Design & Planning of EPWP Phase II

Similar documents
Expanded Public Works Programme

EPWP INCENTIVE GRANT MANUAL

PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES DPW STRATEGIC PLAN AND BUDGET FOR 2012/13 15 MAY 2012

The Presidency Department of Performance Monitoring and Evaluation

Moretele Local Municipality. IDP/Budget Process Plan 2018/ ( IDP: Process Plan)

CHAPTER 7. Assessing Government s Fiscal Instruments to Fund Public Employment Programmes in Rural Areas

2017/18 INTEGRATED DEVELOPMENT PLAN (IDP), BUDGET, MONITORING, EVALUATION AND REPORTING PROCESS PLAN

Ensuring The Effective Participation Of Each Sphere Of Government In The Processes And Structures That Determine Intergovernmental Fiscal Arrangements

RELATIONSHIP BETWEEN THE BUDGET AND THE IDP 28 FEBRUARY 2017

Strategic Plan 2012/17, Annual Performance Plan and Budget 2012/13

WSSCC, Global Sanitation Fund (GSF)

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

Terms of Reference Development of the City of Tshwane Sustainability Financing Mechanism Strategy

Government Gazette REPUBLIC OF SOUTH AFRICA

cidb development through partnership August 2008 Update on the National Infrastructure Maintenance Strategy (NIMS)

DEVELOPMENT PLANNING AND CLIMATE CHANGE IN ZAMBIA

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project

Tracking Climate Finance Flows to South Africa Gaylor Montmasson-Clair Trade and Industrial Policy Strategies (TIPS)

Presentation of the Strategic Plan and APP April 2015

JOB DESCRIPTION FORM Job title:

Country: Serbia. Initiation Plan. Development of Youth Employment Bond

FISCAL OVERSIGHT OPPORTUNITIES AND

IMPROVING BUDGET TRANSPARENCY IN SOUTH AFRICA

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14

SAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only

PART I PRELIMINARY. 1. These Regulations may be cited as the Public Finance Management (Climate Change Fund) Regulations, 2018.

NATIONAL TREASURY STRATEGIC PLAN 2013/17 PRESENTATION TO PARLIAMENTARY FINANCE COMMITTEES

Financial and Fiscal Commission. Strategic Plan 2011/ /2014

Portfolio Committee on Public Service and Administration as well as Planning Monitoring and Evaluation

ENERGY MANAGEMENT PLAN ENERGY MANAGEMENT POLICY: ERG-1

Organisation of Asset and Liability Management in South Africa Coordination of Institutions

Government Gazette REPUBLIC OF SOUTH AFRICA. AIDS HELPLINE: Prevention is the cure

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

South African Human Rights Commission

PIXLEY KA SEME DISTRICT MUNICIPALITY

STRATEGIC PLAN AND BUDGET 2013 TO 2016 MUNICIPAL DEMARCATION BOARD

KENYA HEALTH SECTOR WIDE APPROACH CODE OF CONDUCT

Municipal Infrastructure Grant Baseline Study

with the National Rural Support Programme (NRSP) for the Islamic Republic of Pakistan 13 November 2015 NDA Strengthening & Country Programming

NATIONAL DEVELOPMENT AGENCY PRESENTATION by Anthony Bouwer

CANADIAN ENVIRONMENTAL ASSESSMENT AGENCY REPORT ON PLANS AND PRIORITIES

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

Recent experience of establishing a PPP framework to mitigate fiscal risks in Bangladesh

Private Sector and development: a global responsibility?

Terms of Reference. External monitoring mission for the Project Mid-Term Review

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

Submission on the Function Shift of Further Education and Training (FET)

Proposed Working Mechanisms for Joint UN Teams on AIDS at Country Level

NDT Briefing to the SELECT COMMITTEE ON TRADE AND INTERNATIONAL RELATIONS

4/7/2015. Group. Governance and Legislation

SCOA Integrated Consultative Forum feedback from the City of Cape Town. 18 & 19 September 2014

7 Focus Areas of OME (1)

CHAPTER 6. Assessing Government s Fiscal Instruments to Fund Job Creation Strategies in Rural Areas: The Case of Public Employment Programmes

162,951,560 GOOD PRACTICES 1.9% 0.8% 5.9% INTEGRATING THE SDGS INTO DEVELOPMENT PLANNING BANGLADESH POPULATION ECONOMY US$

OGD action plan design. DPADM/UNDESA, Guide on Open Government Data Action Planning for Sustainable Development, publicadministration.un.

