PROPOSED FY 2012 PRTC BUDGET & SIX YEAR PLAN

Similar documents
FY 2015 Proposed PRTC Budget

Transit Subsidy. Mission Statement. Mandates

FY 2017 Proposed PRTC Budget

The Potomac and Rappahannock Transportation Commission (PRTC) is a multijurisdictional agency representing Prince William, Stafford and Spotsylvania

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Projected FY17 Transit Subsidy

Transit Subsidy. Mission Statement. Mandates

Technical Memorandum #1: Baseline Conditions. This section provides an overview of the main services operated and assets maintained by PRTC.

POTOMAC AND RAPPAHANNOCK TRANSPORTATION COMMISSION

Financial Analysis Working Paper 1 Existing Funding Sources Draft: April 2007

FY 2018 PUBLIC HEARINGS PROPOSED FARE INCREASE

Getting Metro Back on Track

VIRGINIA RAILWAY EXPRESS

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda

VRE Financial Plan Analysis Updated January 15, 2016

Certificate of Achievement for Excellence in Financial Reporting

NORTHERN VIRGINIA TRANSPORTATION COMMISSION

Draft TransAction Plan: Overview and Findings. Martin E. Nohe, Chairman July 13, 2017

VIRGINIA RAILWAY EXPRESS

Executive Summary. Introduction

Operating Budget. Third Quarter Financial Report (July 2005 March 2006)

The following items were handed out at the November 2, 2017 NVTC Meeting.

Certificate of Achievement for Excellence in Financial Reporting

Chairman Skinner and the VRE Operations Board. Authorization to Issue a Request for Proposals for Federal Legislative Services

FOR THE YEARS ENDED JUNE 30, 2016 AND 2015

Certificate of Achievement for Excellence in Financial Reporting

COMPREHENSIVE ANNUAL FINANCIAL REPORT

CHAPTER 7: Financial Plan

Certificate of Achievement for Excellence in Financial Reporting

The Transportation Infrastructure Bond Act of 2000

Public Transit Services Summary of Submitted 2015 Budget From Rates

Budget. Quick. Reference. Guide

Chapter 9 Financial Considerations. 9.1 Introduction

PINELLAS SUNCOAST TRANSIT AUTHORITY KEY BUDGET ASSUMPTIONS FOR FISCAL YEAR 2016

The Transit Fiscal Cliff:

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M

Honolulu High-Capacity Transit Corridor Project Alternatives Analysis

MTA 2010 Preliminary Budget

Chapter 3: Regional Transportation Finance

Community Development Strategic Plan & Current Needs Update

FY2011 Budget Forum. District of Columbia. October 19, 2009

REGIONAL TRANSPORTATION DISTRICT, COLORADO AS OF DECEMBER 31, 2015

CHAPTER 9 FINANCIAL CONSIDERATIONS

Pending Changes to State Transit Funding Programs. Virginia Transit Association Webinar January 7, 2019

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

Keeping Metro Safe, Reliable and Affordable

Solano County Transit

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral

Cash & Liquidity The chart below highlights CTA s cash position at January 2016 compared to January 2015.

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. November 2018 (Third Quarter Fiscal Year-to Date)

FY17 FY16 Valley Metro RPTA Sources of Funds FY17 vs FY16

QUALITY TRANSPORTATION SUMMARY

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. February 2018 (First Quarter Fiscal Year-to Date)

METRO. Fiscal Year 2012 Monthly Board Report. December 2011 (First Quarter Fiscal Year-to-Date)

Financial Plan. Section 8 STATUS QUO PLAN STATUS QUO PLAN ASSUMPTIONS STATUS QUO PLAN BUDGET ITEMS

Cash & Liquidity The chart below highlights CTA s cash position at June 2014 compared to June 2013.

Virginia Railway Express

TSCC Budget Review TriMet

VIRGINIA RAILWAY EXPRESS REQUEST FOR PROPOSALS (RFP) RFP No MAINTENANCE SERVICES / CUSTODIAL AND SEASONAL SERVICES FOR VRE FACILITIES

METRO. Fiscal Year 2012 Monthly Board Report. September 2012 (Fourth Quarter Fiscal Year-to-Date)

Proposed Budget Fiscal Year 2010 July 1, 2009 June 30, 2010

VIRGINIA RAILWAY EXPRESS

Review and Update of Year 2035 Regional Transportation Plan

METRO. Fiscal Year 2017 Monthly Performance Report. Revenue Expense Ridership Performance. October 2016

Section I Year-to-date revenues collected and projected revenues and expenditures for the current fiscal year

APPENDIX A. Financial Plan. September 2018 DRAFT

University Link LRT Extension

Cash & Liquidity The chart below highlights CTA s cash position at July 2015 compared to July 2014.

