Grid Investments from a Nordic Perspective

Similar documents
NordREG Activities 2008

Work Programme Nordic Energy Regulators (NordREG)

Work Programme 2007 Report 1/2007

Draft Outline of the 2016 Work Programme

NordREG s status update to EMG July June Approved by NordREG Board

Electricity Market Group

How to avoid market manipulation lessons learnt in Norway. 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE

Congestion Management Guidelines. Compliance report

Draft Outline of the 2019 Work Programme

ERGEG Public Consultation on Guidelines on Transmission Tarification 1. - Evaluation of the Comments Received

SUMMARY OF THE ASSESSMENT OF THE COMMENTS FROM THE PUBLIC CONSULTATION OF REGARDING PRICE OF THE SERVICES OF ACCESS TO INTERCONNECTION LINES

According to article 9 (8) (d) of Regulation 2015/1222 the proposal is subject to approval by each national regulatory authority.

EFET reaction 25 April 2017

Comments on CEPA s draft conclusions in relation to European transmission tariffs

South East Europe Electricity Market options paper

Draft. COMMISSION REGULATION (EU) No /

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

COMMISSION REGULATION (EU)

Regulation and network losses in Finland. NordREG 27th April 2017 Mikko Friipyöli

Regulatory framework for crossborder redispatching and countertrading

EUROPEA U IO. Brussels, 12 June 2009 (OR. en) 2007/0198 (COD) PE-CO S 3651/09 E ER 173 CODEC 704

Opinion of the European Banking Authority on measures in accordance

The Nordic Market Model 10 Years of Experience

Report on Proposed principles for Common Balance Management

The Concept of Baltic CoBA


CID Methodology Explanatory note

Measures to support the functioning of the Nordic financial electricity market

2011 Work Programme of the Agency for the Cooperation of Energy Regulators

Non-Paper from the services of DG Competition for discussion at a first Multilateral Meeting with experts from the Member States

Intraday Cross-Zonal Gate Opening and Gate Closure Times. Consultation document. PC_2018_E_01 9 January 2018

ACER ON THE CONGESTION INCOME DISTRIBUTION METHODOLOGY. of 14 December 2017 THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS,

European Parliament resolution of 6 April 2011 on the future European international investment policy (2010/2203(INI))

Spurring Growth of Renewable Energies in MENA through Private Sector Investment

GB TSOs Intraday proposal for arrangements concerning more than one Nominated Electricity Market Operator (NEMO) in the GB Bidding Zone in accordance

SHARING THE COSTS OF TRANSMISSION EXPANSION: A COOPERATIVE GAME THEORY APPROACH APPLIED ON THE NORDIC ELECTRICITY MARKET

A common Nordic end-user market. Consequences of the EED

EBA FINAL draft regulatory technical standards

RESPONSE TO ACER'S CONSULTATION ON TARIFFS

EFET Proposal on Regional Independent System Operator (R_ISO) A CEER Response Paper

CROSS BORDER CAPACITY ALLOCATION FOR THE EXCHANGE OF ANCILLARY SERVICES

Supporting document for the Danish TSO, Energinet, of the Nordic Capacity Calculation Region proposal for splitting long-term cross-zonal capacity

C2-102 COMMON NORDIC BALANCE MANAGEMENT. K.LINDSTRÖM FINGRID (Finland)

Explanatory document for the Nordic synchronous area proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2)

Credit risk management in future billing regime. A common Nordic end-user market with combined billing Stockholm, 9 May 2012

Gas Target Model Follow up - CEER Work on Incremental Capacity

Present: Philippe de LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Hélène GASSIN, Jean-Pierre SOTURA and Michel THIOLLIERE, Commissioners.

International data sharing: the example of the G-20 Data Gaps Initiative

First Progress Report on Supervisory Convergence in the Field of Insurance and Occupational Pensions for the Financial Services Committee (FSC)

APPROVAL BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM

Guideline for strengthened bilateral relations. EEA and Norway Grants

ENTSO-E Network Code on Electricity Balancing

Developing the internal energy market further - the European Network Codes

German Working Group within the AEBR. Implementation proposals for INTERREG A

Nord Pool Spot s Market Surveillance focuses on insider trading and market manipulation according to REMIT Article 15

The North Seas Countries Offshore Grid Initiative

CYPRUS ENERGY REGULATORY AUTHORITY

Q1 Q Q3 Q EUR million Jan-Mar 2018 Jan-Mar 2017 Change, % EUR million Jan-Dec 2017

APPROVAL BY ALL CONCERNED CCR HANSA AUTHORITIES

Introduction. 1.1 The CACM Regulation & all TSOs. 1.2 Geographical application of this proposal

