Adaptation Assessment: Economic Analysis of Adaptation Measures

Similar documents
Prioritization of Climate Change Adaptation Options. The Role of Cost-Benefit Analysis

Climate Risk Management For A Resilient Asia-pacific Dr Cinzia Losenno Senior Climate Change Specialist Asian Development Bank

Prioritization of Climate Change Adaptation Options. The Role of Cost-Benefit Analysis

Real Options as a Tool for Valuing Investments in Adaptation to Climate Change

Prioritization of Climate Change Adaptation Options. The Role of Cost-Benefit Analysis. Session 8: Conducting CBA Step 7

Cost Risk Assessment Building Success and Avoiding Surprises Ken L. Smith, PE, CVS

Decision Support Methods for Climate Change Adaption

Probabilistic Benefit Cost Ratio A Case Study

ACRP UPDATE Climate Resilience and Benefit-Cost Analysis

Project Appraisal and Selection

UNFCCC Expert Meeting on Loss and Damage from Climate Change

Value for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.

MODEL VULNERABILITY Author: Mohammad Zolfaghari CatRisk Solutions

Cost-Benefit Analysis (CBAs) in the Pacific. NAP process and the P-CBA initiative UNFCCC LEG-NAP Workshop 3-7 th November, Vanuatu

An Economic Framework for Adaptation

Module 7. Costing, assessing and selecting adaptation and mitigation. Training workshops on mainstreaming climate change

Narikoso Relocation Project

Risk vs. Uncertainty: What s the difference?

METHODOLOGY For Risk Assessment and Management of PPP Projects

Taking a Critical Look at Cost-Benefit Analysis as Part of an Evaluation. Catherine Mueller February 21, 2013

Life-Cycle Cost Analysis: A Practitioner s Approach

Adaptation Practices and Lessons Learned

Climate Change Adaptation Plan for Choiseul Bay Township, Solomon Islands

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Quantification of risk reduction measures

PRIORITIZATION OF ROAD INTERVENTIONS IN NAMPULA AND ZAMBEZIA, MOZAMBIQUE UNDER CHANGING FLOOD RISK

Assessing Modularity-in-Use in Engineering Systems. 2d Lt Charles Wilson, Draper Fellow, MIT Dr. Brenan McCarragher, Draper

Project Theft Management,

General equilibrium simulations of floods

CAPITAL MANAGEMENT - FOURTH QUARTER 2009

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

Cost Risk Assessments Planning for Project or Program Uncertainty with Confidence Brian Bombardier, PE

Economic Cost of Extreme Events Some Issues

Budgeting and Costing Control Workshop

The One Planet Sovereign Wealth Fund Framework

Results from ECA study: Florida

Project Economic and Financial Appraisal & Risk Analysis: A focus on GCF Funding Proposal

RISK MANAGEMENT ON USACE CIVIL WORKS PROJECTS

RISK MANAGEMENT. Budgeting, d) Timing, e) Risk Categories,(RBS) f) 4. EEF. Definitions of risk probability and impact, g) 5. OPA

include cost-effectiveness analysis (CEA), multi-criteria analysis (MCA) and robust decision-making approaches (RDMA).

Economics of Climate Adaptation

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

CA. Sonali Jagath Prasad ACA, ACMA, CGMA, B.Com.

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol

Risk Approach to Prioritising Maintenance Risk Factors for Value Management

Third Session: Small Island Developing States: Transport and Trade Logistics Challenges

PAPER F3 FINANCIAL STRATEGY. Acorn Chapters

Prudential Standard GOI 3 Risk Management and Internal Controls for Insurers

Optimal timing, cost benefit analysis, stochastic analysis, real options, deep uncertainty and climate change

Water risk identification

P3 Fundamentals and Best Practices in Resource and Project Management

Agenda Item B.8 CONSENT CALENDAR Meeting Date: May 19, 2015

Project Management Certificate Program

Measuring Mitigation': Methodologies for Assessing Natural Hazard Risks and the Net Benefits of Mitigation

INVESTMENT PRINCIPLES INFORMATION SHEET FOR INVESTORS THE IMPACT OF INFLATION

Fundamentals of Project Risk Management

INTERNAL CAPITAL ADEQUACY ASSESSMENT PROCESS GUIDELINE. Nepal Rastra Bank Bank Supervision Department. August 2012 (updated July 2013)

