CONSTRUCTION PROJECT - RENOVATIONS OVER $5 MILLION VALUE. CONSTRUCTION MANAGER INSURANCE CHART FOR RFP PURPOSES Updated: November, 2011

Similar documents
Section Insurance Conditions Infrastructure Projects 10M to 50M

EDUCATION AND ADVANCED EDUCATION (PUBLIC SCHOOL DISTRICTS AND PUBLIC POST SECONDARY INSTITUTIONS) OWNER INSURED CONSTRUCTION PROJECTS

EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO.

MCGOUGH STANDARD INSURANCE REQUIREMENTS

EXHIBIT G. Insurance Requirements. [with CCIP]

SUBCONTRACTOR INSURANCE REQUIREMENTS Version 3/1/2018

Exhibit 1 to Part 3 Project-Specific Terms

SCHEDULE 11 INSURANCE REQUIREMENTS SCHEDULE

Real Property Services Questions and Answers Posted to DASNY.org 2/21/19

OREGON STATE UNIVERSITY

Insuring Your Construction Project

EXHIBIT B. Insurance Requirements for Environmental Contractors and/or Consultants

Required Insurance Language for PRF Construction Contracts

Exhibit 1 to Part 3 Project-Specific Terms

BUMBERSHOOT POLICY APPLICATION

W.E. O Neil Construction Co. of Arizona c/o (Project Coordinator) 4511 E. Kerby Avenue Phoenix, AZ Fax (480)

CCIP ADDENDUM. Blasting or any blasting operations;

Rail Owner Controlled Insurance Program Manual

INSURANCE EXHIBIT TO CONSTRUCTION AGREEMENT Insurance Requirements Owner Controlled Insurance Program

AVIATION OWNER CONTROLLED INSURANCE PROGRAM MANUAL

SCHEDULE 11 INSURANCE REQUIREMENTS SCHEDULE

Bernards (Project Name) CCIP Insurance Manual

TRENTON AGRI PRODUCTS LLC INSURANCE & INDEMNIFICATION TERMS & CONDITIONS

Bid/Contract Insurance Requirements (Insurance Manual)

INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Effective Date: April 23, 2018

MANITOBA HOUSING SUPPLEMENTAL CONDITIONS CONTRACT #: XXXX GENERAL

PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS

responsibility of Tenant and/or Construction Contractors or Construction Subcontractors to pay.

OCIP Contract Language

ALL PROOFS OF INSURANCE NAMING COUNTY AS ADDITIONAL INSURED MUST BE RECEIVED PRIOR TO COMMENCEMENT OF WORK

SECTION SUPPLEMENTARY CONDITIONS

FINANCE, RISK, & SUPPLY CHAIN MANAGEMENT Supply Chain Management

AIA Document A101 TM 2017 Exhibit A

PURCHASING PROCEDURES

ADDENDUM A. Subcontractor Insurance Requirements

ROCHESTER SCHOOLS MODERNIZATION PROJECT PHASE 2b School Without Walls Commencement Academy INSURANCE REQUIREMENTS

One ACORD 25 Certificate of Liability (or) Insurance Services Office Form CG Limits of no less than $1,000,000 per occurrence.

Document A Exhibit A Insurance and Bonds

Exhibit E-1: Insurance Requirements

Bid/Contract Insurance Requirements (Insurance Manual)

Massport-LOGAN MODERNIZATION/CAPITAL PROGRAMS

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.01

BETWEEN name. address. AND name (hereinafter called the Subcontractor ) address

Region of Waterloo Terms and Conditions

INSURANCE AND INDEMNIFICATION MANUAL. Supplement to Policy 560 i

Document A141 TM Exhibit B. Insurance and Bonds. for the following PROJECT: (Name and location or address)

Model #48TTF007501BW Efficiency rating 9 EER Replace with three new Bryant High Efficiency roof top package Heating & Cooling Units:

2010 INSURANCE MANUAL

Subcontractor Qualification Statement

GENERAL CONDITIONS UNIT PRICE CONTRACT

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Pier 23 Roof Repair. ADDENDUM No. 1 Issued: December 16, 2016

Construction of the Leased Premises

ADDENDUM TO STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A RESIDENTIAL OR SMALL COMMERCIAL PROJECT AIA DOCUMENT A

MODIFIED REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR FIRE STATION NO. 1 GEOTHERMAL TEST WELL Activity ID

UCIP COVERAGE SUMMARY

DESIGN PROFESSIONAL SERVICES (Type) MASTER CONTRACT CONTRACT NO.

