ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

Similar documents
This action is funded by the European Union

ANNEX III. Action Document for European Union Police and Civilian Services Training Programme EUPCST

Action Document for Turkey Nuclear Safety Cooperation. Total estimated cost: EUR 3 million Total amount of EU budget contribution EUR 3 million 6.

This action is funded by the European Union

This action is funded by the European Union

This action is funded by the European Union

This action is financed by the European Union

This action is funded by the European Union

National Indicative Programme for Tanzania Public Sector policy and administrative management

COMMISSION IMPLEMENTING DECISION. of

Grant: direct award to the OSCE Office for Democratic Institutions and Human Rights (ODIHR) (direct management)

11 th EDF National Indicative Programme (NIP) for Cooperation between Barbados and the European Union

1. Title/basic act/ CRIS number

1. Title/basic act/ CRIS number. 2. Zone benefiting from the action/location 3. Programming document

This action is funded by the European Union

This action is funded by the European Union

ANNEX 1. of the Commission Decision on Support to sustainable Economic Modernisation. Action Document for "Support to Economic Modernisation"

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX III. 1. Title/basic act/ CRIS number

Action Fiche for Libya

This action is funded by the European Union

COMMISSION IMPLEMENTING DECISION. of

This action is funded by the European Union

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) ALBANIA European Union Integration Facility. Action summary

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

Annex. 11 th EDF Support to the Office of the NAO CRIS No. TZ/FED/ Total estimated cost: EUR

EN Official Journal of the European Union L 77/77

ANNEX. DAC code Sector Economic and Development Planning

ANNEX 14 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument. Action Fiche for Public Diplomacy

IcSP Instrument contributing to Stability and Peace

SERBIA. Support to participation in Union Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

Annex 1. Action Fiche for Solomon Islands

This action is funded by the European Union

EN 7 EN. Annex II Action Fiche for West Bank and Gaza Strip/ENPI. 1. IDENTIFICATION Title/Number Total cost 10,500,000

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

EN Official Journal of the European Union L 77/95

This action is co-financed by UfM member countries for an amount of EUR 4.21 million. Aid method / Method of implementation

Council of the European Union Brussels, 12 June 2015 (OR. en)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

Instrument for Nuclear Safety Cooperation

Council of the European Union Brussels, 9 August 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Multi-country European Integration Facility

DAC-code Sector Public Sector Policy and Administrative Management

This action is funded by the European Union

The DAC s main findings and recommendations. Extract from: OECD Development Co-operation Peer Reviews

NEPAD/Spanish Fund for African Women s empowerment

This action is funded by the European Union

Proposal for a COUNCIL DECISION

This action is funded by the European Union

Multi-country European Integration Facility

Cross-border Cooperation Action Programme Montenegro - Albania for the years

This action is funded by the European Union

Twinning and Technical assistance Facility in support to the EU- Armenia ENP AP implementation CRIS n ENPI/2008/

Council conclusions on the EU role in Global Health. 3011th FOREIGN AFFAIRS Council meeting Brussels, 10 May 2010

COMMISSION IMPLEMENTING DECISION. of adopting a

Total estimated cost: EUR 5 million Total amount of EU budget contribution EUR 5 million Project Modality Direct management procurement of services

Action Document for the 11 th European Development Fund Antigua and Barbuda/ EU Public Financial Management & Revenue Reform Programme

Follow-up by the European Commission to the EU-ACP JPA on the resolution on private sector development strategy, including innovation, for sustainable

9644/10 YML/ln 1 DG E II

This action is funded by the European Union

Coherence Report Insights from the External Evaluation of the External Financing Instruments Final Report - Annexes July 2017

This action is funded by the European Union

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201

Official Journal of the European Union

SERBIA. Support to participation to the EU Programmes INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

COMMISSION IMPLEMENTING DECISION. of

COUNCIL OF THE EUROPEAN UNION. Brussels, 15 May /07 DEVGEN 89 ACP 94 RELEX 347

Making the EU commitments a reality through smart programming November 2018

L 347/174 Official Journal of the European Union

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMISSION IMPLEMENTING DECISION. of