Risk Assessment in the CBA process. Bruxelles, 30/9/2015 Antonio Carrarini JASPERS - Vienna Office

Governance and Management

AFRICA ADAPTATION INITIATIVE

Project Risk Management. Prof. Dr. Daning Hu Department of Informatics University of Zurich

Republic of the Maldives: Preparing Business Strategy for Port Development

OVERVIEW OF ECONOMIC ANALYSIS IN ADB OPERATIONS

AGEC 604 Natural Resource Economics

Disaster Risk Management

Analytics across the asset life cycle

CMA Part 2. Financial Decision Making

Accounting for climate change

Chapter 8: Lifecycle Planning

Catastrophe Risk Engineering Solutions

Potential Climate Compatible Tourism Adaptation Strategies for Belize

INTEGRATING RISK AND EARNED VALUE MANAGEMENT

Reservoir safety risk assessment a new guide

Incorporating Climate and Extreme Weather Risk in Transportation Asset Management. Michael Meyer and Michael Flood WSP Parsons Brinckerhoff

EARNED VALUE MANAGEMENT AND RISK MANAGEMENT : A PRACTICAL SYNERGY INTRODUCTION

Indicate whether the statement is true or false.

PROJECT PREPARATORY TECHNICAL ASSISTANCE

provide insight into progress in each of these domains.

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

Environmental Change Institute. Long term investment strategy An independent review of the 2014 assessment Jim Hall

Risk management. VaR and Expected Shortfall. Christian Groll. VaR and Expected Shortfall Risk management Christian Groll 1 / 56

LONG INTERNATIONAL. Rod C. Carter, CCP, PSP and Richard J. Long, P.E.

ECONOMIC ANALYSIS. A. Economic Analysis

Risk Assessment of the Niagara Tunnel Project

Climate related risks to the financial sector A South African perspective

Decision support for mitigation and adaptation in a multihazard. environment. Nadejda (Nadya) Komendantova

Making the Business Case for Risk- Based Asset Management

Climate Change Adaptation A Study in Risk Management. T.D. Hall AAC Conference, Halifax Session 8 September 2015

California Department of Transportation(Caltrans)

Climate risk management plan. Towards a resilient business

IRISH FLOOD PREVENTION PROGRAMME Example of integrating climate change adaptation into projects

TOOL #15. RISK ASSESSMENT AND MANAGEMENT

Bone Bolango, Indonesia

Report on Risk Analysis in the NFAT

The impact of present and future climate changes on the international insurance & reinsurance industry

Project Management in ICT. Prof. Dr. Harald Wehnes

Draft Terms of Reference Preparation of a background paper on climate change and natural hazards For the Pacific Possible Report

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

Cost Benefit Analysis (CBA) Economic Analysis (EA)

Real Property Institute of Canada 10:30 am, November 7, 2012 Montreal. David MacLeod Toronto Environment Office

Transcription:

Adaptation Assessment: Economic Analysis of Adaptation Measures Presentation by Dr. Benoit Laplante Environmental Economist Workshop on Climate Risk Management in Planning and Investment Projects Manila, 9-10 February 2105

Outline of Presentation 1. Background: The role of economic analysis 2. Costs of climate change vs. benefits of adaptation 3. Cost-benefit analysis and cost-effectiveness analysis 4. Possible outcomes of the economic analysis 5. Cost-benefit analysis in a context of risk and uncertainty 6. Concluding remarks 2

Outline of Presentation 1. Background: The role of economic analysis 2. Costs of climate change vs. benefits of adaptation 3. Cost-benefit analysis and cost-effectiveness analysis 4. Possible outcomes of the economic analysis 5. Cost-benefit analysis in a context of risk and uncertainty 6. Concluding remarks 3

Background: The role of economic analysis In presence of limited resources, decision makers are left with the difficult problem of evaluating and choosing investment projects and assessing policies in a context of significant complexity and uncertainty. For this purpose, decision makers have a need for a framework which structures information in a way which makes feasible and transparent this process of evaluation and selection.

