City of Kinston. Stormwater Utility Credit Manual

Similar documents
CITY OF NORTH RIDGEVILLE STORMWATER UTILITY

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

STORM WATER UTILITY CREDIT AND ADJUSTMENT POLICY MANUAL

City of Galesburg Stormwater Utility Credits and Incentives Policy

Lake County Stormwater Utility Fee

City of Duluth Stormwater Utility

Sugar Hill Stormwater Utility Credit Technical Manual

Stormwater Management Utility Fee Reduction Credit Application

Exhibit A. City of Roswell Stormwater Utility. Stormwater Utility Credit Manual. December 27, 2010

City of Maryville, Tennessee STORMWATER UTILITY Credit Manual for Stormwater Fees

City of Brunswick Stormwater Utility

STORMWATER UTILITY FEE CREDIT MANUAL

Peachtree City Public Works Department. Peachtree City Stormwater Utility. Stormwater Utility Credit Technical Manual ...

City of Lebanon, Tennessee Stormwater Utility Credit Manual for Stormwater Fees

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810

Pasco County, Florida

Stormwater Utility Report #2 April 5, 2016

Stormwater System Development Charges

Audit of Selected Stormwater Activity

THE PEOPLE OF THE STATE OF MICHIGAN ENACT:

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

Stormwater Management Fee Policy Options and Recommendations

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

***EXPEDITED REVIEW***

APPLICATION FOR PERMIT FOR ACCESS ENTRANCE TO A COUNTY PUBLIC RIGHT-OF-WAY

STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m.

SUBDIVISION IMPROVEMENTS AGREEMENT

Staff Responses to Council Questions December 13, 2016

Chapter 6 - Floodplains

Handout 8: Rate Structure Adjustments

THE CORPORATION OF THE CITY OF MISSISSAUGA STORMWATER FEES AND CHARGES BY-LAW (amended by , , )

Chapter 5 Floodplain Management

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009

GENERAL PROVISIONS I. WORK REQUIREMENTS

CHAPTER 51: WATER. Contents. General Provisions. Fees and Charges Restricting drainage ditches

DEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial Institutional - Multiple Family Residential

CHEROKEE NATION DEPARTMENT OF TRANSPORTATION UTILITY RELOCATION AGREEMENT

Notice of Termination General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)

Strategic Flood Risk Assessment for SDCC Development Plan

Green Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM

STORMWATER MANAGEMENT FUND Department of Environmental Services

ENGINEERING SERVICES AGREEMENT DRAIN OAKLAND COUNTY, MICHIGAN BETWEEN AND THE DRAINAGE DISTRICT

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

Request for Proposals (RFP): Lake Avondale Stormwater Mitigation Facility Design and Construction Documents

CRS UNIFORM MINIMUM CREDIT NEW JERSEY

Deerfield Regional Storm Water District. Meeting Milestones/Logistics

Attachment A. Rates and Charges

Stormwater Needs Assessment

TRANSFEREE/CO-PERMITTEE APPLICATION FOR A GENERAL OR INDIVIDUAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES

A. All Responses to Request for Statements shall be sent to:

PART #2 IDENTIFY WHO WILL PERFORM THE WORK (Complete either 2a or 2b)

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

MUNICIPAL SERVICE REVIEW FINAL

City of Sultan Utility Services

City of Fayette Water/Sewer Utility Application PO Box 28, 11 S. Main St., Fayette, Iowa

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

Floodplain Development Permit Application

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal

APPLICATION FOR BUILDING PERMIT

SECTION 110A FEE TABLES

Right of Way Permits. Contact Information:

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1606 FOR SALE OF SURPLUS GRAVEL

Floodplain Management Legal Issues. Making the Case for a No Adverse Impact Approach

Manor Township, Lancaster County, PA Zoning Permit Application ( section 702) App. number App. date

Residential Building Permit

Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina Telephone Fax

2664 RIVA ROAD, P.O. BOX 6675

SECTION 7100 GENERAL REQUIREMENTS & PROCEDURES FOR DEVELOPMENT

West Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report

Town of Lloyd Building Department Building Permit Information Sheets

*** DRAFT - NOT YET FILED ***

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1022 FOR SALE OF SURPLUS GRAVEL

Local Government Guide to Understanding the 2015 Florida Peril of Flood Act. Tampa Bay Regional Planning Council. June 2017

Town of Little Elm, Texas

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION

TEMPORARY USE PERMIT APPLICATION PUMPKIN/CHRISTMAS TREE LOT

STATE OF OHIO WATER MANAGEMENT PROGRAM REPORT December 8, 2014

Stormwater Utility & Water Utility Charges & Rates. October 20, 2015

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects

City of Fayette Water/Sewer Utility Application PO Box 28, 11 S. Main St., Fayette, Iowa

The Board of Supervisors of the County of Riverside ordains as follows:

COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

Therefore, having understood the above information, I am signing this certification as contractor to the aforementioned NPDES general permit.