DECISION ON MODIFICATIONS TO THE ELECTRICITY INTERCONNECTOR OPERATOR LICENCE

WP4: 2030 (RES) targets & effort sharing

COMMISSION OF THE EUROPEAN COMMUNITIES

Invitation to Tender

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Towards robust quality management for European Statistics

ACER ON ALL TRANSMISSION SYSTEM OPERATORS PROPOSAL FOR INTRADAY CROSS-ZONAL GATE OPENING AND INTRADAY CROSS-ZONAL GATE CLOSURE TIMES

Review of the Shareholder Rights Directive

All TSOs response to the consultation on the Intraday Cross-Zonal Gate Opening and Gate Closure Times

The current ETSO ITC Model and possible development

18 April 2016 Draft for consultation

FOLKETRYGDFONDET'S EXERCISE OF OWNERSHIP RIGHTS

Introduction to transmission network assessment methodology: the ENTSO-E CBA methodology and the PCI selection process.

EU Capacity Regulations Capacity Allocation Mechanisms with Congestion Management Procedures

Nordic Imbalance Settlement Handbook. Instructions and Rules for Market Participants. 2 nd of December 2016

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON

Contents. Auditors report 35. Addresses 36. Definitions 37

Energinet.dk s proposal for Arrangements concerning more than one NEMO in one bidding zone in accordance with Article 45 and 57 of the Commission

Offshore transmission investments How to regulate these investments? Who should act?

European transmission tariff structures Cambridge Economic Policy Associates

We appreciate your feedback

All Baltic CCR TSOs Common Proposal for Regional Design of Long-Term Transmission Rights in Accordance with Article 31 of the Commission Regulation

Svein Gjedrem: From oil and gas to financial assets Norway s Government Pension Fund Global

Eltel AB Q Presentation

Consultation response Ferd Social Entrepreneurs

The North Seas Countries Offshore Grid Initiative

1. Foreword Main developments in the gas and electricity market The electricity market Wholesale...

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

***I DRAFT REPORT. EN United in diversity EN. European Parliament 2016/0379(COD)

Contents. Auditors report 35. Addresses 36

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL DIRECTIVE

Trans-European Energy Networks

MANUAL ON THE IMPLEMENTATION OF EXCHANGE OF INFORMATION PROVISIONS FOR TAX PURPOSES UNCLASSIFIED MODULE 5 ON CONDUCTING SIMULTANEOUS TAX EXAMINATIONS

Nordic bidding zones. Commissioned by the Swedish Ministry of Enterprise, Energy and Communications / The Nordic Council of Ministers.

Letter of formal notice Assessment of acquisitions and increase of holdings in the financial sector

Report on regulation and the electricity market. Norway

Jürgen Stark: Financial stability the role of central banks. A new task? A new strategy? New tools?

Tackling EU cross-border inheritance tax obstacles Frequently Asked Questions

Chapter 2: Market Governance, Administration and Operation. Industry Guide to the I-SEM

Summary SOU 2017:115

CARIBBEAN REGIONAL NEGOTIATING MACHINERY SPECIAL AND DIFFERENTIAL TREATMENT PROVISIONS IN THE CARIFORUM-EC ECONOMIC PARTNERSHIP AGREEMENT

Transcription:

Grid Investments from a Nordic Perspective NordREG recommendations 1 Background and task As one of the challenges for the further development of the Nordic electricity market has in the last few years emerged the ability to decide, license and finance network infrastructure investments that have a larger scope than purely national. The Nordic TSOs have been forerunners when it comes to the joint regional planning of the network. As a result of the joint planning exercise a common network development plan has been agreed upon among the Nordic TSOs. However, a shortcoming in this system may be that in some cases, from the Nordic grid perspective, the enforcement of the grid is best done in one country whereas the benefits of the investment are felt in a different country. Resulting from this, the costs and benefits of grid investments do not always match. To ensure the efficient functioning of the wholesale market, the relevant legal and regulatory frameworks would need to underpin the development of the network infrastructure. At their meeting in Umeå in 2008, the Nordic ministers of energy adopted an action plan in order to speed up the development of the Nordic electricity market. One of the tasks in the action plan was to compare the national processes for grid investments and to identify possible needs for changes in legislation, rules, criteria for assessment and the mandates of authorities. The purpose was to give the Nordic governments, regulatory authorities and the system responsible authorities a Nordic perspective and mandate, and thereby to increase the efficiency and intensity in the process of developing the Nordic electricity system. The possibilities to create a fairer division of costs for investments that are made in one country but which create benefit in a different country was to be examined. As a result, the Nordic Council of Ministers Electricity Market Group (EMG) invited NordREG to map the procedures and evaluation criteria applied by the national authorities when licensing grid investments limited to the issues that are of special relevance for grid investments with common benefit in several Nordic countries and respectively the procedures and evaluation criteria applied by the transmission system operators (TSOs) as well as laws, rules and mandates which are relevant for their possibility to participate in projects regarding grid investments in other Nordic countries. Additionally, NordREG was asked to map the possibilities for the TSOs to enter into agreements regarding different forms of co-financing or Nordic financing of grid investments in the Nordic countries. The review was to cover also the rules for the ownership of grids indicating whether it is possible to have shared ownership of the grid with other Nordic grid companies. Also relevant 1 NordREG is the cooperation of Nordic energy regulators. However, concerning Nordic grid investments the appropriate Danish authority is the Danish Energy Agency, and not the Danish regulator DERA, the Danish member of NordREG. Moreover, as Island is not involved in cross border investments, their regulator has not taken part in the study. As a consequence of these circumstances the recommendations in this note are jointly made by the regulators from Finland, Norway and Sweden only. 1

