SAWEA submission to the public hearing relating to the NERSA review of the REFIT tariffs. By: Johan van den Berg, CEO.

Similar documents
RAINMAKER ENERGY. Comments to 2011 NERSA REFIT Review Tariffs

MYPD3 Application January 2013

PPA & REFIT. by Andile Gxasheka, RE Specialist. NERSA South Africa

Enabling Renewable Energy in South Africa Assessing the Renewable Energy IPP Procurement Programme

MYPD3 Application Gauteng January 2013

The Economics and Financing of Distributed Generation Investment. Budapest, Hungary November 17, 2016

Ethel Teljeur, Fulltime Regulator Member Primarily Responsible for Piped-gas; and. Robert Opini, Advisor, Regulatory Reporting. NERSA South Africa

Electricity Market Reform

Review of Support Mechanisms and Policy Options for Offshore Wind. Prepared by the Center for Wind Energy at James Madison University.

ESKOM s applications for MYPD4 and MYPD3 RCA 2017/18

SOLUTION. [?]Adoption by all stakeholders of a vision document for the ESI

MYPD Methodology Eskom Response to Consultation Paper

SunEdison s Comments on NERSA REFIT 2011 Consultation Paper

Eskom MYPD4 Revenue Application

Feed in Tariff Guidelines

09 MAY 2017 MEDIA STATEMENT NAMPOWER TARIFF ADJUSTMENT FOR THE FINANCIAL PERIOD 2017/2018

Economic and Financial Viability in RE Projects

Regional Power Market Challenges and Opportunities from Nepalese perspective

IFC Transaction Advisory Services Creating opportunity where it s needed most. From Concept Design to Project Execution

Eskom Revenue Application. Multi Year Price Determination. 2010/11 to 2012/13 (MYPD 2)

NERSA REFIT Review. Indexation is Crucial

ESKOM S FINANCIAL CRISES AND CONTINUING TARIFF INCREASES

EPC CONTRACTS FOR WIND ENERGY PROJECTS - SOUTH AFRICAN RE IPP PROGRAMME - LESSONS LEARNED FROM PHASES 1 AND 2 (OCTOBER 2012)

Minister Jeff Radebe: Independent Power Producer Programmes. Senior officials from all stakeholders behind this outcome

Submission to SALGA and National Treasury

Key lessons from South Africa s Renewable Energy IPP Programme

ESKOM One Year Application 2018/19

Compressed Natural Gas Funding Request Decision Paper. Decision Paper

POWER SECTOR REFORM AND SUBSIDIES. Budak Dilli ESMAP KNOWLEDGE EXCHANGE FORUM GENEVA October 2018

Eskom 2018/19 Revenue Application

NATIONAL ENERGY REGULATOR. Eskom s Regulatory Clearing Account (RCA) Application Third Multi-Year Price Determination (MYPD3) Year 1 (2013/14)

Renewable Energy Investments Centre for Environmental Rights

Contract length analysis for Feed-in Tariff with Contracts for Difference. Summary of onshore and offshore wind analysis

THE SOUTH AFRICAN RENEWABLE ENERGY IPP PROCUREMENT PROGRAMME

IPP Project Development

Department of Energy South Africa

NBFIRA PRESENTATION TO THE BOTSWANA PENSIONS SOCIETY CONFERENCE, 29 FEBRUARY 2016

Eskom RCA: Revenue Application NERSA Public Hearing. City Power Presentation Frank Hinda 11 May 2018

New Brunswick Community Wind Projects Getting to the Tipping Point New Brunswick Department of Energy Generic Business Plan

Offshore electricity transmission: a new model for delivering infrastructure

The South African Grid Code. Transmission Tariff Code. Version 9.0

Request for Advice on Cost Recovery for Mandated Smart Metering Infrastructure

PPAs and Tariff Design

Eskom 2018/19 Revenue Application

Challenges and Solutions for Project Financing Mark Roesink, Oikocredit International

CYPRUS ENERGY REGULATORY AUTHORITY

GET FIT Programme. Energy Sector Working Group. Maputo, 25 May Julia Crause Infrastructure, Southern Africa KfW Development Bank

ESKOM RCA APPLICATION TO NERSA: MINING SECTOR RESPONSE

How multi-technology PPA structures could help companies reduce risk

UK ELECTRIC MARKET REFORM APPLICATION TO TEXAS POWER MARKET. Ingmar Sterzing CEIC Seminar April 10, 2013

The policy and regulatory aspects of a bankable solar power project. Uzbekistan Energy Forum, London 18 April 2018 Louis Skyner Partner