East Brunswick Township Uniform Construction Code Building Permit Application

Stormwater Utility Fund Delivery of Services

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP"

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.

Public Works Maintenance STORMWATER AND

Funding Methods and Revenue Generating Capacity

Floodplain Development Permits A Technical Guidance Document

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT

No An act relating to regulation of flood hazard areas, river corridors, and stream alteration. (S.202)

ASFPM Partnerships for Statewide Mitigation Actions. Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016

Subj: REQUIREMENTS FOR PAYMENT OF STORMWATER MANAGEMENT CHARGES

GAINESVILLE REGIONAL UTILITIES PLAN REVIEW APPLICATION

CHECKLIST OF REQUIRED ITEMS FOR LIQUOR LICENSE APPLICATIONS

Permit Subtype: One Acre or More (total project size), Less Than One Acre (total project size) and Early Grading.

Stormwater Financing Feasibility Study for. Wrightsville Borough, Pennsylvania

Transcription:

City of Kinston Stormwater Utility Credit Manual Effective Date: July 1, 2008

Table of Contents 1.0 INTRODUCTION...3 2.0 DEFINITIONS...4 3.0 GENERAL CREDIT POLICIES...4 4.0 STORMWATER BMP CREDIT POLICY....................... 5 4.1 Stormwater BMP Credit Amounts......................... 5 4.2 Stormwater BMP Credit Requirements..................... 6 5.0 STORMWATER MANAGEMENT CREDIT POLICY............. 6 5.1 Stormwater Management Credit Amounts.................. 7 5.2 Stormwater Management Credit Requirements (NPDES Permitted Property)...7 5.3 Stormwater Management Credit Requirements (Non-NPDES Permitted Property)...7 6.0 CREDIT FOR NON-DISCHARGE TO CITY STORMWATER SYSTEM...8 6.1 Non-Discharge Stormwater Credit Amounts................ 8 6.2 Non-Discharge Stormwater Credit Requirements............ 8 7.0 RIGHT OF ENTRY...9 8.0 CHANGE OF OWNERSHIP...9 9.0 VIOLATIONS OF CREDIT TERMS...9 10.0 APPEALS...9 APPENDIX A - STORMWATER UTILITY CREDIT APPLICATION APPENDIX B - STORMWATER PERMIT -2-

1.0 INTRODUCTION The City of Kinston established a stormwater utility in July, 2007, to provide a stable and adequate revenue source for the City of Kinston s stormwater management program. The intent of the stormwater utility fee is that all users, being those who receive benefits from the management of stormwater, pay a portion of the cost of the program relative to the amount of benefit they receive from the program and relative to the impact their property location has on the stormwater system. As the proper management of stormwater in thc city will reduce flooding on public streets, will reduce harmful pollutants entering our streams and rivers and reduce the negative impacts of these problems on our local economy, including tourism, recreation, economic development, residential growth, and the general conception of Kinston as an attractive place to live, visit and do business, all local properties receive benefits of some degree. All developed properties also have varying affects on the stormwater drainage system. Some of this impact is due to the location of the discharge of stormwater runoff from the property. Some of this impact is due to the volume and quality of runoff generated by each property. Regardless of the location of their discharge, any property can certainly have an impact on neighboring properties, private or public streets and the streams and rivers downstream of their property and as a government entity, it is part of our responsibility to mitigate these impacts. Effective January 1, 2009, the City of Kinston will change the billing of the stormwater utility fee for non-single family properties from a flat fee to one based on the impervious area on the property to more accurately reflect the impact runoff from these properties can have on stormwater management provided by the City. It is recognized that due to a property s location or actions taken by the property owner or tenant, the impact of runoff from a particular property may be controlled. The City of Kinston has developed this Stormwater Utility Credit Manual for non-single family residential customers to receive credits towards their stormwater utility bill for taking specific actions to reduce the impact of stormwater runoff from their location. This manual explains the requirements and procedures for a customer to qualify for credits in any of the following situations: - Stormwater discharges that do not flow through a city-maintained stormwater system (streets, pipes, best management practices (bmps), ditches, etc.). - On-site stormwater structural BMPs constructed to control runoff volume and/or improve runoff quality. - Active management of on-site stormwater systems through state-issued NPDES permits or approved stormwater management plans. -3-

