AGENDA STATUS OF CURRENT YEAR BUDGET FY 19 CURRENT PROJECTIONS REVIEW FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM REVIEW CITY COUNCIL WORK PLAN

Similar documents
CITY OF SAN MATEO. Administrative Report

Budget Initial Public Forum FY16-17 February 22, Town of Chapel Hill 405 Martin Luther King Jr. Blvd.

Budget Initial Public Forum FY Town of Chapel Hill 405 Martin Luther King Jr. Blvd.

Capital Improvement Program. Fiscal Years

Fiscal Year Proposed Budget

CITY OF OCEANSIDE FINANCIAL STATUS REPORT Fiscal Year Second Quarter Ending December 31, 2017

Budget Stabilization Plan Summary of Observations and Recommendations

Balanced Financial Plan Projected Changes and Assumptions

TOWN OF LOS ALTOS HILLS June 21, 2018 Staff Report to the City Council

City of San Juan Capistrano Age eport

Capital Improvement Projects

Quarterly Financial Report 3rd Quarter Ending March 31, 2018

CITY OF POMONA. Financial Update Community Meetings

SAN RAFAEL CITY COUNCIL AGENDA REPORT REVIEW OF THE PRELIMINARY CITY OPERATING BUDGET FOR FISCAL YEAR

GENERAL FUND FINANCIAL FORECAST

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

Budget Public Hearing 6/16/2015

Capital Improvement Program Fund

County of Santa Barbara

Overview FY 2015/16 Proposed Budget Highlights Status of General Fund Reserves Discussion of Unfunded Liabilities FY 2015/16 State Budget Impacts

Be transparent and honest about the problem. Use a comprehensive approach for all funds

INCORPORATED COUNTY OF LOS ALAMOS, NEW MEXICO FY2018 PROPOSED BUDGET. Citizen s Guide

CITY OF LOS ALAMITOS 3191 Katella Ave. Los Alamitos, CA 90720

FISCAL YEAR PROPOSED BUDGET PRESENTATION

City of Pleasanton Finances - Overview. July 12, 2017 Chamber of Commerce

DISCUSSION ON PROPOSED FY 2018/19 OPERATING GENERAL FUND BUDGET

FISCAL YEAR RECOMMENDED BUDGET

Infrastructure and Capital Projects Planning and Funding

City of La Palma Agenda Item No. 12

This page intentionally left blank

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017

Fiscal Year Proposed Budget

Debt Service Obligations

CITY OF OCEANSIDE FINANCIAL STATUS REPORT Fiscal Year Fourth Quarter Ending June 30, 2017

Description of Fund Types and Funds

CITY. RIALTO W w w. R I a l t o c a. g o v. Fiscal Year 2009/10 Interim Financial Report. 5 months ended November 30, 2009

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

DRAFT PROPOSED BUDGET THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017

EVANSTON. FY 2017 Proposed Budget Presentation. Martin Lyons, Assistant City Manger / CFO Lara Biggs, City Engineer.

AMERICAN FORK CITY COUNCIL SEPTEMBER 18, 2018 WORK SESSION AGENDA

City of Rancho Cucamonga

Morro Bay Budget Forecast

Highlights from the Proposed Budget Fiscal Year

Preliminary Budget Overview General Fund Revenues/Expenditures

CITY OF CULVER CITY FY Mid-Year Presentation

City of Chino Five-Year Capital Improvement Program Budget Fiscal Years through

CITY OFANAHEIM. Community Services Department. FY 2017/18Proposed Budget. June 6, Operating Budget & Capital Improvement Program

Funding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500

RESOLUTION NO

Budget. One. Time Cost. Total

Community Budget Priorities FY

Council Communication August 2, 2016, Business Meeting

City of Laredo Capital Improvement Program (CIP) INTRODUCTION

Debt Service Funds Lease Revenue Bond Debt Service Fund 2013 Lease Revenue Bond Debt Service Fund Measure A Debt Service Fund

REQUEST FOR FINANCE COMMISSION ACTION


Minutes Town of Atherton CITY COUNCIL DISTRICT May 20, :00 P.M. Town Council Chambers 94 Ashfield Road Atherton, California Special Meeting

STORMWATER MANAGEMENT FUND Department of Environmental Services

2019 BUDGET MESSAGE. September 18, Honorable Mayor and Town Council Members,

ARLINGTON COUNTY, VIRGINIA

Memorandum. First Quarter Budget Review - Amended City Manager's Annual Budget Report

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 15, Receive the County Manager s Budget Forecast for Fiscal Year 2018.

