PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

Similar documents
OFFICIAL BID TABULATION AWARDED PROJECT

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

PROJECT NO PID CLA TE21-G010(290) TYPE: MISCELLANEOUS LETTING: 07/11/01 COMPLETION DATE: 11/30/01

PROJECT NO PID SCI NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04

OFFICIAL BID TABULATION AWARDED PROJECT

LETTING : CALL : 056 COUNTIES : MILLE LACS

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

OKLAHOMA TURNPIKE AUTHORITY

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

OKLAHOMA TURNPIKE AUTHORITY

TOTAL QUANTITY UNIT COST UNIT

OKLAHOMA TURNPIKE AUTHORITY

PART A ROADWAY - BASE BID

KANE COUNTY DIVISION of TRANSPORTATION

INVITATION TO BID. CONTRACT PERIOD: The contract shall cover the County s needs for the period of July 21, 2015 through July 20, 2015.

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

BID TABULATION PAGE 1 OF 8

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

Engineer's Preliminary Estimate - 100% Submittal

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

A DESIGN-BUILD PROJECT

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS

REPLACEMENT OF MERCER COUNTY BRIDGE

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

Rock Chalk Park - Infrastructure Report. July 2013

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CONTRACT TIME DETERMINATION

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

BID TABULATION BID REQUEST NO

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

BID TABULATION. Engineer's Estmated Opinion of Costs

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

Reviax Constracting Corp. DeSantis Construction

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 958 COUNTY: 06/08/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

N E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS

ADDENDUM No. 1 January 29, Paving Program Village of Milford

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

RFB Addendum 3

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1113 VALUE ENGINEERING IN CONSTRUCTION. October 19, 2012

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address.

STANDARD PROCEDURE FOR VALUE ENGINEERING IN CONSTRUCTION

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

BID TABULATION PAGE 1 OF 6

TABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: US 84 COUNTY: 04/04/2017 ESTIMATE PAID: AWARD DATE: 04/27/2017 ESTIMATE PERIOD:

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: US 59 COUNTY: 02/02/2017 ESTIMATE PAID: AWARD DATE: 02/23/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: SH 29 COUNTY: 01/06/2016 ESTIMATE PAID: AWARD DATE: 01/28/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15

City of Biddeford Finance Committee March 20, :00 PM Council Chambers

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

Active Construction RV Associates Scarsella JR Hayes

SEQ & TABULATIONS with MULTIPLE SPs/FUNDING TYPES. December

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/16 HIGHWAY: COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

THIS SECTION INTENTIONALLY LEFT BLANK

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)

BRIDGE ALTERNATE STUDY No. 1

SUBDIVISION IMPROVEMENTS AGREEMENT

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

AGENDA. Sartell City Council Special Meeting Sartell City Hall July 31, :30 pm. 2. Public Hearing - Vacation of Drainage and Utility Easements

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

Exhibit 4 Page 1 of 8

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Transcription:

AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: ALAN STONE CO INC AWARDED AMOUNT: $ 16,762,891.63 ENGINEERS ESTIMATE: $ 21,435,000.00 BIDDER 1 BIDDER 2 ALAN STONE CO INC KOKOSING CONSTRUCTION COMPANY INC 8589 SR 377 886 MC KINLEY AVE 127 COLUMBUS,OH 43222 CHESTERHILL,OH 43728-0127 BIDDER 3 BIDDER 4 TRUMBULL CORPORATION GARY A RUBEL INC 1020 LEBANON RD 35479 SR 78 98100 LEWISVILLE,OH 43754 WEST MIFFLIN,PA 15122-1036 BIDDER 5 BEAVER EXCAVATING COMPANY 4650 SOUTHWAY ST SW 6059 CANTON,OH 44706