($ in millions) Mid-Year

Notice of Public Hearing Washington Metropolitan Area Transit Authority

MTA 2018 Final Proposed Budget November Financial Plan Volume 1 November 2017

FY2017 Budget Guidance

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority.

Financial Report Fiscal Year 2018

METRO. Fiscal Year 2013 Monthly Board Report. December 2012 (First Quarter Fiscal Year-to-Date)

Santa Cruz METRO Board of Directors September 12, 2014 Alex Clifford, CEO

Federal Assistance 13% Charges for Services 5% Appropriated Fund Balance.5% Other 3% Administration 6% Building Maintenance 3% Other 2%

FY2020 Budget Outlook

Cash & Liquidity The chart below highlights CTA s cash position at February 2017 compared to February 2016.

Cash & Liquidity The chart below highlights CTA s cash position at November 2014 compared to November 2013.

METRO. Fiscal Year 2013 Monthly Board Report. January 2013

Financial Report - FY 2017 Year to Date May 31, 2017

Chairman Smedberg and the VRE Operations Board

Portal North Bridge Project Hudson County, New Jersey Core Capacity Project Development (Rating Assigned February 2017)

Transit Funding and Reform Update

MTA 2016 Final Proposed Budget November Financial Plan Volume 1 November 2015

Virginia Railway Express Annual Customer Survey Customer Opinion Survey Results

Arlington County, Virginia

Cash & Liquidity The chart below highlights CTA s cash position at May 2014 compared to May 2013.

METRO. Fiscal Year 2013 Monthly Board Report. November 2012

VIRGINIA RAILWAY EXPRESS REQUEST FOR PROPOSALS (RFP) RFP No INSURANCE BROKERAGE SERVICES

Cash & Liquidity The chart below highlights CTA s cash position at February 2016 compared to February 2015.

Financial Report Fiscal Year 2018

Cash & Liquidity The chart below highlights CTA s cash position at March 2017 compared to March 2016.

FY2018 Third Quarter Financial Update

MARTA 2009 Budget Summary Review

MTA 2007 Final Proposed Budget

Arlington Transportation Demand Managment Strategic Plan FY FY2040

Economic Impact of Public Transportation Investment 2014 UPDATE

Transcription:

POTOMAC AND RAPPAHANNOCK TRANSPORTATION COMMISSION PROPOSED FY 2012 PRTC BUDGET & SIX YEAR PLAN Presentation to Potomac and Rappahannock Transportation Commission January 13, 2011

Presentation Overview Background Observations Accomplishments to-date FY 2012 budget In summary In detail FY 2012 FY 2017 six year plan two options With a Prince William general fund supplement Without a Prince William general fund supplement Prospects for federal / state relief 2

Background Observations -- Introduction FY 2012 budget inaugurates the practice of preparing a budget in tandem with transit development plan (TDP) TDP is state mandate to delineate operating and capital needs over six-year period Provides VDRPT an explicit it picture of state t assistance needs based on aspirational and fiscally constrained scenarios TDP will be presented to the PRTC Board for adoption in March, shaped by tonight s action on the FY 2012 budget 3

Background Observations Introduction (Continued) Two FY 2012 / six year plan budget proposals being presented One with a proposed Prince William County general fund supplement in the out-years The other without t such a supplement Differences in two proposals confined to out-years (FY 2012 budget is identical in both) Magnitude of general fund supplement request has been reduced significantly 4

Chronology of General Fund Supplement Request Genesis -- Prince William s combined subsidy for PRTC and VRE exceeds County s current motor fuels tax yield In FY 2011, combined subsidy is $15 million while fuels tax yield is $12 million Increased federal / state assistance would ease this but, in the interim, prior year fuel tax surplus being used to sustain services This time last year, PRTC management projected that Prince William s prior year surplus would be depleted by FY 2014, creating cumulative deficits of $4 million in FY 2014 $6 million in FY 2015 Can be read to mean a sum of $6 million of Prince William general funds was projected to be needed d between FY 2012 & FY 2015 to sustain County-sponsored bus and rail services ($1.5 million/year) 5