COMMISSION DECISION. of

1050 Meeting, 11 March Administration and Logistics

COUNCIL DECISION 2011/411/CFSP

CONCORD, the European NGO Confederation for Relief and Development, is seeking a:

This action is funded by the European Union

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

COMMISSION IMPLEMENTING DECISION. of

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on a Union Civil Protection Mechanism. (Text with EEA relevance)

This action is funded by the European Union

Action Fiche for Lebanon

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID AND CIVIL PROTECTION - ECHO

COMMISSION IMPLEMENTING DECISION. of

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until

PUBLIC COUNCIL OF THE EUROPEAN UNION. Brussels, 3 November /05 DOCUMENT PARTIALLY ACCESSIBLE TO THE PUBLIC LIMITE

Action Fiche for Armenia Sector Multi Sector

This action is funded by the European Union

This action is funded by the European Union

EUROPEAN UNION. Strasbourg, 16 April 2014 (OR. en) 2013/0238 (COD) LEX 1514 PE-CONS 43/2/14 REV 2 DEVGEN 37 ACP 27 RELEX 145 CODEC 474

Evaluation of the European Union s Co-operation with Kenya Country level evaluation

EEA AGREEMENT - PROTOCOL 38C p. 1 PROTOCOL 38C{ 1 } ON THE EEA FINANCIAL MECHANISM ( ) Article 1

COUNCIL OF THE EUROPEAN UNION. Brussels, 11 May /10 ECOFIN 249 ENV 265 POLGEN 69

This action is funded by the European Union

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI

Proposal for a COUNCIL REGULATION. establishing an Instrument for Nuclear Safety Cooperation. {SEC(2011) 1472 final} {SEC(2011) 1473 final}

ANNEX 1. of the Commission Implementing Decision on. Action Document for Support to SME Development in Armenia

ANNEX. Technical Cooperation Facility - Suriname Total cost 2,300,000 (EC contribution 100%) Aid method / Management mode

Transcription:

EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357 Conflict Prevention, Peacebuilding and Crisis Preparedness support measures Global The action shall have a global mandate and its coverage will focus on the current on EU strategic foreign policy priorities. 3. Programming document Multiannual indicative Programme 2018-2020 of the Instrument contributing to Stability and Peace 4. Sector of concentration/ thematic area Instrument contributing to Stability and Peace (IcSP) Regulation Art 4; Art 6 (d) 5. Amounts concerned Total estimated cost: EUR 1 000 000 Total amount of EU budget contribution EUR 1 000 000 6. Aid modality(ies) and implementation Project Modality Direct management procurement of services modality(ies) 7 a) DAC code(s) 15220 - Civilian peace building, conflict prevention and resolution b) Main Delivery 52000 - Other (includes 'for profit', consultants and consultancy firms Channel 8. Markers (from CRIS DAC form) General policy objective Not targeted Significant objective Main objective Participation development/good X governance Aid to environment X Gender equality (including X Women In Development) Trade Development X Reproductive, Maternal, New X born and child health RIO Convention markers Not targeted Significant objective Biological diversity X Combat desertification X Main objective 1

