QUANTIFYING THE RISK OF EXTREME EVENTS IN A CHANGING CLIMATE. Rick Katz. Joint Work with Holger Rootzén Chalmers and Gothenburg University, Sweden

Similar documents
EVA Tutorial #1 BLOCK MAXIMA APPROACH IN HYDROLOGIC/CLIMATE APPLICATIONS. Rick Katz

An Introduction to Statistical Extreme Value Theory

Modelling Environmental Extremes

Modelling Environmental Extremes

STOCHASTIC MODELING OF HURRICANE DAMAGE UNDER CLIMATE CHANGE

Generalized MLE per Martins and Stedinger

Financial Risk Forecasting Chapter 9 Extreme Value Theory

Generalized Additive Modelling for Sample Extremes: An Environmental Example

Statistics & Flood Frequency Chapter 3. Dr. Philip B. Bedient

WEATHER EXTREMES AND CLIMATE RISK: STOCHASTIC MODELING OF HURRICANE DAMAGE

NEWCASTLE UNIVERSITY SCHOOL OF MATHEMATICS & STATISTICS SEMESTER /2013 MAS8304. Environmental Extremes: Mid semester test

Stochastic model of flow duration curves for selected rivers in Bangladesh

The University of Chicago, Booth School of Business Business 41202, Spring Quarter 2017, Mr. Ruey S. Tsay. Solutions to Final Exam

AN EXTREME VALUE APPROACH TO PRICING CREDIT RISK

Analysis of extreme values with random location Abstract Keywords: 1. Introduction and Model

Graduate School of Business, University of Chicago Business 41202, Spring Quarter 2007, Mr. Ruey S. Tsay. Solutions to Final Exam

Uncertainty and sensitivity analysis of flood risk management decisions based on stationary and nonstationary model choices

Two hours. To be supplied by the Examinations Office: Mathematical Formula Tables and Statistical Tables THE UNIVERSITY OF MANCHESTER

The University of Chicago, Booth School of Business Business 41202, Spring Quarter 2009, Mr. Ruey S. Tsay. Solutions to Final Exam

Simulation of Extreme Events in the Presence of Spatial Dependence

INDIAN INSTITUTE OF SCIENCE STOCHASTIC HYDROLOGY. Lecture -5 Course Instructor : Prof. P. P. MUJUMDAR Department of Civil Engg., IISc.

GPD-POT and GEV block maxima

Modelling catastrophic risk in international equity markets: An extreme value approach. JOHN COTTER University College Dublin

Chapter 4 Continuous Random Variables and Probability Distributions

Measuring Financial Risk using Extreme Value Theory: evidence from Pakistan

Unconventional Resources in US: Potential & Lessons Learned

Chapter 4 Continuous Random Variables and Probability Distributions

Distribution. Lecture 34 Section Fri, Oct 31, Hampden-Sydney College. Student s t Distribution. Robb T. Koether.

Probability Distributions II

Chapter 7 1. Random Variables

Problems 5-10: Hand in full solutions

The University of Chicago, Booth School of Business Business 41202, Spring Quarter 2012, Mr. Ruey S. Tsay. Solutions to Final Exam

Exam M Fall 2005 PRELIMINARY ANSWER KEY

Risk management. Introduction to the modeling of assets. Christian Groll

Econ 250 Fall Due at November 16. Assignment 2: Binomial Distribution, Continuous Random Variables and Sampling

Chapter 9 Theoretical Probability Models

Lecture 3: Return vs Risk: Mean-Variance Analysis

Bivariate Birnbaum-Saunders Distribution

Lecture 3: Probability Distributions (cont d)

Chapter 5. Statistical inference for Parametric Models

Report for technical cooperation between Georgia Institute of Technology and ONS - Operador Nacional do Sistema Elétrico Risk Averse Approach

SYSM 6304 Risk and Decision Analysis Lecture 2: Fitting Distributions to Data

Expected Inflation Regime in Japan

MODELLING OF INCOME AND WAGE DISTRIBUTION USING THE METHOD OF L-MOMENTS OF PARAMETER ESTIMATION

CPSC 540: Machine Learning

High-Frequency Data Analysis and Market Microstructure [Tsay (2005), chapter 5]

Hydrology 4410 Class 29. In Class Notes & Exercises Mar 27, 2013

Statistics 13 Elementary Statistics

ROBUST HEDGING OF LONGEVITY RISK. Andrew Cairns Heriot-Watt University, and The Maxwell Institute, Edinburgh

The University of Chicago, Booth School of Business Business 41202, Spring Quarter 2011, Mr. Ruey S. Tsay. Solutions to Final Exam.

Sampling Distribution

The Multinomial Logit Model Revisited: A Semiparametric Approach in Discrete Choice Analysis

Random variables. Discrete random variables. Continuous random variables.