PROJ. NO. 016002 PAGE NO. 1 1 201E11000 CLEARING AND GRUBBING 2 202E30700 CONC BARRIER REMOVED 3 202E35100 PIPE REMOVED, 24" & UNDER 4 202E38000 GUARDRAIL REMOVED 5 202E54100 RAISED PVMT MRK RMVD/STRG 6 202E58100 CATCH BASIN REMOVED LUMP SUM AWD $ 200,000.00000 $ 200,000.00 2 $ 404,000.00000 $ 404,000.00 3 $ 75,000.00000 $ 75,000.00 4 $ 150,000.00000 $ 150,000.00 5 $ 315,000.00000 $ 315,000.00 3,060.000 LIN FT AWD $ 7.00000 $ 21,420.00 2 $ 8.00000 $ 24,480.00 3 $ 4.00000 $ 12,240.00 4 $ 8.00000 $ 24,480.00 5 $ 7.00000 $ 21,420.00 1,057.000 LIN FT AWD $ 2.00000 $ 2,114.00 2 $ 8.50000 $ 8,984.50 3 $ 13.00000 $ 13,741.00 4 $ 6.00000 $ 6,342.00 5 $ 14.00000 $ 14,798.00 6,337.500 LIN FT AWD $ 2.00000 $ 12,675.00 2 $ 1.00000 $ 6,337.50 3 $ 1.00000 $ 6,337.50 4 $ 1.50000 $ 9,506.25 5 $ 0.90000 $ 5,703.75 78.000 EACH AWD $ 2.00000 $ 156.00 2 $ 10.00000 $ 780.00 3 $ 5.00000 $ 390.00 4 $ 6.00000 $ 468.00 5 $ 11.00000 $ 858.00 16.000 EACH AWD $ 100.00000 $ 1,600.00 2 $ 40.00000 $ 640.00 3 $ 230.00000 $ 3,680.00 4 $ 200.00000 $ 3,200.00 5 $ 100.00000 $ 1,600.00

PROJ. NO. 016002 PAGE NO. 2 7 202E98200 REMOVAL MISC.: BARRIER REMOVED FOR STORAGE 8 203E12000 EXCAVATION W/O EMBANKMENT 9 203E20000 EMBANKMENT 10 203E45000 PROOF ROLLING 11 203E50000 SUBGRADE COMPACTION 12 604E38500 MONUMENT ASSEMBLY 276.000 LIN FT AWD $ 4.00000 $ 1,104.00 2 $ 6.00000 $ 1,656.00 3 $ 5.00000 $ 1,380.00 4 $ 6.00000 $ 1,656.00 5 $ 9.00000 $ 2,484.00 2,627,084.000 CU YD AWD $ 4.46000 $ 11,716,794.64 2 $ 5.05000 $ 13,266,774.20 3 $ 5.20000 $ 13,660,836.80 4 $ 5.90000 $ 15,499,795.60 5 $ 6.15000 $ 16,156,566.60 2,539.000 CU YD AWD $ 8.00000 $ 20,312.00 2 $ 2.00000 $ 5,078.00 3 $ 0.20000 $ 507.80 4 $ 2.00000 $ 5,078.00 5 $ 5.00000 $ 12,695.00 9.000 HOUR AWD $ 300.00000 $ 2,700.00 2 $ 105.00000 $ 945.00 3 $ 200.00000 $ 1,800.00 4 $ 300.00000 $ 2,700.00 5 $ 150.00000 $ 1,350.00 28,025.000 SQ YD AWD $ 1.33000 $ 37,273.25 2 $ 1.00000 $ 28,025.00 3 $ 1.00000 $ 28,025.00 4 $ 1.00000 $ 28,025.00 5 $ 0.70000 $ 19,617.50 14.000 EACH AWD $ 200.00000 $ 2,800.00 2 $ 485.00000 $ 6,790.00 3 $ 500.00000 $ 7,000.00 4 $ 400.00000 $ 5,600.00 5 $ 525.00000 $ 7,350.00