Background: The role of economic analysis Economic analysis provides a means of assessing and comparing the impacts of projects and policies, even when benefits and costs occur over long time horizons. It provides a systematic means to identify, quantify, and wherever possible monetize all impacts of a project or policy (including their environmental impacts), and present these impacts as economic (or social) costs and social benefits. The role of economic analysis is to provide information to the decision-maker about the costs and benefits of the project or the policy.

Background: The role of economic analysis Warning Numerous other criteria should (must?) also be used to assess projects or policies, such as: Distributional or equity issues; Social and cultural and religious acceptability; Operational practicality; Administrative feasibility; Legality; Etc. The economic analysis informs decision-makers and policymakers only about the economic efficiency of projects or policies.

Background: The role of economic analysis All investment projects funded by ADB must go through an economic analysis, and sometimes also a financial analysis. It must be shown that the net present value (NPV) of the 1 project is positive upon using a discount rate of 12% (or similarly that the internal rate of return of the project is 2 greater than 12%). 1 Note: The net present value of an investment project is defined as the present value of the project s benefits minus the present value of the project s costs. 2 Note: ADB allows for the use of a lower discount rate if the project may deliver large unquantifiable benefits.

Background: The role of economic analysis Financial analysis The only stakeholder included in the analysis is the developer (or investor). The only costs included in the analysis are the costs of the project to the developer or investor. The only benefits included in the analysis are the benefits to the developer or investor. The question is: Will this project increase investors wealth? Economic analysis The stakeholder is all society, not only the developer or investor. The costs included in the analysis are all costs of the project to society, including costs of environmental impacts if any. The benefits included in the analysis are all benefits of the project to society. The question is: Will this project increase society s well-being?

Outline of Presentation 1. Background: The role of economic analysis 2. Costs of climate change vs. benefits of adaptation 3. Cost-benefit analysis and cost-effectiveness analysis 4. Possible outcomes of the economic analysis 5. Cost-benefit analysis in a context of risk and uncertainty 6. Concluding remarks 9

Costs of climate change vs. benefits of adaptation Cost of climate change Reduction of the project net present value as a result of climate change. Costs and benefits of the project without climate change Costs and benefits of the project with climate change 10

Background: The role of economic analysis Costs of the project may increase. For example: As a result of climate change (such as increased intensity of precipitation), the annual repair and maintenance cost associated with a road project may be expected to increase. Benefits of the project may be reduced. For example: As a result of climate change (such as increases in peak temperature), the efficiency of a thermal power plant may be reduced and adversely impact the quantity of energy produced.

Costs of climate change vs. benefits of adaptation Cost of climate change Costs and benefits of the project without climate change Costs and benefits of the project with climate change Costs and benefits of the project without adaptation Costs and benefits of the project with adaptation Note: In all likelihood, cost of climate change > benefit of adaptation. Hence, the presence of residual damages. Benefit of adaptation 12

Outline of Presentation 1. Background: The role of economic analysis 2. Costs of climate change vs. benefits of adaptation 3. Cost-benefit analysis and cost-effectiveness analysis 4. Possible outcomes of the economic analysis 5. Cost-benefit analysis in a context of risk and uncertainty 6. Concluding remarks 13

Cost-benefit vs cost-effectiveness analysis ADAPTATION Required adaptation Efficient adaptation When adaptation responds to complying with codes and standards MRC: Minimum navigational clearance of 37.5 m for the P 05 (5%) annual flood. Cost-effectiveness analysis Question: What is the most cost-effective way of complying with codes or standards?

Cost-benefit vs cost-effectiveness analysis ADAPTATION Required adaptation Efficient adaptation When adaptation responds to complying with codes and standards When whether to adapt and how much to adapt is a choice Cost-effectiveness analysis Cost-benefit analysis

Outline of Presentation 1. Background: The role of economic analysis 2. Costs of climate change vs. benefits of adaptation 3. Cost-benefit analysis and cost-effectiveness analysis 4. Possible outcomes of the economic analysis 5. Cost-benefit analysis in a context of risk and uncertainty 6. Concluding remarks 16

Possible outcomes of the economic analysis Changes in the Net Present Value of the Project as a Result of Climate Change NPV(P) > 0 NPV(P) < 0 Keep project in portfolio Economic analysis of projectlevel climate-proofing options Corollary: The fact that an infrastructure is projected to be adversely impacted by climate change does not necessarily imply that adaptation options must be implemented. NPV(P) > 0 NPV(CP) > 0 NPV(CP) < 0 NPV(P) < 0 NPV(P) > 0 NPV(P) < 0 From an economic point of view, it depends on the costs and benefits of adaptation. Keep project in portfolio with adaptation Remove project from project portfolio Keep project in portfolio without adaptation Remove project from project portfolio