City Council Study Session Part II of III City Fiscal Indicators

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

FUND DESCRIPTIONS FY 2014 PROPOSED BUDGET SUMMARY

Town Square Redevelopment. Phase I Contract Discussion

CalPERS Overview. Presented by: Director of Finance, Joseph Lillio

FUND DESCRIPTIONS FY 2015 PROPOSED BUDGET SUMMARY

Introductory Section

Budget Definitions. Glossary Fund Descriptions

City of Pacifica General Fund Budget

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer

Proposed Operating Budget Overview

The Corporation of the Town of Hanover Financial Statements For the year ended December 31, 2005

PLAN PURPOSE THE PROBLEM. The City's fiscal forecasting is based on assumptions such as:

CITY OF PALM BAY, FLORIDA MONTHLY FINANCIAL REPORT (UNAUDITED) MARCH Financial Report Summary

DEBT SERVICE FUNDS & DEBT SCHEDULES

Debt Service Funds Lease Revenue Bond Debt Service 2013 Lease Revenue Bond Debt Service Measure A Debt Service

Expenditures Fiscal Year 2015/2016. General Fund Expenditures

City of San Juan Capistrano Agenda Report. 1. Adopt the resolution amending the Operating and Capital Improvement Budgets for Fiscal Year ;

FUND DESCRIPTIONS FY 2016 PROPOSED BUDGET SUMMARY

FY Capital Improvement Program City of New Bedford, Massachusetts

Labor Negotiations Community Meeting May 13, 2015

City of San Gabriel Long-Term Financial Plan

Best Practices for Treasurers 2018 Summer Specialized Training RESPONSIBILITIES OF THE TREASURER

Capital Improvement Program Fund

Recent: Payment towards unfunded liability November 2017

GENERAL FUND REVENUES AND EXPENDITURES FY Through March % of Budget Year

Memorandum. Mid Year Budget Review - Amended City Manager's Annual Budget Report

Budget Narrative Page 4. Fiscal Year

Citizens Fiscal Sustainability Task Force. Final Report to Placentia City Council September 19, 2017

T W E L V E - M O N T H S T R A T E G I C O B J E C T I V E S

Securing Burbank s Financial Future

Budget Overview. Section 2 BUDGET SUMMARIES

Concord s Historic Beebe House

The Pension Problem and What the City Is Doing About It

Internal Service and Special Revenue Funds May 24, 2016

CAPITAL IMPROVEMENT PROGRAM SUMMARY

CITY OF BURBANK FINANCIAL SERVICES DEPARTMENT STAFF REPORT

Transcription:

AGENDA STATUS OF CURRENT YEAR BUDGET FY 19 CURRENT PROJECTIONS FOCUS ON COSTS CALPERS UPDATE REVIEW FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM REVIEW CITY COUNCIL WORK PLAN ANSWER QUESTIONS ABOUT DEPARTMENT WORK PLANS PREVIEW TOPICS FOR UPCOMING STUDY SESSIONS FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 2

STATUS OF CURRENT FISCAL YEAR BUDGET (FY 18)

FY 18 GENERAL FUND UPDATE REVENUES FY 18 Adopted Estimate $107.9 million Sales Tax (due to accounting anomaly) $707,000 Property Tax $314,000 Use of Money & Property $300,000 Strike Team Reimbursements $520,000 Fees for Service $140,000 Other Revenues $149,000 FY 18 Updated Estimate $108.6 million FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 4

FY 18 GENERAL FUND UPDATE EXPENDITURES FY 18 Adopted Budget Carryover Encumbrances & Appropriations Negotiated Labor Increases $107.8 million $1.2 million $1.2 million Operating Adjustments $265,000 Grant Appropriations (offset by revenues) $879,000 Preliminary Estimated Savings FY 18 Updated Estimate $3.0 million $108.3 million FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 5

FY 18 GENERAL FUND UPDATE FUND BALANCE Actual Unreserved Fund Balance at 6/30/2017 $ 12,030,096 FY 2017-18 Adjusted Revenues $ 108,570,741 FY 2017-18 Adjusted Expenditures 108,336,236 Excess Expenditures over Revenues 234,505 Transfers Out Adopted with Budget (6/13/2017) (4,400,000) Reserve for FY 19 Lump Sum Payments to Employees (299,300) Estimated Unreserved Fund Balance at 6/30/2018 7,565,301 General Fund Catastrophic Reserve at 6/30/2018 20,067,960 Estimated Total General Fund Balance at 6/30/2018 $ 27,633,261 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 6

FY 19 CURRENT PROJECTIONS

FY 19 CURRENT PROJECTIONS ECONOMIC GROWTH EXPECTED TO CONTINUE THROUGH FY 19 CALPERS COSTS CONTINUE TO RISE MORE CHANGES COMING IN THE FUTURE CONTRACTUAL OBLIGATIONS RISING BUT STILL MANAGEABLE DEPARTMENT OPERATING REDUCTIONS FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 8

FY 19 CURRENT PROJECTIONS GENERAL FUND REVENUES FY 18 Adopted Estimate $107.9 million Sales Tax $855,000 2.0% Property Tax $1.9 million 4.9% Transient Occupancy Tax ($150,000) 2.0% Use of Money & Property $508,000 34.3% Interfund Revenue $350,000 16.7% Other Revenue $93,000 0.6% FY 19 Preliminary Estimate $111.5 million 3.4% FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 9

FY 19 CURRENT PROJECTIONS GENERAL FUND EXPENDITURES FY 18 Adopted Budget $107.8 million CalPERS Contributions $2.2 million Negotiated Labor Increases $2.2 million Overtime Budgets $113,000 Operational Allocations $1.5 million Contractual Obligations $146,000 Department Requests $404,000 Department Reductions $2.5 million FY 19 Preliminary Budget $111.7 million FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 10

FY 19 CURRENT PROJECTIONS CONTRACTUAL OBLIGATIONS METRO CITIES FIRE AUTHORITY - $49,154 NORTH NET JOINT TRAINING CENTER - $15,471 SECURITY SERVICES PARKS & LIBRARY - $25,000 POWER WASHING/STEAM CLEANING - $46,419 STREET SWEEPING - $10,000 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 11

FY 19 CURRENT PROJECTIONS NEW DEPARTMENT REQUESTS ELECTION COSTS - $80,000 MAINT. & OPS. AT YORBA PARK - $34,650 DEA TASK FORCE - $34,567 OLD TOWNE WEST PARKING STRUCTURE MAINTENANCE - $65,000 STREET LIGHT MAINTENANCE - $120,000 PERSONNEL CHANGES - $69,447 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 12

FY 19 CURRENT PROJECTIONS GENERAL FUND EXPENDITURES - $114,114,886 (BEFORE REDUCTIONS) PERS Unfunded Liability Cost $12,831,664 PERS Normal Cost $7,667,582 Employee Cafeteria Plan $8,655,418 Other Employee Benefits & Costs $7,647,548 Overtime $3,900,229 Employee Premiums $2,792,354 Existing Maint. & Ops. $15,940,003 Internal Service Costs $4,380,573 New Contractual Obligations $146,044 New Department Requests $404,103 Salaries & Wages $49,749,368 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 13

FY 19 CURRENT PROJECTIONS GENERAL FUND EXPENDITURES REDUCTIONS ($2,455,767) Community Development $90,779 Community Services $296,314 Administration $195,415 Library $109,340 Salaries 2.5% Public Works $271,781 Fire $598,027 M&O 5% Police $894,111 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 14

