MED PROGRAMME. First Level Control in practice. Most common mistakes - Follow-up measures

Similar documents
Follow up and reporting procedures. Lead partners seminar 5th targeted call Lydwine Lafontaine

Knowledge and Innovation Consultants. Financial Management and Reporting Greek Magistral Lesson Izmir, 28/06/2011

Expenditure reporting procedure in PRESAGE-CTE

South East Europe (SEE) SEE Control Guidelines

First level control report including checklist

FIRST LEVEL CONTROL: PRINCIPLES AND PRACTICE

FLC Guidance. Page 1. Version. September *Disclaimer: This is a living document and further content will be developed at a later stage.

How to close the project

IPA partners seminar. Eligibility of expenditure and specificities of the public procurement. Dubrovnik, 5 th February 2013

Financial rules and procedures in Interreg Europe - second call projects

Lead Partner Seminar. JS/MA Riga

EACEA. Cluster Meeting

INTERREG III B CADSES. Payment Claim Manual

GUIDE FOR PROJECT IMPLEMENTATION

SMALL PROJECT CONSOLIDATED PROGRESS REPORT FORM including guidelines

Annex 3 First level control report including checklist

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms

Eligibility rules, Financial control, Procurement

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

ELIGIBILITY OF EXPENSES: APPLICABLE RULES

Project Monitoring and Reporting Workshop for Interreg programmes

8 th Financial Managers Seminar

Financial rules and procedures

INTERREG V-A GREECE-ITALY PROGRAMME PATRA 24/04/2018 PREVEZA 26/04/2018

Fact Sheet 13 Roles and responsibilities in project partnerships

INTERREG 2 Seas Mers Zeeën First Level Control Manual

ERDF SUBSIDY CONTRACT NO...

CONSOLIDATED PROGRESS REPORT FORM including guidelines

Simplified Cost Options:

Seed Money Facility. Lead Applicants seminar Budapest, 11 April 2016

Control Guidelines for INTERREG IPA CBC Programmes

Interreg V-A Latvia Lithuania Programme

Guidance Note 14 Micro Project scheme

Reporting and First Level Control of Finance and Activities

BALANCE. Reporting, auditing and payment. Kick-off meeting, Copenhagen, Denmark. Jesper H. Andersen 31 August + 1 September 2005

Factsheet N 6 Project implementation: delivering project outputs, achieving project objectives and bringing about the desired change

Second Level Control: process and most common findings

Eligibility of costs in the Horizon 2020 funded EUROfusion project

1st Level Control in the North Sea Region Programme

PROGRAMME RULES ON ELIGIBILITY OF EXPENDITURES

CEF Model Grant Agreement Audit Aspects Introducing Annex VII Certificate on Financial Statements

Creative Europe Sub-programme Culture Financial management

Guidance on management verifications Cooperation Programme Interreg V-A Greece - Italy

Project Changes. Lead Partner Seminar 4th Call for Proposal Budapest 10th December 2012

CENTRAL EUROPE Control and Audit Guidelines TABLE OF CONTENTS

Budget & Finances. Interreg Europe Secretariat. 23 March 2016 Lead applicant workshop. Sharing solutions for better regional policies

8 th Financial Managers Seminar

GUIDELINES FOR FIRST LEVEL CONTROL on CBC Programmes, co-financed by IPA BULGARIA - SERBIA BULGARIA - MACEDONIA BULGARIA - TURKEY

European networks, experience and recommendations helping cities and citizens to become Energy Efficient

Annex VI. Model terms of reference for the Certificate on the Financial Statements

Project Implementation Seminar

First Level Controller MANUAL

1 st call for proposals, 2 nd call for proposals, Priority 3 Better network of harbours version

First Level Control of finance and activities: The Programme rules

Financial Control. Thi s p r og r am m e is co- f i nanced by t he E ur op ean R eg i onal D ev el op m ent F und.

Practical Reporting Do s and Dont s

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

Market Replication: Eco-Innovation F I N A N C I A L G U I D E L I N E S for co-ordinators and co-beneficiaries

Eligibility Rules of Expenditures

User s guide for filling in the Execution Report

First Level Control of finance and activities: The Programme rules

Interreg Nord

Brussels, 11 May FP7 Audit. DG RTD Unit M2

PAC Guidelines for Project Progress Report

SELECTION CRITERIA. for applications submitted to the INTERREG V-A Austria-Hungary Programme

Financial control. Wolfgang Schrattenecker Managing Authority

How to plan your budget and project management?

First call of Interreg CENTRAL EUROPE

Partnership Agreement between the Lead Partner and the other project partners

Audit certificates. Training Seminar Brussels 28 November 2006

FP7 CERTIFICATION MODALITIES

Financial Reporting First Level Control

Implementation Manual. Version 2.1 December 2016

Project Implementation. Project Implementation Seminar Monika Balode, Project Coordinator September 2018 Tallinn & Stockholm

ADMINISTRATIVE MANUAL FOR PROJECT IMPLEMENTATION

Guidance for Member States on the Drawing of Management Declaration and Annual Summary

Project Progress Report User Guide

PROCUREMENT OF SERVICES OPEN CALL FOR TENDERS (Article 29 decree No of 30/12/2005) FRAMEWORK CONTRACT

Practicalities in the Financial Management of FP7 projects - An outlook to audits and Horizon 2020 rules

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006

Version Three offer rules - modifications about beneficiaries asking for offers instead of collecting them.

Guidance for reporting

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Table of contents. Introduction Regulatory requirements... 3

LIFE Grant Agreement Financial Aspects Highlights

Annual Implementation Report CITIZEN S SUMMARY

GREECE-THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA I.P.A. CROSS BORDER PROGRAMME

Control and audit. One of the main concerns of the EU COMM. Single audit system recommended by European Court of Auditors:

IMPLEMENTATION MANUAL. Version 3.1 July 2018

ADRION 2 call for proposals Priority Axis 2 Financial aspects. Tirana, 11 April 2018

INTERREG IIIC West Zone. Programme Complement

Eligibility principles and sound financial management

Partners and FLC Info day. Madrid, 22/06/2017

Audit certificate template for Horizon2020 projects funded by SERI

Guidelines for the AF DSP call for proposals

on the Parallel Audit on by the Working Group on Structural Funds

SIU Management and Monitoring System PROGRESS REPORT USER MANUAL PART 2

ems Technical Guidance

Financial Webinar. IMI 2 projects :00 CET

Transcription:

MED PROGRAMME First Level Control in practice Most common mistakes - Follow-up measures Torino 11 April 2011

BACKGROUND Major common mistakes detected during JTS check 1 st and 2 nd PR Delays in finalization of JTS check procedures Ineligible expenditures Delayed ERDF payments to LPs consequent delayed ERDF quota reimbursement to PPs Expenditures not reimbursed

MISTAKES CONTENT Double funding Entering expenditures in PRESAGE-CTE Staff costs Overheads VAT Depreciation Public procurement Documents justifying incurred expenditure FORMAL FL Controller Commitment Checklist Sections not filled in Checklist - "No" or "N/A answers Strong delays in submission of PRs Incomplete PRsb Original Signature/official stamp on Payment Claim TIP Both First level Controllers and project partners are responsible

MISTAKES CONTENT Double funding Entering expenditures in PRESAGE-CTE Staff costs Overheads VAT Depreciation Public procurement Documents justifying incurred expenditure

CONTENT [1] Double funding WHAT Check mechanism in place to avoid that same expenditures are reimbursed by different public funding (EU, national, regional) WHO Both Project partners and FL Controllers WHERE Section 3.2 checklist certification expenditures

CONTENT [2] Double funding MISTAKES Declaring that the same expenditures won t be charged on more than 1 co-financed project. Any additional information provided Check on double funding only on some cost categories (staff, ) Answers «Yes» «No» or «N/A» with no further explanation provided FOLLOW-UP MEASURES Project partners have to implement a systematic and objective method that allows a real control/follow up of co-financed expenditures Allow a check implemented on 100% of expenditures on all cost categories Compulsory to provide a brief and clear explanation of the method adopted no matter the answer provided even in case of YES answer

CONTENT [3] Entering expenditures in PRESAGE-CTE MISTAKES Expenditures allocated to the wrong budget line «Expenditure amount» higher than «Invoice original amount» Invoice date/payment date: in many cases the same date FOLLOW-UP MEASURES Check working plan + first level control guidelines + fact sheets LP: before validation of PP s expenditures, please verify the allocation per budget lines and components-phases «Expenditure amount» is the amount charged on the project Invoice date: date expenditure document has been issued Payment date: date the payment has been finalized

CONTENT [4] Entering expenditures in PRESAGE-CTE

CONTENT [5] Staff costs MISTAKES Costs are based on estimations Example: Employee X charged 3h/day for every working day of the month POSSIBLE MISTAKE Double funding: Same employee charged on more than 1 project. All projects financed through public funding have to be considered FOLLOW-UP MEASURES Staff costs must be based on real costs meaning cost based on real hours worked on the project PPs have to implement a systematic method that allows a verifiable control/follow up to avoid charging more than 100 % of the working time thus excluding double funding. Timesheets including all project co-financed, not only MED Check to be finalized by the FLC as well Section 3.2 checklist

CONTENT [6] Overheads MISTAKES Cost items considered to calculate overheads do not have a direct link with project s implementation (garden maintenance, ) FOLLOW-UP MEASURES Costs related to project implementation Check method of calculation with FL Controllers + NCP

CONTENT [7] VAT MISTAKES "No" or "N/A" answers in the checklist section 3.15 without any explanation and/or no coherence between the answer/comment and the information entered in PRESAGE concerning PP s VAT status. It is not clear if relevant amount has been excluded or not. FOLLOW-UP MEASURES Check the information entered in PRESAGE In case "No" or "N/A" answers are given, provide the relevant explanation coherent with the information entered in PRESAGE Specify if expenditures have been considered as not eligible + related amount

CONTENT [8] VAT MED PARTNER MED PARTNER MED PARTNER 0123456789

CONTENT [9] Depreciation MISTAKES Depreciation NOT applied even if the purchased good is not 100% used for project purposes PCs charged 100% of their cost and not justified in the framework of project activities FOLLOW-UP MEASURES In case goods are NOT used exclusively for the project purposes depreciation applies Only a share of depreciation corresponding to actual use for project purposes In case of PC charged 100% it has to be used at least by 1 employee charged 100% or by more employees charged on the project with different % (50% + 50%; 30% + 70%; etc.)

CONTENT [10] Public procurement WEAKNESS Purchase of: External expertise/services Promotion, information Durable-consumable goods. In case of minor contracts a simplified procedure of effective selection has not been implemented FOLLOW-UP MEASURES MED Programme Framework: A simplified procedure of effective selection is warmly recommended even for low amounts. PPs shall request at least 3 offers from 3 different providers before selecting one to ensure that prices have been compared. Respect of principles of: transparency non-discrimination equal treatment effective competition

CONTENT [11] Documents justifying incurred expenditures WEAKNESS Purchase of: External expertise/services Durable-consumable goods. In many cases, according to specific national rules, there are NO contracts or/and invoices against payments TIP Check carefully FACT 19 SHEET FOLLOW-UP MEASURES MED Programme Framework: A complete audit trail shall be ensured at each PP level thus also for low amounts at least a letter to the provider shall exist indicating: the service/ external expertise/ durable-consumable good purchased related cost name of MED project Same for related invoice/doc. justifying the expenditure

MISTAKES FORMAL FL Controller Commitment Checklist - Sections not filled in Checklist - "No" or "N/A answers Strong delays in submission of PRs Incomplete PRs Original Signature/official stamp on Payment Claim

FORMAL [1] FL Controller Commitment MISTAKES Missing indication of the relevant body validating the choice of the FL Controller (in case FLC system not cartelized or with a system of 2 phases certification) missing/wrong indication of the declared expenditures submitted to FL Controller. Not to be confused with confirmed eligible expenditures FOLLOW-UP MEASURES The validating body is NOT the project partner who has chosen the FL Controller but the national regional relevant body that has validated the choice: i.e: Spain - Ministry of Economy Italy ad hoc Commission France Region PACA Cyprus Planning Bureau Declared expenditures Expenditures submitted to FLC Confirmed eligible expenditures Certified expenditures

FORMAL [2] FL Controller Commitment FL Controller s name Name of relevant body validating the choice 16.000

FORMAL [3] FL Controller Commitment Check that amounts indicated under total declared expenditure and confirmed eligible expenditures CORRESPOND in Annex 2 of the certification 17.548 16.000

FORMAL [4] Checklist Sections not filled in "No" or "N/A answers MISTAKES Relevant Sections of the checklist are not filled in NO or N/A answer provided with no explanation in the comment box FOLLOW-UP MEASURES Check that relevant Sections are duly filled in in case of NO or N/A answer, provide the necessary clarifications. Particularly when NO or N/A are provided and expenditures are certified as eligible. in case expenditures, or part, ae not considered as eligible, specify the amount

FORMAL [5] Checklist Sections not filled in "No" or "N/A answers TIP The following Sections have always to be filled in 3.1 Accounting System 3.2 Double financing 3.3 Compliance with project budget 3.14 Additional respect of community policies 3.15 Other checks The other Sections are specifically related to budget lines and preparation costs

FORMAL [6] Strong delays in submission of PRs WHEN? Within 2 months from the end of the 6 months implementation period Check art 3.3 subsidy contact

FORMAL [7] Incomplete PRs WHAT? PAYMENT CLAIM signed and stamped in original Copy of the CERTIFICATIONS OF EXPENDITURES and related CHECK LIST of validated expenditures provided by the first level controllers Copy of the VALIDATION of the certification by RELEVANT NATIONAL Authorities (Spain Portugal) PROGRESS REPORT with relevant information concerning the activities implemented during the relevant implementing period Check carefully Copy of OUTPUTS TIP FACT SHEET 21 REPORTING

FORMAL [8] Signature/official stamp on Payment Claim Lead partners: TIP Remember to sign and stamp in original the payment claim Use the official stamp of the LP s structure

THANK YOU FOR YOUR ATTENTION! Patrizia Busolini Financial monitoring officer Phone: +33 4 91 57 52 45 E-mail: pbusolini@regionpaca.fr