E-Tender for Providing & labour charge for underground work by laying 11 KV XLPE cable of approved work under Mehsana Division

Similar documents
PR.NO : / RFQ.NO: Tender Notice No MSN CO : 123/2017

6 Date & Time Of Opening Of Tender Dt At Pm (If Possible) 7 Tender Fee (Non Refundable) Rs 1000/- 8 Time Limit One Year

E-Tender for Labor work for laying of LT AB Cable and replacement of service at various Sub Division under Bopal Division in IPDS Scheme.

: To be filled by the tenderer :

DIVISION OFFICE, GANDHINAGAR. TENDER NOTICE NO : SR NO :- 1 P R No: RFQ No:

PR No: RFQ No: 48439

Tender notice no.28 item-1,

Save Energy for Benefit of Self and Nation PR NO RFQ NO 48087

CIN-U40102GJ2003SGC PR NO RFQ NO 47678

Last date of receipt of tender at Date : On Hrs Date of opening the tender at Date : On Hrs.

PR NO RFQ NO 41580

Supply of Earthing Kit for the special type earthing of Distribution transformer centres Under Patan City-1 S/Dn, Division Office Patan, UGVCL.

Save Energy for Benefit of Self and Nation CIN U40102GJ2003SGC042906

PR NO : RFQ No: E-Tender Notice No GNR-DO

PR No: RFQ No: CIN : U40102GJ2003SGC Estimate cost. Rs Rs in form of cash/ Demand Draft of nationalized bank

ADVERTISED TENDER NOTICE NO.: PLN-CO-36 /

E-Tender for Annual work order for underground 11 KV 185 mm2 XLPE cable fault detection for Shela & Sanand-1 S Dn

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

TENDER. No. TDD/TECH/TENDER/2011/20/5418. Construction of RCC 5000 ltr. Capacity underground SUMP at 66kV Gadhada S/S under Dhasa TR. Division.

Tender for Supply of ISI Make Black Cotton / Friction Insulation Tape Roll and Brown Tape Roll for City Division office-1, Rajkot.

Tender For. Supply, Installation & commissioning APC/HITACHI MAKE UPS. SLDC-Vadodara

ADVERTISED TENDER NOTICE NO.: PLN-CO-32 /

PR No: RFQ No: 49403

Administration of Dadra and Nagar Haveli, Dr. B. B. A. Government Polytechnic, Karad D.P Tender Notice

PO NO RFQ 39846

Annual Contract for Garden Maintenance at office campus UGVCL Mehsana.

TENDER FOR PROVIDING 5 NOS LABOUR FOR LOADING & UNLOADING OF PSC POLE & 1 NOS LABOURS AS CLEANER FOR TRUCK IDAR DIVISION STORE UNDER IDAR DIVISION

ADVERTISED TENDER NOTICE NO 25 / TO, M/s

(CIN) : U40100GJ1999SGC STATE LOAD DESPATCH CENTRE

TENDER NOTICE NO. PLN-CO-25 /

TECH / 120 Days from the date of opening of the enquiry Contract Period

ISO 9001:2008 Certified WEB TENDER NOTICE NO: DGVCL/Civil/2015/Steel Cupboards/41. Website:

Tender for Supply of LED Light Fittings for Bank s Main Office Building at Lucknow. Part I

OFFICE OF THE UNIVERSITY ENGINEER PATNA UNIVERSITY, PATNA

Tender Notice Ref. No. NITJ/Store/133/15 Tender no. 01/2018

Chennai Metro Rail Limited (A Joint Venture of Govt. of India and Govt. of Tamil Nadu)

To 27/04/2017. Sub: Providing and Fixing of signage board at PFRDA

Chennai Metro Rail Limited (A Joint Venture of Govt. of India and Govt. of Tamil Nadu)

TENDER FOR HIRING OF VEHICLE FOR VADALI SDN UNDER IDAR DIVISION. (For 24 Hours)

NATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ

e-tender Providing and fixing Modular Partition & Roller curtain Important Information: BID FORM for Procurement of

Notice Inviting Tender.