FY 19 CURRENT PROJECTIONS GENERAL FUND EXPENDITURES - $111,659,119 PERS Unfunded Liability Cost $12,831,664 PERS Normal Cost $7,448,036 Employee Cafeteria Plan $8,655,418 Other Employee Benefits & Costs $7,428,576 Overtime $3,900,229 Employee Premiums $2,712,400 Existing Maint. & Ops. $15,427,182 Internal Service Costs $4,380,573 New Contractual Obligations $146,044 New Department Requests $404,103 Salaries & Wages $48,324,894 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 15

FY 19 CURRENT PROJECTIONS GENERAL FUND TRANSFERS OUT Computer Equipment Replacement (790) $ 900,000 Equipment Replacement Fund (720) 1,000,000 Capital Projects Fund (500) 500,000 Business Investment Fund (115) 1,500,000 General Liability Fund (740) 1,000,000 Total Transfers Out $ 4,900,000 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 16

FY 19 CURRENT PROJECTIONS GENERAL FUND FUND BALANCE Estimated Unreserved Fund Balance at 6/30/2018 $ 7,565,301 FY 2018-19 Estimated Revenues $ 111,519,174 FY 2018-19 Estimated Expenditures 111,659,119 Excess Expenditures over Revenues (139,945) Proposed Transfers Out (4,900,000) Reserve for FY 20 Lump Sum Payments to Employees (149,650) Estimated Unreserved Fund Balance at 6/30/2019 2,375,706 General Fund Catastrophic Reserve at 6/30/2019 20,067,960 Estimated Total General Fund Balance at 6/30/2019 $ 22,443,666 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 17

FY 19 CURRENT PROJECTIONS GENERAL FUND PATH TO BALANCED BUDGET FEE STUDY ORGANIZATIONAL EFFICIENCIES FURTHER REFINEMENT OF REVENUES & EXPENDITURES MORE TO FOLLOW AT NEXT STUDY SESSION FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 18

FY 19 CURRENT PROJECTIONS CALPERS UPDATE FIRST YEAR OF REDUCED DISCOUNT RATE 7.5% TO 7.375% 7.25% IN FY 20 7% IN FY 21 INCREASES NORMAL COST CREATES UNFUNDED LIABILITY BASE IN YEAR OF REDUCTION INCREASE IN NUMBER OF NEW PERS MEMBERS (PEPRA) 69 SWORN (26.8% OF ACTIVES) 115 NON-SWORN (31.9%) RESULTS IN LOWER NORMAL COSTS IN LONG-TERM FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 19

FY 19 CURRENT PROJECTIONS CALPERS UPDATE NEW AMORTIZATION POLICY INVESTMENT GAINS & LOSSES 30 YEAR AMORTIZATION 20 YEARS 5 YEAR RAMP UP REMAINS, 5 YEAR RAMP DOWN ELIMINATED 3% ANNUAL GROWTH IN CONTRIBUTION 0% ANNUAL GROWTH ASSUMPTION CHANGES (DISCOUNT RATE, MORTALITY, ETC.) 20 YEAR AMORTIZATION REMAINS 5 YEAR RAMP UP AND RAMP NO RAMP UP OR DOWN 3% ANNUAL GROWTH IN CONTRIBUTION 0% ANNUAL GROWTH FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 20

FY 19 CURRENT PROJECTIONS CALPERS UPDATE NEW AMORTIZATION POLICY EFFECTIVE WITH JUNE 30, 2019 ACTUARIAL VALUATION REPORT WILL AFFECT NEW BASES ONLY EARLIEST IMPACT WILL BE IN FY 22 FISCAL IMPACT IS UNKNOWN AT THIS POINT FUTURE BASES WILL HAVE HIGHER CONTRIBUTION ON FRONT END PAID OFF MORE QUICKLY AND WITH LESS INTEREST COST OVER LIFE OF BASE FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 21

FY 19 CURRENT PROJECTIONS CALPERS UPDATE 3,500,000.00 3,000,000.00 2,500,000.00 Old Investment ($56,800,070.31) 2,000,000.00 1,500,000.00 1,000,000.00 500,000.00-1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 22

FY 19 CURRENT PROJECTIONS CALPERS UPDATE 3,500,000.00 3,000,000.00 2,500,000.00 2,000,000.00 Old Investment ($56,800,070.31) New Investment ($42,428,441.75) 1,500,000.00 1,000,000.00 500,000.00-1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 23

FY 19 CURRENT PROJECTIONS CALPERS UPDATE 2,000,000.00 1,800,000.00 1,600,000.00 1,400,000.00 Old Assumption Change ($26,106,703.44) 1,200,000.00 1,000,000.00 800,000.00 600,000.00 400,000.00 200,000.00-1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 24

FY 19 CURRENT PROJECTIONS CALPERS UPDATE 2,000,000.00 1,800,000.00 1,600,000.00 1,400,000.00 1,200,000.00 1,000,000.00 Old Assumption Change ($26,106,703.44) New Assumption Change ($23,572,416.80) 800,000.00 600,000.00 400,000.00 200,000.00-1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 25

FY 19 CURRENT PROJECTIONS CALPERS UPDATE $35,000,000 23.9% 25% $30,000,000 $25,000,000 18.6% 20% $20,000,000 12.9% 15% $15,000,000 $10,000,000 $5,000,000 10% 5% $0 FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 Normal Cost (all funds) Unfunded Liability (all funds) % of General Fund 0% FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 26

FY 20 PROJECTIONS GENERAL FUND ASSUMPTIONS SIMILAR GROWTH IN SALES AND PROPERTY TAXES SOME ADDITIONAL TOT CALPERS INCREASE OF $2.5 MILLION 2% GROWTH IN OTHER EXPENDITURES CONTINUATION OF OPERATING REDUCTIONS 2.5% LABOR 5% MAINTENANCE & OPERATIONS FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 27

FY 20 PROJECTIONS GENERAL FUND FUND BALANCE Estimated Unreserved Fund Balance at 6/30/2019 $ 2,375,706 FY 2019-20 Projected Revenues $ 113,500,000 FY 2018-19 Projected Expenditures 116,100,000 Excess Expenditures over Revenues (2,600,000) Projected Unreserved Fund Balance at 6/30/2020 (224,294) General Fund Catastrophic Reserve at 6/30/2020 20,067,960 Projected Total General Fund Balance at 6/30/2020 $ 19,843,666 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 28

QUESTIONS ON FY 19?

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CIP HIGHLIGHTS FIVE-YEAR PLANNING PERIOD 149 PROJECTS 125 CARRYOVER PROJECTS 24 NEW PROJECTS MOSTLY FUNDED THROUGH FUNDING RESTRICTED TO CAPITAL USE CITY COUNCIL HAS SET ASIDE $8.6 MILLION FOR FUTURE CAPITAL PROJECTS AS OF THE END OF FY 18 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 31

CAPITAL IMPROVEMENT PROGRAM NEW FY 19 CIP COSTS BY FUND TYPE TOTAL $23,771,073 Enterprise Funds $5,835,000 Grants $3,946,621 Successor Agency Funds $1,097,815 Capital Projects Fund $470,000 Landscape Maint. District $100,000 Internal Service Funds $1,070,000 Public Safety Funds $578,166 Developer Impact Fees $5,029,140 Transportation Funds $5,644,331 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 32

COMMUNITY SERVICES PROJECTS

CAPITAL IMPROVEMENT PROGRAM YORBA PARK RENOVATIONS (20315) B E F O R E A F T E R FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 34

CAPITAL IMPROVEMENT PROGRAM YORBA PARK RENOVATIONS (20315) B E F O R E A F T E R FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 35

CAPITAL IMPROVEMENT PROGRAM YORBA PARK RENOVATIONS (20315) B E F O R E A F T E R FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 36