Chronology of General Fund Supplement Request (Continued) PRTC management highlighted the same issue in a budget preview presentation at the PRTC December 2010 meeting Advised Board that two alternative FY 2012 budgets would be presented one with and one without a general fund supplement Indicated that magnitude of the prospective supplement would be resized / lowered as part of the FY 2012 budget preparation Re-sizing of prospective supplement completed, and it is substantially less than last year s projection because Ridership / passenger revenue tracking much better than budget One-time discretionary grant award (TIGER; $10 million) has lessened dependency on local funds State capital participation rates better than assumed last year (80% for rolling stock rather than 50%) Substantial carry-forward ($3.3 million) now confirmed as FY 2012 source VRE subsidy in out-years less than last year s projections 6

Accomplishments To-Date Service and Usage Ridership level sustained 4,500,000 despite lingering recession and drop in fuel 4,000,000 Annual PRTC Bus and VRE Ridership prices 3,500,000 3,000,000 Overcrowding conditions 2,500,000 on OmniRide eased but not eliminated resource 2,000,000 constraints 1,500,000 OmniLink on-time performance and call volume challenges being addressed by Board adopted remedial action plan 1,000,000 500,000 0 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 OmniRide OmniLink PRTC Bus VRE 7

Accomplishments To-Date Asset Management Bus fleet is well maintained and in excellent shape Mid-life overhauls progressing as scheduled Buses continue to be replaced generally as they reach PRTCdefined retirement age Longer than federal standard for commuter buses New commuter park-rideride lot completed Whole bus fleet now camera-equipped Transit Center enhancements progressing as planned New building security system procurement completed Emergency exit plans progressing Existing bus maintenance facility at practical capacity Environmental / design work on second bus maintenance facility to begin shortly 8

Accomplishments To-Date Customer Service Initiatives Completed Interactive voice response phone system enhancements Rider Express instant messaging enhancements Progressing as scheduled CAD/AVL system procurement New itinerary builder imminent; partnership with Google Bus shelter program 9

FY 2012 Budget Overview No new service or fare increase $230/month commuter benefit extended to end of calendar year 2011, meaning that benefit could revert to $120/month halfway into FY 2012 Minimal revenue hour allowance for schedule adjustments to compensate for increasing running times Capital investments in FY 2012 confined to: Safety sensitive improvements (e.g., replacement of retirement-age buses in active fleet; bus overhauls) CAD/AVL-related options * Reserve amounting to 2% for minimal COLA / merit adjustment last one was in FY 2009 * Base portion of the CAD/AVL is TIGER funded in FY 2011 10

Proposed FY 2012 Operating & Capital Expenses (PRTC & VRE Combined) PRTC Amount Percent First Transit contract $16,264,000 58% PRTC personnel 4,284,900 15% Fuel 3,810,400 14% Facility improvements / maintenance 603,800 2% Bus shelters / maintenance 521,000 2% Printing and reproduction 510,800 2% Computer equipment / services 378,200 1% Professional services 353,600 1% All other 1,486,900 5% Total operating budget $28,213,600 100% Bus purchases / rehabs / other capital improvements 7,944,720 Total operating and capital budget $36,158,320 VRE Operating and Capital (PRTC & NVTC jurisdictions combined) $87,686,175 11

Proposed PRTC FY 2012 Operating & Capital Budget Sources of Funds Description Admin OmniRide OmniLink Marketing Cap Improv Total Farebox $0 $9,353,600 $879,800 $0 $0 $10,233,400 Reimb. From VRE 80,600 0 0 0 0 80,600 State Grants 1,324,300 2,200,300 1,080,200 239,600 4,509,717 9,354,117 Federal Grants 0 2,366,200 638,700 240,000 2,170,336 5,415,236 Advertising Revenue 0 0 0 100,000 0 100,000 Interest 1,600 500 500 0 0 2,600 Carryover Fed/State/Local Funds 0 25,000 0 0 572,772772 597,772772 Subsidy PWC 192,400 2,327,900 5,974,400 664,100 689,995 9,848,795 Subsidy Manassas 23,900 0 201,600 11,200 1,100 237,800 Subsidy Man Park 14,700 0 151,200 8,400 800 175,100 Subsidy Stafford 60,500 0 0 0 0 60,500 Subsidy - Fredericksburg 22,600 0 0 0 0 22,600 Subsidy Spotsylvania 29,800 0 0 0 0 29,800 Total Revenue $1,750,400 $16,273,500 $8,926,400 $1,263,300 $7,944,720 $36,158,320 12

