GOVERNMENT OF MADHYA PRADESH

Implementation of Solar Based Projects in MP Dated 20 July, 2012

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal

Uttar Pradesh Electricity Regulatory Commission

Chhattisgarh State Electricity Regulatory Commission

Meghalaya State Electricity Regulatory Commission

CHAPTER I: PRELIMINARY Short title, commencement and interpretation

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. No. UPERC/Secy/Regulation/ Lucknow : Dated, 17 th August, 2010

CENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) 3rd & 4th Floor, Chandralok Building, 36, Janpath, New Delhi : /

Compendium of State Government Policies on Renewable Energy Sector in India ARUNACHAL PRADESH

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

Bhopal: Dated 5 th May 2006

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA NOTIFICATION. Shimla, the 26 th May, 2010 REGULATIONS

GOVERNMENT OF PUNJAB DEPARTMENT OF POWER (Power Reforms Wing) NOTIFICATION The 21 st June, 2010

Regulatory Framework for New Bagasse Based Cogeneration Projects

Bhopal, Dated:

BIHAR ELECTRICITY REGULATORY COMMISSION

GOVERNMENT OF KERALA

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

State Policy on Chhattisgarh Special Economic Zone. Government of Chhattisgarh. Department of Commerce and Industries

Uttarakhand Electricity Regulatory Commission

THE JHARKHAND GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal

Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2012 (Regulation No. 1 of 2012).

PUBLIC NOTICE. Sub: Previous publication for OERC (Renewable Purchase Obligation and its Compliance) Regulation, 2010

Preamble : Policy Frame Work :

1.1 These regulations shall extend to whole of the State of Punjab.

To [Name & Address of the Assured] Dear Mr./Ms.[ ] Subject: Letter of Assurance

GUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005

2. APPLICABILITY AND SCOPE

Government of India Ministry of Commerce & Industry Department of Commerce Directorate General of Foreign Trade New Delhi

Acceptance of Deposits by Companies - CA.B. Kalyan Srinath,

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd.

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Development, Govt. of India, and 40% funded by Govt. Madhya Pradesh.

2. APPLICABILITY AND SCOPE

DRAFT (To be signed on Non-judicial stamp paper of Rs.100/-)

Information Technology Investment Policy

Jawaharlal Nehru National Solar Mission

PROCEEDINGS OF GOVERNMENT OF KARNATAKA

To [Name & Address of the Assured] Dear Mr./Ms.[ ] Subject: Letter of Assurance

JAMMU & KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED

*29(510(172)-+$5.+$1' '(3$570(172),1'8675,(6 127,),&$7,21 5DQFKLWKH

KErala StatE ElECtriCity regulatory CommiSSion (Renewable Energy) Regulations, 2015.

Development, Govt. of India, and 40% funded by Govt. Madhya Pradesh.

RfS & Rs with compare to other states, there is no such charge

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)

Treading the GST Path 50! FAQ on TDS (GST) (A Team effort of Swamy Associates)

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

[Insert Name]Coal Mine

[TO BE PUBLISHED IN THE GAZETTE OF INDIA EXTRAORDINARY PART II SECTION 3, SUB-SECTION (ii)]

Securities and Exchange Board of India (Delisting of Equity Shares) Regulations, 2009

Industries Department Goa Industrial Development Corporation

Accounting for Expenditure Incurred as a Pre-Condition to Obtaining Environmental Clearance for Setting up Power Project and Coal Mines

EXTRAORDINARY PART I- SECTION 1

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Competitive Bidding Guidelines for procurement of Electricity

Auction of Coal Mines for Production of Iron & Steel 5 th Tranche. SCOPE Complex, New Delhi April 24, 2017

Water Resources Rules, 2050 (1993)

Response to Bidders Queries for Development of 50 MW of Solar Power Projects in the State of Karnataka. Clause No. Clause Query Response

THE UNION TERRITORY GOODS AND SERVICES TAX (AMENDMENT) BILL, 2018

Gujarat State Electricity Corporation Limited

4.2 Definitions In this Clause 4 and Schedule E the following terms shall have the meanings ascribed to them below:-

(Unofficial Translation) NEPAL GAZETTE PART 2

[Insert Name]Coal Mine

Rajasthan Electricity Regulatory Commission

Chapter 4. Tariff Policy. (Amendments made in the Tariff Policy vide resolution and in corporated)