PROJ. NO. 016002 PAGE NO. 3 13 606E13000 GUARDRAIL, TYPE 5 14 606E22010 ANCHOR ASSEMBLY, TYPE E-98 15 606E25000 ANCHOR ASSEMBLY, TYPE A 16 606E35000 BRIDGE TERM. ASSY, TYPE 1 17 606E35100 BRIDGE TERM ASSY, TYPE 2 18 607E98000 FENCE, MISC.: TEMPORARY ROCK FENCE 1,698.750 LIN FT AWD $ 9.12000 $ 15,492.60 2 $ 8.70000 $ 14,779.13 3 $ 9.00000 $ 15,288.75 4 $ 9.23000 $ 15,679.46 5 $ 8.70000 $ 14,779.13 3.000 EACH AWD $ 1,600.00000 $ 4,800.00 2 $ 1,490.00000 $ 4,470.00 3 $ 1,500.00000 $ 4,500.00 4 $ 1,579.40000 $ 4,738.20 5 $ 1,490.00000 $ 4,470.00 1.000 EACH AWD $ 700.00000 $ 700.00 2 $ 600.00000 $ 600.00 3 $ 600.00000 $ 600.00 4 $ 636.00000 $ 636.00 5 $ 600.00000 $ 600.00 1.000 EACH AWD $ 1,500.00000 $ 1,500.00 2 $ 880.00000 $ 880.00 3 $ 900.00000 $ 900.00 4 $ 932.80000 $ 932.80 5 $ 880.00000 $ 880.00 1.000 EACH AWD $ 500.00000 $ 500.00 2 $ 300.00000 $ 300.00 3 $ 300.00000 $ 300.00 4 $ 318.00000 $ 318.00 5 $ 300.00000 $ 300.00 5,860.000 LIN FT AWD $ 280.00000 $ 1,640,800.00 2 $ 170.00000 $ 996,200.00 3 $ 300.00000 $ 1,758,000.00 4 $ 200.00000 $ 1,172,000.00 5 $ 232.00000 $ 1,359,520.00

PROJ. NO. 016002 PAGE NO. 4 19 622E24000 CONC BARRIER, TYPE D 20 622E24005 CONC BARRIER, TYPE D1, APP 21 690E20010 AS-BUILT CONSTRUCTION PLANS 16.500 LIN FT AWD $ 100.00000 $ 1,650.00 2 $ 90.00000 $ 1,485.00 3 $ 80.00000 $ 1,320.00 4 $ 84.80000 $ 1,399.20 5 $ 80.00000 $ 1,320.00 5,600.000 LIN FT AWD $ 55.00000 $ 308,000.00 2 $ 50.00000 $ 280,000.00 3 $ 50.00000 $ 280,000.00 4 $ 51.94000 $ 290,864.00 5 $ 50.00000 $ 280,000.00 LUMP SUM AWD $ 4,000.00000 $ 4,000.00 2 $ 7,000.00000 $ 7,000.00 3 $ 5,000.00000 $ 5,000.00 4 $ 6,000.00000 $ 6,000.00 5 $ 5,500.00000 $ 5,500.00 22 690E98400 MISC. PRE-CONSTRUCTION SURVEY AND BLAST MONITORING LUMP SUM AWD $ 3,000.00000 $ 3,000.00 2 $ 25,000.00000 $ 25,000.00 3 $ 1,000.00000 $ 1,000.00 4 $ 20,000.00000 $ 20,000.00 5 $ 57,000.00000 $ 57,000.00 23 864E10100 SEALING OF CONC SURF (EPOXY-URETHANE) 6,246.000 SQ YD AWD $ 7.00000 $ 43,722.00 2 $ 8.00000 $ 49,968.00 3 $ 6.00000 $ 37,476.00 4 $ 3.00000 $ 18,738.00 5 $ 6.00000 $ 37,476.00 S.1 ROADWAY TOTALS AWD $ 14,043,113.49 2 $ 15,135,172.33 3 $ 15,915,322.85 4 $ 17,268,156.51 5 $ 18,321,287.98