CAPITAL IMPROVEMENT PROGRAM SHAFFER PARK RENOVATIONS (30042) FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 37

CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FY 19 CIP SUMMARY 19 CIP PROJECTS AT $7.2 MILLION OVER NEXT 5 YEARS 16 CARRYOVER PROJECTS 3 NEW PROJECTS FUNDED BY PARK DEVELOPER FEES, GRANTS & LANDSCAPE MAINTENANCE DISTRICT ASSESSMENTS FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 38

CAPITAL IMPROVEMENT PROGRAM SOURCES OF FUNDING FUND AMOUNT 510 Park Acquisition $3,219,544 511 Park Acquisition (Quimby) $420,298 512 El Modena Cell Revenue $566,592 550 Grants $2,512,750 291 Landscape Maintenance District $500,000 TOTAL PROPOSED ALLOCATION $7,219,184 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 39

CAPITAL IMPROVEMENT PROGRAM FY 19 HIGHLIGHTS 20255 (Pg. 11) Santiago Hills Assessment District General Renovation 20315 (pg. 14) Hart Park Pickleball and Fitness Circuit (if awarded LWCF grant) 30048 (pg. 25) El Modena Upper Restroom and Area Renovation - Design FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 40

CAPITAL IMPROVEMENT PROGRAM TRAILS UPDATE Cemetery Ridge Trail (20320) Colony Trail Santiago Creek Bike Trail Extension (20325) Santiago Canyon Road Multi- Purpose Trail (30019) FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 41

CAPITAL IMPROVEMENT PROGRAM FY 20-23 HIGHLIGHTS 20317 (pg. 16) FY 20 Handy Park Community Building - Design 20321 (pg. 18) FY 21 Grijalva Park Master Plan Update FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 42

PUBLIC WORKS PROJECTS

CAPITAL IMPROVEMENT PROGRAM OLD TOWNE WEST (METROLINK) PARKING STRUCTURE UPDATE FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 44

CAPITAL IMPROVEMENT PROGRAM OLD TOWNE WEST (METROLINK) PARKING STRUCTURE UPDATE FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 45

CAPITAL IMPROVEMENT PROGRAM FY 18 HIGHLIGHTS ANNUAL PAVEMENT & CONCRETE MAINTENANCE FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 46

CAPITAL IMPROVEMENT PROGRAM FY 18 HIGHLIGHTS ANNUAL PAVEMENT & CONCRETE MAINTENANCE FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 47

CAPITAL IMPROVEMENT PROGRAM FY 18 HIGHLIGHTS CITY-OWNED STREET LIGHT LED RETROFIT FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 48

CAPITAL IMPROVEMENT PROGRAM FY 18 HIGHLIGHTS TUSTIN/LINCOLN IMPROVEMENTS FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 49

CAPITAL IMPROVEMENT PROGRAM FY 18 HIGHLIGHTS SEWER CLEANING AND VIDEO FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 50

CAPITAL IMPROVEMENT PROGRAM FY 18 HIGHLIGHTS WATER DIVISION SECURITY IMPROVEMENTS FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 51

CAPITAL IMPROVEMENT PROGRAM FY 18 HIGHLIGHTS WATER PIPELINE RENEWAL PROJECTS FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 52

CAPITAL IMPROVEMENT PROGRAM FY 19 PUBLIC WORKS CIP SUMMARY TOTAL FUNDING REQUEST = $17.4 MILLION 13 FUNDING SOURCES 79 PROJECTS TOTAL 65 EXISTING PROJECTS 14 PROPOSED NEW PROJECTS FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 53

CAPITAL IMPROVEMENT PROGRAM FY 19 PUBLIC WORKS CIP SUMMARY Fund Amt. Pct. 220 Sanitation Fund $ 300,000 1.72% 263 Measure M Turnback 2,145,000 12.29% 272 Gas Tax 1,793,102 10.28% 274 SB 1 2,429,331 13.92% 284 TSIP Area B 1,384,500 7.94% 285 TSIP 36,250 0.21% 310 CDBG 969,772 5.56% 500 Capital Projects 506,250 1.18% 520 Sewer Construction 2,000,000 13.18% 550 Grants 2,052,450 11.76% 600 Water Capital Projects 3,535,000 20.12% 725 Major Building Improvements 221,000 1.27% 954 Successor Agency 100,000 0.57% Total $ 17,447,655 100% FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 54

CAPITAL IMPROVEMENT PROGRAM FY 19 HIGHLIGHTS PAVEMENT MANAGEMENT PROGRAM (13120) [PAGE 92] STRUCTURAL EVALUATION OF CITY BRIDGES (13816) [PAGE 94] SEWER LINE REPLACEMENT/MAINTENANCE (15508) [PAGE 97] CITY FACILITY IMPROVEMENTS (19809) [PAGE 99] SANTIAGO CREEK BIKE TRAIL EXTENSION (20325) [PAGE 103] FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 55

CAPITAL IMPROVEMENT PROGRAM FY 19 HIGHLIGHTS METROLINK PARKING LOT RESTORATION (20372) [PAGE 137] TRAFFIC SIGNAL SYNCHRONIZATION PROJECTS (20191, 20376 & 20381) [PAGES 130, 139 & 144] WATER PLANT TELEMETRY SCADA (18912) [PAGE 168] PIPELINE RENEWAL PROJECTS (18400) [PAGE 167] FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 56

FIRE STATION 2 APPARATUS BAY

CAPITAL IMPROVEMENT PROGRAM FIRE STATION 2 FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 58

OTHER CAPITAL IMPROVEMENT PROJECTS

CAPITAL IMPROVEMENT PROGRAM OTHER CAPITAL PROJECTS IMPROVEMENTS AT FIRE STATIONS 3 & 4 (20332) [PAGE 44] LIBRARY REHABILITATION PROJECTS (20358, 20371, 30055, 30056) (PG. 75-78) REPLACEMENT OF SAN AT POLICE DEPARTMENT (20387) [PAGE 66) MIGRATION OF EXCHANGE E-MAIL SERVICES TO CLOUD-BASED (20390) [PAGE 69] CONTINUATION OF SECURITY IMPROVEMENTS (20347 & 20348) [PAGES 63-64] OLD TOWNE EAST PARKING STRUCTURE (20247) [PAGE 177] FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 60

WORK PLANS FOR FY 19

WORK PLANS HIGHLIGHTS CITY COUNCIL POLICY DIRECTION FOR FISCAL STABILITY AND COMMUNITY PRESERVATION PROVIDE RESOURCES FOR PUBLIC SAFETY WORK WITH STATE LEGISLATORS TO ENSURE THAT NEEDS OF ORANGE RESIDENTS AND BUSINESS ARE MET LEGISLATIVE LEADERSHIP TO ACCOMPLISH CITY MISSION STATEMENT MONITOR CONSTRUCTION OF METROLINK PARKING STRUCTURE FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 62

WORK PLANS HIGHLIGHTS CITY COUNCIL FACILITATE AND PROVIDE POLICY DIRECTION FOR OLD TOWNE PARKING SOLUTIONS WORK WITH COUNTY, NEIGHBORING CITIES AND OTHERS TO EFFECTIVELY ADDRESS THE PROBLEM OF HOMELESSNESS IN OUR COMMUNITY AND REGION FACILITATE A POSITIVE RELATIONSHIP WITH CHAPMAN UNIVERSITY AND THE SURROUNDING COMMUNITY EVALUATE OPTIONS TO ASSIST BUSINESSES WITH DEVELOPMENT ACTIVITIES ENHANCE CITY S ECONOMIC BASE FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 63

QUESTIONS ON DEPARTMENTAL WORK PLANS?

TOPICS FOR NEXT STUDY SESSION

TOPICS FOR NEXT STUDY SESSION APRIL 24, 2018 FURTHER DETAIL ON FY 19 GENERAL FUND BUDGET DEEPER LOOK INTO REVENUES BALANCING THE BUDGET REVIEW OF FEE STUDY PROPOSED RESERVE POLICY LOOK AT OTHER FUNDS OTHER TOPICS THE COUNCIL WISHES TO EXPLORE FY 2018-19 1ST BUDGET STUDY SESSION 3/27/2018 66