Article. MCA relaxes controls on Managerial Remuneration: Professional Directors benefited. CS Aman Nijhawan

Uttar Pradesh Electricity Regulatory Commission

THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA. NOTIFICATION Shimla, the 22 nd November, 2018

Draft Consultative Paper on. Captive Generating Plants

AGREEMENT FOR SYNCHRONOUS OPERATION OF CAPTIVE POWER PLANTS OF.. WITH JHARKHAND STATE ELECTRICITY BOARD SYSTEM

National Electric Power Regulatory Authority

[TO BE PUBLISHED IN THE GAZZETE OF INDIA, EXTRAORDINARY, PART II, SECTION 3, SUB-SECTION (i)]

Overview of the framework

National Electric Power Regulatory Authority Islamic Republic of Pakistan

60,000 K.MS. PER YEAR WITH WHITE COLOUR.

POLICY FOR PROVIDING PREFERENCE TO DOMESTICALLY MANUFACTURED IRON & STEEL PRODUCTS IN GOVERNMENT PROCUREMENT

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )

Order on. Petition No. 21/2014

Clarifications Sought No. 1 In what format the Bank Guarantee will be accepted if Bank Guarantee is from outside India.

June 08, 2017 Ratings

GUJARAT ELECTRICITY REGULATORY COMMISSION No. ---/---/---/GERC Dated: 13/01/2017. NOTIFICATION No. of 2017

POWER PURCHASE AGREEMENT FOR SUPPLY OF ---- MW SOLAR POWER FROM GRID CONNECT SOLAR PV POWER PLANT FOR 12 YEARS

BPO/BPM Policy. Government of Madhya Pradesh

NOTIFICATION. No.HPERC/dis/479: Shimla the 30 th March, 2012

TRIPURA ELECTRICITY REGULATORY COMMISSION

INTERNATIONAL CONFERENCE ON HYDRO POWER FOR SUSTAINABLE DEVELOPMENT FEB , 2015 DEHRADUN. Small Hydro Power Presentation by Arun Sharma President

DETAILED NOTICE INVITING TENDER N (State Connectivity Bridges) No /22/D-12/MPRRDA/2018 Bhopal, Dated: 20/06/2018

DRAFT PRE BID (MoU) (Rev-1) Memorandum of Understanding

The Madhya Pradesh Gramin Avsanrachna Tatha Sadak Vikas Adhiniyam, 2005

GRANT THORNTON DRAFT CONCESSION AGREEMENT

Transcription:

New and Renewable Energy Department Vallabh Bhavan, Bhopal English Translation of Policy for Implementation of Biomass based Electricity (Power) Projects in Madhya Pradesh, 2011 (As Amended on 21st February 2013 & 24 August 2015) (Notified in Gazette in Hindi vide notification 460 dated 12 th October 2011 & notification 688, dated 24 August 2015) 1. Preamble: 1.1. Government Madhya Pradesh (GoMP), with the aim of promoting setting up of renewable energy-based power plants, has issued policies for various energy sources to encourage investors/developers. (GoMP) issued a policy in the year 2006 for promoting power generation through new and renewable energy sources in the State. In policy- 2006, provisions were made for establishing biomass-based power projects in Madhya Pradesh as well as giving incentives for the same. 1.2. Considering the large potential of biomass based energy available in Madhya Pradesh need has been felt for preparing a new policy for implementation of biomass based power projects for investors/ developers. 1.3. This policy shall be called as Madhya Pradesh Biomass based Electricity (Power) Project Implementation Policy, 2011. 2. Criteria for Registration: 2.1. Project Allotment Process- Allotment of new projects shall be done by department by inviting applications time to time, keeping the area of 25 KM radius reserved for the project sites registered with the department. Allotment of project will be made for the particular site on the basis of maximum free energy per MW offered to (GoMP) by the developer. Clause-2(A-1) - Public Sector Institutions shall any time apply for allotment of projects on Government land. There will be no upper limit towards capacity of a project. Land use permission shall be provided free of cost for the projects in case of anytime application for allotment of a project. In these projects Government of MP shall have its stake equal to the cost of land calculated as per policy of New and Renewable Energy Department, on the following options. The right of selection of option shall vest with the concerned Public Institution. Page 1 of 10