TECHNOLOGY XTEND ENDORSEMENT

Insurance Requirements

EXHIBIT B. Insurance Requirements for Construction Contracts

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - COST PLUS FEE WITH AN OPTION FOR A GUARANTEED MAXIMUM PRICE

INSURANCE REQUIREMENTS Chicago Department of Aviation Certified Service Provider Program ( CSPP )

INDEMNITY AGREEMENT THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS COUNTY OF NUECES

AIA Document A101 TM 2017 Exhibit A

TEMPORARY SERVICE APPLICATION (HYDRANT METERS)

QBE Construction Package. A comprehensive construction and engineering insurance cover

Pollution Exposures an a d n d Co C ve v r e a r g a e g s e

TERREBONNE PARISH CONSOLIDATED GOVERNMENT INSURANCE REQUIREMENTS CONTRACTORS

ADM.21 INSURANCE AND INDEMNITY REQUIREMENTS FOR CONTRACTS

Lane County Health & Human Services Youth Services Division Motivational Interviewing REQUEST FOR QUOTES

Document A101 TM. Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

CITY OF SACRAMENTO NONPROFESSIONAL SERVICES AGREEMENT LESS THAN $25,000

COMMERCIAL GENERAL LIABILITY APPLICATION

ADDENDUM NO. 1. ADDENDUM NO. 1 for the above referenced project hereby modifies the RPF documents, as follows:

Southern California Schools Risk Management Coverage Summary

VENDOR PREQUALIFICATION FORM

BUILDING SERVICES AGREEMENT

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGER-AT-RISK BEXAR COUNTY COMMUNITY ARENAS BOARD BEXAR COUNTY, TEXAS FREEMAN COLISEUM PHASE II RENOVATIONS

REQUEST FOR PROPOSAL (RFP) for PROFESSIONAL CONSULTING SERVICES. to perform an

Construction Insurance 2018 Construction Certification Review Course. Christopher Mueller Taylor, Day, Grimm & Boyd

Exhibit. Owner Controlled Insurance Program. Insurance Requirements

REQUEST FOR PROPOSALS FISCAL AGENT SERVICES FOR THE MONTANA AVENUE BUSINESS IMPROVEMENT DISTRICT CITY OF SANTA MONICA

CASTAIC LAKE WATER AGENCY STANDARD CONTRACT RISK TRANSFER PROVISIONS, GENERAL CONDITIONS and REQUIRED INSURANCE for

QBE Construction Package. A comprehensive construction and engineering insurance cover

AMENDMENT OF SOLICITATION REQUEST FOR PROPOSALS (RFP) ADDENDUM No. 1. Issued: May 23, 2016

5.0 TERREBONNE PARISH CONSOLIDATED GOVERNMENT, DEFINED.

Innovative Ways to Insure Project Risks

Time Outline: 150 TOTAL MINUTES OF INSTRUCTION = 3 HOURS OF CE CREDIT (50 minute of instruction + 10 minute break per hour)

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET PO BOX 191 MANCHESTER, CONNECTICUT (860) FAX (860)

Town of Manchester, Connecticut General Services Department. Request for Proposals for Fingerprinting Services 17/18-85.

REQUEST FOR PROPOSAL CHARTER TOWNSHIP OF WEST BLOOMFIELD POLICE DEPARTMENT WINDOW TINTING PROJECT

A Guide to Construction Insurance

Contractor s Insurance Requirements

Request for Proposal. Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville. June 15, 2015

Insurance Handbook for VHFA-financed rental housing contains the following: 1) Insurance coverages and limits that are required by VHFA;

SUBCONTRACTOR/SUPPLIER QUALIFICATION STATEMENT

AIA Document A101 TM 2007

Name of Entity Description of Operation Location Years in Business. Name of Entity Estimated Gross Revenue Estimated Payroll No.

Debbie Sines Crockett CHEFFY PASSIDOMO ATTORNEYS AT LAW Tampa & Naples, Florida

Copies of this directive should be posted and distributed to all employees who may operate a state vehicle in the scope of their employment.

Transcription:

CONSTRUCTION PROJECT - RENOVATIONS OVER $5 MILLION VALUE CONSTRUCTION MANAGER CHART FOR RFP PURPOSES Updated: November, 2011 FILE NOTES (Not to be included on chart given to Manager): The UofC gets charged the premiums as part of the contract with the Manager for all insurance that we require from them. Requirement for General Liability for the only $2M (as opposed to $5M under the smaller projects) as the Wrap-Up Liability program supplied by the the primary insurance for the construction site and the $2M CGL provided by the CM is mostly for offsite liability. Requirement for Auto Liability for the only $2M (as opposed to $5M under the smaller projects) as the Wrap-Up Liability program supplied by the CM will cover the University in the non-owned auto capacity if the CM s owned vehicle gets into an accident. Requirement for Aircraft/Watercraft Liability is done through the General Liability so it must be the same level of requirement. The Wrap-Up Liability must cover watercraft under 500 tonnes gross registry. It also must provide some aircraft coverage excluding a) aircraft that is owned (in whole or part) by the CM b) leased by the CM or c) chartered by the CM. Generally, if you use a regular transportation company, and you do not specifically charter or lease the aircraft, there is coverage under the Wrap-Up. In a Manager Renovations over $5M project, the Architect (including the services of the sub-consultants) is separately contracted. The difference between the Manager-Renovations over $5M project and the Design-Build over $5M contract, is that the D-B Team also includes the architect and therefore the D-B team contract must produce Professional Liability for $2M & $5M aggregate. Note: In Manager-Renovations over $5M the insurance covering temporary Boilers (required as a separate insurance in the under $5M) is included in the Contractor s Equipment section. SPECIAL CIRCUMSTANCE REQUIREMENT OVER AND ABOVE THOSE NOTED BELOW Boilers & Machinery: In ALL CASES WHERE A BOILER IS BEING INSTALLED, Risk Management & must be notified during the RFP process as there must be continual insurance for the boiler through testing and in the hand over to the University. Pollution : If the contract includes the removal or movement of contaminated items, areas or soil, they must also provide Contractors Pollution Liability. The required coverage amount would be related to the Work that they are doing and must be discussed with Risk Management. Collapse & Underground Liability: If the contract includes excavating or working underground, they may also be required to provide this type of Project Over $5 Million Manager RFP Chart 1

