SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077) (City Wide)

Similar documents
The City of Owen Sound Asset Management Plan

Municipal Asset Management Plans

ASSET MANAGEMENT PLAN EXECUTIVE SUMMARY

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

INFORMATION REPORT. Update Respecting Multi Residential Taxation (FCS18002) (City Wide) (Outstanding Business List Item)

CORPORATE AND EMERGENCY SERVICES

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3

MUNICIPALITY OF MISSISSIPPI MILLS. plan. December, 2016

City of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By:

Asset Management Plan

Asset Management Program. Background

Asset Management Plan - Introduction

Report to: Council. October 26, Submitted by: Marian Simulik, City Treasurer

That the report from the Director of Finance regarding the Strategic Asset Management Policy, dated June 20, 2018, be received; and

Strategic Asset Management Policy

Financial Plan Water and Wastewater Lines of Service

City of Mississauga Municipal Performance Measurements Program (MPMP) Results. For the period ending December 31, 2013

South Huron Asset Management Program. Spending the right amount of money, on the right assets, at the right time

WORKSHOP 1: LONG-RANGE FINANCIAL PLANNING

AMP2016. County of Grey. The 2016 Asset Management Plan for the. w w w. p u b l i c s e c t o r d i g e s t. c o m

AMP2016. i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m. The 2016 Asset Management Plan for the Township of Hamilton

Budget. Quick. Reference. Guide

ASSET MANAGEMENT PLANS: GETTING YOU PREPARED ROMA Conference

Asset Management Plan 2016 Township of King

SUBJECT: 2016 Asset Management Financing Plan. Committee of the Whole. Finance Department. Recommendation: Purpose: Page 1 of Report F-12-17

Priorities. Vision and Mission Statements

Asset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko

January 24, 2018 Page 1 of 8

Treasury Board Secretariat. Follow-Up on VFM Section 3.07, 2015 Annual Report RECOMMENDATION STATUS OVERVIEW

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

Fire. Service Area Asset Management Plan. Town of Whitby. Town of Whitby Fire Service Area Asset Management Plan DECEMBER 2017 ASSET HEALTH GRADE

CORPORATION OF THE TOWNSHIP OF MALAHIDE. Consolidated Financial Statements

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.

BUDGET COMMITTEE DECEMBER 4, LONG-RANGE FINANCIAL PLANNING INFRASTRUCTURE FUNDING STRATEGY (Referred Item)

Asset Management Outcomes

2017 Capital Budget Presentation. October 11, 2016

Township of Essa. Asset Management Plan

Asset Management Planning: Legislation & Integration

Y01 kregion. Dear Ms. Angus-Traillz. Re: Response to Ministry of Infrastructure - Proposed Municipal Asset

Tax Supported Preliminary Capital Budget. Book Capital Budget Summary Reports FCS16089

MUNICIPALITY OF MIDDLESEX CENTRE FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2016

An Inclusive and Data-Rich Approach to Infrastructure Development

STATUS OF ASSET MANAGEMENT IN BRITISH COLUMBIA RESULTS FROM THE 2016 GAS TAX FUND ASSET MANAGEMENT BASELINE SURVEY

1. Committed Balance - Funding approved as per FIN : Financial Reserves policy to be applied towards specific expenditures.

Tax Supported Preliminary Capital Budget. Book Capital Budget Summary Reports FCS17099

Year Tax Supported Capital Budget Forecast Investing In Welland

Overview of Municipal Asset Management Planning Regulation (O. Reg. 588/17)

City of Markham Asset Management Plan

CITY OF BRAMPTON Budget Highlights. As Approved by City Council on February 23, 2011

AMP2016. w w w. p u b lii c s e ctt orr di igg ee sst t.. cco o m. The 2016 Asset Management Plan for the Municipality of Grey Highlands

Development Charges and Cost of Growth Analysis Town of Whitby Case Study Friday, September 22, 2017

CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE. Financial Statements. December 31, 2015

CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE. Financial Statements. December 31, 2016

Pre-Budget Submission

STAFF REPORT. central principle is to promote equity by recovering the cost of servicess from those

LONDON CORPORATE ASSET MANAGEMENT PLAN 2014

The City of Hamilton Reviewing Vacant Unit Tax Rebate Program and Discounts for Excess/Vacant Land

COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013

Report to Committee of the Whole

Ontario Sewer and Watermain Construction Association

CHAIR AND MEMBERS CORPORATE SERVICES COMMITTEE MEETING ON JANUARY 10, 2017

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transit Division

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS

Building a Better Tomorrow

AMO s 2017 Pre-Budget Submission: What s Next Ontario?