i- The Public Sector Institutions can establish the project by forming a Joint Venture Company or, under Joint Ownership Agreement with M P Urja Vikas Nigam Limited. For the projects be established under this mode, the cost of land calculated as per policy of New and Renewable Energy Department shall be adjusted as equity amount Of M P Urja Vikas Nigam Limited under Joint Venture Company or, under Joint Ownership Agreement. ii- In case Public Sector Institutions establish the project by their own, the cost of proportionate energy, calculated as ratio of cost of land calculated as per policy of New and Renewable Energy Department and the standard project cost to the ratio of total energy generated from the project shall be given to M P Urja Vikas Nigam Limited. The value for this energy shall be calculated at the rate decided by the concerned Regulatory Commission. Clause-2(A-2) As per policies of New & Renewable Energy Department, M.P Urja Vikas Nigam Ltd. shall deposit the amount payable towards the cost of land to State Government within the prescribed time limit. If the amount is deposited after the prescribed time limit, then amount to be deposited, shall be calculated on the basis of Net Present Value. 2.2. Maximum Capacity of any project shall not exceed 15 MW. 2.3. If the availability of biomass is reduced than the required then for continuous and smooth operation of plant the developers shall be allowed to use 15 percent conventional fuel (other than firewood) on the basis of declared rated heat rate. 2.4. Developer/Promoter shall have to follow the guidelines issued by Ministry of New and Renewable Energy, Government of India, New Delhi and relevant guidelines/regulations issued time to time by the (GoMP). 2.5. The developer will be free for captive use of the electricity generated, within the state / sale to third party consumer within the state or sale to state owned power trading company. The eligibility for third party sale will be as per the related provisions of Electricity Act-2003 and the Orders/Regulations issued by M P Electricity Regulatory Commission from time to time. The developer can also sale the electricity generated under REC Mechanism. The first right of purchase of electricity, generated from the project established on government land, shall be of state owned power trading company. 2.6. In view to ensure forest protection, the proposed biomass-based plant shall be established at a distance of minimum 2 kilometres or more from the periphery of reserved and protected forests of the State. 2.7. In view to forest conservation, any block/region of the State where forest cover is more than a specified limit, shall be declared restricted Page 2 of 10

for setting up of biomass-based power plants. Notification of this effect shall be issued within a month of this policy becoming operative. This restriction shall not be applicable to the projects which were registered prior to coming in force of this policy. 3. Process for Registration 3.1.1 The projects registered and approved, under Energy Policy-2006 shall be migrated in this policy. 3.1.2 The developers shall have to commission the projects, approved under Energy Policy-2006, within 12 months from the date of migration. The developers of other registered projects shall have to submit the Detailed Project Report within 3 months and shall have to commission the project within 18 months from date of migration. 3.1.3 The migrated projects shall have to deposit the performance guarantee as per the clause no. 4.3 of the policy. 3.2. The issue related to the applications pending for allotment of projects prior to issue of this policy shall be resolved by participation of such developers in Application Invitation Process for registration of project by the department. These developers shall be informed as possible, during Application Invitation Process. 3.4 The applicant shall submit the following documents for registration i. Application in prescribed format. ii. Memorandum of Articles of Association of Company/Certified copy of Bye-laws of Registered Society. iii. Certified copy of Partnership deed (if applicable). iv. Copy of Accounts (Balance sheet) of last three years. v. Pre- feasibility report. 3.5 If the project is found eligible than demand letter to deposit the registration fees shall be issued within 15 days and the selected applicant have to deposit registration fees at the rate Rs. One lakh per Megawatt within 15 days to register the project. This registration fees shall non refundable. 3.6 In case the registration fee is not deposited within the prescribed time limit (15 days) than the application shall be cancelled and new developer shall be selected as per Clause 3 for the respective project capacity. 4. Process after the Registration 4.1. Developer shall present the following documents for approval within the prescribed time-limit (three months) i.detail Project Report ii.biomass assessment Report Page 3 of 10

