Processing Best Practice Effective equipment utilisation and maintenance optimisation Improved feed characterisation Shorter haul times Partnering with Suppliers Data & Technology Light-weighting of truck beds Increase mining rates Payload optimisation Integrated operations Increase concentrator throughput Maintenance tactics and centralisation of maintenance Increase metal recovery Tolling of concentrate for value Automation Ore grade distribution Planning and schedule Resources Mine planning optimisation

Strong growth and expansion pipeline 9 Supply surplus Supply deficit 2018 2020 2021 2025-2030 Kennecott South push back underpins margin and volume increase Additional pushback and underground options study Oyu Tolgoi HNL1 development to first production Substantial increase in copper production Escondida EWSE ~1.2 Mtpa average production capacity 1 Resolution Exploration Project permitting and continued studies Sustained and committed global programme with an emphasis on the Americas Potential project execution 1.Source: BHP Copper Briefing and Chilean site tour - http://www.bhpbilliton.com/investors/reports/copper-briefing-and-chilean-site-tour, released by BHP on 1 December 2015

Kennecott: mine life extension on-track 10 Focus on improving productivity and optimising performance Accounts for almost 11% of the US annual copper production Studies on track to extend the life of mine beyond 2030 Return to higher grades expected from 2021 1 1. Based on the actual production schedule. Not attributable to expansion or uncommitted projects.

Kennecott: growth and productivity across the value stream 11 Mining Concentrator improvements Smelter and refinery Functional / other South Pushback optimisation South Pushback Slice 2 PFS Drainage Gallery Ore FS Molybdenum plant optimisation Pyrite deportment to improve concentrate quality South Pushback throughput readiness Modernisation programme Third party concentrate strategy Procurement value delivery Sales & Marketing

Oyu Tolgoi: a leading Tier 1 copper project 12 One of the world s highest quality copper developments Average underground grades of 1.66%Cu and 0.35g/t Au 1 $5.3 billion development capex projected Underground project on budget and schedule First drawbell production expected mid 2020 Productivity improvement across project and operations More than 90% workforce Mongolian nationals Excellent safety performance 1. Hugo Dummett North and Hugo Dummett North Extension. Probable Ore Reserves for Hugo Dummett North and Hugo Dummett North Extension (499 Mt at 1.66% Cu, 0.35g/t Au) were released to the market in the 2017 Rio Tinto Annual Report on 2 March 2018. The Competent Persons responsible for reporting of those Ore Reserves was J Dudley (AusIMM). Rio Tinto is not aware of any new information or data that materially affects the above ore reserve or mineral resource estimates as reported in the 2017 Annual Report, and confirms that all material assumptions and technical parameters underpinning these estimates continue to apply and have not materially changed. The form and context in which each Competent Person s findings are presented have not been materially modified.

Oyu Tolgoi: growth and productivity across the value stream 13 Maximize open pit productivity to bring forward head grade prior to commencing UG: Mine plan optimisation Mine truck and shovel productivity improvement UG Project on time to deliver mid 2020: UG innovation programme UG mine and open pit scheduled to deliver on average 560kt of Cu per year between 2025 and 2030 1 Continuing negotiations for long-term in-country power solution 1. The production target for Oyu Tolgoi shown on this slide is the average production 2025-2030, including open pit production. This production target was disclosed in a release to the market on 6 May 2016 ( Rio Tinto approves development of Oyu Tolgoi underground mine ). All material assumptions underpinning these production targets continue to apply and have not materially changed

Grasberg: in transition 14 Rio Tinto has signed a binding agreement to sell its entire interest in the Grasberg mine to PT Indonesia Asahan Aluminium (Persero) (Inalum), Indonesia s state mining company, for $3.5 billion Completion expected in first half of 2019* * The transaction and the Inalum/FCX transaction (which are inter-conditional) are each subject to a number of conditions precedent being satisfied, including the receipt of regulatory approvals.