for SUPPLY OF HP TONER CARTRIDGE

TENDER BOOKLET /// TECHNICAL BID /// Tender notice no:450/16/w,rfq

No. 542-W-14/12/MH/2013 DT TENDER NOTICE

TENDER BOOKLET TECHNICAL BID. Tender KLTPS-56 / W-565 RFQ-29818

STATE BLOOD TRANSFUSION COUNCIL, ODISHA

Supply of Tree Guards QUOTATION NOTICE

The work of Replacement of Suspension / Tension Insulators by Rubberize polymer Insulator on 220KV & 66 kv Lines

NORTH CENTRAL ZONAL OFFICE, ENGG. DEPTT. 16/275, M.G. ROAD, KANPUR (U.P.) TENDER NOTICE

* * * * * TENDER DOCUMENT FOR SUPPLY OF CASTING ITEMS FOR DIFFERENT PROJECTS

Tender No. AYCL/ED/SWG/14-16/Security Agency dated 24/10/2014. Appointment of Security Agency at. Electrical Division (Kolkata Operation)

E-Tender Form Season

Bank of Baroda inviting tenders from Gujarat Based Reputed Printers for F.Y with BOB Zonal Stationery Cell, Baroda. Ph.

GUJARAT ENERGYTRANSMISSION CORPORATION LIMITED TRANSMISSION DIVISION, SAVARKUNDLA

* * * * * TENDER DOCUMENT FOR SUPPLY OF CHAIN PULLEY BLOCK REQUIRED FOR RET CONSTRUCTION SLUICE GATE

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED TRANSMISSION DIVISION - RAJKOT TENDER

(F.No. IG/RC-CHN/F&A/Security/1.25/16)

Description. Laying of underground 11 KV XLPE cables of any rating UPTO 300 sq.mm 1. Name of Work (Subject of Tender)

Government of Punjab Department of Revenue, Rehabiliation & Disaster Management Office of the Divisional Commissioner Jalandhar Division Jalandhar

Office of the Sutahata Panchayat Samiti

Ph: / Fax: / Corporate Identity Number: U40100GJ1993SGC TENDER BOOKLET

Central University of Orissa

OFFICE OF THE SUPERIINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE SHAHJAHANPUR TENDER SPECIFICATION NO. 208-EDC/SPN

TENDER AIR CONDITIONING WORK OF JALNA BRANCH, BANK OF BARODA AURANGABAD REGION.

NSIC ISO 9001:2008 The National Small Industries Corporation Ltd. III-B/118, Sector-18, Shopping Complex Noida

TENDER DOCUMENT TENDER FOR SUPPLY & INSTALLATION OF WATER COOLERS AT OFFICES UNDER LIC DO, MEERUT

BID FOR HIRING OF AGENCY FOR PRINTING JOBS IN CONSULTANCY DEVELOPMENT CENTRE (CDC) CONSULTANCY DEVELOPMENT CENTRE

TENDER. Tender Notice No. MRC - 13 ( )

TECHNICAL BID T 3469

SARDAR PATEL UNIVERSITY UNIVERSITY PRESS. University Road, Vallabh Vidyanagar , Gujarat Annexure -I

Chennai Metro Rail Limited (A Joint Venture of Govt. of India and Govt. of Tamil Nadu)

NOTICE INVITING TENDER (NIT)

Regd.& Corporate Office: INKEL Centre, Off Vallathol Junction, Seaport-Airport Road, Thrikkakara, Cochin TENDER DOCUMENT

TENDER ENQUIRY NO. BCL / PUR / KSR / CABLES/CW&AW/2019 Dated Due on Cable Specification Make Qty. Reqd.

Name of the work: AIR CONDITIONING WORKS TO BE CARRIED OUT AT OUR EXISTING BRANCHES IN THE REGION RO JAIPUR. SYNDICATEBANK:

TENDER DOCUMENT FOR SUPPLY OF ELECTROMAGNETIC BRAKES FOR 25T GANTRY CRANE FOR ANANDAPUR BARRAGE PROJECT

* * * * * TENDER DOCUMENT FOR SUPPLY OF CASTING ITEMS FOR MAHANADI BARRAGE PROJECT

at 13:30 hrs

e-tender Notice `.9.99 Lacs `.25,000/-

NOTICE INVITING TENDERS

TECHNICAL BID PART I

Critical Dates. Date & time of pre-bid meeting : at 3.00 p.m. Last date & time of submission of Tender/Bid : at 3.00 p.