iii.land related documents (site identified for the project) iv.c.p.m./pert Chart (for implementation of proposed project) v. Water allocation order on the basis of water availability at project site and map indicating grid status. vi. Affidavit to follow the Policy of State government issued by Madhya Pradesh Electricity Regulatory Commission and guidelines/notifications issued by competent authorities, from time to time, that applies to the Biomass based power projects. vii. In principle consent of grid connectivity for power evacuation from local electricity Transmission/Distribution Company. viii. Required Performance Guarantee as per the Clause 4.3 of this Policy. ix. Certificate from Divisional Forest Officer verifying that the plant is at minimum distance of 2 kilometres from the range of nearest protected/reserved forest. x. If the project is located in urban/rural area than No Objection Certificate of the concerned municipal body/gram panchayat. 4.2. Extension in time limit As mentioned in Clause 4.1 of this policy, if there is delay in expected activities and this delay is beyond developer s control then after resolving the reason of delay (as per the specific circumstances of the case) time limit may be extended in two blocks, each of 2 months. 4.3. Performance Guarantee To ensure the commitment towards the commissioning of the project, developer shall have deposit the performance guarantee of the amount equal to 1% of the total project cost. Performance guarantee shall be deposited in two stages. The developer shall have to deposit in first stage, the performance guarantee at the rate of Rs 1 lakh per MW within one month time from project allotment and in second stage, the performance guarantee of balance amount at the time of submission of DPR. The validity of performance guarantee will be for 30 months. (1) After evaluating the achievements of project milestone as per the specified time lines performance guarantee shall be released at different stages according to the Clause 6.1 of this policy. (2) If developer fails to achieve progress in accordance with the timebound activities and the project is cancelled as per the provisions mentioned in Clause 7 of this policy then the remaining performance guarantee shall be forfeited and shall be in-cashed as penalty. Selection of new developer for these cancelled project locations shall be carried out as per the project allotment process of this policy. Page 4 of 10

5. Approval of the Project: After examining the proposal received as per the clause 4.1 if the proposal is found appropriate then it shall be approved within one month time. 6. Activities after approval: 6.1. Commissioning of the project shall be done within the stipulated time limit of 24 months from the date of approval. Monitoring of the progress achieved by developer shall be done on following basis Internal Benchmarks of Biomass based Power Project and its time limits S. No. Benchmark 1 Date of issuance of administrative approval 2 Land s ownership/possession /Diversion Information 3 Allotment Consent of Pollution Control Board for project installation Power Purchasing Agreement /Power Sale Arrangements Financial Closure 4 Appointment of E.P.C. (Erection, Procurement and Commissioning) Contractor 5 Certificate of 50% completion of Physical and Financial progress of the total project 6 Commissioning Commercial Operation Date Time limit (from 0 days) Release of Performance Guarantee (%) 0 day -- 3 months 25 % 8 months 25 % 10 months -- 18 months -- 24 months 50 % 6.2. Developer shall obtain the in principle consent from power Distribution/Transmission company for grid connectivity for power evacuation prior to approval of the project (in accordance with Clause 5). Power Distribution/ Transmission Company shall provide consent on the basis of agreement by developer to deposit estimated amount for power evacuation. This permission shall subject to the provisions of Electricity Supply Code issued by Madhya Pradesh Electricity Regulatory Commission, Grid Code and other related regulations. The developer shall incorporate the estimated amount of the concerned Page 5 of 10

