APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI

Similar documents
FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231)

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.

Right-of-Way Utilization Permit Please complete a separate application for each road

EXCAVATION PERMIT GUIDELINES

ROAD OPENING PERMIT APPLICATION. Instructions

Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina Telephone Fax

RIGHT-OF-WAY PERMIT APPLICATION

Standard Specifications for Work on Railroad Property

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID

NOTICE TO BIDDERS H.M.A. PAVING

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address:

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

APPLICATION & PERMIT FOR CONSTRUCTION IN PUBLIC RIGHT OF WAY. Name of Owner: Name of Applicant: Address of Applicant: City: State: Zip:

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT

WATER CHAPTER 8 PIPE INSTALLATION SYSTEM SPECIFICATIONS JUNE 2016

ROAD/RIGHT-OF-WAY EXCAVATION PERMIT APPLICATION

Gladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5

COUNTY OF PAMLICO REQUEST FOR QUOTES: PAVING DRIVEWAY OF GOOSE CREEK ISLAND VOLUNTEER FIRE DEPARTMENT

OPTION A: 2 BITUMINOUS PAVING WITH SHOULDERS OPTION B: SCRATCH COURSE BITUMINOUS PAVING WITHOUT SHOULDERS

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

OLMSTED STONE ARCH BRIDGE REPAIR PROJECT

INVITATION TO BID. Purchase of 2019 Requirements of Road Materials, as needed

Allen County Highway Engineering Department Problems and Progress

CURB CUTS SPECIFICATIONS AND STANDARDS

MODIFIED REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR FIRE STATION NO. 1 GEOTHERMAL TEST WELL Activity ID

Monroe County Road Commission. 840 S. Telegraph Road Monroe, MI Phone Fax Driveway Procedures. Driveway Procedures

CHECK IF WORK INCLUDES

BERRIEN COUNTY ROAD COMMISSION

PROPOSAL AND SPECIFICATIONS FOR FURNISH, HAULING AND SPREADING PROCESSED ROAD GRAVEL

PROPOSAL AND SPECIFICATIONS FOR ROADSIDE MOWING

NOTICE TO BIDDERS CONCRETE CONSTRUCTION

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

Fees: An application fee of one hundred dollars ($100) shall be included with the application submission.

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

OHIO TURNPIKE CROSSING PERMIT REQUEST INFORMATION UNDERGROUND CROSSING

APPLICATION FOR RIGHT-OF-WAY CONSTRUCTION PERMIT

Sponsoring Organization Information Legal Business Name: Address: City: State/Zip: Mailing Address: City: State/Zip: Telephone: Address:

Demolition, Landscaping and Insurance Requirements for the Razing of Buildings and other Structures Located in the City of Appleton

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM

MODIFIED REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR FD Training & Logistics Facility Geothermal Test Well Activity ID

BARTOW COUNTY UTILITY PERMIT PROCEDURES

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1022 FOR SALE OF SURPLUS GRAVEL

TOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES ENGINEERING DIVISION

PROPOSAL AND SPECIFICATIONS FOR PAVEMENT MARKING COUNTY PRIMARY ROADS CITY OF ALLEGAN MARCH 21, 2018

MEMORANDUM 7/30/15 BID NUMBER #02-15 REPLACEMENT OF WB HILL CROSS-CULVERT INVITATION TO BID

BOARD OF COUNTY ROAD COMMISSIONERS OF THE COUNTY OF ST. CLAIR PROPOSAL FOR NEW FUELING FACILITY AT CAPAC WAREHOUSE

Owner(s) Signature. (Provide additional sheet if necessary for multiple property owners)

2015 SIDEWALK REPAIR REQUEST FOR TENDER

PROPOSAL AND SPECIFICATIONS FOR FURNISH, HAULING AND SPREADING PROCESSED ROAD GRAVEL

CHEROKEE NATION DEPARTMENT OF TRANSPORTATION UTILITY RELOCATION AGREEMENT

CASTAIC LAKE WATER AGENCY STANDARD CONTRACT RISK TRANSFER PROVISIONS, GENERAL CONDITIONS and REQUIRED INSURANCE for

ARTICLE RIGHT-OF-WAY RULES AND REGULATIONS

REQUEST FOR QUOTATION

BIDS WILL BE OPENED AT 1:00 p.m., local prevailing time, WEDNESDAY, MARCH 13, 2019.