PROJ. NO. 016002 PAGE NO. 5 24 601E32200 ROCK CH PROT, C W/FILTER 25 601E34200 ROCK CH PROT, C W/O FILTER 26 870E00100 SOIL ANALYSIS TEST 27 870E00200 PLACING TOPSOIL 28 870E10000 SEEDING AND MULCHING 29 870E14000 REPAIR SEEDING AND MULCHING 22.000 CU YD AWD $ 40.00000 $ 880.00 2 $ 100.00000 $ 2,200.00 3 $ 45.00000 $ 990.00 4 $ 45.00000 $ 990.00 5 $ 130.00000 $ 2,860.00 64.000 CU YD AWD $ 44.00000 $ 2,816.00 2 $ 50.00000 $ 3,200.00 3 $ 40.00000 $ 2,560.00 4 $ 35.00000 $ 2,240.00 5 $ 50.00000 $ 3,200.00 7.000 EACH AWD $ 100.00000 $ 700.00 2 $ 48.50000 $ 339.50 3 $ 100.00000 $ 700.00 4 $ 100.00000 $ 700.00 5 $ 50.00000 $ 350.00 2,978.000 CU YD AWD $ 12.00000 $ 35,736.00 2 $ 7.00000 $ 20,846.00 3 $ 7.00000 $ 20,846.00 4 $ 3.00000 $ 8,934.00 5 $ 4.00000 $ 11,912.00 320,611.000 SQ YD AWD $ 0.35000 $ 112,213.85 2 $ 0.30000 $ 96,183.30 3 $ 0.48000 $ 153,893.28 4 $ 0.40000 $ 128,244.40 5 $ 0.30000 $ 96,183.30 20,052.000 SQ YD AWD $ 0.10000 $ 2,005.20 2 $ 0.15000 $ 3,007.80 3 $ 0.20000 $ 4,010.40 4 $ 0.15000 $ 3,007.80 5 $ 0.15000 $ 3,007.80

PROJ. NO. 016002 PAGE NO. 6 30 870E20000 COMMERCIAL FERTILIZER 31 870E30000 AGRICULTURAL LIME 32 870E35000 WATER 33 877E10000 TEMPORARY SEEDING AND MULCHING 43.280 TON AWD $ 400.00000 $ 17,312.00 2 $ 240.00000 $ 10,387.20 3 $ 180.00000 $ 7,790.40 4 $ 300.00000 $ 12,984.00 5 $ 250.00000 $ 10,820.00 132.730 TON AWD $ 40.00000 $ 5,309.20 2 $ 82.50000 $ 10,950.23 3 $ 35.00000 $ 4,645.55 4 $ 100.00000 $ 13,273.00 5 $ 85.00000 $ 11,282.05 1,731.000 M GAL AWD $ 10.00000 $ 17,310.00 2 $ 1.00000 $ 1,731.00 3 $ 0.25000 $ 432.75 4 $ 2.10000 $ 3,635.10 5 $ 1.00000 $ 1,731.00 80,208.000 SQ YD AWD $ 0.10000 $ 8,020.80 2 $ 0.15000 $ 12,031.20 3 $ 0.13000 $ 10,427.04 4 $ 0.15000 $ 12,031.20 5 $ 0.14000 $ 11,229.12 34 877E30100 TEMPORARY PERIMETER FILTER FABRIC FENCE 9,150.000 LIN FT AWD $ 2.00000 $ 18,300.00 2 $ 1.05000 $ 9,607.50 3 $ 1.50000 $ 13,725.00 4 $ 1.50000 $ 13,725.00 5 $ 1.75000 $ 16,012.50 35 877E30300 TEMP INLET PROT FILTER FABRIC FENCE 1,170.000 LIN FT AWD $ 2.00000 $ 2,340.00 2 $ 6.25000 $ 7,312.50 3 $ 2.00000 $ 2,340.00 4 $ 1.50000 $ 1,755.00 5 $ 5.00000 $ 5,850.00