insurance. The required coverage amount would be related to the Work that they are doing and must be discussed with Risk Management. Project Over $5 Million Manager RFP Chart 2

/ CONSTRUCTION MANAGER PROVIDES: Course of Covers physical loss or damage to the Work, including all machinery, materials and supplies at the Place of the Project and intended to become a part of the finished Work, and while there, awaiting erection or installation and during erection and installation, and testing, and until final acceptance by the University. It also includes $1 million in transit insurance for the above mentioned equipment; $1 million for this equipment while it is in another location for storage. Also provides for Boiler and Machinery coverage for testing and commissioning of the applicable equipment that will be part of the building. NOTE: CM must consult with Risk Management regarding any project related to boilers to ensure For an amount not less than the full value of the Work. University, Manager and Trade Contractors At the University s discretion. The maximum deductible that the Manager /Trade Contractor would on loss would be 25,000. The deductible will be the responsibility of the Party at fault OR the Party who suffers the loss where fault cannot reasonably be attributed to one or more parties (i.e. by reason of acts of God. Project Over $5 Million Manager RFP Chart 3

/ ongoing coverage after testing. Wrap-Up Liability Commercial General Liability Automobile Liability Covers damages because of bodily injury, personal injury, or damage to/destruction of third party property (including loss of use of occupation) arising out of covered operations in connection with the Work and subject to all exclusions set forth in the policy. Coverage includes twenty four (24) months completed operations liability. Including blanket contractual liability and contractor s protective liability. Must also include pollution exposure if University deems necessary (dependant on the Project). Note that the Wrap Up Liability insurance provided by the CM will be primary for on-site activities that are included in such coverage. Covering all motor vehicles owned, non-owned, leased, operated At University s Discretion check with Risk Management and Department as to value. occurrence. University, Manager and Trade Contractors At the University s discretion. The maximum deductible that the Manager /Trade Contractor would on loss would be 25,000. The deductible will be the responsibility of the Party at fault OR the Party who suffers the loss where fault cannot reasonably be attributed to one or more parties (i.e. by reason of acts of God. Project Over $5 Million Manager RFP Chart 4

/ Aircraft or Watercraft Liability On-Hook Liability Asbestos Abatement Liability All Risk Contractor s Equipment and/or licensed in the name of the Manager used in the performance of this Contract. When owned or non-owned aircraft or watercraft are used directly or indirectly in the performance of the Work. For any Work involving the mechanical hoisting of objects, materials or equipment. Required if the Contract includes asbestos abatement work. Covering construction machinery and equipment used or provided by the Manager for the performance of the work, including boiler insurance on temporary boilers and pressure vessels in a form acceptable to the University. This insurance coverage shall not allow subrogation claims by the insurer as against the University. occurrence. Replacement value of equipment. Manager or Trade Contractor that operates the crane/hoist is responsible for the deductible. Project Over $5 Million Manager RFP Chart 5

/ Professional Liability Trade Contractor default insurance or Bonding Shall include coverage for all professional consultants or subconsultants (i.e. architects, engineers, etc. Shall include all issued sub contracts. If trade contractor default insurance is used, where the Manager subcontracts a portion of the Project to their own company, they must provide bonding as trade contractor default insurance would not apply in that instance. occurrence and not less than $5,000,000 annual aggregate. In an amount and in a form suitable to the University. Performance & material labour payment bonds 50% or trade contractor default insurance. Design Build Team is CONSTRUCTION MANAGER ENSURES THAT TRADE CONTRACTORS HAVE THE FOLLOWING : Commercial General Liability Automobile Liability Including blanket contractual liability, contractor s protective liability). Covering all motor vehicles owned, non-owned, leased, operated and/or licensed in the name of the Trade Contractor used in the performance of this Contract. occurrence. The Trade Contractor shall the payment of all deductible amounts. The Trade Contractor shall the payment of all deductible amounts. Project Over $5 Million Manager RFP Chart 6

V:\DOCS\\A - Contracts - Standard Formats\ Manager\ Manager - Renovations over $5M Chart for RFP Nov 2011.docx Project Over $5 Million Manager RFP Chart 7