City of Escondido Field Engineering 201 North Broadway Escondido, CA Phone: (760) Fax: (760) ENCROACHMENT PERMIT

SPECIAL EVENT APPLICATION

REGULATIONS GOVERNING RIGHT-OF-WAY PERMITS

QUOTATION ONLY -- NOT AN ORDER

Festival of the Hills!

DPW Permit Provisions (Terms and Conditions) DPW- shall mean the City of Norwalk, Connecticut Department of Public Works and its staff.

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES

TOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES ENGINEERING DIVISION

Donald S. Rector, P.E. January 1, Fairfield County Utilities Department Renewal - Service Line Contractor s License.

Owner Phone. Contractor. Address. Type Existing Type Proposed. Type Existing Type Proposed. Length Width Area S.F.

Rev. 1/30/2015. DPW Permit Provisions (Terms and Conditions)

INDEMITY AND HOLD HARMLESS AGREEMENT

ST LUCIE COUNTY FIRE DISTRICT FIRE PREVENTION CODE. RESOLUTION NO

Laois County Council Licence for Opening Roads, Footpaths and Verges. Application Form

2017 TRAIL PAVING TENDER DOCUMENT FOR. THE MUNICIPALITY DISTRICT OF BONNYVILLE No. 87

REQUEST FOR PROPOSAL (RFP) PW CONCRETE SIDEWALK REPLACEMENT 370 LINEAR FEET WITHIN THE VILLAGE OF PORTLAND

CONSUMER COMPOST USE PROGRAM LOGO USE AGREEMENT BETWEEN THE UNITED STATES COMPOSTING COUNCIL AND PROGRAM PARTICIPANT

APPANOOSE COUNTY USE OF RIGHT OF WAY PERMIT Date

REQUEST FOR SEALED BIDS FOR MOWING OF WEEDY LOTS

COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO

A NEW online entry system for applications and submittal of documents will be available in summer of 2018.

REQUEST FOR PROPOSAL

HOLD HARMLESS AND INDEMNIFICATION AGREEMENT FOR MAINTENANCE OF A PUBLIC RIGHT OF WAY

Right of Entry Permit

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1606 FOR SALE OF SURPLUS GRAVEL

GP-4-1 of 9 GP-4 SCOPE OF WORK

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

CITY AND BOROUGH OF JUNEAU (CBJ) REQUEST for QUOTES (RFQ) Adair Kennedy Park Tree Removal. RFQ No. E18-239

GENERAL PROVISIONS I. WORK REQUIREMENTS

ROAD COMMISSION FOR IONIA COUNTY

1.7 Effect of Acceptance

DEVELOPER EXTENSION AGREEMENT

BIDS WILL BE OPENED AT 1:00 p.m., local prevailing time, WEDNESDAY, FEBRUARY 4, 2015.

PROPOSAL BITUMINOUS ASPHALT CONCRETE NON-CAPITAL PROJECTS PAVING

PROFESSIONAL SERVICES and NON-CONSTRUCTION CONRACTS

The City of Roanoke is currently soliciting bid proposals for fire lane striping for all City owned facilities with fire lanes.

Invitation to Bid. Asphalt and Concrete Repairs Bid No

BID PROPOSAL FORM FOR SALE AND REMOVAL OF A HOUSE DATE OF BID PROPOSAL:

County of Gillespie. Bid Package for CONCRETE. Bid No November 2018

REQUEST FOR PROPOSAL (RFP) PW CONCRETE SIDEWALK REPLACEMENT 370 LINEAR FEET WITHIN THE VILLAGE OF PORTLAND

ARTICLE I. Section 1. "City" shall mean the City of Marion, Linn County, Iowa.