PROJ. NO. 016002 PAGE NO. 7 S.2 EROSION CONTROL TOTALS AWD $ 222,943.05 2 $ 177,796.23 3 $ 222,360.42 4 $ 201,519.50 5 $ 174,437.77 36 602E20000 CONCRETE MASONRY 37 603E01500 6" CONDUIT, TYPE F, 707.41, 707.42, 707.45 38 603E05900 15" CONDUIT, TYPE B 39 603E07400 18" CONDUIT, TYPE B 40 603E10400 24" CONDUIT, TYPE B 5.100 CU YD AWD $ 1,200.00000 $ 6,120.00 2 $ 850.00000 $ 4,335.00 3 $ 1,400.00000 $ 7,140.00 4 $ 800.00000 $ 4,080.00 5 $ 1,200.00000 $ 6,120.00 1,117.000 LIN FT AWD $ 11.00000 $ 12,287.00 2 $ 23.00000 $ 25,691.00 3 $ 8.70000 $ 9,717.90 4 $ 5.00000 $ 5,585.00 5 $ 13.00000 $ 14,521.00 246.000 LIN FT AWD $ 24.00000 $ 5,904.00 2 $ 86.00000 $ 21,156.00 3 $ 35.00000 $ 8,610.00 4 $ 20.00000 $ 4,920.00 5 $ 50.00000 $ 12,300.00 1,003.000 LIN FT AWD $ 28.00000 $ 28,084.00 2 $ 88.00000 $ 88,264.00 3 $ 40.00000 $ 40,120.00 4 $ 24.00000 $ 24,072.00 5 $ 55.00000 $ 55,165.00 395.000 LIN FT AWD $ 47.00000 $ 18,565.00 2 $ 90.00000 $ 35,550.00 3 $ 45.00000 $ 17,775.00 4 $ 32.00000 $ 12,640.00 5 $ 65.00000 $ 25,675.00

PROJ. NO. 016002 PAGE NO. 8 41 603E10600 24" CONDUIT, TYPE C 42 603E13400 30" CONDUIT, TYPE B 43 604E01600 CATCH BASIN, NO. 5 44 604E36600 PRECAST REINF CONC OUTLET 45 605E11100 6" SHALLOW PIPE UD 46 605E13402 6" UNCL PIPE UD FOR SPRINGS 479.000 LIN FT AWD $ 54.00000 $ 25,866.00 2 $ 37.00000 $ 17,723.00 3 $ 38.00000 $ 18,202.00 4 $ 32.00000 $ 15,328.00 5 $ 40.00000 $ 19,160.00 137.000 LIN FT AWD $ 56.00000 $ 7,672.00 2 $ 96.00000 $ 13,152.00 3 $ 52.00000 $ 7,124.00 4 $ 38.00000 $ 5,206.00 5 $ 75.00000 $ 10,275.00 18.000 EACH AWD $ 1,700.00000 $ 30,600.00 2 $ 1,765.00000 $ 31,770.00 3 $ 2,200.00000 $ 39,600.00 4 $ 2,000.00000 $ 36,000.00 5 $ 1,700.00000 $ 30,600.00 31.000 EACH AWD $ 450.00000 $ 13,950.00 2 $ 150.00000 $ 4,650.00 3 $ 130.00000 $ 4,030.00 4 $ 300.00000 $ 9,300.00 5 $ 150.00000 $ 4,650.00 24,368.000 LIN FT AWD $ 7.00000 $ 170,576.00 2 $ 5.40000 $ 131,587.20 3 $ 3.70000 $ 90,161.60 4 $ 6.00000 $ 146,208.00 5 $ 3.00000 $ 73,104.00 300.000 LIN FT AWD $ 10.00000 $ 3,000.00 2 $ 24.00000 $ 7,200.00 3 $ 13.00000 $ 3,900.00 4 $ 8.00000 $ 2,400.00 5 $ 8.00000 $ 2,400.00

