The Bank s Emergency Policy

Similar documents
Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29

Guidance Note to Staff

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

Mournag, Tunisia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Beirut, Lebanon. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Birgunj Sub metropolitan City, Nepal

Skardu, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Binjai, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109

Preparing Projects under Situations of Urgent Need or Capacity Constraints. Enrique Pantoja & Ammar Oumalek, OPCS November 2018

Padang Lawas, Indonesia

SISRI Knowledge Notes. The Small Island States Resilience Initiative (SISRI) OVERVIEW NOTE: #1 FOCUS: PROGRAM OVERVIEW OVERVIEW: NOTE: #1

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108

OP Investment Project Financing. Bank Access to Information Policy Designation Public

Bone Bolango, Indonesia

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PUBLIC CREDIT OFFICE MANAGING LIQUIDITY RISK THROUGH CONTINGENT LINES OF CREDIT

Improving Korea s Disaster Risk Reduction Policy using the Sendai Framework

Batam, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION

Pidie Jaya, Indonesia

Skardu, Pakistan. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle)

Rationalle for the Sendai Framework for DRR Evidence from the 2009, 2011 and 2013 Global Assessment Report on DRR

Environmental Assessment

Palu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( )

OECS Disaster Vulnerability and Climate Risk Reduction Program Region. Latin America and the Caribbean Country

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

DEFINING THE PROTECTION GAP. 1: Decide who /what should be protected:

Hazard Mitigation FAQ

Karlstad, Sweden. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Global Facility for Disaster Reduction and Recovery. of the Hyogo Framework for Action. Kobe, January 15, 2007

Bangkok, Thailand. Local progress report on the implementation of the Hyogo Framework for Action ( )

The World Bank Group in Myanmar

Earth is our Business

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

SCALING UP RESILIENCE THROUGH SOCIAL PROTECTION

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project

Matthew W. Wall Recovery and Resilience Division Acting Director Virginia Department of Emergency Management

Catastrophe Risks and their Financing in India including Regulatory Landscape

CLIMATE INVESTMENT FUNDS

Patika, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

The World Bank s Safeguard Policies Under Pressure

Workshop Climate Change Adaptation (CCA)

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

Actual Project Name : Marmara Earthquake Emergency Reconstruction Project Country: Turkey US$M): Project Costs (US$M

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-17383,TF Jun ,540,000.00

The Integration of Hazard Mitigation, Disaster Recovery, and Climate Adaptation

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS

PROJECT PREPARATION FACILITY: INCREASE IN COMMITMENT AUTHORITY

Barito Kuala, Indonesia

MANAGING DISASTERS AND CONFLICTS

MEETING OF THE SOUTHERN AFRICA REGION FLASH FLOOD GUIDANCE SYSTEM (SARFFGS) Country Presentation for Malawi 28TH OCTOBER, 2015.

Emergency SME Revitalization and Governance Project. I. Key development issues and rationale for Bank involvement

Disaster Risk Management

INNOVATIONS AND TRENDS IN FINANCIAL INCLUSION

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Padang Lawas, Indonesia

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT

Introduction to the Disaster Risk Profile of Chittagong

Disaster Risk Financing in Japan

Ex Ante Financing for Disaster Risk Management and Adaptation

TOWARD A NEW FRAMEWORK FOR

Southeast Asia Disaster Risk Insurance Facility

Funding mechanisms for long-term drought mitigation and early action: examples and recommendations

Facing the need for a sustainable growth strategy, Moldova has

Governor's Statement No. 32 October 7, Statement by the Hon. AIYAZ SAYED-KHAIYUM, Governor of the Fund and the Bank fo the REPUBLIC OF FIJI

Cayman Islands. National progress report on the implementation of the Hyogo Framework for Action ( ) - interim

6 Report No.: JSDSC1361 1

Global experiences on managing disaster risk - rethinking New Zealand's policy approach

Re: Public Comments on Establishing a Deductible for FEMA s Public Assistance Program; Docket ID FEMA

The World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)

INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0

Joint Bank-Fund Debt Sustainability Analysis Update

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

A Practical Framework for Assessing Emerging Risks

ELEMENTS OF FINANCING MODALITIES

Suggested elements for the post-2015 framework for disaster risk reduction

Jamaica. October 24, Remarks Dr. Warren Smith WFCP Page 1

Executive Summary (in one page)

Dr. Joseph A. Weinstock Asian Development Bank

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

GPE OPERATIONAL FRAMEWORK FOR EFFECTIVE SUPPORT IN FRAGILE AND CONFLICT- AFFECTED STATES

2015 Development Policy Financing Retrospective: Preliminary Findings

Making the Business Case for Risk- Based Asset Management

Hillsborough County Local Mitigation Strategy and the Community Rating System

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

Country Practice Area(Lead) Additional Financing Indonesia Water P161514

Regional trends on gender data collection and analysis

Managing Natural Disasters

The approach to managing natural hazards in this Plan is to: set out a clear regional framework for natural hazard management

CARIBBEAN DEVELOPMENT BANK SUPPORT FOR HAITI TO MEET COMMITMENT TO CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY FOR THE HURRICANE SEASON

CRISIS & EMERGENCY MANAGEMENT

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M):

Executive Summary. Introduction and Purpose. Scope

Kathmandu, Nepal. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle)

Transcription:

The Bank s Emergency Policy 04/10/2006 1 Emergency Recovery Assistance OP 8.50 Bank emergency assistance may take the form of (a) immediate support in assessing the emergency's impact and developing a recovery strategy; (b) restructuring of the Bank's existing portfolio for the country, to support recovery activities; (c) redesign of projects not yet approved, to include recovery activities; (d) an emergency recovery loan (ERL); and (e) mitigation investment loans. 04/10/2006 2 Emergency Recovery Loans (ERLs) ERL takes into account CAS and sectoral development strategies. Country lending program may be adjusted to accommodate new ERL (normally within the country's general lending allocation). Frequency and urgency: For recurring events, such as annual flooding, a regular investment loan is more appropriate. For a slow-onset disaster such as a drought, the more thorough preparation of a regular investment project may be preferable. ERL is expected to be fully implemented in 2-3 yrs. 04/10/2006 3 1

ERLs promote: Emergency Recovery Loans use of improved reconstruction standards, and emergencypreparedness studies and technical assistance on prevention and mitigation measures, to strengthen the country's resilience to natural hazards. ERLs do not address long-term economic, sectoral, or institutional problems, and include conditionality linked to macro-economic policies. They should include only conditions directly related to the emergency recovery activities and to preparedness/ mitigation. 04/10/2006 4 Limitations under existing OP 8.50 1. Narrow definition of ERL and its objectives 2. Inadequate treatment of implementation issues 3. Non-coverage of contingent emergency support 4. Non-coverage of trust funds 04/10/2006 5 Are ERLs working? Percent 100 93 90 82 80 78 80 72 70 70 63 64 56 60 53 50 45 38 37 39 40 31 30 20 10 0 Outcome satisfactory Sustainability likely ID Impact substantial ND Portfolio ERLs Disaster Only-non ERLs One Disaster Component Bank-Wide 04/10/2006 6 2

What is working under ERLs? Expedited procedures for processing emergency assistance from project initiation through Board approval Quick disbursements through positive list Phased engagement by deferring safeguards and some fiduciary work until later stages The ad-hoc committee Are the above actually working? 04/10/2006 7 ERLs: Current Objectives and Key Missing Objectives Current: Restoring assets and production levels in the disrupted economy Helping rebuild physical assets and social activities after emergencies Missing: Preservation of human, institutional and/or social capital (insufficient focus on importance of addressing social/institutional issues as part of comprehensive emergency assistance) Preservation or restoration of essential services Emphasis on prevention and/or impact mitigation of impending emergencies Acknowledgement of important role of trust funds 04/10/2006 8 Definition of emergency Under current OP 8.50 Borrower can request emergency assistance when it is struck by an emergency that seriously dislocates its economy, and calls for a quick response from the government and the Bank Bank can render emergency assistance in response to an extraordinary event of limited duration, such as war, civil disturbance, or natural disaster (e.g., cyclones, droughts, earthquakes etc.) 04/10/2006 9 3

Definition of emergency Issue: Uncertainty about Bank s ability to respond to many situations: Avian flu, SARs, terrorist attacks with global impact, political upheavals, economic crises; imminent emergencies (e.g., crack in a dam); contingent support for Borrowers afflicted with periodically occurring emergencies One proposed solution: looking at consequences rather than defining an event. This would enable the Bank to provide emergency assistance in response to an event that has caused, or is likely imminently to cause, a rapid and major adverse economic and/or social impact. 04/10/2006 10 ERLs: Implementation Issues/Proposed Issue: Lack of funds for essential start up activities One proposed solution: Expand Project Preparation Facility to $5 million and permit Bank-execution where requested by government and otherwise appropriate 04/10/2006 11 ERLs: Implementation Issues/Proposed Issue: Difficulty in proceeding with safeguardneutral project components until all arrangements for safeguard-sensitive components are in place. One proposed solution: Clarify the ability to defer EA to implementation stage. 04/10/2006 12 4

Environmental Assessment (OP 4.01): Emergency Recovery Projects OP 4.01 normally applies to emergency recovery projects processed under OP 8.50, Emergency Recovery Assistance....when compliance with any requirement of OP 4.01 would prevent effective and timely achievement of objectives of an emergency recovery project, the Bank may exempt the project from such a requirement. justification for any such exemption is recorded in the loan documents. 04/10/2006 13 Environmental Assessment (OP 4.01): Emergency Recovery Projects In all cases, however, Bank requires at a minimum that: (a) the extent to which the emergency was precipitated or exacerbated by inappropriate environmental practices be determined as part of the preparation of such projects, and (b) any necessary corrective measures be built into either the emergency project or a future lending operation. 04/10/2006 14 EA Sourcebook Update #21 Environmental Hazard and Risk Assessment Natural disasters and global challenges, pp. 8-9... the Bank is also concerned with risks arising from natural disasters such as floods, typhoons and earthquakes. Environmentally unsustainable development can undermine key ecological functions and increase the frequency of natural disasters and associated risks. The challenge is to foster development that protects natural systems which buffer communities (such as wetlands), while investing in cost-effective measures to control risks from natural occurrences. In the area of climate change, the impacts of sea level rise and disturbed weather patterns are of concern to both human and ecological communities. 04/10/2006 15 5

ERLs: Implementation Issues/Proposed Issue: Bottlenecks in efficient project implementation One proposed solution: Extend the life of ad hoc committee through project implementation to completion 04/10/2006 16 ERLs: Implementation Issues/Proposed Issue: Reluctance to apply more flexible disbursement mechanisms in weaker environments (e.g., report-based disbursements) One proposed solution: emphasize new expenditure eligibility and simplified disbursement modalities for emergency operations and clarify flexibility already available under existing procurement, financial management and disbursement policies. 04/10/2006 17 ERLs: Implementation Issues/Proposed Issue: Historic rigidity in financing recurrent expenditures required for transitional safety net support and other recovery activities One proposed solution: Expand OP coverage (and examples its gives) to include cash payments and safety net support 04/10/2006 18 6

Restructuring Existing Loans Additional Financing Policy replaces old policy on Supplemental Financing Applies to additional loans, credits or grants considered by the Board on or after July 1, 2005 04/10/2006 19 WHAT does new Additional Financing Policy Permit? It permits the Bank to provide additional financing (new money on top of original loan, credit or grant amount) for ongoing investment projects under implementation to address 3 situations: cost overrun or a financing gap (as under the supplemental financing policy ) scaling-up of successful projects, and restructuring of well-performing projects in response to changed circumstances (e.g., emergencies) 04/10/2006 20 WHEN can Bank Provide Additional Financing? When project implementation is satisfactory and on track for achieving results When the additional loan is economically justified, In situations of scaled-up or modified activities, when such activities are: consistent with project DOsand the current CAS appraised by the Bank expected to be completed within 3 years of the current closing date for the project 04/10/2006 21 7

Approval Authority, Processing and Documentation All additional loans: require Board approval on a streamlined basis (18 circulation days) are identified and prepared/appraised during project supervision are processed on the basis of streamlined documentation (a Project Paper and an amendment to legal agreements) are included in the ISR and ICR for original project 04/10/2006 22 Additional Financing: Financial Terms Financial terms set independently from original terms For IBRD borrowers this means A choice of financial product for additional loan Front-end fee Full grace period and independent amortization For IDA borrowers this means Additional credits are subject to full grace period and repayment schedule Credit/grant decision for additional financing is made based on DSA framework under IDA 14, not the terms of original IDA financing 04/10/2006 23 Contingent Financing Issue: Lack of adequate preparedness, and no readily available resources to address expected emergencies Proposed : Emphasize Bank s ability to support free-standing investment projects for prevention and mitigation in countries prone to specific types of emergencies. Assist in developing a national strategy establishing an adequate institutional and regulatory framework carrying out studies of vulnerability and risk assessment reinforcing vulnerable structures and adjusting building and zoning codes, and acquiring hazard reduction technology 04/10/2006 24 8

Contingent Financing? Hyogo Framework for Action calls on governments to invest in measures such as national and local risk assessments, early warning systems, public awareness and education, better urban planning and safe building construction codes (present through 2015) 04/10/2006 25 Role of Trust Funds 9