9. Global Public Goods and Challenges (GPGC) thematic flagships Climate change mitigation X Climate change adaptation X Not applicable 10. SDGs Sustainable Development Goal (SDG) 16 "Promote peaceful and inclusive societies for sustainable development, provide access to justice for all and build effective, accountable and inclusive institutions at all levels" and Goal 5 "Achieve gender equality and empower all women and girls". SUMMARY The Conflict Prevention, Peacebuilding and Crisis Preparedness support measures will contribute to the identification, formulation, evaluation, and implementation, inter alia providing technical assistance and training, and organising meetings and seminars, for actions under Article 4 Assistance for conflict prevention, peace-building and crisis preparedness of the Instrument contributing to Stability and Peace (IcSP). 1 CONTEXT 1.1 Thematic area The "Instrument contributing to Stability and Peace (IcSP)" provides direct support for the Union s external policies by increasing the efficiency and coherence of the Union s actions in the areas of crisis response, conflict prevention, peace-building and crisis preparedness, and in addressing global and trans-regional threats. Article 4 of the IcSP aims in particular to ensure capacity and preparedness of the EU and its partners to prevent conflict, build peace and address pre-and post-crisis situations in close coordination with the United Nations and other international, regional and sub-regional organisations, and state and civil society actors. Measures include knowhow transfer, the exchange of information and best practices (including the use and development of methodologies and/or knowledge products), risk/threat assessment, research and analysis, early warning systems, training and service delivery, as well as financial and technical assistance for the implementation of peace-building For the above, the EU as a whole and its partners, including third countries, must be able to draw upon expertise to support the identification, programming and implementation of peacebuilding activities. 1.1.1 Public Policy Assessment and EU Policy Framework Not applicable. 2

1.1.2 Stakeholder analysis The main stakeholders are third countries, civil society actors and regional and international partner organisations that will benefit from this expertise with the aim of rendering their delivery to final beneficiaries more effective. The EU Member States can also contribute to the action mobilising appropriate expertise. 1.1.3 Priority areas for support/problem analysis As defined by the relevant Regulation the main areas of intervention under the Article 4 of the IcSP are the following: (a) (b) (c) (d) (e) promoting early warning and conflict-sensitive risk analysis in the policy-making and the implementation of policy; facilitating and building capacity in confidence-building, mediation, dialogue and reconciliation, with particular regard to emerging inter-community tensions; strengthening capacities for participation and deployment in civilian stabilisation missions; improving post-conflict recovery as well as post-disaster recovery with relevance to the political and security situation; curbing the use of natural resources to finance conflicts, and supporting compliance by stakeholders with initiatives such as the Kimberley Process Certification Scheme, especially as regards the implementation of efficient domestic controls over the production of, and trade in, natural resources. 2 RISKS AND ASSUMPTIONS The interventions under this action will be performed according to the procedures for the EU external actions, in particular through framework contracts and attention will be paid to transparency and to the fair treatment of the potential implementers of the action. The results of the implementation of the actions will be regularly monitored. 3 LESSONS LEARNT, COMPLEMENTARITY AND CROSS-CUTTING ISSUES 3.1 Lessons learnt The support measures have demonstrated their added value in the preparation and implementation of the programming of the EU External Financial Instruments. As this is the first support measures action under Article 4 there are no specific lessons learnt that need to be applied. Nevertheless a good example of similar positive lessons learnt, is the assessment made of the comparable support measure under the other programmable component of Article 5 of the IcSP. The Expert Support Facility (ESF) for this Article, (generally around 3% - 6% of the annual amount for Article 5), has been implemented since 2007 (first under the Instrument for Stability, the predecessor of the IcSP, then under the IcSP). This measure is seen as crucial in providing the necessary elements for the definition of 3