2.0 DEFINITIONS Best Management Practice (BMP) - Activities, practices or procedures intended to control or improve stormwater quality. Structural BMPs are physical, engineered devices designed to treat and/or detain stormwater runoff. Non-structural BMPs are practices or procedures used to prevent the polluting of stormwater runoff and to maintain stormwater drainage systems. Credit - A recurring reduction in a stormwater utility fee based on the relative impact of runoff and development at a particular property on the City of Kinston stormwater management program. Equivalent Residential Unit (ERU) - A billing unit used to determine the stormwater utility fee charged to non-single family residential customers. One ERU is equivalent to the average impervious area found on a single family residential property. By measuring a representative of residential properties, it has been determined that the average residential property has a total impervious area of 3,059 square feet. Therefore, 1 ERU = 3,059 square feet of impervious area. The stormwater utility fee for any non-single family residential property will be determined by dividing the total impervious area on the property by 3,059 square feet, rounding up to the next whole number, and multiplying by the stormwater utility fee charge in effect for the current billing period. Impervious Area - Any fixed surface that prevents the natural infiltration of stormwater into the soil. Impervious surfaces include buildings, asphalt, concrete, solid wood, compacted gravel, etc. On-Site Stormwater Drainage System - A network of swales, ditches, pipes and/or bmps maintained by the property owner that conveys at least 75% of a property s stormwater drainage. 3.0 GENERAL CREDIT POLICIES Only those properties paying a stormwater utility fee based on their actual impervious area are eligible to apply for credits under this policy. An eligible property may apply for credits under one or more sections of this policy. It is the property owner s responsibility to apply for a stormwater credit. Credit applications will be available online or at the City of Kinston Public Services Department offices, located at 2360 Highway 258 South. Questions regarding the application or policy should be directed to the City of Kinston Water Resources Manager -4-

at (252) 939-3312. Only fully complete applications will be reviewed. A complete application includes a signed application form, plus all additional information and documents required for the type of credit being requested. The City will review and either approve or disapprove each application within 30 days of receipt. If approved, the appropriate credit will begin with the next full billing period for that property after the date of approval. In no circumstances will credits be given for bills issued before the date of the credit application approval. Credits will be in effect as long the requirements for the credit are being met by the customer. Should the customer fail to meet all of the requirements at any time while receiving a credit, the credit will be cancelled and the customer will be billed their full stormwater utility fee. To be eligible to reinstate the credit, the customer would be required submit a new stormwater credit application. No credit shall result in a stormwater utility bill for less than one ERU. Properties on which the property owner has requested the stormwater utility fee be divided over individual tenant spaces will not be eligible for BMP or Stormwater Management credits, except for any portion of the stormwater utility fee that the property owner is still paying. 4.0 STORMWATER BMP CREDIT POLICY 4.1 - Stormwater BMP Credit Amounts These credits are available to qualified properties who use structural best management practices to provide detention, retention and/or treatment of stormwater runoff. The amount of the credit will be based on the size storm the bmp is designed for and the percentage of the on-site drainage that is received by the bmp. Maximum credit by storm size: 2 year storm: 20% credit 10 year storm: 25% credit 25 year storm: 30% credit 50 year storm: 35% credit 100 year storm: 40% credit Bmps that provide water quality benefits, but no detention, will be eligible for a maximum credit of 20%. If bmps are installed in series (runoff flows from one bmp to the next one), the maximum credit will be determined by the peak flow leaving the bmp -5-

furthest downstream. 4.2 - Stormwater BMP Credit Requirements The bmp must be located on the property requesting the credit and must be maintained by that property owner. Properties draining to offsite bmps or to any bmps maintained by the City will not receive any credit for those bmps. Bmps must be built to the specifications found in the North Carolina BMP Manual, current edition. Bmps built after the effective date of this manual must be built to the specifications in effect at the time of construction or at the time of submittal of the credit application, whichever is more restrictive. The following information must be submitted to be considered for a Stormwater Utility BMP Credit: 1) A completed Stormwater Utility Credit Application. 2) A completed City of Kinston Stormwater Permit. 3) Design plans and calculations, including the following; - site plan showing elevations, contours, impervious areas, bmp locations, existing and proposed easements and access, riparian buffers and any other related stormwater information - bmp dimensions - % of site draining to bmp - design storm size - detention calculations - pollutant removal rating 4) A BMP Maintenance Plan (see the City of Kinston Stormwater Program for Nitrogen Control and the North Carolina Stormwater Best Management Practices Manual). 5) Recorded easements for any public drainageways, which shall include the width of the drainageway, plus a minimum of 15' from the top of bank measured perpendicular to the centerline of the channel. The Stormwater Utility Credit Application can be found in Appendix A. The Stormwater Permit can be found in Appendix B. 5.0 STORMWATER MANAGEMENT CREDIT POLICY Some properties may have an on-site stormwater collection system which the property owner or occupant maintains. Certain industrial sites are also required to hold a National -6-