Escondida: strong partnership with long-term optionality 15 Strong cash flow underpins dividends No significant capex is required in the short term 271kt 1 Total 2017 Attributable Cu production (RT share) Processing capacity exceed 153.7 Mt per annum 2 Sustainable water strategy transition to full desal by 2030 3 4 Partnership approach strengthens the business 2018 production increase supported by three concentrators Resource base offers significant long-term optionality 1. Source: Rio Tinto Annual Report 2017 (pg 226) 2. Refers to nominal milling capacity. Source: BHP Annual Report 2017 (pg 239) 3. Source: Case studies Reducing reliance on groundwater at Escondida https://www.bhp.com/community/case-studies/2018/08/reducing-reliance-on-groundwater-at-escondida. 4. Transition could be earlier. It is subject to receive the water permit (Monturaqui) approval by 2020. If not, this transition will be during that year (2020) supported by EWSE project.

Resolution: potential Tier 1 asset 16 One of the largest undeveloped copper deposits in the world Large, high-grade resources (1.787bt @1.54 percent Cu 1 ) Pre-feasibility study progressing targeting 2022 completion Permitting on track Options for development acceleration are under review 1. The Mineral Resource estimate for Resolution was reported in Rio Tinto s 2017 Annual Report, released to the market on 2 March 2018. This resource estimate is reported on a 100% basis. The Competent Person responsible for that previous reporting was C Hehnke (AusIMM). Rio Tinto is not aware of any new information or data that materially affects the above ore reserve or mineral resource estimates as reported in the 2017 Annual Report, and confirms that all material assumptions and technical parameters underpinning these estimates continue to apply and have not materially changed. The form and context in which each Competent Person s findings are presented have not been materially modified.

Future optionality for the Copper business 17 Continued focus on copper exploration, primarily in the Americas ~60 per cent of Rio Tinto exploration spend is focussed on copper 16 copper exploration programmes New technologies and innovation Source: Rio Tinto second quarter operations review

Building a sector-leading copper portfolio 18 Portfolio Performance Growth Simplified and focussed portfolio High quality Reserve & Resource base Technical synergies with diamonds Mine to market approach is delivering Productivity gains at Kennecott and OT Continued focus on cost efficiency Integrated commercial hubs Core strengths Projects at OT and Kennecott on-track Production increase at Escondida Growth to market optimally timed Resolution progressing Integrated leadership model Long history of successful partnerships Some of the most productive operations at Rio Tinto with potential for further improvement Deep project study and execution expertise Block-caving know-how

Appendix slides

Mine output steady, inventories shrinking 20 Disruption rates and causes (% mine supply) China s copper inventory 9% 8% 9% 8% 1100 1000 Bonded warehouses + SHFE inventory 7% 6% 5% Long-term avg 7% 6% 5% 900 800 4% 3% 2% 4% 3% 2% 700 600 1% 1% 500 0% 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 YTD Pit Walls Strikes Technical Slow Ramp Up Weather Grades Other 0% 400 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 5-yr range 5-yr average 2018 Disruptions to mine output have been below average so far in 2018. Labour negotiations at mine sites have been resolved without industrial action, 80% of planned contract renewals now settled. Inventories across China s supply chain are at / below average levels China s demand growth is normalising as anticipated, although some sectors continue to exceed expectations (air con, property) Source: Bloomberg, CRU, Wood Mackenzie

Copper price: trade tensions drive sell-off Copper vs CNY: both weakening on growth concerns Concerns over trade tensions between China and the US drove the 2018 mid-year selloff in copper 7,500 6.20 prices US$/t 7,250 7,000 6,750 6,500 6,250 6,000 5,750 5,500 5,250 LME Copper (LHS) USD/CNY (RHS) 5,000 Jan-17 Apr-17 Jul-17 Oct-17 Jan-18 Apr-18 Jul-18 6.30 6.40 6.50 6.60 6.70 6.80 6.90 7.00 7.10 INVERTED AXIS The first tranche of US tariffs on $50bn of Chinese imports will have little impact on copper demand. China s 10-25% tariffs on US copper product exports will not affect global supply, but will disrupt trade flows, especially in scrap Robust mine operation performance in 2018 is likely a factor behind copper s underperformance vs rest of metals complex Source: Bloomberg 21