PROJ. NO. 016002 PAGE NO. 9 47 605E32200 AGG DRAIN FOR SPRINGS 300.000 LIN FT AWD $ 6.00000 $ 1,800.00 2 $ 22.00000 $ 6,600.00 3 $ 13.00000 $ 3,900.00 4 $ 8.00000 $ 2,400.00 5 $ 8.00000 $ 2,400.00 S.3 DRAINAGE TOTALS AWD $ 324,424.00 2 $ 387,678.20 3 $ 250,280.50 4 $ 268,139.00 5 $ 256,370.00 48 301E46000 BITUMINOUS AGGREGATE BASE, PG64-22 49 304E20000 AGGREGATE BASE 6,149.000 CU YD AWD $ 51.00000 $ 313,599.00 2 $ 51.00000 $ 313,599.00 3 $ 47.50000 $ 292,077.50 4 $ 51.63000 $ 317,472.87 5 $ 48.70000 $ 299,456.30 4,671.000 CU YD AWD $ 33.60000 $ 156,945.60 2 $ 38.00000 $ 177,498.00 3 $ 29.00000 $ 135,459.00 4 $ 45.00000 $ 210,195.00 5 $ 32.00000 $ 149,472.00 50 407E14000 TACK COAT FOR INTERMEDIATE COURSE 51 408E10000 BITUMINOUS PRIME COAT 1,098.000 GALLON AWD $ 2.00000 $ 2,196.00 2 $ 2.00000 $ 2,196.00 3 $ 2.00000 $ 2,196.00 4 $ 2.07000 $ 2,272.86 5 $ 1.95000 $ 2,141.10 11,068.000 GALLON AWD $ 1.00000 $ 11,068.00 2 $ 0.80000 $ 8,854.40 3 $ 0.80000 $ 8,854.40 4 $ 1.01000 $ 11,178.68 5 $ 0.95000 $ 10,514.60

PROJ. NO. 016002 PAGE NO. 10 52 448E46050 ASPH CONC INTERMEDIATE, TYPE 2, PG64-22 1,334.000 CU YD AWD $ 60.00000 $ 80,040.00 2 $ 64.00000 $ 85,376.00 3 $ 65.50000 $ 87,377.00 4 $ 60.70000 $ 80,973.80 5 $ 57.26000 $ 76,384.84 53 448E47021 ASPH CONC SURFACE, T1, PG64-22, APP 953.000 CU YD AWD $ 66.00000 $ 62,898.00 2 $ 66.00000 $ 62,898.00 3 $ 64.75000 $ 61,706.75 4 $ 59.74000 $ 56,932.22 5 $ 56.35000 $ 53,701.55 S.4 PAVEMENT TOTALS AWD $ 626,746.60 2 $ 650,421.40 3 $ 587,670.65 4 $ 679,025.43 5 $ 591,670.39 54 621E00100 RAISED PAVEMENT MARKER 55 626E00100 BARRIER REFLECTOR, TYPE A 56 626E00200 BARRIER REFLECTOR, TYPE B 78.000 EACH AWD $ 50.00000 $ 3,900.00 2 $ 45.05000 $ 3,513.90 3 $ 50.00000 $ 3,900.00 4 $ 47.31000 $ 3,690.18 5 $ 45.05000 $ 3,513.90 22.000 EACH AWD $ 7.00000 $ 154.00 2 $ 4.50000 $ 99.00 3 $ 4.75000 $ 104.50 4 $ 4.77000 $ 104.94 5 $ 4.50000 $ 99.00 63.000 EACH AWD $ 7.00000 $ 441.00 2 $ 4.75000 $ 299.25 3 $ 5.00000 $ 315.00 4 $ 5.04000 $ 317.52 5 $ 4.75000 $ 299.25