2018 Operating Budget Process

JUNE 2015 STRATEGIC PLAN

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN

City of Toronto Core Service Review Project. Final Report to the City Manager. July 7, 2011

Building Detail and Buy-in For Your Long-Term Multi-Asset Investment Plan

City of Waterloo Financial Dashboard

Asset Management Plan Public Works, Social Housing, Parks and Recreation Infrastructure City of Brantford, Ontario

DRAFT. Contents. City of London at a Glance... 3 Message from the City Manager... 4 Financial Reporting City of London Budget...

3 YORK REGION 2031 POPULATION AND EMPLOYMENT FORECASTS

Financial Statements December 31, April 25, 2016

THE CORPORATION OF THE CITY OF WINDSOR POLICY

perthcounty_amp2_d The Asset Management Plan for the County of Perth October 2016

STAFFF REPORT UPDATE ON THE CORE SERVICE REVIEW AND SERVICE EFFICIENCY STUDIES

TOWN OF SMITHS FALLS DRAFT 2018 BUDGET GUIDE. Your town, your money, our future

This photo was taken in 1930 and if you direct your attention to the MacDonald Hotel on the bottom right hand side, you will see just how much the

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process

Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN

6 Draft 2018 Development Charge Background Study and Proposed Draft Bylaw Amendment

Independent Auditors' Report

Deputy City Manager & Chief Financial Officer. P:\2016\Internal Services\Cf\Ec16003Cf (AFS # 22159)

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Toronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project

Village of Minburn Viability Review

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog

Asset Management Plan Contract No. ES-13-2

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Transportation Division

Town of Huntsville Municipal Asset Management Plan

BUDGET DRAFT 1 November 19, 2019

8 OMBI 2005 PERFORMANCE BENCHMARKING REPORT

Canada s New Infrastructure Plan Phase 2 Programming/Funding SUBMISSION TO INFRASTRUCTURE CANADA FROM THE UNION OF BC MUNICIPALITIES

2017 ENTERPRISE ASSET MANAGEMENT PLAN

Councillor Pam McConnell Budget Overview. February 24, 2010

The purpose of this report is to present the Oshawa Asset Management Plan for Council endorsement.

p Local governments in Canada moved from a modified accrual to a full accrual accounting approach.

Asset Management Investment Plan

Transcription:

TO: Mayor and Members General Issues Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: October 16, 2013 SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077) (City Wide) SUBMITTED BY: Mike Zegarac Acting, General Manager Finance & Corporate Services -and- Gerry Davis, CMA General Manager Public Works SIGNATURE: PREPARED BY: Joseph Spiler (905) 546-2424 ext 4519 John Murray (905) 546-2424 ext 4479 Council Direction: N/A. Information: In June 2011, the Province of Ontario released Building Together, its long-term infrastructure plan with a strategic framework to guide future investments. This plan sets out the government s commitment to making investments in public infrastructure which: support economic growth and competitiveness; align public services with demographic changes; and ensure good stewardship of public assets.

Requirements (FCS13077/PW13077) (City Wide) Page 2 of 8 However, with the current economic climate and fiscal pressures which challenge the Province s ability to support infrastructure investment, the Province has made clear that future funding commitments to municipalities will be based on focused investments which address needs rather than wants. To aid municipalities in identifying and prioritizing infrastructure investment, the Ministry of Infrastructure has developed the Municipal Infrastructure Strategy (Strategy), which intends to aid municipalities in strengthening asset management practices across the Province. Within the Strategy is a requirement that municipalities seeking provincial capital funding will now be required to submit a detailed Asset Management Plan (AMP) for future consideration. This requirement will become effective as of December 31, 2013 and must be endorsed by council. The initial AMP must include the following assets: Roads, bridges, water and waste water systems, and social housing. Elements of the Asset Management Plan As part of the Province s Strategy, the Ministry of Infrastructure has released a document titled Building Together: Guide for Municipal Asset Management Plans to assist municipalities in preparing an AMP which will be effective in prioritizing infrastructure investment decisions and meet the Province s requirement for future funding consideration. This document provides the necessary elements of the AMP, which are outlined below: Executive Summary The executive summary will provide a succinct overview of the AMP. Introduction The introduction of the AMP will explain how the municipality s goals are dependant on its infrastructure. It will clarify how the municipality s AMP is related to its planning and financial documents, including the strategic plan, as well as identify its purpose. It will outline which assets are included as part of the AMP; it is recommended that all assets under the municipality s responsibility will be included ultimately, but at a minimum must cover roads, bridges, water and wastewater systems and social housing. State of the Local Infrastructure This section of the AMP will summarize, preferably in a table format, the following:

Requirements (FCS13077/PW13077) (City Wide) Page 3 of 8 Asset types (e.g. urban arterial road, rural arterial road, watermains) and quantity/extent (e.g. length in kilometres for linear assets); Financial accounting valuation and replacement cost valuation. Asset age distribution and asset age as a proportion of expected useful life, and; Asset condition (e.g. proportion of assets in good, fair and poor condition). In addition, this section is to be supported by a an inventory database of the infrastructure assets covered by the AMP. Finally, a data verification policy and a condition assessment policy must be set out within this section of when and how asset information will be verified and when and how assets will be assessed to determine their condition. Desired Levels of Service This section of the AMP will define the municipality s targeted levels of service for the infrastructure assets included in the AMP. It is to include performance measures as well as targets and timelines for infrastructure which does not currently attain the desired levels. Any external trends or factors which may affect the municipality s ability to meet service levels should be identified and indicated within this section. This section is supported by documentation that specifies which performance measures are associated with which assets, current asset performance and expected performance over the planning period, as well as all assumptions. Asset Management Strategy The asset management strategy is the set of planned actions that will enable the assets to provide the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Planned actions outlined with the AMP should include: Non-infrastructure solutions actions or policies that can lower costs or extend asset life (e.g., better integrated infrastructure planning and land use planning, demand management, insurance, process optimization, managed failures, etc.); Maintenance activities; Renewal/rehabilitation activities; Replacement activities; Disposal activities, and; Expansion activities (if necessary) planned activities required to extend services to previously non-serviced areas - or expand services to meet growth demands.

Requirements (FCS13077/PW13077) (City Wide) Page 4 of 8 This section is to outline comparative options/actions to provide the needed levels of service. Options must be compared on: Lifecycle cost total cost of the asset, including construction, maintenance, renewal and operational costs throughout its service life. Future costs must be discounted and inflation incorporated, and; Direct and indirect benefits and costs. Risks associated with implementing the municipality s strategy must be assessed, as well as identifying any planned actions in response to materialized risks. This includes a comparative analysis of risks associated with all potential options/actions undertaken to meet levels of service. Upon its completion, the asset management strategy is to be a set of actions that, taken together, has the lowest cost overall for the infrastructure program. Financing Strategy This section of the AMP is intended to demonstrate that the municipality has made a concerted effort to integrate asset management planning with financial planning and budgeting and is willing to utilize all available infrastructure financing tools. This section will include: Annual expenditure forecasts categorized by: o Non-infrastructure solutions o Maintenance activities o Renewal/rehabilitation activities o Replacement activities o Disposal activities o Expansion activities (if necessary); Actual expenditures incurred for the above categories for the previous 3 years to facilitate comparison; Annual revenues to fund expenditures by confirmed sources; Key assumptions and alternative scenarios, and; Identified funding shortfalls relative to financial requirements that cannot be eliminated by revising service levels, asset management and/or financing strategies and an explanation of the impact of the funding shortfalls and how they are managed This section will include documentation explaining how the expenditure and revenue forecasts were developed and must be consistent with the options analysis outlined within the Strategy section of the AMP. At a minimum, the financing strategy must incorporate a ten year timeframe; however, a best practice is identified as spanning the lifecycle of the assets included in the AMP.

Requirements (FCS13077/PW13077) (City Wide) Page 5 of 8 Hamilton s Current Asset State of Affairs In its 2013 Tax-supported Capital report FCS12096 the City identified a significant funding gap regarding what the City should be spending annually on existing asset repair versus available funding. This is illustrated in the following table, TABLE 1 2012 Infrastructure Funding Deficit (Annual)($000's) 2012 2012 Infrastructure Required Funding Deficit Roads/Bridges 179,078 69,490 109,588 Waste Management 16,979 7,270 9,709 Corp Facilities (inc C.H.) 15,645 5,455 10,190 Rec Facilities 10,000 4,000 6,000 Culture Facilities 7,000 4,166 2,834 Housing 37,500 16,000 21,500 Parks / Open Space 10,296 7,927 2,369 Forestry 10,000 1,500 8,500 Fleet 10,820 9,386 1,434 Fire, EMS, Police Fleet 6,171 4,459 1,712 Transit 11,593 11,593 - Long-Term Care 2,226 1,670 556 Other 10,773 6,143 4,630 Financing Costs 16,404-16,404 Total 344,485 149,059 195,426 The $195 million represents the City s annual infrastructure funding gap for 2012. The 2012 funding gap adds to the City s cumulative infrastructure funding deficit which is currently approaching $2 billion. This means that the City needs to spend approximately $2 billion dollars today in order to have all of its tax-supported assets maintained and in good repair. The absence of this funding has resulted in poor conditioned roads, deferred asset maintenance and ultimately will lead to asset failure which in the longterm is more expensive. In addition, the City s available capital capacity will in the future be increasingly used more for emergency repairs and less for new capital initiatives. City of Hamilton Measures to Tackle the Infrastructure Funding Gap The City has taken the following measures with regards to its infrastructure funding shortfall; Developed a 10-year Discretionary Capital Forecast to identify available funding. Developed a Capitalization Prioritization Process based on stakeholder input which allows for long-term asset repair planning to promote cost efficiencies. Council has adopted a long-term fiscal strategy which incorporates a 0.5% total levy increase dedicated exclusively to the Capital Levy. This ensures that the