THE BOARD OF SUPERVISORS OF THE COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, Ordains as follows:

RFP NO: REQUEST FOR PROPOSAL BUILDING DEMOLITION SERVICES CITY OF SOUTH BAY 335 SW 2ND AVENUE, SOUTH BAY, FLORIDA 33493

Transcription:

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: _100.00 Date: / / Receipt No: APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE, AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY; OR TO CLOSE A CITY STREET If a contractor is to perform the construction entailed in this application and permit, and is supplying the bond, said contractor will fill out the information block provided, and thereby assume responsibility and liability, along with the applicant, for any provisions of this application and permit and regulations which apply. Applicant s Name Applicant s Address Applicant s Phone # Contractor s Name Contractor s Address Applicant s Email Applicant s Fax # Applicant s Signature Contractor s Signature The above named applicant hereby makes application for a permit to construct, operate, use, and/or maintain; or close a city street within the following right-of-way: Address Range From: To: Street One Address Range From: To: Street Two S:\Forms\Permits and Forms\Word Copies 11/19/14 1

Address Range From: To: Street Three Address Range From: To: Street Four A detailed description of the desired facility and/or activity is as follows (Include size, length, type of facility. If crossing under roadbed, describe method. If buried, indicate depth from top of facility to surface. If facility to run parallel to street, indicate distance from inside edge of facility to pavement edge. If driveway approach, state if residential or commercial; if commercial, state type of establishment it will service.) The above stated intentions will be carried out in the manner applied for and in accordance with plans, specifications, maps and statements filed with the City Manager as part of this application and if said permit is granted, the above named applicant and contractor agrees to do the following: 1. Give written notice to the City Manager in which said work is to be performed at least one (I) day (24 hrs.) prior to commencement of operations covered by this permit. 2. Any and all operations under this permit meet all requirements of Ordinance No. 38, or other City or State regulations. 3. Take, provide, and maintain all necessary precautions to prevent injury or damage to persons and property from operations covered by this permit and use safety devices which are approved by the City of Swartz Creek. 4. To defend, pay on behalf of, indemnify, and hold harmless the City, its elected and appointed officials, employees and volunteers and others working on behalf of the S:\Forms\Permits and Forms\Word Copies 11/19/14 2

City against any and all claims, demands, suits, or loss, including all costs connected therewith, and for any damages which may be asserted, claimed or recovered against or from the City, its elected and appointed officials, employees, volunteers or others working on behalf of the City, by reason of personal injury, including bodily injury or death and/or property damage including loss of use thereof, which may arise as a result of his act, omissions, faults and negligence or any of his employees, agents and representative in performance of this Agreement. 5. Procure and provide evidence of insurance required under this section. All coverage s shall be placed with insurance companies licensed and admitted to do business in the State of Michigan unless otherwise approved by the City. Policies shall be reviewed by the City for completeness and limits of coverage. All coverage s shall be with insurance carriers acceptable to the City. The Provider shall maintain the following insurance coverage s for the duration of the Agreement. A. Commercial General Liability coverage of not less than one million dollars ($1,000,000) per person and two million dollars ($2,000,000) per occurrence combined single limit with the City, and including all elected and appointed officials, all employees and volunteers, all boards, commissions and/or authorities and their board members, employees and volunteers, named as Additional Insured. The coverage shall be primary as to the Additional Insured s, and not contributing with any other insurance or similar protections available to the Additional Insured s, whether said other available coverage be primary, contributing or excess. B. Workers Compensation Insurance in accordance with Michigan statutory requirements including Employer s Liability Coverage. C. Commercial Automobile-Vehicle Insurance in the amount of not less than one million dollars ($1,000,000 per person and $5,000,000 (five million dollars) per occurrence combined single limit per accident with the City, including all elected and appointed officials, all employees and volunteers, named as an Additional Insured. 6. Surrender the permit herein applied for, cease operations, and surrender all rights thereunder whenever notified to do so by the City Manager because of his need for the area covered by the permit or because of a default in any of the conditions of the permit. 7. Immediately remove, alter, or relocate at applicant s own expense the facility for which this permit is granted if requested by the City of Swartz Creek to do so. Upon failure to remove, alter, relocate or surrender the facility pursuant to the request of the City of Swartz Creek, reimburse the City of Swartz Creek for its cost in doing same. S:\Forms\Permits and Forms\Word Copies 11/19/14 3