Support mechanisms for RES-e

Peter Wright. Renewable Energy Projects in Africa Comparing Procurement Models for Renewable Generation Capacity. Simmons & Simmons March 2015

GLOBAL POWER SECTOR REFORM AND THE CASE FOR REFORM IN SOUTH AFRICA

KINGDOM OF CAMBODIA NATION RELIGION KING ELECTRICITY AUTHORITY OF CAMBODIA REGULATIONS

Electricity blackouts in South Africa: proximate and ultimate causes & recommendations for the future

SUB-NATIONAL GREEN BONDS

1: Levelized Cost of Energy. Calculation. Methodology and Sensitivity

Atoms for the Future New Build

Performance-Based Ratemaking

Establishing the right price for electricity in South Africa. Brian Kantor with assistance from Andrew Kenny and Graham Barr

Electronic Communications Amendment Bill (ECA Bill)

COMPANY OVERVIEW ABOUT PEC METERING. Background

Eskom Upington CSP Case Study Preliminary insights

Headline Verdana Bold. Uganda PPP Act - Implications for Public Sector Accounting Kenneth LEGESI Deloitte (Uganda) Limited

A Rational Price Path for South Africa

M.P. Electricity Regulatory Commission Bhopal

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

Utility Financial Equilibrium vs. Customer Interests. Presented by: Thembani Bukula - NERSA

Update on the Energy Conservation Scheme (ECS) proposed by the DME and Eskom. by Chris Yelland CEng Managing editor EE Publishers

#Learnmoreabout TARIFF STRUCTURE

CGN INAUGURAL GREEN BOND ISSUANCE

3. In accordance with Article 14(5) of the Rules of procedure of the EBA, the Board of Supervisors has adopted this opinion.

Resource Planning Update. May 12, 2016 Board Meeting Presentation

CONSULTATION PAPER THE DISCOUNT RATE METHODOLOGY FOR LICENSED ELECTRICITY DISTRIBUTORS PUBLISHED ON 19 SEPTEMBER 2017

Raising Equity for large biomass to power projects

UK s Offshore Transmission Regime:

Economic and financial feasibility of PV projects

Cost of Equity (USD)

Financing Renewables. EPG Summit, Prague. 3 December 2012

EIUG Comment on Eskom s RCA Applications 2014/15, 2015/16, 2016/17

Transmission Tariff Code

National Grid Gas plc. Overview of Indexation Principles. For. Gas Operating Margins

INVESTIGATING THE FINANCIAL CLOSE OF PROJECTS WITHIN THE SOUTH AFRICAN RENEWABLE ENERGY INDEPENDENT POWER PRODUCER PROCUREMENT PROGRAMME

Pricing of Renewable Energy Services in Malawi: Key Issues. Presented at Mzuzu Hotel On 18 th January, 2018

ENEL Green Bond Framework

Understanding the key elements of BEE: Charters, Scorecards and Codes of Good Practice for the Mining Industry

Minimising Risk Maximising Return. Chanda Kapande Business Development Manager Wind Prospect

WALK-THROUGH THE LEGAL STRUCTURE OF PPA S عرض الهيكل القانوني التفاقيا شراء الطاق

Eskom 2018/19 Revenue Application

Is 2016 a game changer for renewable investment?

5th Annual Renwable Energy Finance in Practice 21 October Support Tendering - François van Leeuw CEO of Parkwind

MYPD 3 (Year 2013/14) Regulatory Clearing Account Submission to NERSA

FY2017/18, Year 5 of MYPD 3 Period

Investor Presentation. Cover slide (same as IR cover)

The Impacts of Policy on the Financing of Renewable Projects: A Case Study Analysis

CONSULTATION PAPER ON THE REVIEW OF INCLINING BLOCK TARIFFS FOR ELECTRICITY DISTRIBUTORS

Attachment C: How capital expenditure is proposed and approved under the capex IM

Solutions for Financing Local Government PV Projects September Nick Hylla, Executive Director Midwest Renewable Energy Association

The voice of the energy industry. Brexit & the future EU-UK energy relationship

Transcription:

SAWEA submission to the public hearing relating to the NERSA review of the REFIT tariffs By: Johan van den Berg, CEO Date: May 2011

Overview 1. Who we are and our vision 2. Some history of our engagement with the REFIT 3. Qualitative response 3.1 Ancillary benefits funded by the REFIT 3.2 The importance of stable REFIT assumptions and methodology 3.3 Unexpected changes since REFIT announcement 3.4 The IRP 2010 and the fundamental role of wind power 3.5 Sending the right investment signal 3.6 Status of the procurement process 4. Quantitative response 4.1 WACC assumption is incorrect 4.2 Indexation approach is erroneous 4.3 Suggested tariff NPV is lower than megaflex NPV 4.4 Additional comments on the calculation methodology 5. Summary

Who we are and our vision Very representative industry body for wind in SA Purpose to promote the sustainable use of wind energy in South Africa act as a central point of contact promote wind energy to government, industry, the media and the public facilitate the exchange of technical information, expertise and experience in the wind energy sector Confident we can deliver the wind power in IRP1 and IRP2010 and more We see the biggest challenge as maintaining investor confidence given the slow REFIT roll-out, general regulatory hurdles and costs. The first 1,000 MW s are crucial and me must get there asap We want to assist for an optimal COP17 showcase of RE in SA

NERSA s regulatory mandate a) to achieve the efficient, effective, sustainable and orderly development and operation of electricity supply infrastructure in South Africa; b) to ensure that the interests and needs of present and future electricity customers and end users are safeguarded and met, having regard to the governance, efficiency, effectiveness and long term sustainability of the electricity supply industry within the broader context of economic energy regulation in the Republic; c) to facilitate investment in the electricity supply industry; d) to facilitate universal access to electricity; e) to promote the use of diverse energy sources and energy efficiency; f) to promote competitiveness and customer and end user choice; and g) to facilitate a fair balance between the interests of customers and end users, licensees, investors in the electricity supply industry and the public. SAWEA supports tariff review as narrow (f - g) NERSA mandate to keep costs low We stress NERSA s broader mandate (a-e) to be the custodian of our collective energy well-being which requires establishing a successful and strong wind industry Investors have proceeded thinking a change would only come after first procurement We think new tariff should apply 2014 while the old one should apply until then

SECTION A: Qualitative responses (on policy and supporting regulatory framework) 3.1 Ancillary benefits funded by the REFIT 3.2 The importance of stable REFIT assumptions and methodology 3.3 Unexpected changes since REFIT announcement 3.4 The IRP 2010 and the fundamental role of wind power 3.5 Sending the right investment signal 3.6 Status of the procurement process

3.1Ancillary benefits potentially funded by the REFIT 1. BBBEE 2. Smaller players/new entrants 3. Local Economic Development and Enterprise Development 4. Emissions reductions 5. Reductions in water consumption 6. De-risking of the SA economy by using less volatile priced fossil fuels 7. Rural development 8. Skills development

3.2 The importance of stable REFIT assumptions and calculation methodology Assumptions and calculation methodology like the Constitution Provides long-term certainty that over-rides the imperatives and uncertainties of the day Investors in wind have by definition accepted risks like exchange rate fluctuations Cannot accept the risk that assumptions and/or methodology change without very good reason A perennial argument between stakeholders about assumptions and methodology should be avoided at all costs make transparent like recalculation of fuel price A decision not to allow indexation of capital would be an example of a fundamental change that breaches the Constitution of REFIT For these reasons SAWEA has proceeded on the assumptions and methodology of 2009 Not even the 17% real IRR equity hurdle is being discussed or addressed The final REFIT scorecard my require a change of Constitution (acceptance of a standardised PPA, local economic development, BBBEE, Viable network integration requirements, Under-written debt, Preference for small distributed generators over centralised generators)

3.3 Unexpected changes since REFIT announcement Fixed price tender rather than pure REFIT Dove-tailing of regulatory regimes became even more essential Delays with permitting became potentially ruinous Understanding in industry was price would hold until after 1 st procurement ZAR 400 million + estimated to have been spent by wind alone preparing for REFIT

3.4 The IRP 2010 and the fundamental role of wind power Additional 8,400 MW s of wind power Big responsibility which we embrace Must avoid pitfalls, disillusionment and disinvestment created by peakers, PNCP, MTPPP initiatives

3.5 Sending the right investment signal The first 1,000 MW s procured will create the investment attitude and confidence/distrust Vital for the long term that developers and investors have a positive experience COP17 will create considerable scrutiny The wind farms pursued with the old tariff fit with the old tariff due to technical reasons (site accessibility, logistics, deployment at scale, grid concerns)

3.6 Status of the procurement process Variable The following aspects must dovetail Status as a minimum: IRP NERSA tariff review finalisation EIA ROD s DAFF approvals re agricultural land Some given. Delays.Final policy, height of hurdles and time delays uncertain. The process is unfolding Policy not finalised REFIT scorecard New generation regulations Civil aviation authority approvals Standardised PPA Transport and erection approvals and logistics Local authority rezoning approvals Grid access and readiness Generation licences Not finalised Not finalised Slow, uncertain how radar issues etc will be treated Not finalised Untested and complex Untested but may await DAFF certainty Probably but large disconnect with EIA and DAFF Probably

SECTION B: Quantitative responses (what should the recalculated REFIT be?) 4.1 WACC assumption is incorrect 4.2 Indexation approach is erroneous 4.3 Suggested tariff NPV is lower than megaflex NPV 4.4 Additional comments on the calculation methodology

4.1 WACC assumption is incorrect Nominal cost of debt should be 13.5% of 9.93% This leads to a WACC of 11.9% not 9.8%

4.2 Indexation approach is erroneous In REFIT 2009 entire tariff was indexed For Constitutional reasons alone this should be maintained However the fact that in revised tariff calculation this is not done leads to a tariff that cannot sustain the industry lack of indexation would dictate a higher staring tariff not lower

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Nominal Tariff R/kWh 4.3 Suggested tariff NPV is lower than megaflex NPV Means wind would be subsiding Eskom and the consumer not the idea behind REFIT Would lead to bilateral PPA s rather than a REFIT scheme TARIFF ANALYSIS & PROJECTIONS Detail Dec-09 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 ASSUMPTIONS MegaFlex Tariff Megaflex: 5 years of 25% then PPI 24.80% 25.80% 25.40% 25% 25% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% NERSA 2011 REFIT Tariff Capital Portion 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% O&M Portion 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% 5.80% ESKOM TARIFFS Megaflex tariffs (5 years at 25%,then PPI) 0.33 0.38 0.4780 0.5995 0.7493 0.9367 0.9910 1.0485 1.1093 1.1736 1.2417 1.3137 1.3899 1.4705 1.5558 1.6460 1.7415 1.8425 1.9494 2.0624 2.1821 2.3086 2.4425 2.5842 2.7341 NERSA 2011 REFIT Tariff (Non Capital 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 0.8200 capital portion escalated) Non-Capital 0.1180 0.1248 0.1321 0.1397 0.1479 0.1564 0.1655 0.1751 0.1853 0.1960 0.2074 0.2194 0.2321 0.2456 0.2598 0.2749 0.2908 0.3077 0.3256 0.3444 0.3644 0.3856 0.4079 0.9380 0.9448 0.9521 0.9597 0.9679 0.9764 0.9855 0.9951 1.0053 1.0160 1.0274 1.0394 1.0521 1.0656 1.0798 1.0949 1.1108 1.1277 1.1456 1.1644 1.1844 1.2056 1.2279 Discount rate Megaflex NPV 18% R 5.44 NERSA 2011 NPV 18% R 5.34 Wind vs. Eskom tariffs (Nominal) 3.0000 Megaflex tariffs (5 years at 25%,then PPI) NERSA 2011 REFIT Tariff (Non capital portion escalated) 2.5000 2.0000 1.5000 1.0000 0.5000 0.0000

4.4 Additional comments on the calculation methodology O & M assumption is too low. Local developers may be forced to use turbine suppliers for O & M by the banks. Tender values show a lifetime cost of up to ZAR0,30/kWh if calculated over the 20 year lifetime of the project. A report by Deloitte shows average European O & M costs at about ZAR 0.21/kWh. Local costs should be equal or higher. For strong entities able to do O & M themselves the local value should be around ZAR 0.14 0.16. The percentage changes reflected in Table 5 are calculated on an absolute basis and should rather be calculated on an inflated 2009 number. The NERSA levelised cost model assumes that both debt and equity receive returns uniformly throughout the 20 year period. Often however debt is repaid over 15 years (not 20) and where this consumes the majority of the early income stream. The return to equity is tail-ended and without full indexation, due to inflation effects, the value of these returns are eroded. Grid integration costs and interest during construction may be significantly higher than allowed for. Some estimates require 4% to fund the debt service reserve that is required by lenders, about 7% to fund interest, and about 2% to fund grid connection costs.

In Summary SAWEA supports periodic REFIT tariff review process should not prejudice NERSA s broader mandate which is collective energy well-being Wind power in SA has seen a decade of very limited success (8 turbines installed). Rapid industry development crucial for success of the IRP 2010 and COP17 Industry has believed tariff would hold until after first procurement. Suggest the recalculated tariff should only apply for the years 2014 and further. Suggest establish a transparent set of assumptions and calculation methodology for REFIT in order to engender investor confidence and avoid continuous debate/conflict It is submitted a correct recalculation yields a REFIT value close the 2009 value. Certain of the draft criteria for IPP selection will have presently unaccounted and unquantified cost implications and are likely to dictate an amendment to the assumptions/methodology of calculation of REFIT.