the actions and for its subsequent implementation. An independent assessment 1 of the ESF Framework Contract concluded that the ESF is a flexible and quick instrument that requires only light administration and their projects met the criteria related to relevance, effectiveness, efficiency, impact and sustainability and recommended to continue its use for the preparation of the projects within the framework of the IcSP. In the Mid-term Evaluation (MTE) of the IcSP it was stated that " was also noted by stakeholders in the MTE Open Public Consultation (OPC) process, with the absence of such a facility having negative effects on efficiency. Small actions (e.g. conflict analyses, feasibility studies, etc.) undertaken to enhance efficiency, should not require the same processes to be followed as large decisions 2 ". 3.2 Complementarity, synergy and donor coordination The present action complements other instruments of financial and technical cooperation, including geographic and thematic programmes, as well as other tools for implementation of EU policies concerning security, including the support interventions in favour of the African peace and Security Architecture (APSA) financed under the African Peace Facility (APF), and in particular the crisis-related interventions of the Instrument contributing to Stability and Peace, both in its short-term and long-term components (Articles 3, 4 and 5). 3.3 Cross-cutting issues Projects cut across many different sectors and issues, ranging from human rights, gender equality and good governance. All activities of the projects will be carried out in conformity with the principles of good governance, internationally recognised human rights standards as well as taking into account gender equality and will take into account the rights enshrined in the Charter of Fundamental Rights. Environment will be taken into consideration as a crosscutting issue in the implementation of actions. 4 DESCRIPTION OF THE ACTION 4.1 Objectives/results The overall objective of the Conflict Prevention, Peacebuilding and Crisis Preparedness support measures is to contribute to the aims of the IcSP by ensuring the best use of the resources in terms of the priorities to be addressed and the impact of responses. The specific objective is to establish the Conflict Prevention, Peacebuilding and Crisis Preparedness support measures as a flexible structure aiming at the provision of more reliable and effective technical assistance to beneficiaries in the areas covered by the IcSP. To this end, the Conflict Prevention, Peacebuilding and Crisis Preparedness support measures is responsible for the support to the preparation and implementation of multi-purpose projects and programmes at the programming and implementation levels, as a centre of expertise. It will focus on Article 4 of the IcSP Regulation. 1 Contract IFS-2012-294970, final report of the 28/02/2013 2 http://ec.europa.eu/dgs/fpi/documents/key-documents/icsp-mte-final-report.pdf (page 25). 4

4.2 Main activities The Conflict Prevention, Peacebuilding and Crisis Preparedness support measures will contribute to the identification, formulation, implementation and evaluation of actions under Article 4 of the Instrument contributing to Stability and Peace. The expected results to be achieved and the corresponding activities to be undertaken by the support measures may include the following: a) The capacity to support and to assist beneficiary countries in the framework of initiatives such as short term training, legal advice, strategy support, etc. b) The development of quality policy, strategies and overall programming through advisory groups and through access to quality studies undertaken by appropriate EU and third country experts and the establishment of sustainable relationships with the beneficiary countries: Organising and facilitating workshops/seminars/conference/study visit programmes; Undertaking studies covering risk analysis, gender analysis, assessments, identification/definition of needs, feasibility, analysis; Identifying synergies with actions by other donors. c) Support to the identification and formulation of projects and programmes taking into account the real needs and priorities of beneficiary countries: Conducting needs-assessment missions; Consulting and informing beneficiary countries in order to ensure their ownership; Drafting project proposals, terms of references, etc.. d) Deployment of experts on a short-, mid- or long-term basis for the carrying out of factfinding and needs-assessment missions, ensuring a gender balanced approach; the provision of ad-hoc technical assistance, advices, trainings, capacity building inputs, etc.; or the concrete implementation in full or in part of programmes and projects: Taking delivery of and processing requests from beneficiary countries and Commission services for expert deployments; Recruitment of experts via public and/or para-public bodies already pre-selected under framework contract procedure; Preparing the experts through documentations, meetings and briefings in Brussels and/or the field; To the extent possible, consider the possibility of training the experts on EU policies and procedures, including on EU gender policies and the Gender Action Plan (2016-2020) 3 ; Support in making logistical arrangements for the deployment of selected experts. e) Programmes and projects implemented in/with beneficiary countries are monitored and 3 Joint staff working document of the European Commission and the High Representative of the Union for Foreign Affairs and Security Policy of the 21/09/2015 on the gender Equality and Women s Empowerment 5