NOTICE INVITING TENDER/एन आई ट. Lac (Rs.)

Ref. No: NIEPMD/ESTATE 6(9)/

AUCTION NOTICE. The sealed offer should be submitted in the office of SBTE. No offer will be accepted beyond the date and time mentioned as below.

BID DOCUMENT (DNIT) FOR ASSIGNING THE CONTRACT FOR SALE OF UNUSED AND USED QUESTION PAPER BOOKLET/LAST PACKET OF THE EXAMINATIONS

Odisha Power Generation Corporation L i m i t e d IB Thermal Power Station

APHMEL/PUR/FMT/1:A Phones: , , TIN: Fax : E Mail : INVITATION FOR TENDER

TENDER CUM AUCTION FOR THE SALE OF MARINE VESSELS. TENDER NO. : Tender No.TCL/MM/ /1 Dated

6 Earnest Money Deposit Rs. 17, Date of Opening of Price Bid Hrs.

E-TENDER NOTICE COMPUTER STATIONERY ITEMS

Sub : Tender for sale of Furniture, Computers, UPS and Racks as scrap on As is where is Basis.

INDIAN INSTITUTE OF SCIENCE BENGALURU

LIMITED TENDER ENQUIRY TENDER DOCUMENT (Includes both Technical & Financial bid documents)

MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD. EHV O&M DIVISION, RATNAGIRI RE-TENDER DOCUMENT

Persons to clean the institute including washrooms

Sub: e-enquiry for Supply, installation, configuring and commissioning of the 5 nos. of HDD of 300 GB for SAN Storage at SLDC Kalwa.

Government Hospital,Daman Administration of Daman and Diu, 0/0 Medical Superintendent,

YASHWANTRAO CHAVAN ACADEMY OF DEVELOPMENT ADMINISTRATION RAJBHAVAN COMPLEX, BANER ROAD, PUNE

Transcription:

PR.NO :-215926 / RFQ.NO:-29565 Tender Notice No : 45/2014 E-Tender for Providing & labour charge for underground work by laying 11 KV XLPE cable of approved work under Mehsana Division To Issued (Name & Address of Tenderer).. Contact No:- /. To be filled by the tenderer. Tender Value:-896190/- E.M.D paid vide M.R.No/D.D.No.Dt. Tender fee paid vide M.R.No/D.D.No.Dt.. -1-

Executive Engineer, UGVCL, Mehsana DO invites On-line e-tender for providing & labour charges for underground work by laying 11KV XLPE cable of approved work under Mehsana Division. Tender Papers & Specifications may be down loaded from Web site https://ugvcl.nprocure.com (To view, download and on-line submission) and UGVCL web site www.ugvcl.com (To view & download only). Last date of on line submission is 09/07/2014, upto 15 hrs.tender fee may be paid along with submission of tender and its receipt to be kept in the cover containing EMD, for respective tender. All the relevant documents of tenders to be submitted physically will be received only by RegisteredPost A.D. or Speed Post addressed to Executive Engineer, UTTAR GUJARAT VIJ COMPANY LTD., DIVISION OFFICE, Mehsana. NO COURIER SERVICE OR HAND DELIVERY will be allowed Sr.No Particulars Description 1 Tender for e-tender for providing & labour charges for underground work for laying 11KV XLPE cable of approved work under Mehsana Division 2 Estimated cost 896190/- 3 Earnest Money Deposit 9000/- 4 Security Deposit 5% of order value 5 Last date for online tender submission 6 Last date for physical submission of Tender, & EMD (DD) payable to UGVCL and other documents by RPAD/speed post only 09/07/2014, 15:00 hrs 14/07/2014,16:00 hrs 7 Date & time of opening of tender 14/07/2014, 17:00 hrs (If possible ) 8 Tender fee 500.00 9 Time Limit 180Days from the date of firm order placed with the successful bidder. 10 Pages 1 to 16-2-

Details of contractor 1. Name of Firm and Contact Person :- 2 Full Postal Address & Phone / Fax No./Mobile No./e-mail id :- 3 GST/CST/ECC No. :- 4 Status of Firm, with supporting Documents, Duly Discharged :- Proprietary/Partnership Pvt. /Public Limited 5 Name of Agencies/Directors if not proprietary. Name of owner if Proprietary with Phone/Fax Nos. :- 6 Registration No. with Organization. :- 7 P.F. A/c Code No. :- 8 Tender Fee Amt. & DD No & Date:- 9 EMD amount & DD No& Date:- 10 PAN / TIN No / VAT No / ST No. :- Dated Signature of Vendor/Contractor With Stamps -3-

Name of works: - Labour charges for underground work for laying 11 kv XLPE cable(from 70 to 300 mm 2 ) of approved work under Mehsana Division SR NO ITEAM CODE ITEAM DESCRIPTION 1 9500000004 2 9500000004 3 9500000004 4 9500000004 Labour charges for Horizontal : State / NH/ TAR Road crossing by push through method at a depth of minimum 4 feet from Ground level & using G.I pipe( 100/150 mm) only UNIT QTY RATE AMOUNT ( Cable will be supplied by UGVCL) MTR 100 1100 110000 P & F of Laying of 11 KV 185 mm2 XLPE insulated, Aluminium conductor, armoured cable in ground up to 100 cms deep 500 mm wide cable trench, providing sand cushioning before and after laying cable and covering the cable with half round PCC slab/bricks and refilling the trench(rate shall include cost of excavation of trench), (cable only will be supplied by UGVCL) MTR 2000 280 560000 Supply of 150mm dia( 6 " ) C.I pipe of good quality, approx.wt = 25-28 Kg/MtrorSupply of 100mm dia (4 approx.) C.I. Pipe of good quality, approx. weight = 22-25 Kg/ mtr. As per requirement of the job and instructions from E-I C. MTR 100 700 70000 supply of 100mm dia ( 4 ") G.I pipe of good quality & ISI mark UGVCL approved ( i.e ASIAN pipe or equivalent blue border patta ) thickness 5 mm & weight per meter 11 KG for cable guard MTR 50 500 25000-4-

5 9500000001 6 9500000004 7 9500000001 Providing & Supply, fixing route marker of 150mm x 150mm concrete stone UGVCL marked embedded in earth at,at least 300mm below the ground level and 450mm above ground level at distance of approx. 30 meters along the length of cable. The route marker should be painted with UGVCL's blue colour The rate is inclusive of cost of paint. NOS 67 70 4690 Laying of 11 KV XLPE Cable open to air with P & F all necessary fitting like wooden clamp, nut bolts etc. MTR 50 320 16000 Supply & providing HT push on/heat shrink type straight joint preferably 3m(m-seal) or Raychem make or equivalent for 3 core 185 Sq mm 11 KV XLPE aluminium conductor armoured cable as specified with connection of leads including cutting stripping of cable insulations providing compression type terminals crimping of lugs with suitable crimping tool NOS 13 8500 110500 Total RS. 896190 Supdt of Accounts. (Exp) Contractor s Signature with Stamp Executive Engineer, Mehsana Division -5-

Documents to be submitted by contractor with Tender Copy Documents /Proofs to be Submitted by the Tenderer /Bidder Submitted / Not Submitted. Experience Certificate of Contractor for the UG work Valid Bank Solvency Certificate issued by any Nationalizes Bank as per UGVCL s Rules & Regulations (20% of Estimated cost ) Copy of Employee s Provident Fund Certificate (E.P.F) Valid electrical License of the Contractor Valid Sales Tax Registration ( Vat Tin No ) Certificate of the Co. Valid Service tax registration no (ST-2 certificate ) must be submitted with tender Copy of PAN no of the contractor or firms Valid Labour License of current year Group Insurance copy of the insurance policy of the insured labourer s under W.C. Act. Tools &tackles Certificate. Tin No / Pin No Note:-Successful bidder must be filled above details and submit with hard copy. Contractor s Signature with Stamp Date:- Place:- Supdt of Accounts.(Exp) Executive Engineer, Mehsana Division -6-

Notes for qualification The tender documents are in two separate bids i.e. technical bid (qualifying bid) and price bids (commercial bid). Technical bid is to be submitted in a separate sealed envelope and supper scribing the envelope as Technical Bid as well as on onsite with scanning. Technical bid should be submitted with documents as under, failing to which tender is liable for rejection. The tender has to be submitted on (n) Code, invariably. The physical copy without (n) Procure submission shall not be entertained. In case of any discrepancy or deviation between physical copy and detailed submitted with (n) Code shall lead to rejection without assigning any reason. 1. The Earnest Money Deposit and Tender Fee will be accepted by Demand Draft payable at Mehsana of any Nationalized Bank, Scheduled Bank, Public Sector Banks & approved Private Sector Banks authorized to undertake Government business notified at present and amended time to time by Government and drawn in favour of UTTAR GUJARAT VIJ COMPANY LIMITED. Tender without EMD and tender fee shall be rejected outright. Two separate demand drafts for Tender fee and EMD should be submitted. The EMD COVER should be clearly super- subscribed with tender no.,due date of opening of tender and name of work. Any eventuates arising out due to not mentioning of above detail, shall be to the bidders account. 2. Work Experience: Contractor should submit evidence of having experience in the form of work completion Certificate of executed works under single contract as main contractor of similar nature &minimum 70% value of estimated cost of tender magnitude wise with the departments like UGVCL/GUVNL& its subsidiary companies / Central / State Government / Railway / Semi-Government/Public SectorOrganization. The contractor should submit the satisfactory work completion certificate fromrespective department / organization. Contractor has also to submit the details of works tendered and in hand with documentary evidence thereof. 3. Separate employee provident fund code number towards your firm registered with Regional P.F. Commissioner allotted by RPFC & Last Six month of current year EPF Challan paid copy is required 5. Solvency certificate 20% of estimated cost of tender 6. Details of personnel. The details of tools and tackles, owned and available for using in this work. -7-

7. Latest income tax clearance certificate. With PAN card. Group Insurance A copy of the insurance policy of the insured labourer s under W.C. Act. 10.At least Rs. 10 Lacks turn over required in bank Statement. 11. Details of equipment available with the tendered. 12. Electrical contractor license registration valid with current year is required. 13. Attested copy of Power of Attorney, if any, for signing the documents. The commercial bid (i.e. Price bid) shown in tender documents comprising schedule-b shall be filled up in, online tender by mentioning % of estimated cost only. The technical bid shall be opened at date and time mentioned in the tender notice, if possible, in the presence of parties who are present. After scrutiny of the technical bid, if any party fails to fulfil the above requirement for qualification, the price bids of such parties will not be opened. The price bid of technically qualified parties shall be opened on-line, if possible, on the date of opening of price bid. The offer should be valid for acceptance for a minimum period of 180 days from the date of opening of technical bid. General Condition. 1)Earnest Money Deposit (A) Earnest money ( 1% of the estimated cost ) as indicated on the face sheet should be paid by the tender along with the tender in cash or by D/D on any schedule Bank in favour of UGVCL in which case receipt shall be attached with tender. (B) Tender will be rejected if E.M.D is not paid. (C) Earnest money deposit will be forfeited in case the successful tenderer after his tender has been accepted shall refuse to pay the prescribed security deposit and execute the contract. Validity of Tender: All tenders shall be opened for acceptance by the Company for a period of 90 days from the date of opening the tenders and may be further extend to 60 days, if required and the tenderer shall be bound to execute the supply on such acceptance. -8-

2)Acceptance of Tenders: The Company does not bind itself to accept the lowest or any tender either will any reason be assigned for the rejection; it is also not binding on the Company to disclose any analysis report on the tender. 3)Security Deposit: The lowest tenderer whose tender is accepted shall have to pay 05% Security (work) Deposit of the tender cost, in cash within 10 days from the receipt of the acceptance order. In case successful bidder falls, his earnest money will be forfeited and order cancelled without issuing any notice. 4)Contract documents: The lowest tenderer whose tender is accepted will have to execute a stamped agreement in standard form of the Company and will have to discharge (sign) the booklet at his own cost. In case of partnership firms, necessary partnership documents will have to be produced for verification on authority to sign the bills measurements enter and into contract as well correspondence with the Company Wherever required necessary power of attorney will have to be produced. 5)Jurisdiction: Any dispute of difference arising out of or in connection with the contract if concluded shall be subject to the exclusive jurisdiction of Mehsana. 6)Materials: Materials are to be supplied at Mehsana Division Store/ RSO Office. -9-

7)General: All tenderers must be submitted in forms provided by this office and must be clearly and legibly filled in. The tenders should be filled in ink. The tenderers are requested to sign wherever mentioned in tender and schedule or rate and if not signed the tender should be rejected. 8)Penalty of late work:penalty will be lay able as per Company s rules in force, by time to time. 9) The time limit for this work is 4 month from the date of work order issued. 10) The rate should be quoted in percentage higher/lower rate to rate 11) Additions and alterations of any kind in tender forms conditions etc. by the tenderer without the consent of the undersigned is not permissible. a) The tenderer must quote his rates per unit specified in figures as well as inwards. b) The tenderer must quote his rates not lowest and the rates not confirming to the unit specified I n Schedule may not be considered even though they may be lowest. c) The price must be stated for each items separately and 11 additions the percentage of reduction on the total price of any should also be quoted in order to that extent is placed. d) Any variation rates etc. Will not allowed on any ground after the tender is submitted. The tenders printed forms and conditions of the contractor will not be considered as forming the part of the tender. e) All tenders must be submitted in the forms provided by this office and must be clearly and legibly filled in, with ink. The tenderer are requested to sign -10-

wherever mentioned in tenders and as schedule of rates and if not signed, the tender shall be liable for rejection. f) All corrections whatsoever made in the tender must be initiated by the tenderer. 12) Totaling up of figures: While quoting the rate per unit against each item tenderness are required to give total cost against each item as well as grand total of the work. 13) Addressing Tenders: Tenders must be submitted in envelops which must be properly sealed by the tenderer with their office seal and must be super scribed with following. [a] Tender No. [b] Opening date and time of the tender. [C] Technical Bid orprice Bid. It is responsibility of the tenderer to see that the tenders received in the Company s office by RPAD only, within the stipulated time and date. 14)The company s General conditions of contract will apply to all the successful bidders and he is deemed to be fully aware of company s general conditions of the contract for the work in respect of security deposit, terms of payments, penalty for the delivery of suppler etc. and any ignorance of these conditions will not exempt the successful bidder from the company s Rules and regulations in force. -11-15) Deviation of Specification : Preference will be given to tendering firms whose rates are in accordance to the tender

Specifications. 16) Terms of Payments: The Bill shall be submitted by the successful bidder after completion of entire ordered work with the supply. 17) Recording of measurements in the presence of successful bidder: a. In cases of supply/works carried out satisfactorily by the bidder, the bidder by prior intimation from the Company s officers, shall have to witness the recording the measurements on the appointment date within one month of completion of supply either the conditions as specification vide condition No.5 read with condition No.4[b] or tender and supply for works. b. The company s booklet of tender conditions shall apply and the recording of measurements shall be done within one month of completions of work after replacement of defect by the Company at the contractor s cost, as the case may be and any further delay in the recording of measurement and finalization of the bill due to the fault of the bidder shall be subject to the conditions as laid down in Clause [a]. 18) Extension of Time limit: The time limit for supplying materials is within 30 days from the date of issuing the orders. Extension of time limit if for any reasons, the successful bidder is not in position to carry out the work within the stipulated period, he should put his application to the Engineer-in-charge before one month of expiry of the stipulated time limit or -12- Completion of work for the extension of time limit giving valid reasons for the required extension.

TERMS AND CONDITIONS: 1. The successful bidder will have to give the following under taking: 2. Should this tender be accepted, I/We hereby agree to abide by fulfil all the terms and provisions of the Tender and Contractor of supply as applicable and in default thereof to forfeit and pay to the Company the sum of money due. 3. The full value of Earnest money deposit paid there with should be absolutely forfeited to the Company should not deposit the full amount of specified Security Deposit. 4. The Contractor shall be cooperative with the Company (and there by the staff) in recording measurement of bills etc., as expeditiously as possible and he shall fulfil all the requirements which are necessary to finalize his outstanding bills within 6 months from the date of completion of work, failing which, the Company shall finalize the account on the basic of its records, any payment made to contractor- such amount as it is found due to him-together with the amount of Security Deposit, if any remaining payable to him after deducting therefore, claim from him thereafter. The Competent authority can delete any item in Schedule B in the tender, if he feels that the rate quoted by thesuccessful bidder for that item is abnormally high when compared to the estimated rate. -13- SIGHT EXECUTION TERMS & CONDITIONS 1. The Contractor shall consider the site conditions of underground cable laying work before quoting the offer

2. Contractor shall have to strictly follow all the instructions, terms and conditions and concerns by the respective Government authorities. The necessary approval/noc s etc. is to be obtained by the Contractor from concern R & B/NHAI/AUDA &etc. Govt Authority. 3. All materials used shall be of approved/good quality and as per directions and instructions of Engineer- in- Charge. 4. Work under normal land and at DP structure to be carried out as per instructions by Engineer in charge of UGVCL. 5. Looping of cable is to be done in the ground below DP structure by excavating earth and approximately 06 meters of looping to be laid in the excavated earth on both sides. After which the same shall be filled with sand and warning bricks shall be provided on cable for which no extra payment will be made. 6. Cable removing from drums shall be done with proper care as no damage to the power cable normally11 KV XLPE 3 core cable of size 150 mm2 to 240 mm2 ( any one size) according to availability will be supplied by UGVCL for laying underground work. 7. Where the cable rise from ground to DP structure the each power cable to be taken separately in 4 (100 mm dia) G.I. pipe for mechanical protection of the XLPE cable GI may be kept approximately 4 meters. -14-8. The Length, quantity and distance mentioned in Schedule is approximate. It can be increased or decreased. The payment will be made as per actual quantity executed. 9. The Contractor will have to provide cable markers made from 3 mm thick MS plate (400 mm x 260 mm) along with the MS angle of 50 mm x 50 mm size at least

1700 mm long and the same shall be painted in Red & White colour with all the necessary instructions written in English,Gujarati & Hindi language clearly painted on it after which the same shall be concreted with the help of cement, sand, aggregate stone and water as per approved drawings of Railway and as per the direction of Railway authorities. 10. Contractors have to observe the standard norms/rules and regulations of the Railway while lying of cable work under Railway areas, failing which to do so are the responsibility of the Contractor. 11. Empty cable drum to be returned after completion of work, however the site Engineer will issue the required 11 KV XLPE cable for the above work. 12. The Contractor has to ensure that the work would be run smoothly throughout the period of the contract and work should be completed in time. 13. UGVCL, Mehsana will not be responsible for any loss, damages etc. as a result of the Contract. 14. Any damages to any of the Government / private property during the execution of work shall be on your account and you shall make good the same. Claims arising out of the damages shall have to be borne and settled by you. 15. Time limit allowed for completion of above works inclusive of providing jointing of cable termination end kit and lying of 11 KV XLPE cable under the Railway line -15- and other area is 60 days from the date of issue of instruction of commencing the work bye-i-c. 16. All the power cable routes shall be carefully measured and the required cable shall be cut to the required length for laying sufficient length, for the final connection of the cable to the terminal of the equipment. Undue wastage shall be avoided.

17. The company shall not be responsible for any kind of accident during the execution of the work by the contractor. The contractor shall have to hold the responsibilities of any accident that occurs during the execution of the work. The contractor shall settle any issue arising out of any occurrence that takes place during execution of the work; on his own. 18. Contractor has to submit feeder map with signature and stamp mentioning the U/G cable work carried out along with location of straight joint and outdoor/indoor kit location to S/dn and one copy to Division Office. Also, the name of the contractor to be written by marker pen on straight joint and outdoor/indoor kit. 19. Work to be carried out in other sub Division under jurisdiction of Mehsana Division in case of emergency. Contractor s Signature with Stamp Supdt of Accounts. (Exp) Mehsana Division Executive Engineer, Mehsana Division -16-