Forward Contracts. Bjørn Eraker. January 12, Wisconsin School of Business

Statistical Methods in Financial Risk Management

The University of Chicago, Booth School of Business Business 41202, Spring Quarter 2010, Mr. Ruey S. Tsay Solutions to Final Exam

From Discrete Time to Continuous Time Modeling

VALUATION OF FLEXIBLE INSURANCE CONTRACTS

CPSC 540: Machine Learning

1 The Solow Growth Model

Internet Appendix for Asymmetry in Stock Comovements: An Entropy Approach

Sharpe Ratio over investment Horizon

Graduate School of Business, University of Chicago Business 41202, Spring Quarter 2007, Mr. Ruey S. Tsay. Final Exam

5.3 Interval Estimation

PROBABILITY ODDS LAWS OF CHANCE DEGREES OF BELIEF:

Financial Time Series and Their Characterictics

CVE SOME DISCRETE PROBABILITY DISTRIBUTIONS

Nonparametric Statistics Notes

Random Variables and Probability Distributions

The Normal Distribution

19. CONFIDENCE INTERVALS FOR THE MEAN; KNOWN VARIANCE

Introduction to Probability and Inference HSSP Summer 2017, Instructor: Alexandra Ding July 19, 2017

Climate change and flood frequency: The critical roles of process and seasonality

Slides for Risk Management

Module 4: Probability

Deriving the Black-Scholes Equation and Basic Mathematical Finance

SMILE EXTRAPOLATION OPENGAMMA QUANTITATIVE RESEARCH

Price manipulation in models of the order book

Lecture 4: Return vs Risk: Mean-Variance Analysis

BROWNIAN MOTION Antonella Basso, Martina Nardon

RISK ADJUSTMENT FOR LOSS RESERVING BY A COST OF CAPITAL TECHNIQUE

A potentially useful approach to model nonlinearities in time series is to assume different behavior (structural break) in different subsamples

Risk management. VaR and Expected Shortfall. Christian Groll. VaR and Expected Shortfall Risk management Christian Groll 1 / 56

Financial Econometrics (FinMetrics04) Time-series Statistics Concepts Exploratory Data Analysis Testing for Normality Empirical VaR

LECTURE CHAPTER 3 DESCRETE RANDOM VARIABLE

Statistics Class 15 3/21/2012

ECE 295: Lecture 03 Estimation and Confidence Interval

Queens College, CUNY, Department of Computer Science Computational Finance CSCI 365 / 765 Fall 2017 Instructor: Dr. Sateesh Mane.

Chapter 5. Sampling Distributions

WARRANTY SERVICING WITH A BROWN-PROSCHAN REPAIR OPTION

Chapter 7. Confidence Intervals and Sample Sizes. Definition. Definition. Definition. Definition. Confidence Interval : CI. Point Estimate.

Modeling the extremes of temperature time series. Debbie J. Dupuis Department of Decision Sciences HEC Montréal

Diploma in Business Administration Part 2. Quantitative Methods. Examiner s Suggested Answers

FINA 695 Assignment 1 Simon Foucher

DATA SUMMARIZATION AND VISUALIZATION

Estimate of Maximum Insurance Loss due to Bushfires

FX Smile Modelling. 9 September September 9, 2008

Projects to Avoid Catastrophes

Why Indexing Works. October Abstract

Section 1.3: More Probability and Decisions: Linear Combinations and Continuous Random Variables

Transcription:

QUANTIFYING THE RISK OF EXTREME EVENTS IN A CHANGING CLIMATE Rick Katz Joint Work with Holger Rootzén Chalmers and Gothenburg University, Sweden email: rwk@ucar.edu Talk: www.isse.ucar.edu/staff/katz/docs/pdf/qrisk.pdf

Quotes/Titles Milly et al. (Science, 2008) -- Stationarity is Dead: Whither Water Management? Lins and Cohn (JAWRA, 2011) -- Stationarity: Wanted Dead or Alive? Serinaldi and Kilsby (AWR, 2015) -- Stationarity is Undead: Uncertainty Dominates the Distribution of Extremes

Outline (1) Motivation (2) Example of Non-Stationarity in Extremes (3) Quantifying Risk under Stationarity (4) Quantifying Risk under Climate Change (5) Design Life Level (6) Discussion

(1) Motivation Trends in Precipitation Extremes -- Review paper for US National Assessment (Kunkel et al., 2013) Method -- Generalized extreme value (GEV) distribution for annual maxima (Linear trend in location parameter) -- Fit indirectly using peaks over threshold/point process approach -- Runs declustering (r = 1) -- Seasonality ignored

Change in 20-Year Return Level of Daily Precipitation Extremes

Issues -- Trend detection Difficult to detect trends in precipitation extremes (Much uncertainty in estimated return levels) Need to borrow strength across space (Regional analysis) -- Interpretation of change in extremes Changes in return levels (Meaning under non-stationarity?)

(2) Example of Non-Stationarity in Extremes Example (Mercer Creek, WA) -- Small watershed near Seattle -- Period of rapid urbanization (starting about 1970) -- Anticipated effects of land-use changes on runoff Increase in peak flow Not necessarily any effect on mean flow

Model for Non-Stationarity in Annual Peak Flow -- GEV cumulative distribution function (CDF) G(x; μ, σ, ξ ) = exp{ [1 + ξ (x μ) / σ] 1/ξ } Location parameter μ Scale parameter σ > 0 Shape parameter ξ -- Assume μ & ln(σ) have piecewise linear trends (i) Constant 1956 1970 (ii) Linear 1971 1985 (iii) Constant 1986 2006

(3) Quantifying Risk under Stationarity Stationarity -- Remains prevailing paradigm in engineering design

Return Period / Return Level -- e. g, so-called 100-yr flood Return level has 1% chance of being exceeded in given year Return period (or average recurrence interval ) corresponding to this probability of 0.01 is 1/0.01 or 100 yrs -- Suppose random variable X has CDF F Return level x(p) (with return period 1/p) is 1 p quantile of F That is, x(p) = F 1 (1 p)

Interpretation of return level x(p) with return period T Pr{X > x(p)} = p, where p = 1/T (i) Length of time T for which expected number of events = 1 1 = Expected no. events = T p, so T = 1/p (ii) Expected waiting time Need to assume temporal independence Waiting time W has geometric distribution: Pr{W = k } = (1 p) k 1 p, k = 1, 2,..., E(W) = 1/p = T

(4) Quantifying Risk under Climate Change Non-Stationarity -- How to measure risk (over design life time period) Lack of appreciation of issue -- Avoidance of problem Treat climate change as shift to new stationary regime -- Use non-stationary quantiles Effective return period / Effective return level (As if move flood plain from one year to next)

Extension of Existing Concepts -- Could retain one of two interpretations under stationarity (i. e., frequency or waiting time) -- Notation Under non-stationarity, risk depends on year t For simplicity, assume design time period starts at year t = 1 Let pt (u) = Pr{Xt > u}, year t = 1, 2,...

(i) Expected number of events -- Let NT (u) denote number of events during t = 1, 2,..., T E[NT (u)] = p1(u) + p2(u) + + pt (u) -- Given specified return period T Set E[NT (u)] = 1 & solve for return level u Then u satisfies p1(u) + p2(u) + + pt (u) = 1 In other words, average of T probabilities is 1/T

Mercer Creek Example (Return to) -- Imagine engineer in 1955 Faced with flood design for next 50 years (i. e., 1956 to 2005) -- Suppose perfect knowledge available about effect of development in watershed on flood statistics Use observed shift in parameters of GEV distribution (Ignoring any uncertainty)

Frequency-Based Return Level (u 871 cfs for T = 50 yr)

(ii) Expected waiting time -- Assume temporal independence -- Let W(u) denote first time t that Xt > u Pr{W(u) = k } = { t=1,k 1 [1 pt (u)] } pk (u), k = 1, 2,... Given specified return period T: Set E[W(u)] = T Solve for return level u

Waiting Time-Based Return Level (u 871 cfs for T = 50 yr)

Return Levels for Mercer Creek Example -- Stationarity assumption Fit single GEV distribution: u 1036 cfs for 50-yr return level -- Frequency-based definition u 871 cfs for 50-yr return level -- Waiting time-based definition u 871 cfs for 50-yr return level Note: Two definitions produce approximately same return levels (but not exactly see Cooley, 2013 for an example)

(5) Design Life Level Abandon / Replace Existing Concepts -- Reasons for doing so (even under stationarity) 100-yr flood vs. probability of one or more floods within (e. g.) 30- yr time period -- Risk of failure (Court, 1952; Gumbel,1958) Under stationarity (and independence), risk of failure over T yrs.: 1 (1 p) T

Non-Stationarity (and Independence) -- Design life time period yr 1 to yr T Risk of failure = 1 {[1 p1(u)] [1 pt (u)]} -- Choose Design Life Level to achieve desired risk of failure (say α) -- Let Gt denote GEV CDF for year t Then CDF of maximum over t = 1, 2,..., T given by F1,T (x) = G1(x) G2(x) GT (x) So Design Life Level u (with risk α for time period yr 1 to yr T ) can be expressed as 1 α quantile of F1,T

Another Example (Manjimup, Australia) -- Manjimup, Australia winter maximum daily precipitation Region in state of Western Australia has experienced decline in precipitation in recent decades -- Fit linear trend in location parameter μ of GEV distribution (Note: More realistic model would allow for nonlinear trends in location and scale parameters of GEV)

Future Design Problem -- Design life time period: 2011 to 2060 Extrapolate trend in location parameter μ of GEV dist. (i) Risk α = 0.05 Design Life Level: u = 121 mm (SE 36 mm) Standard error (SE) based on implicit delta method (ii) Risk α = 0.40 ( Risk over 50-yr period for 100-yr return level under stationarity) Design Life Level: u = 77.5 mm

(6) Discussion Uncertainty in Estimated Design Life Level -- Better method for quantification (e. g., based on profile likelihood or resampling) Uncertainty About Future Climate -- Peaks over threshold (point process) instead of block maxima -- Borrow strength across space (Regional analysis) -- Combine observed trends with future projections

Related Work -- Rootzén & Katz (2013) Paper in Water Resources Research -- Cooley (2013) Chapter in Extremes in a Changing Climate (AghaKouchak et al.) -- Salas & Obeysekera (2013) Paper in Journal of Hydrologic Engineering