evaluated: Monitoring the ongoing programmes and projects financed under the IcSP and providing recommendations on necessary corrective measures; Carrying out evaluations of programmes and projects including the assessment of outputs, outcomes and impacts. 4.3 Intervention logic N/A 5 IMPLEMENTATION 5.1 Financing agreement In order to implement this action, it is not foreseen to conclude a financing agreement with the partner country, referred to in Article 184(2)(b) of Regulation (EU, Euratom) No 966/2012. 5.2 Indicative implementation period The indicative operational implementation period of this action, during which the activities described in section 4.1 will be carried out and the corresponding contracts and agreements implemented, is 60 months from the date of adoption by the Commission of this Action Document. Extensions of the implementation period may be agreed by the Commission s authorising officer responsible by amending this decision and the relevant contracts and agreements; such amendments to this decision constitute technical amendments in the sense of point (i) of Article 2(3)(c) of Regulation (EU) No 236/2014. 5.3 Implementation modalities Subject in generic terms, if possible Identification, formulation, implementation, evaluation etc. 5.3.1.1 Procurement (direct management) 5.4 Scope of geographical eligibility for procurement Type (works, Indicative Indicative trimester supplies, number of of launch of the services) contracts procedure Services 10 Q3/2018 The geographical eligibility in terms of place of establishment for participating in procurement award procedures and in terms of origin of supplies purchased as established in the basic act and set out in the relevant contractual documents shall apply. The Commission s authorising officer responsible may extend the geographical eligibility in accordance with Article 9(2)(b) of Regulation (EU) No 236/2014 on the basis of urgency or of unavailability of products and services in the markets of the countries concerned, or in other duly substantiated cases where the eligibility rules would make the realisation of this action impossible or exceedingly difficult. 6

5.5 Indicative budget Module EU contribution Third party contribution (amount in EUR) 5.3.1. Procurement (direct management) 1,000,000 Total 1,000,000 0 5.6 Organisational set-up and responsibilities The implementation of this project will be coordinated and led by the European Commission. 5.7 Performance monitoring and reporting The day-to-day technical and financial monitoring of the implementation of this action will be a continuous process and part of the implementing partner s responsibilities. To this aim, the implementing partner shall establish a permanent internal, technical and financial monitoring system for the action and elaborate regular progress reports (not less than annual) and final reports. Every report shall provide an accurate account of implementation of the action, difficulties encountered, changes introduced, as well as the degree of achievement of its results (outputs and direct outcomes) as measured by corresponding indicators, using as reference the logframe matrix (for project modality) or the list of result indicators (for budget support). The report shall be laid out in such a way as to allow monitoring of the means envisaged and employed and of the budget details for the action. The final report, narrative and financial, will cover the entire period of the action implementation. The Commission may undertake additional project monitoring visits both through its own staff and through independent consultants recruited directly by the Commission for independent monitoring reviews (or recruited by the responsible agent contracted by the Commission for implementing such reviews). 5.8 Evaluation Having regard to the nature of the action, a mid-term or final evaluation will not be carried out for this action or its components. The Commission may, during implementation, decide to undertake an evaluation for duly justified reasons either on its own decision or on the initiative of the partner. Any evaluation reports shall be shared with the partner country and other key stakeholders. The implementing partner and the Commission shall analyse the conclusions and recommendations of the evaluations and, where appropriate, in agreement with the partner country, jointly decide on the follow-up actions to be taken and any adjustments necessary, including, if indicated, the reorientation of the project. 5.9 Audit Without prejudice to the obligations applicable to contracts concluded for the implementation of this action, the Commission may, on the basis of a risk assessment, contract independent audits or expenditure verification assignments for one or several contracts or agreements. 7

5.10 Communication and visibility Communication and visibility of the EU is a legal obligation for all external actions funded by the EU. This action shall contain communication and visibility measures which shall be based on a specific Communication and Visibility Plan of the Action, to be elaborated at the start of implementation and supported with the budget indicated in section 5.5 above. In terms of legal obligations on communication and visibility, the measures shall be implemented by the Commission, the partner country, contractors, grant beneficiaries and/or entrusted entities. Appropriate contractual obligations shall be included in, respectively, the financing agreement, procurement and grant contracts, and delegation agreements. The Communication and Visibility Manual for European Union External Action shall be used to establish the Communication and Visibility Plan of the Action and the appropriate contractual obligations. 8