for the study was how the current EU legislation affects Nordic grid investments across the borders, especially with relevance for investments with common benefit in several Nordic countries and how the new EU legislation of the third package will influence the network planning, cross-border investments and joint Nordic investments and their financing. Finally, the analysis was to address the possibilities for Nordic financing, for example the increased possibilities to use national network tariffs for investments with Nordic benefit, congestion rents and specific market fees collected from the market actors operating in the Nordic power exchange. Method NordREG undertook the mapping task in its Wholesale and Transmission Working Group. A task force was set up with representatives from the Norwegian (chair), Finnish and Swedish regulators and a representative from the Danish Energy Agency, which is the agency responsible for electricity network licensing in Denmark. Additionally, outside expertise from Econ Pöyry was hired to review the specific issue of financing. In late 2009, a workshop was organised with participation of regulators, TSOs and representatives from the EMG. The draft report from the working group was delivered to EMG by 15 March 2010. Comparison of the legal framework of transmission infrastructure A short summary of the mapping of the current national legislation regarding ownership of the network, licensing criteria, economic regulation and possibilities of TSOs to participate in the financing of network infrastructure projects outside their country are presented below. Ownership of transmission infrastructure In Sweden there is a rule defining that the national grid should be owned and operated by Svenska Kraftnät and that Svenska Kraftnät should have a decisive influence (51% ownership) in cross-border lines. Denmark, Finland and Norway have no legal rules on ownership of the transmission infrastructure that would explicitly define who may own transmission network or parts of it. Even though the ownership of transmission network is not formulated legally in the other Nordic countries and thus not explicitly limited to the TSO, the general idea is that the TSO should own and operate a major part of the transmission network in all the Nordic countries. In Norway, a license from the regulator is required to build, own and operate transmission infrastructure. In Denmark and Finland a license is required to build and operate transmission infrastructure. In Sweden a high-voltage line above 220 kv can not be build or used without a license from the Government. Licensing of new network infrastructure The approval processes for constructing electricity network infrastructure are relatively similar in all Nordic countries but there are differences in details. With few exceptions, the rules and procedures are national in scope. The licensing procedures in Norway and Denmark imply that a national socio-economic benefit is required to grant a license. In Finland, in addition to the precondition that the cross-border line is needed to secure transmission of electricity, it has to be justified for the development and reciprocity of the electricity market. Accordingly, the Finnish legislation does contain a criterion that would make it possible to 2

justify the construction of the cross-border line due to the fact that it is needed for the development of the market. Depending on the application and interpretation this could refer to the Nordic wholesale electricity market. In Sweden, there has prevailed a tradition to have a Nordic perspective in the licensing process but it does not have a clear legal support in the legislation. Participation in an investment abroad The legislation in none of the Nordic countries currently addresses explicitly the possibility of a TSO to participate in a network infrastructure project located in another country. So the legislation neither prohibits nor supports such activity. The same applies to the legal rules on the economic regulation of transmission network operation. Apparently, this may create a disincentive as it attaches uncertainty to the fact whether an investment abroad would be treated favourably in the economic regulatory framework and accepted in the regulatory asset base. However, the experience from Norway shows that the costs of an investment into another country but assessed beneficial for the Norwegian network customers has been allowed to be recovered through the Norwegian TSO tariff. Financing of common network infrastructure projects Alternative ways for the financing of common network infrastructure projects were studied and evaluated with regard to incentives to invest, market consequences and their legitimacy. The alternatives that were regarded as viable were tariffs complemented with congestion rents (in accordance with the provisions in the third package). Since the benefits of investments may be unequally distributed, investment contributions between TSOs could be a feasible way to distribute costs in a better way among the TSOs. Alternatives that were not considered feasible were a Nordic trading fee meaning a fee per kwh traded in some predefined manner, e.g. based on trading in the financial or physical market, or be applied to all balanceresponsible entities in the Nordic market. Two models combining financing and organisation alternatives were identified. The first model was the multilateral voluntary cooperation within the new EU framework. In this model cooperation structure would be based on the new EU framework with a common planning process but with national decisions and ownership. Financing of the network infrastructure investments would be done by using national tariffs and congestion income, combined with voluntary investment contributions between TSOs to achieve a better match of costs and benefits at the national level. The second model relied on joint Nordic decision committee, which implies formalized cooperation through joint committee responsible for a common planning process but in addition making binding investment decisions. In this model, too, financing would be realised through the use of national tariffs and congestion income, combined with investment contributions between TSOs to achieve a better match of costs and benefits at the national level. The decision committee would need the authority to make decisions on financing, including the obligation to use investment contributions to balance costs and benefits. NordREG recommendations The assignment of the Nordic Council of Ministers Electricity Market Group focuses on the Nordic electricity market, its current legal framework and the eventual obstacles for the development of the electricity transmission network infrastructure to better respond to the needs of the Nordic market actors. Parallel to this exercise, the 3 rd Legislative Package has been adopted within the EU to be implemented by March 2011 across the Nordic countries as 3

members of the EU and the EEA. The 3 rd Legislative Package sets obligations for both European wide and regional cooperation and coordination when it comes to network planning and the creation of rules affecting transmission system operators. Whereas prior to it, there were no legal obligations for Nordic TSOs to cooperate in a wider regional context with regard to network planning, the new European framework contains an obligation to cooperate in a wider setup than just Nordic one. This is an issue to be taken into consideration when assessing the Nordic framework and electricity market development. To follow up on the mapping and analysis given in the report the NordREG Board will make the following recommendations: 1. The legal framework for licensing new network infrastructure needs to be harmonised across the Nordic countries and amended to take explicitly into account the Nordic and regional network development aspect. In all Nordic countries the rules and procedures for grid investments are national and are not adapted for common network infrastructure investments. In order to create a true Nordic electricity market, it is necessary to create a more common legal and regulatory foundation for common investments with the purpose of improving the functioning of the Nordic electricity market by reducing congestion within the Nordic market. 2. Any obstacles to participation by a TSO into a jointly agreed network infrastructure project with other Nordic national TSOs should be removed. Legislation and rules may pose some restrictions on the freedom to organize ownership of joint Nordic investments. This may inhibit a TSO to participat, as a co-owner, into network investment projects in other Nordic countrys. 3. The national legal frameworks for economic regulation of transmission network need to be adjusted to allow the inclusion of investments into the network infrastructure that have been made abroad if the investment brings benefits to the domestic customers (i.e. enabling sharing of costs and benefits) Further analysis is needed on the assessment of costs and benefits and their division between various TSOs. If a project is perceived to have an acceptable distribution of costs and benefits between the involved TSOs, which is often the case when only two countries are involved in the project, the solution may be relatively simple, and there is no need for new structures. When more complex investments are considered, new models may be required. For instance, a new interconnector may not provide real benefits unless the countries that it connects undertake reinforcements in their domestic networks. Therefore it is very important that these secondary investments are taken into consideration in the discussions relating to the distribution of costs. 4. The model for co-financing and participating into the investment projects outside the country of the TSO needs to be clearly designed and described to increase common understanding and awareness of this solution. The model of co-financing or participating into the investment costs has been discussed mainly on the general level. To be able to fully analyse its specificities and consequences for economic regulation - and to be able to amend the necessary parts of the economic regulatory framework - a proper understanding of the financial arrangements is needed. TSOs are invited to provide this description and clarification. 5. The Nordic TSOs are requested to continue the elaboration of the criteria that are applied in the selection of the network infrastructure projects and to improve the transparency of their application in the selection process. 4

The Nordic welfare criteria that have been applied by the Nordic TSOs in connection with the grid planning methodology seem to provide a good basis for the selection of investments. Still, the methodology and the criteria used could be further elaborated. As the aim is to have the participation of foreign TSOs and accordingly, other than domestic grid customers in the financing of the network infrastructure projects it would be very important that the criteria for selecting the projects that are necessary from the wider regional perspective are well understood and transparent. 6. NordREG will provide an opinion on the investment plan The 3 rd Legislative Package establishes the bi-annually prepared Community-wide ten year network development plan on which the Agency for the Co-operation of Energy Regulators will provide its opinion. In line with the European procedure, NordREG intends to provide an opinion on the planned investments from the Nordic and regional point of view. With regard to financing and organisation of the jointly selected network infrastructure projects, the model of multilateral voluntary cooperation within the new EU framework is supported. The cooperation structure of the model is based on the new EU framework with a common planning process but with national decisions and ownership. Financing of the network infrastructure investments would be done by using national tariffs and congestion income, combined with voluntary investment contributions between TSOs to achieve a better match of costs and benefits at the national level. 5