Proposed PRTC FY 2012 Operating & Capital Budget Uses of Funds Description Admin OmniRide OmniLink Marketing Cap Improv Total Personnel & Fringe Benefits $1,456,700 $1,304,900 $1,228,500 $294,800 $0 $4,284,900 Contractual Services 183,300 10,921,400 6,658,800 252,900 516,500 18,532,900 Other Services 88,600 3,548,800 804,100 709,600 0 5,151,100 Capital Outlay 21,800 498,400 235,000 6,000 7,428,220 8,189,420 Total Expenses $1,750,400 $16,273,500 $8,926,400 $1,263,300 $7,944,720 $36,158,320 13

Proposed PRTC FY 2012 Operating & Capital Budget Jurisdictional PRTC/VRE Subsidies Summary Subsidy by Jurisdiction Net Local Transit Expenditures PWC Proposed Manassas Proposed Man Park Proposed Stafford Proposed Fredericksburg Proposed Spotsylvania Proposed Total Proposed PRTC PRTC Admin Subsidy OmniRide (Commuter Bus) $192,400 $23,900 $14,700 $60,500 $22,600 $29,800 $343,900 2,327,900 0 0 0 0 0 2,327,900 Marketing 664,100 11,200 8,400 0 0 0 683,700 OmniLink (Local Bus) Local Capital Match 5,974,400 201,600 151,200 0 0 0 6,327,200 689,995 1,100 800 0 0 0 691,895 Subtotal $9,848,795 $237,800 $175,100 $60,500 $22,600 $29,800 $10,374,595 VRE Op. Subsidy 5,859,007 817,993 566,504 2,505,805 420,566 577,020 $10,746,895 Total PRTC/VRE Subsidy $15,707,802 $1,055,793 $741,604 $2,566,305 $443,166 $606,820 $21,121,490 14

FY 2012 FY 2017 Six Year Plan -- Overview Two options one with Prince William general fund supplement and one without t Differences are confined to FY 2013 FY 2017 Guided by the principle that service cuts are more of a hardship for riders and should be averted if possible No new or expanded services * Two options differ in two respects Magnitude of fare increases Age of OmniRide buses when they are retired * While there are no new or expanded services envisioned in the six year plan, one existing service OmniRide service to Tyson s seemingly requires bridge funding by PRTC tosustain ti it until the I 95 HOT lanes project and itspledged ld drevenue materializes. As the Commission i knows, the I 95 HOT lanes project has been delayed and consequently state funding to sustain the Tyson s service once the Beltway mitigation funding ceases will not be instantaneously forthcoming. Also, the Board s adopted plan for reconstituting Linton Hall service requires a nominal local expenditure beginning infy 2013 (i.e., $27K) 15

FY 2012 FY 2017 Six Year Plan Differences* * With Prince William general fund supplement A sum of $1.9 million spread over the FY 2013 FY 2017 period Fare increases amount to (on average) 8% in FY 2013 8% in FY 2015 8% in FY 2017 14 year life for OmniRide buses Without general fund supplement Fare increases amount to (on average) 10% in FY 2013 10% in FY 2015 10% in FY 2017 15 year life for OmniRide buses * Both six year plans sustain existing services, exclude new or expanded services,and nearly deplete PrinceWilliamCounty s fuel tax fund balance by end of six year period absent additional federal and/or state help 16

Six Year Plan Summary of flocal lsubsidy -- PRTC Jurisdiction FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 Total Prince William (with supplement) Prince William (without supplement) $9.85M $11.18M $11.29M $10.36M $11.76M $11.99M $66.43M $9.85M $11.01M $10.96M $10.19M 19M $11.18M 18M $10.96M $64.15M Stafford $0.06M $0.06M $0.06M $0.06M $0.07M $0.07M $0.38M Fredericksburg $0.02M $0.02M $0.02M $0.02M $0.03M $0.03M $0.14M Manassas $0.24M $0.26M $0.26M $0.28M $0.29M $0.30M $1.63M Manassas Park $0.17M $0.20M $0.19M $0.20M $0.21M $0.22M $1.19M Spotsylvania $0.03M $0.06M $0.06M $0.07M $0.08M $0.08M $0.38M Total (with supplement) Total (without supplement) $10.37M $11.78M $11.88M $10.99M $12.44M $12.69M $70.15M $10.37M $11.61M $11.55M $10.82M $11.86M $11.66M $67.87M 17