China s waste import ban disrupting global trade flows 22 400 300 200 100 0-30% Jan-15 Jul-15 Jan-16 Jul-16 Jan-17 Jul-17 Jan-18 Jul-18 Others Hongkong EU 28 US JKT Other Asian countries Total imports cu content 3mma YoY (RHS) 1,500 1,250 1,000 750 500 250 0 China scrap monthly imports (kt gross weight) Annual scrap imports cu content (kt cu) 2017 2018 before tariff placed on US Imports from other countries Averaged cu content (RHS) 2018 after tariff placed on US 2019 after full import ban and US tariff Imports from US 30% 10% -10% 80% 60% 40% 20% 0% From mid-2017, Chinese authorities began restricting imports of low-quality copper scrap ahead of a full ban in 2019. On Aug 23, China placed a 25% tariff on copper scrap imports from the USA (~20% of total imports). In 2018 China s copper scrap imports are forecast to drop ~75% by volume, but just ~5% by copper content as higher quality scrap is drawn in. Imports of other copper products are increasing to make up for lost copper units from foreign scrap (cathode, concentrate, blister).

Copper & Diamonds H1 2018 highlights 23 H1 2018 H1 2017 Change Mined copper prod n (Rio share) - kt 296.1 208.9 +42% Refined copper prod n (Rio share) - kt 117.9 77.1 +53% Diamonds production (Rio share) k carats Underlying EBITDA US$m 9,241 8,487 +9% 1,360 771 +76% Underlying EBITDA margin 45% 40% Underlying earnings / (loss) US$m Net cash generated from ops* US$m Capex excluding equity accounted units - US$m Free cash flow US$m 450 (69) n/a 838 649 +29% (810) (585) +38% 28 62-55% Free cash flow positive in H1 2018 (inclusive of dividends received from Escondida) despite a $225m increase in capex as activity ramped up at the Oyu Tolgoi Underground Project 2018 share of production guidance: 510-610kt for mined copper 225-265kt for refined copper 17-20 M carats of diamonds * Net cash generated from operating activities excludes the operating cash flows of equity accounted units (Escondida) but includes dividends from the equity accounted units.

Copper & Diamonds: higher prices and volumes driving increased EBITDA 24 Underlying EBITDA H1 2017 vs H1 2018 $ million 1,500 1,250 1,000 750 771 291 (11) (14) (21) 1,016 202 (48) (30) 191 29 1,360 500 250 0 H1 2017 underlying EBITDA Price Exchange rates Energy Inflation Flexed H1 2017 underlying EBITDA Volumes & Mix Cash costs Exploration & evaluation H1 2017 oneoffs Other H1 2018 underlying EBITDA Copper & Diamonds underlying EBITDA of $1,360 million benefitted from stronger copper production and higher prices in H1 2018 Copper & Diamonds generated net cash from operating activities of $0.8 billion in H1 2018 and invested around $0.7 billion in development capital Absence of Escondida strike in H1 2018 resulted in a favourable one-off impact, partly offset by the non-recurrence of the Manefay slide insurance settlement To maximise use of available smelter capacity, Kennecott purchased and tolled 83.1 thousand tonnes of third party concentrate in H1 2018 At 30 June 2018, the Group had an estimated 264 million pounds of copper sales that were provisionally priced at 312 cents per pound. The final price of these sales will be determined during the second half of 2018. This compares with 250 million pounds of open shipments at 31 December 2017, provisionally priced at 304 cents per pound

Kennecott: growth options progressing 25 South Pushback Provides a platform for growth and supports a decade of high-quality cash flow Phased development optimises life of mine plan and preserves optionality for future pushbacks Next Pushback Study Next Pushback study underway - options for future mine life extension 3D model of the South Pushback Underground Options Underground opportunities aligned to open pit mine life including near term Drainage Gallery Ore