General Guide to the Local Government Budget Process for District & LLG Councillors, NGOs, CBOs & Civil Society

FINANCIAL AND FISCAL COMMISSION

Annual Performance Plan

Ethiopia s Climate Resilient Green Economy (CRGE) Facility Terms of Reference

APPENDIX AICD COMMENTS ON THE DRAFT ASX PRINCIPLES 27 JULY 2018

REGIONAL HOMELESSNESS PLAN FOR METRO VANCOUVER TERMS OF REFERENCE

Policy Brief. Monitoring and Evaluation A Roadmap to Results on Roma Inclusion

Initiative of National Department of Health to accelerate Health Infrastructure Service Delivery

COHESION POLICY

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh

Benin 27 August 2015

ZIMBABWE_Reporting format for final scoring (Ref. 4)

Good Practices in Anti-Poverty Family- Focused Policies and Programmes in Africa: Examples and Lessons Learnt

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

UGANDA DEVELOPMENT PARTNER. Division of Labour Exercise AID INFORMATION MAP. Introduction and Instructions for DP Questionnaire.

OPERATIONAL INSTRUCTION REF. OI.IPMG ACCEPTANCE OF ENGAGEMENT AGREEMENTS

ANNOUNCEMENTS, TABLINGS AND COMMITTEE REPORTS

8 Legislative Changes and Potential Impact of Provincial Reforms across Social Services

SECTION 9: AUDIT OUTCOMES OF INDIVIDUAL PORTFOLIOS. Consolidated general report on national and provincial audit outcomes for

VAT FOR THE GOVERNMENT SECTOR

Treasury Guidelines Preparation of Expenditure Estimates for the 2010 Medium Term Expenditure Framework

GUYANA FORESTRY COMMISSION

DIVISION OF REVENUE TO PROVINCES AND LOCAL GOVERNMENT

UNICEF s Strategic Planning Processes

2. The Department of Social Development Strategic Plan and the Annual Performance Plan

Presentation to the Egyptian Ministry of Planning, Monitoring, and Administrative Reform (MPMAR) Study Tour: South Africa.

Conditional Cash Transfer Programs in South Africa

AFGHANISTAN ALLOCATION GUIDELINES 22 JANUARY 2014

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. TO: Leader and Cabinet 14 April 2005 Development Services Director LETTINGS POLICY REVIEW

MINUTES OF THE CORPORATION MEETING HELD ON TUESDAY 3 FEBRUARY A Rajguru (Vice Chair) Governor

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630

Introduction to EDD Annual Performance Plan

Annex 1. Action Fiche for Solomon Islands

Housing Operations. Housing Division Re-Organization. Rent Supplement Deficit 2016 Audit Results 2018 Operating Budget(s) Next Steps

PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATIONS BRIEFING ON THE 2015 APPROPRIATION BILL 19 MAY 2015

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

DOHA MINISTERIAL DECLARATION [excerpts]

The Quantity Surveyor s Role in the Budgeting Process in Nigeria- Best Practice

Tajikistan Country Report. Mid Term Review of the UNDP-UNEP Poverty- Environment Initiative (PEI) Scale-Up. Kris B. Prasada Rao

Accelerated and Shared Growth Initiative South Africa

CABINET DECISION MAKING STRUCTURES PROCESS

Summary of Project/Program. Summary - Project/Program Approval Request. Private: Public: X Mixed: Grant: USD31 Million 1. Loan: USD5 Million Project:

Transcription:

Design & Planning of EPWP Phase II Briefing and Key Decisions 10 November 2008

EPWP 2 GOAL To create 4,5 million (short and ongoing) work opportunities for poor and unemployed people in South Africa so as to contribute to reducing unemployment by 2014, through the delivery of public and community services. (This will scale up from 500,000 per year in 2009/10 to 1.5 million in 2013/14) EPWP to enable government to act as an employer of last resort as part of the Anti-Poverty Strategy 2

Background to EPWP 2 EPWP 1 achieved its 1 million work opportunities targets a year ahead of schedule EPWP 2 to adjust and scale up to contribute significantly to halving unemployment by 2014 (as part of Government s Anti-Poverty Strategy) Cabinet approved the high level proposals for EPWP 2 in June 08 R 5 billion allocated over the MTEF to scale up the EPWP EPWP 2 business plan to be submitted to the January Cabinet Lekgotla EPWP 2 implementation to start on 1 April 2009

Medium term budget statement: Next year, government will initiate the second phase of the expanded public works programme. Drawing on the successes and lessons of this programme over the past five years, R4 billion is added to this programme to incentivise the creation of longer term, more stable employment in provinces, municipalities and non-governmental organisations. It is anticipated that this programme will be phased up to grow the number of full time equivalent jobs from about 145 000 at present to over 300 000 a year

Critical Success Factors for EPWP 2 Work creation must be the primary objective (Employer of last resort) Locate clear political and administrative accountability for targets for creating EPWP work opportunities across all spheres of government Align EPWP with the core mandates of all implementing public bodies Have fiscal mechanisms to accelerate scaling up of EPWP outputs across all spheres of government Mobilise non-state capacity to deliver additional EPWP work opportunities

Definitions Work opportunities (WO): Opportunity to work provided to targeted individuals measured by duration and level of income and regularity Full Time Equivalent employment (FTE): Measure of number of full years of employment (230 days of work per year) created through the work opportunities Impact on unemployment: the degree to which unemployment, as measured, is reduced as a result of the EPWP

Targets EPWP 1 and 2 Phase 1: Cumulative Achievements 2004-08 Annual WO 2007-08 Annual FTE 2007-08 1 million WO 440 000 191 300 Phase 2: Cumulative Target 2009-14 Annual Target WO 2013-14 Annual Target FTE 2013-14 4.5 million WO 1.5 million 652 000

Key Components of EPWP 2 1. Targets and accountability across Government 2. Fiscal mechanisms & budgets a) Incentive for provinces and Municipalities for infrastructure b) National Departments (Environmental Sector) c) Social Sector 3. Non-State sector 4. Technical Support to spheres, sectors and implementing bodies 8

1. Targets and Accountability across all spheres of Government Overall Phase 2 targets will be distributed across all spheres of government and the five year period so that: Each public body has a clear target for each financial year It is clear which programmes/ activities of the public body are expected to contribute to the target The targets are adjusted annually over the MTEF in line with budget allocations and performance Respective political and administrative heads to be held accountable for achieving respective targets EPWP Unit to manage the setting, monitoring and feedback process for performance in relation to all targets 9

2. Fiscal Mechanisms and Budgets EPWP unit will: Lead the EPWP component of the annual MTEC which includes consolidating and endorsing budget requests across all spheres of government Monitoring and evaluating performance of specific EPWP budget allocations Management of Fiscal Incentive for Infrastructure Sector Management of Non-State Sector Allocations 10

2.1 EPWP incentive for provinces and municipalities MTEC made allocation for an incentive to provinces and municipalities to increase performance in the infrastructure sector Incentive targets based on the potential of the total infrastructure budget of each public body (with different formulas for civil and construction) The incentive is designed to influence the behaviour and performance of provinces and municipalities in three areas: Increased numbers of public bodies contribute to and report on EPWP Public bodies increase the labour intensity of their infrastructure portfolio Public bodies mobilise a larger share of their infrastructure budgets to contribute to the EPWP Provinces and municipalities that meet or exceed their annual targets are rewarded Targets are increased annually to ensure year on year growth of the EPWP work opportunities Public bodies that perform below minimum targets are not eligible for the incentive 11