PROJ. NO. 016002 PAGE NO. 11 57 630E02100 GR MTD SUPP, #2 POST 58 630E80100 SIGN, FLAT SHEET 59 630E84900 RMVL/GR MTD SIGN & DISP 60 630E86002 RMVL/GR MTD POST SUP/DISP 61 642E00100 EDGE LINE, TYPE 1 62 642E00301 CENTER LINE, TYPE 1, AS PER PLAN 11.800 LIN FT AWD $ 12.00000 $ 141.60 2 $ 7.00000 $ 82.60 3 $ 7.00000 $ 82.60 4 $ 7.42000 $ 87.56 5 $ 7.00000 $ 82.60 6.000 SQ FT AWD $ 23.00000 $ 138.00 2 $ 20.00000 $ 120.00 3 $ 20.00000 $ 120.00 4 $ 21.20000 $ 127.20 5 $ 20.00000 $ 120.00 4.000 EACH AWD $ 10.00000 $ 40.00 2 $ 12.00000 $ 48.00 3 $ 12.00000 $ 48.00 4 $ 12.72000 $ 50.88 5 $ 12.00000 $ 48.00 2.000 EACH AWD $ 850.00000 $ 1,700.00 2 $ 12.00000 $ 24.00 3 $ 12.00000 $ 24.00 4 $ 12.72000 $ 25.44 5 $ 12.00000 $ 24.00 5.200 MILE AWD $ 912.00000 $ 4,742.40 2 $ 725.00000 $ 3,770.00 3 $ 800.00000 $ 4,160.00 4 $ 761.25000 $ 3,958.50 5 $ 725.00000 $ 3,770.00 2.610 MILE AWD $ 9.00000 $ 23.49 2 $ 870.00000 $ 2,270.70 3 $ 975.00000 $ 2,544.75 4 $ 913.50000 $ 2,384.24 5 $ 870.00000 $ 2,270.70

PROJ. NO. 016002 PAGE NO. 12 S.5 TRAFFIC CONTROL TOTALS AWD $ 11,280.49 2 $ 10,227.45 3 $ 11,298.85 4 $ 10,746.46 5 $ 10,227.45 63 614E11100 LEO WITH PATROL CAR 64 614E12470 WORK ZONE SPEED LIMIT SIGN 65 614E12500 REPLACEMENT SIGN 66 614E13000 BIT CONC FOR MAINT TRAF 67 614E13302 BARRIER REFL, TYPE B2 500.000 HOUR AWD $ 50.00000 $ 25,000.00 2 $ 50.00000 $ 25,000.00 3 $ 39.00000 $ 19,500.00 4 $ 37.00000 $ 18,500.00 5 $ 41.00000 $ 20,500.00 6.000 EACH AWD $ 166.00000 $ 996.00 2 $ 140.00000 $ 840.00 3 $ 135.00000 $ 810.00 4 $ 105.00000 $ 630.00 5 $ 94.00000 $ 564.00 20.000 SQ FT AWD $ 24.00000 $ 480.00 2 $ 20.00000 $ 400.00 3 $ 10.00000 $ 200.00 4 $ 14.00000 $ 280.00 5 $ 8.50000 $ 170.00 20.000 CU YD AWD $ 112.00000 $ 2,240.00 2 $ 400.00000 $ 8,000.00 3 $ 120.00000 $ 2,400.00 4 $ 50.00000 $ 1,000.00 5 $ 200.00000 $ 4,000.00 236.000 EACH AWD $ 6.00000 $ 1,416.00 2 $ 4.00000 $ 944.00 3 $ 4.50000 $ 1,062.00 4 $ 8.00000 $ 1,888.00 5 $ 4.00000 $ 944.00