Jurisdiction Six Year Plan Summary of flocal lsubsidy -- VRE FY FY FY FY FY FY 2012 2013 2014 2015 2016 2017 Total Prince William $5.86M $5.70M $5.80M $4.97M $4.78M $4.58M $31.69M Stafford $2.51M $2.43M $2.48M $2.13M $2.04M $1.96M $13.55M Fredericksburg $0.42M $0.41M $0.42M $0.36M $0.34M $0.33M $2.28M Manassas $0.82M $0.80M $0.81M $0.69M $0.67M $0.64M $4.43M Manassas Park $0.57M $0.55M $0.56M $0.48M $0.46M $0.44M $3.06M Spotsylvania $0.58M $1.17M $1.19M $1.02M $0.98M $0.94M $5.88M Total $10.76M $11.06M $11.26M $9.65M $9.27M $8.89M $60.89M 18

Jurisdiction Prince William (with supplement) Prince William (without supplement) FY 2012 Six Year Plan Summary of Local Subsidy PRTC & VRE Combined FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 Total $15.71M $16.88M $17.09M $15.33M $16.54M $16.57M $98.12M $15.71M $16.71M $16.76M $15.16M $15.96M $15.54M $95.84M Stafford $2.57M $2.49M $2.54M $2.19M $2.11M $2.03M $13.93M Fredericksburg $0.44M $0.43M $0.44M $0.38M $0.37M $0.36M $2.42M Manassas $1.06M $1.06M $1.07M $.97M $.96M $.94M $6.06M Manassas Park $0.74M $0.75M $0.75M $0.68M $0.67M $0.66M $4.25M Spotsylvania $0.61M $1.23M $1.25M $1.09M $1.06M $1.02M $6.26M Total (with supplement) Total (without supplement) $21.13M $22.84M $23.14M $20.64M $21.71M $21.58M $131.04M $21.13M $22.67M $22.81M $20.47M $21.13M $20.55M $128.76M 19

Fuel Tax Fund Balances Over Time Millions of Dolla ars $18.0 $16.0 $14.0 $12.0 $10.0 $8.0 $6.0 $4.0 $2.0 $- Prince William County With Supplement FY12 FY13 FY14 FY15 FY16 FY17 $18.0 $16.0 $14.0 $12.0 $10.0 $8.0 $6.0 $4.0 $2.0 $- Prince William County Without Supplement FY12 FY13 FY14 FY15 FY16 FY17 PRTC & VRE Project Subsidy Fund Balance Fuel Tax Reciepts 20

Fuel Tax Fund Balances Over Time llions of Dollars Mi $6.0 $5.0 $4.0 $3.0 $2.0 $1.0 $- Stafford County FY12 FY13 FY14 FY15 FY16 FY17 $6.0 $5.0 $4.0 $3.0 $2.0 $1.0 $- City of Manassas FY12 FY13 FY14 FY15 FY16 FY17 City of Manassas Park Millions of Dolla ars $4.0 $3.5 $3.0 $2.5 $2.0 $1.5 $1.0 $0.5 $- FY12 FY13 FY14 FY15 FY16 FY17 Total Subsidy and Other Transportation Projects PRTC & VRE Project Subsidy Other Transportation Projects Fund Balance 21

Fuel Tax Fund Balances Over Time City of Fredericksburg Spotsylvania County Millio ons of Dollars $2.0 $1.8 $1.6 $1.4 $1.2 $1.0 $0.8 $0.6 $0.4 $0.2 $- FY12 FY13 FY14 FY15 FY16 FY17 $6.0 $5.0 $4.0 $3.0 $2.0 $1.0 $- FY12 FY13 FY14 FY15 FY16 FY17 Total Subsidy and Other Transportation Projects PRTC & VRE Project Subsidy Other Transportation Projects Fund Balance 22

Prospects for Federal / State Relief Federal reauthorization still in a holding pattern 6-12 month wait New bill could be shorter than six years, and its magnitude / complexion is highly uncertain in light of mid-term election result Also uncertainty about earmarks Governor McDonnell s proposals Increased transportation funding employing one-time sources Increased bonding supported by multiple sources Sale of ABC stores One-time revenue identified by VDOT audit Possible recurring sources TBD Increased use of tolling, HOT lanes Constitutional prohibition on diversion of Trust Fund revenues 23

Questions? 24