Possible outcomes of the economic analysis A menu of possible decisions: Invest now Be ready and invest later if needed Do nothing and invest later if needed

Possible outcomes of the economic analysis Invest now if: costs of climate-proofing now are relatively small while the expected benefits are estimated to be very large (a low-regret approach), and/or costs of climate-proofing at a later point are expected to be prohibitive, or climate-proofing at a later point in time is technically not possible; and/or among climate-proofing options there exist options which deliver net positive economic benefits regardless of the nature and extent of climate change, including the current climate conditions (a no-regret approach); and/or the set of climate-proofing options includes options which not only reduce project climate risks, but also have other social, environmental or economic benefits (co-benefits). The presence of co-benefits, if any, must be included in the economic analysis of adaptation options.

Possible outcomes of the economic analysis Be ready and invest later if: No climate-proofing investment is needed now, but the project can be designed to accommodate climate-proofing in the future if and when circumstances indicate this to be a better option than not climateproofing. This type of decisions aim to ensure that a project is climate ready. Economic analysis can be used not only to say yes or no to adaptation but also to analyse the best timing for adaptation investments.

Possible outcomes of the economic analysis Do nothing and invest later if: costs of climate-proofing now are estimated to be large relative to the expected benefits; and/or costs (in present value terms) of climate-proofing (e.g. retro-fitting) at a later point in time are expected to be no larger than climate-proofing now; and/or expected benefits of climate-proofing are estimated to be relatively small. Note: The decision to do nothing does not come from ignoring climate change, but from rationally deciding out of a technical and economic assessment that the best thing to do for now is to do nothing.

Possible outcomes of the economic analysis A menu of possible decisions: Invest now If navigation clearance could become an issue, raising the bridge deck may not be an option in the future. It has to be done at the time of construction. Be ready and invest later if needed In order to raise a sea dyke at a later point in the future to deal with higher sea level or storm surges, its base may have to be constructed to be able to accommodate an increase in height (and weight) when needed. Do nothing and invest later if needed The project design is sufficiently flexible to accommodate numerous types of changes and it is better to wait to have more information about the extent of climate change.

Outline of Presentation 1. Background: The role of economic analysis 2. Costs of climate change vs. benefits of adaptation 3. Cost-benefit analysis and cost-effectiveness analysis 4. Possible outcomes of the economic analysis 5. Cost-benefit analysis in a context of risk and uncertainty 6. Concluding remarks 23

Risk and uncertainty Accounting for risk: Sensitivity analysis Probabilistic analysis Discrete probabilistic analysis Continuous probabilistic analysis (Monte Carlo simulation) Dealing with uncertainty: Real options analysis Robust-decision making analysis Assessing the costs of climate change and the net benefits of adaptation under various climate change scenarios and assessing the robustness of the adaptation decision to a range of scenarios.

Outline of Presentation 1. Background: The role of economic analysis 2. Costs of climate change vs. benefits of adaptation 3. Cost-benefit analysis and cost-effectiveness analysis 4. Possible outcomes of the economic analysis 5. Cost-benefit analysis in a context of uncertainty 6. Concluding remarks 25

Concluding remarks There is no need to adapt cost-benefit analysis to climate change. The general framework for conducting economic analysis of investment projects and of adaptation options in a context of climate change is appropriate. The greatest difficulty in conducting an economic analysis of a climateproofing investment is not with the economics. The greatest difficulty is with the identification of projected changes in climate variables, and then of the physical impacts of these changes on infrastructure. Once these impacts are quantitatively identified, the economic analysis of climate-proofing investment is relatively straightforward. As is ALWAYS the case, the economic analysis of an investment project is a multi-disciplinary exercise which requires the inputs of multiple experts and which is conducted in a context of uncertainty.

Adaptation Assessment: Economic Analysis of Adaptation Measures Presentation by Dr. Benoit Laplante Environmental Economist Workshop on Climate Risk Management in Planning and Investment Projects Manila, 9-10 February 2105