PROJ. NO. 016002 PAGE NO. 13 68 614E13350 OBJECT MARKER 69 614E18501 PRTBLE CHNGBLE MSSGE SIGN,APP 70 614E21100 TEMP CL, CL I, 642 PAINT 71 614E22100 TEMP EDGE LINE, CL I, 642 PT 72 616E10000 WATER 73 616E20000 CALCIUM CHLORIDE 472.000 EACH AWD $ 16.00000 $ 7,552.00 2 $ 14.00000 $ 6,608.00 3 $ 9.00000 $ 4,248.00 4 $ 20.00000 $ 9,440.00 5 $ 12.50000 $ 5,900.00 2.000 EACH AWD $ 20,000.00000 $ 40,000.00 2 $ 950.00000 $ 1,900.00 3 $ 22,000.00000 $ 44,000.00 4 $ 30,000.00000 $ 60,000.00 5 $ 12,500.00000 $ 25,000.00 1.000 MILE AWD $ 1,300.00000 $ 1,300.00 2 $ 1,300.00000 $ 1,300.00 3 $ 1,335.00000 $ 1,335.00 4 $ 721.86000 $ 721.86 5 $ 1,196.00000 $ 1,196.00 2.000 MILE AWD $ 1,200.00000 $ 2,400.00 2 $ 980.00000 $ 1,960.00 3 $ 1,175.00000 $ 2,350.00 4 $ 519.40000 $ 1,038.80 5 $ 1,051.00000 $ 2,102.00 3,000.000 M GAL AWD $ 20.00000 $ 60,000.00 2 $ 28.00000 $ 84,000.00 3 $ 25.00000 $ 75,000.00 4 $ 10.00000 $ 30,000.00 5 $ 19.00000 $ 57,000.00 30.000 TON AWD $ 100.00000 $ 3,000.00 2 $ 100.00000 $ 3,000.00 3 $ 575.00000 $ 17,250.00 4 $ 300.00000 $ 9,000.00 5 $ 125.00000 $ 3,750.00

PROJ. NO. 016002 PAGE NO. 14 74 622E40030 PORTABLE CONC BARRIER, 50" 5,860.000 LIN FT AWD $ 50.00000 $ 293,000.00 2 $ 13.00000 $ 76,180.00 3 $ 15.00000 $ 87,900.00 4 $ 30.00000 $ 175,800.00 5 $ 44.00000 $ 257,840.00 S.6 MAINTENANCE OF TRAFFIC TOTALS AWD $ 437,384.00 2 $ 210,132.00 3 $ 256,055.00 4 $ 308,298.66 5 $ 378,966.00 75 100E00300 RAILROAD INSURANCE BOND 76 103E05000 CONTRACT PERFORMANCE BOND 77 614E11000 MAINTAINING TRAFFIC 78 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 15,000.00000 $ 15,000.00 2 $ 700.00000 $ 700.00 3 $ 12,600.00000 $ 12,600.00 4 $ 3,000.00000 $ 3,000.00 5 $ 12,500.00000 $ 12,500.00 LUMP SUM AWD $ 170,000.00000 $ 170,000.00 2 $ 95,000.00000 $ 95,000.00 3 $ 65,000.00000 $ 65,000.00 4 $ 76,000.00000 $ 76,000.00 5 $ 83,000.00000 $ 83,000.00 LUMP SUM AWD $ 220,000.00000 $ 220,000.00 2 $ 14,000.00000 $ 14,000.00 3 $ 55,000.00000 $ 55,000.00 4 $ 60,000.00000 $ 60,000.00 5 $ 20,000.00000 $ 20,000.00 LUMP SUM AWD $ 250,000.00000 $ 250,000.00 2 $ 162,000.00000 $ 162,000.00 3 $ 50,000.00000 $ 50,000.00 4 $ 60,000.00000 $ 60,000.00 5 $ 300,000.00000 $ 300,000.00

PROJ. NO. 016002 PAGE NO. 15 79 624E10000 MOBILIZATION 80 806E16020 FIELD OFFICE, TYPE C LUMP SUM AWD $ 400,000.00000 $ 400,000.00 2 $ 400,000.00000 $ 400,000.00 3 $ 317,189.50000 $ 317,189.50 4 $ 300,000.00000 $ 300,000.00 5 $ 499,000.00000 $ 499,000.00 14.000 MONTH AWD $ 3,000.00000 $ 42,000.00 2 $ 6,000.00000 $ 84,000.00 3 $ 2,500.00000 $ 35,000.00 4 $ 2,500.00000 $ 35,000.00 5 $ 6,500.00000 $ 91,000.00 S.7 INCIDENTALS TOTALS TOTAL AMOUNT OF THE BID AWD $ 1,097,000.00 2 $ 755,700.00 3 $ 534,789.50 4 $ 534,000.00 5 $ 1,005,500.00 AWD $ 16,762,891.63 2 $ 17,327,127.61 3 $ 17,777,777.77 4 $ 19,269,885.56 5 $ 20,738,459.59