Requirements (FCS13077/PW13077) (City Wide) Page 6 of 8 Capital Budget increases proportionately greater than the operating budget in spite of local fiscal constraints. Redirected area-rating fiscal capacity to deal with infrastructure deficiencies in the older areas of the City. Introduced purchasing/tendering policies which allow program staff to maximize cost efficiencies with existing funding (i.e., local neighborhood road repair). All of the above measures have served to only slow asset decay. The only solution to solve the City s infrastructure repair problem is if the senior levels of government truly partner with the City and re-direct more of the federal and provincial taxes generated in this community towards repairing the existing municipal assets. The municipal tax capacity in this community is not sufficient to effectively deal with this problem. Hamilton s Current AMP Status The City currently maintains or has developed all of the Provincial AMP requirements; however, some of the information currently maintained, such as the levels of service, needs to be compiled into a consistent framework for the purpose of the AMP. Further, some integration of processes may be required. Below is a summary of the City s current status of the various required elements: State of the Local Infrastructure The City currently produces the State of the Infrastructure report on a 5 year basis. This report has been identified as a best practice by the Ministry of Infrastructure and was referenced as an example in representing assets within the Building Together: Guide for Municipal Asset Management Plans document. The City s current State of the Infrastructure reporting covers all assets required by the province: Roads, bridges, water and waste water systems and social housing. Also, all business areas related to the above asset categories have detailed inventory databases as required. Desired Levels of Service The City currently identifies and tracks performance measures in regards to infrastructure and levels of service through a variety of different documents and service areas. For instance, within the Strategic Plan, State of the Infrastructure Report, Development Charges (DC) Background Study, Ontario Municipal Benchmarking Initiative (OMBI), Municipal Performance Measurement Program (MPMP). There are

Requirements (FCS13077/PW13077) (City Wide) Page 7 of 8 many other areas and documents within the City where performance metrics are tracked. A selection of the above measures will be pooled together into a consistent framework for each infrastructure category. The framework will include strategic, tactical, operational and financial measures tied to a customer and service delivery focus. Asset Management Strategy The province defines this section as, a set of planned actions that will enable the assets to provide the desired levels of service, while managing risk, at the lowest cost. In short, these are the documents, actions and policies that should define the 10 year infrastructure plan. The City has a number of processes, procedures and best practices in regards to the above and these will be compiled for each infrastructure category within the AMP. Generally these will be reported under the following categories: asset data management asset life cycle management asset risk management asset decision making Financing Strategy The City s current capital budget methodology meets the minimum requirements of the AMP, outlining capital budgetary costs for a ten year period and partially categorizing spending according to classifications required. In certain circumstances, categorization may need to be refined; however, the current capital budget system has the functionality to support AMP requirements. Stretching the capital budget to span the lifecycle of the infrastructure addressed is unfeasible as certain assets, such as sewer mains, can have a useful life of 100 years. Full lifecycle financing plans will have to be maintained outside of the capital budget incorporated into the asset management strategy. This should then derive capital budget funding requests based on best practice asset management. Next Steps/Action Plan Both Public Works (Hamilton Water and Engineering Services) and Community Services (Housing), working with Corporate Finance, have retained consultants to compile and develop AMP s, using a consistent format, that will adhere to the provincial

Requirements (FCS13077/PW13077) (City Wide) Page 8 of 8 requirements. These documents will be brought forward to Council for approval prior to year end. Conclusion With future funding contributions from the Province reliant on an effective AMP, Hamilton in large part meets the requirements set out in the Building Together: Guide for Municipal Asset Management Plans document. Some work and coordination will be required between affected departments to ensure the various elements are integrated and incorporate the outlined requirements in future document preparation. Work is underway and will be completed prior to year end.