Power Distribution/ Transmission Company in the detail project report (D.P.R.). 7.Monthly Progress Report and Project Cancellation: 7.1. The developer shall have to submit monthly progress report in the prescribed format along with the supporting documents, from the date of registration to the date of commercial operation (Date of Commissioning). 7.2. The status of project- progress shall be reviewed with the time limits and benchmarks of this policy. Explanation for any delay or failure in this regard shall be obtained. In case the explanation is not found satisfactory then the project shall be cancelled. 8.Increase in time limits under special circumstances: Under special and exceptional circumstances the time limit of 24 months as mentioned in Clause 6.1 may be extended reasonably by the State government. 9.Tariff: Developer may sell the power generated to the Third Party or M P Electricity Trading Company/Distribution Company. Madhya Pradesh Trading Company/Distribution Company may purchase the biomass power generated from the project on the prevailing rate as declared in the tariff order issued by the Madhya Pradesh Electricity Regulatory Commission or as per the State s Policy for power purchase. In case of Third party sale there shall be freedom for sale at the mutual agreed rate. The orders of Madhya Pradesh Regulatory Commission shall be applicable in this regard. 10. Development of Infrastructure Developer shall arrange separately for ABT (Ability Based Tariff) metering on his own expenses for which suitable meter and metering equipments, on injection and drawl points, shall be installed as per the provisions mentioned in Clause 16 of Terms and Conditions of Intra State Open Access in Madhya Pradesh Regulations, 2005 issued by Madhya Pradesh Electricity Regulatory Commission. Developer shall have to follow the Transmission Metering Code (Part 5, Section 16) of Madhya Pradesh Electricity Grid Code issued by Madhya Pradesh Electricity Regulatory Commission and related Regulations issued by Central Electricity Authority (C.E.A.) for setting up and operation of meters. Page 6 of 10

11. Facilities and Incentives: 11.1. Electricity Duty and CESS exemption All the Biomass-based Power Generating projects (including Captive) shall be entitled for exemption from Electricity duty and CESS for a period of 10 years from the date of commissioning of the project. 11.2. Wheeling Charges As per the wheeling charges determined by Madhya Pradesh Electricity Regulatory Commission, the Biomass-based Power Projects shall be provided the wheeling facilities by M.P. Power Transmission Company. Subsidy of 4 % shall be provided by the State government on above wheeling charges, for a period of 10 years from the date of commissioning of project. The balance amount of wheeling charges after subsidy shall be borne by the project developer. 11.3. Contract demand reduction The Industrial units, which are the consumer of Madhya Pradesh State Electricity Board/Subsequent Company, install Biomass-based Power Plants for Captive use or purchase power generated from biomass sources as third party, shall be provided the facility of reduction in contract demand. 11.4. Third Party Sale Eligibility for Third party sale shall be in accordance with the related provisions of Electricity Act, 2003 and orders/regulations issued, from time to time by Madhya Pradesh Electricity Regulatory Commission in this regard. 11.5. Status of Industry Projects implemented under this policy shall receive the status of industry and shall be eligible for all the incentives provided under Industrial Promotion Policy of State government as amended from time to time. If there is any contradiction between the provisions of Industrial Promotion Policy of the State and the Biomass Incentive Policy then the provisions of Biomass Incentive Policy of the State shall be applicable. 11.6. If the required quantity of water is available, then the developer shall be permitted to use water at the prevailing rates of Narmada Valley Development Authority/Water Resources Department or at the rates determined by the State Government. 11.7. Land Allotment 11.7.1 Terms and Conditions applicable for Government revenue land allotment The terms and conditions laid down in the circular No. F-16-14/2013/Seven/Gov.2A, dated 30-05-2013 issued by Revenue Department of Madhya Pradesh Government shall be applicable for government revenue land allotment and for permission to use the land. Page 7 of 10

11.7.2 For just utilisation of the land, maximum 2 acres of land per megawatt may be used for establishment of biomass-based power generating plants. 11.7.3 If the Government revenue land has been recorded as forest of small-big trees in Revenue records or defined as a forest land under the provisions mentioned in the Circular of Revenue department dated 18-01-1997 then the applicant shall obtain permission for the project under the provisions of Forest Conservation Act, 1980 through the competent officer of Forest Department. 11.7.4 Exemption on Stamp duty on purchase of private land Developer shall be eligible for 50 % exemption on stamp duty on purchase private land for the project. If the project is not installed on this land then the exemption shall be taken back and actions for recovery shall be taken as per the Notification No. 70 B-4-08-2-V, date 21-08- 2008. 11.7.5 Use of non-forest wastelands for biomass production The revenue department as per the provisions of State Government s Policy for allotment of non-forest wastelands, shall make available Non-forest wastelands for biomass production subject to availability. Such land shall be given for use on the following terms 1. The maximum area of land for the project will be 100 acres per MW and land will be made available for maximum 5 MW capacity. 2. If the developer does not use the conventional fuel as permitted under provision of clause no.2.3 and the project is completely based on biomass then for biomass production the additional 50 acres per MW of land shall made available for use. 3. The state owned power trading company shall have the first right of purchase of electricity, generated from these projects. 11.7.6 The prime lending institution shall have the right to substitute the developer for land use permission during the loan period. 11.8. C.D.M. Benefits Developers/Investors of biomass-based power projects shall receive the carbon credit benefits as per the guide lines of M.P. Electricity Regulatory Commission. Page 8 of 10

11.9 The equipments purchased before commissioning of biomass-based power projects shall be exempted from Entry tax. 11.10 Transfer of Project The developer shall require the approval from the Department for transfer of the project prior to commissioning, to another developer/investor. As per the Clause 3.7 of this policy, an additional amount of Rs. One Lakh per Megawatt shall have to be paid as transfer fee for the transfer of the project, which shall not be refunded. 11.11 Provisions regarding other facilities/incentives, which are specified by M.P. Electricity Regulatory Commission about Open Access, Reactive Power, Metering and Renewable Energy Purchase Obligation (R.P.O.) shall be applicable. 12 Other Facilities: 12.1The cases for addressing the difficulties in smooth implementation of project and to resolve interdepartmental coordination issues can be presented before the Project Clearance and Implementation Board (PCIB) constituted under the chairmanship of Chief Secretary. 12.2 Once the commissioning of the project is done, the developer of biomass-based power project shall be have to submit following details in hard copy and soft copy (online) A. Monthly i. Monthly Data of electricity generated certified by the concerned Distribution/Transmission Company. ii. Details of the actual fuel used during the month (including biomass, conventional fuel, its quantity and payment cost/price) B. Yearly Developer shall present the certificate of the details of monthly fuel used, verified and certified by Chartered Accountant. Every year in the month of September details of the last financial year must be presented necessarily. 12.3 Notwithstanding anything incorporated in this policy, the provisions of the Electricity Act, 2003 and the orders of Madhya Pradesh Electricity Regulatory Commission issued from time to time, shall be applicable (valid) for the implementation of this policy. 12.4 For implementation of Biomass-based power projects in Madhya Pradesh, this Policy shall become effective from the date of publication of notification in State Gazette. Page 9 of 10

TERMS AND CONDITIONS FOR PURCHASE OF POWER UNDER R.E.C. MECHANISM BY M.P. POWER MANAGMENT CO. LTD 1.Within the provisions of State Government policies for purchase of electricity from non-conventional energy from developers, the total or balance energy(left balance after third party sale or captive use) generated from such projects shall purchased under REC mechanism on APPC rate. 2.M P Power Management Company (MPPCL) shall enter into Power Purchase Agreement for purchase of energy under REC mechanism. 3.The following conditions are to be included in Power Purchase Agreement- 3.1Developer has to submit performance guarantee at the rate of Rs.7.5 lakh per MW at the time of execution of power purchase agreement, which will be in form of irrevocable bank guarantee and will be released after 3 months from Commercial Operation Date (COD). If commercial production is delayed from scheduled date then M P Power Management Company will impose penalty on daily basis. The performance guarantee payable to department of New and Renewable Energy as per their policy will not be payable in this case. 3.2During the agreement period Complete or part of the capacity for which the agreement is executed will not be sold to any party by developer without prior consent from M P Power Management Company ltd.(mppmcl). On doing so, this will be treated as violation of Power Purchase Agreement and State Government will have right to withdraw incentives (including land) made available under Policy of New and Renewable Energy Department for setting up of the projects. 3.3 In condition of sale of total or part of power to third party by developer, with consent from MPPCL, developer shall have to pay MPPMCL, for the energy sold, at half rate of difference of third party sale rate and prevailing APPC rate of MPPMCL for that year, on monthly basis. Note: - For the purpose of interpretation of the provisions, the Hindi version of this Policy shall prevail. Page 10 of 10