Pollutant Discharge Elimination System (NPDES) Stormwater Permit, which has strict requirements for monitoring, maintaining and operating their drainage system. Because management of an on-site system that discharges into a city-maintained system can reduce costs to manage and maintain the city s system or could reduce negative impacts of the property s discharge to other streams and systems downstream, a credit is available for such practices. 5.1 - Stormwater Management Credit Amounts Any property approved for a Stormwater Management Credit will receive a credit of 25% toward their monthly stormwater utility fee. The Stormwater Utility Credit Application can be found in Appendix A. 5.2 - Stormwater Management Credit Requirements (NPDES Permitted Property) Any property required to have a National Pollutant Discharge Elimination System Stormwater Permit by the State of North Carolina is eligible to request a credit. To be approved for a Stormwater Management Credit, the property must submit the following: 1) Either a copy of their Certificate of Coverage if covered by a General NPDES permit, or a copy of their complete permit if covered by an Individual NPDES permit. 2) The Stormwater Pollution Prevention Plan required by their permit. 3) A completed Stormwater Utility Credit Application. 4) A site plan showing the stormwater drainage system being maintained, easements for any public drainageways on the property and riparian buffer areas for any state-recognized streams. 5) Recorded easements for any public drainageways, which shall include the width of the drainageway, plus a minimum of 15' from the top of bank measured perpendicular to the centerline of the channel. 6) Annually, by January 31 each year after the approval of this credit, the property owner must submit a report summarizing the activities that occurred during the previous calendar year that affected their stormwater system and shows compliance with their Stormwater Pollution Prevention Plan. 5.3 - Stormwater Management Credit Requirements (Non-NPDES Permitted Property) A property not required to have a National Pollutant Discharge Elimination System permit by the State of North Carolina, but which does manage an On-Site Stormwater Drainage System, may be eligible to request a credit. The property owner must be managing an On-Site Stormwater Drainage System as defined in the beginning of this manual. To be approved for a Stormwater Management Credit, the property must submit the following: -7-

1) A completed Stormwater Utility Credit Application. 2) A Stormwater Pollution Prevention Plan meeting NPDES requirements. 3) A site plan showing the stormwater drainage system being maintained, easements for any public drainageways on the property and riparian buffer areas for any state-recognized streams. 4) Recorded easements for any public drainageways on the property, which shall include the width of the drainageways, plus a minimum of 15' from the top of bank measured perpendicular to the centerline of the channel. 5) Annually, by January 31 each year after the approval of this credit, the property owner must submit a report summarizing the activities that occurred during the previous calendar year that affected their stormwater system and shows compliance with their Stormwater Pollution Prevention Plan. 6.0 NON-DISCHARGE STORMWATER CREDIT POLICY Some properties, due to their location and topography may discharge stormwater runoff that never flows through a City-maintained stormwater system. Since these properties do not impact the maintenance cost incurred by the City, they also are eligible for a credit toward their stormwater utility fee. 6.1 - Non-Discharge Stormwater Credit Amounts Any property approved for a Non-Discharge Stormwater Credit will receive a credit of 65% toward their monthly stormwater utility fee. A property approved to receive a Non-Discharge Stormwater Credit may also be eligible for a Stormwater BMP Credit and/or a Stormwater Management Credit, provided it meets the requirements for either of these credits. The Stormwater Utility Credit Application can be found in Appendix A. 6.2 - Non-Discharge Stormwater Credit Requirements To be approved for a Non-Discharge Credit, the property owner must submit the following information: 1) A completed Stormwater Utility Credit Application. 2) A geographic map showing the property location and stormwater runoff discharge locations, and the protection of any riparian buffers for natural streams located on the property. If any drainage from a property flows through any drainage feature maintained by the City of Kinston at any point downstream from the property, the property will not be eligible for this credit. -8-