Targets and indicative incentives per public bodies as published in the Division of Revenue Act Public Body Target (FTE) Year 1 Year 2 Year 3 Indicative incentive (R 000) Target (FTE) Indicative incentive (R 000) Target (FTE) Indicative incentive (R 000) A 100 0 200 4 000 300 6 000 B 300 6 000 600 12 000 700 14 000 C 500 10 000 600 12 000 700 14 000 D 500 10 000 600 12 000 700 14 000 Totals 1 400 26 000 2 000 40 000 2 400 48 000

Performance of public bodies-an example Public Body A: Is not reporting and not eligible for incentive Public Body B: Is eligible but will not receive the incentive as it is not meeting minimum performance level Public Body C: Exceeds minimum performance level but not meeting full target and receives a part of its incentive Public Body D: Is exceeding its full target, gets full incentive and possibly more is funds are available Phase 2 Target (500) Public Body D Performance 625 FTE s Minimum performance (100) 0 performance (no reporting) Public Body A Performance: 0 FTE s Public Body B Performance 80 FTE s Public Body C Performance: 250 FTE s

Performance of public bodies-an example Actual incentives paid out in year 1 Year 1 (Indicative) Year 1 (Actual) Public Body Target (FTE) Indicative incentive (R 000) Actual A 100 0 0 0 B 300 6 000 80 0 Actual incentive (R 000) C 500 10 000 400 8 000 D 500 10 000 800 10 000+ 6 000 Totals 1 600 26 000 955 24 000

2.2 Budgets, Mechanisms and Targets for National Departments (Environmental) Currently this applies primarily to Environmental sector programmes (DWAF & DEAT) Budgets for EPWP 2 to be allocated through the normal budgeting process, with the possibility of an amount ring-fenced for application to the EPWP over and above existing allocations Budget Allocations to National Departments to be linked to targets over the MTEF National Departments to be monitored against these targets Performance to be considered in future bids for additional budgets 15

2.3 Budgets and Targets for Social Sector Not possible to apply incentives to the social sector at this stage In the meantime: Provincial targets for EPWP outputs will be developed by applying a standard agreed formula taking into account key current programmes: Department of Social Development -ECD Department of Education -ECD Department of Health -Home Based Care Department of Social Development -Home Based Care Above targets consolidated into overall provincial EPWP targets In order to put in Social Sector EPWP incentives in place by July 2009, the following needs to be resolved: Basis for EPWP targets, incentives and alignment to be agreed The basis for explicit provincial budgets to the key social sector programmes EPWP Employment conditions for the sector 16

3. Non-State Sector EPWP targets are limited by the rate at which state programmes can expand their contribution to the EPWP Consequently there is a need to mobilise the capacity of the non-state sector Currently Community Works Programme of the Presidency is piloting an area based approach There is a need to also pilot an institution based approach to mobilising the non-state sector (eg existing NGO managed neighbourhood clean up programmes) 17

Non-State Sector Initiative A detailed proposal and business plan to pilot the non-state sector initiative over the 2009-10 financial year to be prepared and approved EPWP incentive applied by funding the wage costs (plus some administration costs) of additional EPWP work opportunities created by non-state organisations The Business Trust to act as the primary intermediary between DPW and the non-state sector Disbursements to be subject to participation agreements, detailed reporting and verification undertaken by the Business Trust Community work programme to be incorporated into the non-state initiative and expanded The institutional based approach to be initiated on a pilot basis 18

4. Technical Support to Implementing Public Bodies Increased technical support is critical to meeting expanded targets Technical support by the EPWP Unit to the spheres of government will include: Engagement to agree on targets Development of plans to meet targets Coordination processes to hold implementers within the sphere accountable Oversee progress and performance Technical Support by the EPWP Unit to the Sector lead departments to improve consistency and integration of approaches across the overall programme Technical support by the sector lead departments to implementers will include: Identifying areas with potential to create to create EPWP work opportunities Developing and promoting best practice Assisting with reporting EPWP outputs Monitoring and improving performance 19

