Safety - Introduction

Similar documents
Power Construction Company CCIP Program Safety Requirements

POWER CONSTRUCTION COMPANY CCIP PROGRAM SAFETY REQUIREMENTS

Safety & Health Manual

ACCIDENT PREVENTION POLICY Signature Page Assign, Sign, & Return this page only to DiFiore Construction

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE

San Antonio Water System PROJECT CONSTRUCTION PROGRAM HEALTH AND SAFETY PROGRAM

SAFETY POLICY. Office Address 5195 W. 58 th Ave. Unit F Arvada, CO

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

San Antonio Water System Standard Specifications for Construction

ATTACHMENT "I" SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

MINIMUM BASIC OUTLINE FOR ACCIDENT PREVENTION PLAN

Carson, CA Inland Star Distribution Centers, Inc. PSM/CalARP

HULCHER CONTRACTOR SAFETY MANAGEMENT PROCESS

A1) General Safety Guidelines applicable to external employees at all Company workplaces.

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

CONTRACTOR S RESPONSIBILITY FOR PROJECT SAFETY [Major Construction Category]

Cooperation with the University s representatives, addressing specific safety issues at the Project.

CONTRACTOR PRE-QUALIFICATION FORM

Electric Transmission Texas, LLC Supplemental Safety Terms and Conditions

Exhibit. Owner Controlled Insurance Program. Insurance Requirements

Contractor Safety Policy

OSHA 1926 Subpart A General

Contractor Qualification Statement

Contractor Guidelines

Property Inspection Guidelines

Construction accidents..add $10 billion annually to construction cost

Appendix I: Safety Orientation Checklist GENERAL Department Safety Program, Crop and Soil Sciences, Washington State University

CONSTRUCTION SAFETY. Safety and Health

Facilities Management

Accident Prevention Plans (APP) Appendix A EM (15 SEPTEMBER 2008 edition)

Northwest Construction Consumer Council

Security, Safety, and Environmental Guidelines for Contractor Employees EXHIBIT S-1

1-10-C126 Questions and Answers Unarmed Guard Services at Washington Dulles International Airport and the Dulles Toll Road August 9, 2010

ROLLING OWNER CONTROLLED INSURANCE PROGRAM CONSTRUCTION SAFETY AND HEALTH GUIDELINES

ADDENDUM TO INSURANCE MANUAL. Safety Standards. Owner Controlled Insurance Program (OCIP)

CONTRACTOR SAFETY AGREEMENT

Introduction to OSHA and OSHA Inspections. Jim Shelton, CAS, Houston North

Contractor Safety Management Standard

ANSI A10.1 Pre-Project/Pre-Task Safety & Health Planning

Denver Public Schools. Bond Construction. Construction Safety Standards West Seventh Avenue Denver, CO 80204

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

Contractor s Environmental Health & Safety Disclosure

Construction Site Safety and Health Hazards September 25, 2013

Activity Hazard Analysis (AHA) Overall Risk Assessment Code (RAC) (Use highest code) SIGNATURES Activity # AHA #

Putting an end to fatalities: How behaviour-based safety can eliminate serious injuries and fatalities. Daryl Wake Senior Consultant 24 th May, 2016

To provide all new employees with a standardized orientation to the county s safety program.

TAMPA ELECTRIC COMPANY ENERGY SUPPLY CONTRACTOR SAFETY COMPLIANCE PROGRAM

~!'BCdBulldor. A partnering program between the. Associated Builders and Contractors of Minnesota. and the. Occupational Safety and Health Division

DATA ITEM DESCRIPTION

AECOM - SUBPORT Prequalification Questionnaire. General Information. Organization and Experience. Type of Services:

ROBERT A. BOTHMAN, INC. EXHIBIT "A" SUBCONTRACTORS SCOPE OF WORK EXHIBIT A SUBCONTRACTOR SCOPE OF WORK, dated this

CHEVRON CANADA LIMITED CONTRACTOR HEALTH, ENVIRONMENTAL AND SAFETY CONTRACT ADDENDUM

TRANSFLO MOTOR CARRIER OPERATING PROVISIONS

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S220 Hazard Communication Program REV /13/2012

Guideline for external contractors working on the premise of MANN+HUMMEL

Roger Williams University Contractor Protocols

SERIOUS INJURY AND FATALITY PREVENTION - CAN THEY BE PREVENTED?

Summary Description of Rail OCIP Coverage

Occupational Safety & Health Policy & Guidelines for Contractors

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

RISK CONTROL SOLUTIONS

CN Course Exercise. c. Ensure all employees have received the required training for their work.

TOOLS FOR SAFETY ENFORCEMENT ON CONSTRUCTION AND CONTRACT PROGRAM MANAGEMENT PROCEDURES THAT APPLY TO CONSTRUCTION ALTERATION & REPAIR PROJECTS

HAZARD IDENTIFICATION AND ASSESSMENT

EXHIBIT C SUBCONTRACTOR SAFETY REQUIREMENTS TABLE OF CONTENTS

Stewart Richey Construction, Inc. ( Stewart-Richey )

Building Permit Check Sheet

OSHA 101 When OSHA Comes to Call!

Contractor Safety!!!

Solano Irrigation District July 2015 SAFETY OFFICER / RISK MANAGER

RULES, REGULATIONS AND GENERAL SPECIFICATIONS FOR SUB CONTRACT WORK

Contractor Pre-qualification Questionnaire

I. Identification of Partners

Contractor Health and Safety Code of Practice. Updated June 4, 2018

Safety Program Table of Contents

SUPPLEMENTARY EHS CONDITIONS OF CONTRACT. SUPPLEMENTARY EHS CONDITIONS OF CONTRACT FOR WORK ON SABIC SITES in Europe

WCS4. Auto Owners WCS4 Account / Account Code: Insured: Policy #: Survey Address: Policy Information. General Information

WORKING WITH CONTRACTORS POLICY AND PROCEDURE

SAFETY POLICY PART 1 - GENERAL POLICY

Promoting Best Practices in safety and risk management with CDRA member companies CDRA Best Practices in Safety Awards Application

EMERGENCY TELEPHONE No: 555

Management Accountability: The Key to an Effective Safety Program

Instructions for Completing TRANSFLO s Motor Carrier Access Agreement

Safety Program 1. Is there a formal written Safety Program in effect? 2. Are Regular safety meetings conducted? How Often? 3. Is there a Safety Commit

Davidson County Fire Marshal Office of the Fire Marshal 935 North Main Street Lexington, NC Fees Paid: $ Check No.

Demolition Program Checklist

1042 FORUM DRIVE BROUSSARD, LA PHONE: (337) FAX: (337) Products & Services JANUARY 2015

Contractors Induction Booklet. Contractor s Name:

Tower Contractor Questionnaire

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.

CONSTRUCTION SUBCONTRACT. (Subcontract No.) EXHIBIT "F" ENVIRONMENT, SAFETY AND HEALTH PROVISIONS. (Date)

Guidelines for Improving Contractor Safety Performance in the Natural Gas Industry

Exhibit A : Standard Subcontract Agreement

EDISON ELECTRIC INSTITUTE SAFETY AND HEALTH COMMITTEE OSHA UPDATE. Stephen C. Yohay April 22, 2009 Alexandria, Virginia

1.3 All employees are equally responsible for complying with the Ontario Occupational Health & Safety Act and its Regulations.

Health & Safety Policy

Subcontract Project Work Authorization

ARTICLE ( X )HEALTH AND SAFETY REQUIREMENTS

CONTRACTOR SAFETY QUALIFICATION PACKET

A UNIQUE AND COMPREHENSIVE INSURANCE SCHEME FOR THE ELECTRICAL INDUSTRY

Transcription:

Safety - Introduction Disclaimer: The following slides are NOT all inclusive of the safety requirements required by the Federal, State, local governments, the contract or MWAA s Construction Safety Manual (CSM), Revision 17. The following slides only serve as an overview for some of the safety requirements of the CSM. Be sure to read your contract and the CSM. Link to CSM below: http://www.mwaa.com/sites/default/files/safety _manual-rev17.pdf 11/28/2017 1

Safety Pre-Start Pre-start Required Subcontractor Information Package Checklist (PRSIPC) MUST be completed prior to the start of work. PRSIPC must be signed acknowledging that the contractor has read and understands the Airports Authority s Construction Safety Manual (CSM). CSM Must be followed by the contractor and their subcontractors. Emergency Contact names and numbers for senior Company managers (Include President, Project Manager and Safety Director). Experience Modifier Rate (EMR)- If EMR is 1.0 or greater, submit the OSHA 300 logs for the past three (3) years, plus the current calendar year. Additionally, create and submit a Safety Mitigation Plan addressing the safety issues that the contractor has identified from the OSHA logs mentioned above. 11/28/2017 2

Safety Pre-Start Safety and Health Program to include Site Specific Safety program to the general contractor. Examples include but not limited to the following: o Confine Spaces, Electrical, o LOTO, o Hazard Communication Program, o Erection and or Lifts o Site Specific Fall Protection, o Respiratory, o Demolition Plans, o Substance Abuse Program, o Return to Work/Light Duty Program (mandatory), o Emergency Response 11/28/2017 3

Safety Pre-Start Safety Data Sheets (SDS) and Site Specific Chemical Inventory List (Separate binders) Documentation of employee training on company letterhead which includes the employees signatures for the following topics: o Fall Protection o Equipment Operation o Hazard Communication o General Construction Safety o Operators Of Heavy Equipment o Confined Space (if applicable) o Scaffold training (if applicable) o Powder actuated tools (if applicable) 11/28/2017 4

Safety Pre-Start Definable Features of Work- List to be submitted along with Job Hazard Analysis (JHA) for all known work activities. JHAs to be prepared on the Pre-Task Work Plan (PTWP) Form in Appendix E of CSM. JHAs required prior to any work on-site. Be very detailed on this plan. Contractors duty to prevent jobsite accidents Contractor and ALL their subcontractors required to enroll in the Owner Controlled Insurance Program (OCIP). OSHA 30 Hour Construction certification required for supervisors. One 30 Hour OSHA trained employee per subcontractor must be on site at all times. All workers are required to have 10 hour OSHA construction training (provide copies of cards for all of the aforementioned). 11/28/2017 5

Safety-Pre-Start CPR/First Aid Qualified Personnel, Certification cards must have expiration date (provide copy of each CPR/First aid trained person). List of Competent Persons per OSHA definitions. Provide Contact numbers and credentials for each. Provide training certificates/documentation for each competent employee. List of Equipment to be used on site (update as needed). All equipment must Identify owner company. Provide training records. Cranes: provide annual inspection, Certified Crane Operators Card(s), Riggers training and certification card. Signalman training and certification card, Lift Plan and Erection Plan (provide copies). Fork lifts (including rough terrain), Powder Actuated, Boom & Scissor lifts authorization cards/list. Provide training records. 11/28/2017 6

Safety-Preparatory 10 and 30 hours OSHA certification must be obtained within 6 months of Notice to Proceed (NTP) Contractor must develop a safety plan that is site specific and follows the guideline set forth in Appendix C of the CSM. Safety Plan must be submitted and approved prior to the start of any work. Safety Professionals- Submit resumes for review and candidate for interview. SM has the final approval/disapproval of candidate. o Safety engineers- Required for the Project/shift. Must have 5 yrs. Of continuous construction experience relevant to the work being performed (dual roles will not be accepted). Perform daily inspections of contractors and subcontractor s job sites. o Safety Managers- A full time on-site safety Professional with a minimum 10yrs of experience managing safety programs on large construction projects. Monitors efforts of Safety Engineers and performs administrative duties set forth in the CSM and OCIP manuals. 11/28/2017 7

Safety-Preparatory o o o o The contractor shall provide adequate safety coverage if the approved safety engineer or safety manager is absent or for any other reason. Therefore, additional safety professionals must be pre-approved to cover safety staffing requirements. On-site work may not be performed until the specified safety professional(s) is/are approved and present on-site. Controlling contractor or sub tier contractors who have over 30 working employees working shall have a dedicated safety engineer. Safety personnel can only work on one project at a time. 11/28/2017 8

Safety- Reporting Metropolitan Washington Airports Authority (Airports Authority) shall require the contractor and their subcontractors to preplan their work activities on a daily basis. Prior to the actual start of work, the foreman shall conduct a Pre- Task Work Planning (PTWP) meeting with the work crew performing the work. Job Hazard Analysis/ Activity Hazard Analysis (JHA/AHA) required for each Definable Feature of Work (DFOW). Report unsafe conditions immediately to the Project Safety Manager (PSM). ALL injuries, Incidents, Near misses are to be reported immediately to the PSM. Written incident reports are to be submitted to the PSM within 24 hours. Monthly man-hour report must be submitted by the 10 th of each month. 11/28/2017 9

Safety- Cranes Critical lifts are any lift exceeding 75% of the rated capacity of the crane or I involving two or more cranes. Lift plans shall be submitted for review to the PSM prior to any crane lift. Chains are prohibited for lifting. Crane mats must be a minimum of 9 square feet for cranes of 50 tons or less. Cranes with a capacity greater than 50 tons will use the following formula for determination of the crane pad size.. Capacity of the crane / 5= area of crane pad. 11/28/2017 10

Safety-Excavations Prior to excavation a preplanning meeting will take place with the Airports Authority Prior to excavation ALL utilities must be identified in an area 5 feet beyond the intended area of excavation. Look in manholes and for other clues. Contractor will use the Excavation checklist (appendix F) MWAA requires protection of excavation starting at 4 feet in depth. Benching, sloping, trench boxes all permissible. Means of egress must not be more than 25 ft. from employee at any point in the excavation. 11/28/2017 11

Safety-Excavations Competent person shall inspect the excavation /trench prior to anyone entering excavation. Competent person shall be at the excavation/trench site while work is being performed. If using a trench box, tabulated data shall be submitted to the Airports Authority COTR and reviewed by the PSM. Trench box data shall be stamped by a PE. Excavation spoils and equipment operating next to an excavation shall be a minimum of 2 feet away from the leading edge.. Trenches/excavations 4 feet and greater require atmospheric monitoring 11/28/2017 12

Safety-Fall Protection Policy Statement Metropolitan Washington Airports Authority (Airports Authority) Fall Protection Policy requires 100% fall protection when employees are exposed to a fall hazard six (6) feet or greater. There will be a zero tolerance for not being 100 % tied off over 6 feet. Contractors working on an Airports Authority project installing and using fall protection systems shall be in compliance with 29 CFR 1926, Construction Industry Regulations, Subpart M - Fall Protection in addition to the following procedures and requirements. 11/28/2017 13

Safety- Fall Protection All fall protection systems shall not be over 5 years (depending on manufacturer) of the manufacturers issue date or service date by the contractor (documentation required). Employees shall be protected from falling objects by the installation of toe boards, barricades, snow fence, mesh or canopy structure. All persons on scaffolding are required to use PFAS and tie off.. 11/28/2017 14

Safety- Misc. Req. MOT- Prior to performing construction, maintenance, or other work activities along the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH) and/or other connecting arterial roadways supporting vehicle conveyance at DCA or IAD a Traffic Control Plan shall be developed. MOT- ANSI Class 3 high-visibility clothing is required on all Airports Authority construction projects and roadway maintenance operations TOOLS- No cartridge style nail guns, nor any tool that uses a cartridge or any explosive charge, shall be permitted in public areas, unless authorized by Airport Operations / Security.. 11/28/2017 15

Safety- Misc. Req. GENERAL-Personal electronic devices prohibited. EMERG-Contractors shall follow NOAA weather alerts HOT WORK- A Fire watch is required during operations and for 30 minutes after completion of welding/cutting unless otherwise specified by the fire marshal or other hot work operations. HOT WORK- (2)A:(20)B:C rated fire extinguisher is required where work is being performed. No combustibles within 35 feet of Hot work unless an approved cover is used. Flash arrestors are to used at both the regulator and torch ends of the hose.. 11/28/2017 16

Safety- Misc. Req. HOUSEKEEPING- Housekeeping shall be maintained as an integral part of every work operation. It s the controlling contractor s responsibility to conduct routine housekeeping inspections of their project. PPE- Contractors shall establish a Glove Protection Policy appropriate to the hazards identified by specific task(s). PPE- Gloves will be required at all times when working on Airports Authority construction sites. Gloves worn to be selected on basis of hazard. PPE- Employees shall wear full length chaps (e.g. Kevlar) or the equivalent, wire mesh face shield, leather gloves, safety goggles, Steel/composite toed boots and hearing protection when operating a chain saw. 11/28/2017 17

Safety-Fines NCN Violation Fine Schedule AOA & NON- AOA Safety Violations Fine 1. Incursion of Aircraft $5,000 per occurrence 2. Encroachment of RSA $5,000 per occurrence 3. Violation of not having flagging operations on active runways $1,000 per occurrence 4. Failure to follow MWAA Utility Locating Procedures $1,000 per occurrence 5. Violation of MWAA Excavation Policy $5,000 per occurrence 6. Exposure. to Live Electrical Parts / Not Following MWAA LOTO Procedures or NFPA 70 E Requirements $5,000 per occurrence 11/28/2017 18

Safety- Fines, Cont d 7. Violation of MWAA Confined Space Procedures & Policies $1,000 per occurrence 8. Violation of MWAA Fall Protection Policy $2,000 per occurrence 9. Violation of Escort Procedures on the AOA $1,000 per occurrence 10. Violation of Airport Security Policies & Procedures $1,000 per occurrence 11. Violation of MWAA Fire Prevention Procedures/Hot Work Policies & Procedures $1,000 per occurrence 12. Violation of MWAA Crane Policies & Procedures / FAA Requirements. $7,000 per occurrence 11/28/2017 19

Safety-Fines, Cont d 13. Violation of not providing safety representation on the job site $1,000 per occurrence 14. Violation of not following and maintaining MOT Plan $500 per occurrence 15. Violation of creating an imminent danger situation $7,000 per occurrence 16. Violation of MWAA Scaffolding Policy $1,000 per occurrence 17. Violation of MWAA Material Handling Policy $500 per occurrence 18. Violation of MWAA Safety Construction Manual Policies & Procedures. $500 per occurrence 11/28/2017 20