8. Upon request, file a bond in the sum of $5,000 acceptable to the City of Swartz Creek and conditioned upon performance of the conditions of the permit and compliance with all requirements of law. A permit as requested in the foregoing application subject to the conditions to which applicant therein agrees, is hereby granted for the period commencing / / and ending / /. The period applied for and granted in this application and permit covers activities within the right-of-way. This obligation to operate, use, and/or maintain the facility to the satisfaction of the City of Swartz Creek remains in force as long as the facility exists and is within an area under the jurisdiction of the City. Street Administrator Date: Or City Manager Date: NOTE: Contractor must follow the City of Swartz Creek s Engineering Standards Manual guidelines unless otherwise directed, in writing, to do otherwise by the City s Engineer or Street Administrator. This permit does not relieve applicant from meeting any applicable requirements of law or of other public bodies or agencies. 1. PERMIT - The foreman in charge of the work shall have the permit and the approved plan or sketches in his possession on the job at all times. 2. EXCAVATION AND DISPOSAL OF EXCAVATED MATERIALS - The City Engineer shall specify if trenches or excavations under or adjacent to the road surface shall be sheeted, shored, and/or braced in such a manner as to prevent caving, loss, or settlement of foundation material supporting the pavements. Excavated material shall be stocked in such locations that it does not obstruct vision on the traveled portion of the street and in such a manner that it will interfere as little as possible with the flow of traffic. Sod and top soil shall be stocked separately from other excavated material. The applicant shall dispose of all surplus and unsuitable material outside of the limits of the street unless the permit provides for disposal at approved locations within the S:\Forms\Permits and Forms\Word Copies 11/19/14 4

right-of-way. In the latter case, the material shall be leveled and trimmed in an approved manner. 3. BACKFILLING AND COMPACTING BACKFILL - All trenches, holes, and pits shall be filled with sound earth or with sand-gravel if so provided, placed in successive layers not more than six (6) inches in depth, loose measure, and each layer shall be thoroughly compacted by tamping and all backfill subject to check by the Controlled Density Method. Sod and top soil shall be replaced and necessary seeding done under the direction of the City of Swartz Creek. Sand-gravel backfill material shall consist of approved bank run sand or gravel or a mixture of approved sand or stone screenings with gravel or crushed stone, provided that there shall be a substantial excess of sand or stone screenings in the mixture. All of the material shall be of such size that it will pass through a screen having 2½ inch square openings, unless otherwise authorized. 4. CROSSING ROAD-BED BY TUNNELING - When the pipe is installed by tunneling, boring, or jacking without cutting the existing pavement, the backfill shall be made by tamping a dry mix of lean concrete into place so as to completely fill any voids remaining around the installation. The concrete shall be composed of one part of Portland Cement and ten (10) parts of sand gravel by volume. Sand-gravel shall conform to the requirements given in paragraph 3. 5. CROSSINC BY CUTTING PAVEMENT AND TRENCHING - When this method is used, the pavement shall be cut back so that the opening is at least six (6) inches wider on each side than the width of the trench. In all concrete surfaces or bases, edges of trenches shall be formed by the use of concrete saw. The pavement shall be broken in such a manner as to allow the reinforcing steel to protrude a sufficient distance for lapping or typing with similar reinforcement in the pavement patch. Backfill shall be made with sand gravel as specified in paragraph 3. After the backfill has been thoroughly compacted, the pavement shall be replaced with new pavement of the original type and quality, unless at a season of the year when it is not feasible to replace pavement in kind, in which case a temporary surface of bituminous material shall be placed, and later replaced with pavement of original type at the applicant s expense. 6. DEPTH OF COVER MATERIAL - Pipes shall be placed to a depth that will provide not less than four (4) feet of cover between the top of roadway surface and the pipe. 7. Full compliance is required with any regulations of the City of Swartz Creek. S:\Forms\Permits and Forms\Word Copies 11/19/14 5

THE FOLLOWING MUST BE ATTACHED TO APPLICATION WHEN APPLICABLE: 1. Bond, except for residential driveways and local units of government. 2. Plans, specifications and location of facility. 3. Traffic plan in cases of street closure. 4. Certificates of insurance. S:\Forms\Permits and Forms\Word Copies 11/19/14 6