MTEF Budget of R 5 billion Line item Infrastructure incentive grant for provinces and municipalities National departments (DEAT and DWAF) Amount R3 800 million R 630 million Non-state Sector initiative EPWP unit New Programmes (Working for Energy) R400 million R125 million R 45 million 20

Implications for EPWP Unit and DPW Organisational assessment and development of EPWP Unit to ensure capacity to respond adequately to EPWP 2 Financial administration and management of R4.2 billion of grants and incentives Capacity and institutional arrangements to mobilise intergovernmental commitments (political and administrative) to deliver on EPWP 2 targets Ongoing participation in Anti Poverty Strategy development and alignment 21

Implementation Timelines Business plan to January 2009 Cabinet Lekgotla Nov Dec/Jan Feb Mar x Communicate EPWP 2 x x x x Establish infrastructure fiscal incentive for provinces and municipalities Non state sector business plan x x Final EPWP 2 Log-frames Interim capacity mobilised x x Operational systems for fiscal incentive in place M&E Framework finalised Target agreement process X x Recommendations on employment conditions Roles and responsibilities clarified x x x x x x x x x

Support Programme Contribution Background The Support Programme (EPWSP) is a joint initiative between Business Trust and the Department of Public Works [DPW] The Goal of the EPWSP is to support the implementation of the EPWP by undertaking focused and prioritized programmes, which seek to maximise the achievement of the EPWP s targets Total funding R110 million R100 million : Business Trust R10 million: DPW Five year programme 1 March 2005 to 31 March 2010 Currently in fourth year [2008/09] The Support Programme targets was to assist in creating 440 000 work opportunities (44% of the overall EPWP target). This target will be reached a year early in March 2009nd progress are as follows:

Support Programme Contribution cont. Overall Support Approach Overall target of Support Programme in securing 430 000 work opportunities by March 2010 in respect of Business Trust contractlikely to be met by March 2009 Handover process developed and implemented - ensure that all learnings, systems and processes are handed over to the EPWP Unit. Focus support on assisting the EPWP Unit implement EPWP 2- from January 2009 existing resources to be refocused on following two types of support: Strategic/Technical: Assignments undertaken with EPWP Unit to address agreed critical issues Operational : Operational assistance undertaken with a Chief Director EPWP Unit to scope, procure/allocate and induct the capacity essential to implement a critical element of work

Support Programme Contribution cont. Strategic and Technical Support Strategic support for planning of EPWP 2 including: Business Plan for January Cabinet Lekgotla, development of the Overall and Sector Log-frames, clarification of roles and responsibilities, and setting targets for all Public Bodies Infrastructure Fiscal Incentive -Development of the infrastructure fiscal incentive for EPWP 2 Social Sector- support the resolution of key conditions to secure EPWP Social Sector incentive grants for 2010/11 Environmental Sector- support engagement with DWAF and DEAT to enhance alignment and basis for expansion of the existing EPWP linked programmes Non State Sector-proposals for the pilot so as to secure approval and funding Institutionalization of STAF for EPWP 2-basis for ongoing access to this support Learning programme for the EPWP 2-skills development for EPWP practitioners Conditions of employment for EPWP 2- assist with review and revision Long term Institutional Proposals for the EPWP 2

Support Programme Contribution cont. Operational Support Subject to the approval of the EPWP 2 business Plan the following areas will be supported: Infrastructure Sector: Support to scope, procure/allocate and induct the capacity to implement the fiscal incentive Mainstreaming EPWP 2: Support to scope, procure/allocate and induct the capacity to implement the stakeholder engagement and management process (where Public Bodies accept their EPWP 2 targets and incorporate these into their performance management process). Support to scope, procure/allocate and induct the capacity to communicate the EPWP to all stakeholders. Subject to approval and funding for implementation of the following areas of work, support to scope and procure the capacity to implement the: Institutionalization of the STAF Oversight of the Non State Sector initiative Subject to the approval and funding to the Business Trust for the Non State

Key issues and recommendations Agree overall approach Agree sphere targeting approach Agreement on incentive approach Year 0 or Year 1 for assessing first year of performance Non state pilots Budget Business Trust role Community Works Programme Agreement on technical support approach