7.0 RIGHT OF ENTRY The City of Kinston shall have the right to enter upon any property to inspect stormwater drainage systems for compliance with the conditions of any permits or credits being received. 8.0 CHANGE OF OWNERSHIP In the event a property is sold which is receiving a stormwater utility credit, the new property owner must complete all the appropriate applications and documents requiring owner signatures for the credit(s) being received within 30 days of the transfer of ownership. Failure to do so will be considered a violation of the credit terms. 9.0 VIOLATIONS OF CREDIT TERMS If the City of Kinston determines that any conditions exist on a property receiving a stormwater credit that do not meet the conditions of the credit being received, the following action will be taken: 1) The property owner will be notified in writing of the violation and given 30 days to remedy the situation and demonstrate compliance with the conditions of the credit. 2) If the violation is not corrected within 30 days, the credit will be revoked. Reinstatement of the credit will require resubmittal of a full credit application. 3) If a property is receiving multiple credits, only those credits affected by the violation will be revoked. Other credits whose conditions are still being met will remain in effect. 10.0 APPEALS If a property owner is not satisfied with any decision made regarding the approval of a credit or actions taken as a result of a violation, the property owner may appeal the decision by submitting a written appeal with the Public Services Director of the City of Kinston. The Public Services Director may require the property owner to present their appeal to the Utility Advisory Commission before making a final decision. A final decision will be made within 90 days of receiving the appeal. -9-

APPENDIX A STORMWATER UTILITY CREDIT APPLICATION

City of Kinston Stormwater Utility Credit Application APPLICANT INFORMATION Business/Property Owner: Contact Person: Mailing Address: Telephone: FAX: PROPERTY INFORMATION Property Name: Billing Premise Number: Tax Parcel Number: Street Address: Type of Credit being applied for (check all that apply): BMP Credit Stormwater Management Credit Non-Discharge Credit OWNER CERTIFICATIONS: Please initial each of the following statements certifying that you have read and understand each one: I hereby certify that I will notify the City of Kinston should any changes occur on the property that would prohibit meeting the conditions of any of the credits being received. I hereby certify that I will manage the property, including any stormwater structures and drainage systems, in accordance with the conditions of the City of Kinston Stormwater Utility Credit Manual. I hereby certify that I am the financially responsible person or the officer, director, partner or registered agent with authority to execute instruments for the financially responsible person. I hereby grant the City of Kinston access to the property referenced in this document to inspect the property for compliance with the conditions of any credits being received from this application. Name (Please Print) Title Signature Date

APPLICATION CHECKLIST: Stormwater BMP Credit Stormwater Credit Application City of Kinston Stormwater Permit Design Plans, including the following information: site plan with scale, compass, contours, impervious areas, easements, riparian buffers, stormwater structures, stormwater system, drainage areas, property lines, discharge points from property, and other related stormwater information detail plans, including bmp designs, construction details, seeding schedule, construction schedule, etc. Stormwater calculations, including drainage areas for each bmp, design storm size, detention and pollutant removals for each bmp, impervious area size, etc. BMP Maintenance Plans Easements for public drainageways Stormwater Management Credit Stormwater Utility Credit Application Certificate of Coverage (if covered by General NPDES permit) NPDES permit (if covered by individual NPDES permit) Stormwater Pollution Prevention Plan Site plan, showing stormwater system being managed, easements for public drainageways, and riparian buffers. Recorded easements for public drainageways Non-Discharge Stormwater Credit Stormwater Utility Credit Application Geographic map showing property location, stormwater runoff discharge points and riparian buffers for natural streams on the property. DO NOT WRITE BELOW THIS LINE - CITY USE ONLY Credit Approvals: Total Impervious Area (sf) = ERUs = Stormwater BMP Credit Approved? Amount (%) = Stormwater Management Credit Approved? Amount (%)= Non-Discharge Credit Approved? Amount (%) = Total Credit Amount (%) = Adjusted Bill Amount (ERUs) = Justification for Disapprovals/Comments:

APPENDIX B STORMWATER PERMIT

City of Kinston Stormwater Permit Project Name: Permit #: SP - Project Location: Owner: Contact: Address: Telephone: Fax: Project Best Management Practices (bmps) BMP Type: location: BMP Type: location: BMP Type: location: BMP Type: location: BMP Type: location: I,, do hereby take responsibility for these Best Management Practices (BMPs). This responsibility includes inspections, maintenance and repairs as needed for the BMPs to perform as designed. The City of Kinston has permission to enter upon the property to perform annual inspections of the components of the storm water system. I am responsible for any expenses incurred by the City of Kinston pertaining to these BMPs including annual inspection fees, permit fees, repairs and maintenance performed by the City or by any other person contracted by the City in the event I do not perform such work myself as directed by the City, and any legal expenses incurred to perform such work and/or collect monies due the City of Kinston in regards to these BMPs. Any changes to the site plan for this property may result in a violation of this permit and necessitate a new permit being issued. Notary Seal: Signed: Date: / / I,, a Notary Public of the County of, State of, hereby certify that personally appeared before me this day, and, being first duly sworn, executed the foregoing stormwater permit. City Official: Name/Title: Notary Public: My commission expires: